Transmission Lines
1
Rev_00 09.05.22
Summary
Summar
▪ VPS – Elements of the PNR Implementation Process
▪ Scope and Applicability
▪ Bowtie Synthesis
▪ Main Standards and RAGAGEP
▪ Critical Controls
▪ Highlights and requirements
▪ Examples of Deployment / Application of Standards
▪ Developers (multipliers)
2
VPS - ELEMENTS OF THE PNRS IMPLEMENTATION ASSET
PROCESS MANAGEMENT
3 3. Organizational design.
Ensuring that the organizational structure is respected.
ASSET
SCOPE AND APPLICABILITY MANAGEMENT
4
ASSET
BOWTIE SYNTHESIS MANAGEMENT
The PNR is
applied as a
degradation
control of the
primary barriers
so that they are
available and
functional.
5
ASSET
MAIN STANDARDS AND RAGAGEPS MANAGEMENT
CÓDIGO TÍTULO
IEEE 957:2015 Guide for Cleaning Insulators
IEEE 524:2016 Guide for the Installation of Overhead Transmission Line Conductors
IEEE 691:2001 Guide for transmission structure foundation design and testing
IEEE 1441:2004 Guide for Inspection of Overhead Transmission Line Construction
C2:2017 National Electrical Safety Code
European Committee for Electrotechnical Standardization (CENELEC) CIGRE – International Council on Large Electric Systems
CÓDIGO TÍTULO
CÓDIGO TÍTULO
BS EN 50341- Overhead electrical lines exceeding AC 1 kV General requirements. Common
1:2012 specifications TB-175:2000 Management of existing overhead transmission lines
BS EN Effects of electromagnetic interference on pipelines caused by high voltage
50443:2011 a.c. electric traction systems and/or high voltage a.c. power supply systems Ground potential rise at overhead AC transmission line structures
TB-694:2017
during power frequency faults
CÓDIGO TÍTULO
#2 Wind vibration
2 requirements
damper
#7 Signaling 5 requirements
7
ASSET
HIGHLIGHTS AND REQUIREMENTS MANAGEMENT
Below are some examples of the requirements that can be found in the standard
Inspection Plans
This PNR contains Appendix IV - Visual, Thermographic and Ultrasonic Inspection Checklist, which
contains the activities required to check the condition of the air lines;
Design Criteria
Methodology for mechanical design of overhead lines: loading assumption, wind data, environmental
pollution for insulator sizing, admissible foundation types, control of step and touch voltages and
electromagnetic interference;
Critical controls
Safety distance, wind vibration dampers, physical barrier, maintenance procedure, assembly procedure,
right-of-way, and signage;
Commissioning
Assembly verification, pre-energizing and post-energizing conditions;
Decommissioning
Definition
8 of protocol for deactivation and decommissioning.
EXAMPLES OF DEVELOPMENT / PNR ASSET
MANAGEMENT
APPLICATION
Example: Physical barrier.
PNR requirements may have more or less technical details, whatever is necessary to establish safe operational conditions.
Such requirements will be detailed in the project documents, procedures and operating plans for the application of the
9 Standard.
ASSET
DEVELOPERS (MULTIPLIERS) MANAGEMENT
Check the last Appendix to the standard and find out who are the representatives of your
area.
10
AM