Stormwater Management for

Manchester DOT

Business process and benefits of


implementation using stormwater analyst

by

Isaac Oti
Business Requirement Analysis

Management and
Goals and Business Employees/
Information
policies process Users systems

 Identifies  Supports
 Streamlines
potential  Identifies data business
needs data needs
objectives and process
performance
indexes.  Identifies  Determines
required  Ensures
system needs
employee/ user integrity of
 Informs skills data
business
process  Streamlines  Determines
performance data stewards
indexes 
and custodians
 
Business Framework –Asset Management
Asset Management : Data driven and risk based decision making process
Goals and Policies

Asset Inventory
• To control pollution
in stormwater runoff
Condition Assessment and
Performance Modelling
• To control flooding
Alternatives Evaluation and Budget/
Program Optimization Allocations
and erosion

Short- and Long- Range


Plans (Project Selection) • To keep all
stormwater assets
Program
Implementation
functioning as
intended
Program Monitoring
(Feedback)
Classification and Inventory of
Stormwater Assets
• Proposed asset categories:
1. Drainage assets: Pipes and culverts,
inlets, channels, ditches, and cross
slopes.
2. Water quality treatment assets: Basins
and ponds.
Ditch
• Agency to collect geographic and linear
referenced storm sewer asset inventory.

• Assets are weighted based on:


1. Cost of construction and maintenance.
2. Effect on flooding and pollution of water
bodies. Detention pond
Objectives, performance measures and
condition assessment
Decision Objectives Performance
level measure
• Condition assessment criteria
1. Routine inspection
Network 80% of Weighted number
weighted of assets in good 2. Detailed and overall
number of condition condition rating (Good,
assets are in fair and poor).
good condition 3. Based on general site
Project No asset Percent conditions, structural,
component is in performance vegetation, spills,
poor condition measure rated fair 4. Checklist for immediate
or good
actions are provided
Examples of performance measures
Grade
Performance (Good,
Asset Performance Measure
Measure No. Fair or
Poor)
1 Blockage and sediment buildup is < 10%(good), 10-30%(fair), >30%(poor).  
Ditches
2 Ditches and slopes have no washouts or ruts.  
and
For lined ditches (such as concrete ditches), lining is not damaged, separated  
Slopes 3
at the joints, or misaligned.
Work plans
• Maintenance actions are to be broadly classified as routine,
preventive, minor or major repairs.
• Maintenance manager or designated employee to act on
inspection results.
• Immediate repairs are carried out soon after needs are
reported.
• Prioritization and alternative evaluation are to be
conducted routinely
• Short and long range plans integrating agency wide needs
to be developed.
Benefits of Implementation using
Stormwater Manager
Performance monitoring

Performance modelling
Data visualization

Stormwater
Analyst

Reporting Workplan optimization and


trade-off analysis

Work request management


Benefits of Implementation using
AgileAssets Stormwater Manager
• Conserves resources and improves efficiency in
business process.
1. Provides integrated decision level support
2. Inspection results are available immediately.
3. Requests are received and scheduled faster.
4. Process is paperless.