PNR-000188 – Distribution Lines and

Transmission Lines

1
Rev_00 09.05.22
Summary

Summar
▪ VPS – Elements of the PNR Implementation Process
▪ Scope and Applicability
▪ Bowtie Synthesis
▪ Main Standards and RAGAGEP
▪ Critical Controls
▪ Highlights and requirements
▪ Examples of Deployment / Application of Standards
▪ Developers (multipliers)

2
VPS - ELEMENTS OF THE PNRS IMPLEMENTATION ASSET
PROCESS MANAGEMENT

4. Risk perception and management; 13. Strategy deployment;


Risk Management Requirements (MUEs). Identification, prioritization, communication and
deployment of goals according to the company's
5. Health, safety, environment and communities; strategy.
SSMAC Requirements for Critical Assets.
14. Routine management;
6. Projects and constructions; Definition and standardization of indicators,
Requirements for Critical Assets in projects. performance routine, visual management and
7. Operation; verification of standards.
Requirements for Operating Critical Assets. 15. Processes and standardization;
8. Maintenance; Process of preparation and publication of PNRs and
Requirements for Maintenance of Critical Assets. Asset Management Portal.

9. Change Management; 16. Problem solving and continuous


Requirements for Changes to Critical Assets. improvement;
Identification and resolution of problems through the
10. Systems and technology; process of Lessons Learned, Benchmarks and
Systems and Technologies applied to Critical Assets.
Technical Committees.
11. Supplies and Services; 1. Behaviors and commitment of the 17. Evaluation of the management model
Supply requirements for Critical Assets
leadership; and results.
12. Emergency plans People Management with an inclusive environment Performance evaluation of PNRs in the field through
Pemergency preparedness and response plans for reinforcing values, key behaviors and organizational the Check Process.
respond to urgent situationsfor Critical Assets. discipline.
2. People management;
.
Technical Competency Requirements in PNRs and
PNR Training.

3 3. Organizational design.
Ensuring that the organizational structure is respected.
ASSET
SCOPE AND APPLICABILITY MANAGEMENT

4
ASSET
BOWTIE SYNTHESIS MANAGEMENT

The PNR is
applied as a
degradation
control of the
primary barriers
so that they are
available and
functional.

5
ASSET
MAIN STANDARDS AND RAGAGEPS MANAGEMENT

Institute of Electrical and Electronics Engineers (IEEE)

CÓDIGO TÍTULO
IEEE 957:2015 Guide for Cleaning Insulators
IEEE 524:2016 Guide for the Installation of Overhead Transmission Line Conductors
IEEE 691:2001 Guide for transmission structure foundation design and testing
IEEE 1441:2004 Guide for Inspection of Overhead Transmission Line Construction
C2:2017 National Electrical Safety Code

European Committee for Electrotechnical Standardization (CENELEC) CIGRE – International Council on Large Electric Systems

CÓDIGO TÍTULO
CÓDIGO TÍTULO
BS EN 50341- Overhead electrical lines exceeding AC 1 kV General requirements. Common
1:2012 specifications TB-175:2000 Management of existing overhead transmission lines
BS EN Effects of electromagnetic interference on pipelines caused by high voltage
50443:2011 a.c. electric traction systems and/or high voltage a.c. power supply systems Ground potential rise at overhead AC transmission line structures
TB-694:2017
during power frequency faults

International Electrotechnical Comission (IEC)

CÓDIGO TÍTULO

6 IEC 60826:2017 Design criteria of overhead transmission lines


ASSET
CRITICAL CONTROLS MANAGEMENT

Requirements x Critical Controls

#1 Safety Distance 3 requirements

#2 Wind vibration
2 requirements
damper

#3 Physical Barrier 3 requirements


PNR- Item risk scenarios
Distribution
#4 Maintenance 01 Loss of electrical energy containment
Lines and 6requirements
Procedure 02 Loss of structural stability of supporting
Transmission structures
Lines #5 Assembling
7 requirements
Procedure

#6 Right of ways 3 requirements

#7 Signaling 5 requirements

7
ASSET
HIGHLIGHTS AND REQUIREMENTS MANAGEMENT

Below are some examples of the requirements that can be found in the standard

Inspection Plans
 This PNR contains Appendix IV - Visual, Thermographic and Ultrasonic Inspection Checklist, which
contains the activities required to check the condition of the air lines;

Design Criteria
 Methodology for mechanical design of overhead lines: loading assumption, wind data, environmental
pollution for insulator sizing, admissible foundation types, control of step and touch voltages and
electromagnetic interference;

Critical controls
 Safety distance, wind vibration dampers, physical barrier, maintenance procedure, assembly procedure,
right-of-way, and signage;

Commissioning
 Assembly verification, pre-energizing and post-energizing conditions;

Decommissioning
 Definition
8 of protocol for deactivation and decommissioning.
EXAMPLES OF DEVELOPMENT / PNR ASSET
MANAGEMENT
APPLICATION
Example: Physical barrier.

In locations with the presence of people and machines


outside the operational context, with motorized traffic, there
is the risk of collision with the support structures, thus the
physical barrier becomes a safety barrier for the integrity of
the overhead lines.
- Design: Evaluate the locations and specify the barriers
according to the operational context;
- Maintenance Plan: Include the inspection of existing
physical barriers;
- Maintenance: Ensure the integrity of the physical
barriers installed

PNR requirements may have more or less technical details, whatever is necessary to establish safe operational conditions.
Such requirements will be detailed in the project documents, procedures and operating plans for the application of the
9 Standard.
ASSET
DEVELOPERS (MULTIPLIERS) MANAGEMENT

The standards are prepared by a multidisciplinary Technical Committee, made up of


representatives from various areas of Vale and specialist companies, under the leadership of
the Asset Management Board.

Committee participants have an important role as multipliers of standards: facilitating the


process of technical standard implementation, supporting their application and
deployment, and clarifying the understood.

Check the last Appendix to the standard and find out who are the representatives of your
area.

10