SESSION PLAN

Sector : ELECTRICAL & ELECTRONICS SECTOR


Qualification Title : ELECTRICAL INSTALATION AND MAINTENANCE NC II
Unit of Competency : INSTALL WIRING DEVICES OF FLOOR AND WALL MOUNTED OUTLETS, LIGHTING FIXTURE/SWITCHES
AND AUXILLIARY OUTLET
Module Title : INSTALLING WIRING DEVICES OF FLOOR AND WALL MOUNTED OUTLETS, LIGHTING
FIXTURE/SWITCHES AND AUXILLIARY OUTLET

Learning Outcomes:
LO1. Select wiring devices
LO2.Install wiring devices
LO3.Install lighting fixture/ switches
LO4.Notify completion of work

A. INTRODUCTION
This session covers the knowledge, skills and attitudes on selecting and installing wiring devices, installing lighting
fixtures/switches and notifying completion of work of floor and wall mounted outlets and auxiliary outlets.

B. LEARNING ACTIVITIES
LO1. Select wiring devices
Learning Content Methods
Presentation Practice Feedback Resources Time

DATE DEVELOPED: DOCUMENT


ELECTRICAL INSTALLATION AND MAINTENANCE JUNE 2019 NUMBER:
NC II EIM—NCII-—
DATE REVISED: 0014--001
DEVELOPED BY: COMPETENCY
INSTALL WIRING DEVICES OF FLOOR AND WALL BASED
MOUNTED OUTLETS, LIGHTING JOHN AMEIL R. LEARNING
FIXTURE/SWITCHES AND AUXILLIARY OUTLET YASAY MODULE
 Read Information  Answer Self Compare Answer Information Key 3.1-1.1
 OHS and PPEs Individual study Sheet 3.1.1-1 on Check 3.1-1-1 on Key 3.1.1-1 Self Check 3.1-1.1
OHS and PPEs OHS and PPEs Answer Key 3.1-1.1 1 Hour

Demonstration  Observe trainer  Perform Task Compare to Task Key 3.1.2-2 1 Hour
perform on OHS and Sheet 3.1.2-1 on Performance
PPEs OHS and PPEs Criteria
Checklist Performance Criteria
3.1.2-1 Checklist 3.1.2-2

Hard Hat or Helmet


Goggles
Safety shoes
Gloves
 Read Information  Answer Self Compare Answer Information Key 3.1.2-1 1 Hour
 Materials specification Individual study Sheet 3.1.2.-1 on Check 3.1.2-1 on Key 3.1.2-1 Self Check 3.1.2-1
Materials Materials Answer Key 3.1.2-1
specification specification

Lecture/ Listen to trainer’s power Answer trainer’s oral Trainer evaluates LCD projector 1 Hour
discussion point presentation on questions answers to oral Laptop
Materials specification questions Smart board
Data show
Computers
Windows server
Demonstration Observe trainer perform Perform Task Sheet Compare to Task Key 3.1.2-2 1 Hour
on Materials 3.1.2-1 on Materials Performance

DATE DOCUMENT
ELECTRICAL INSTALLATION AND MAINTENANCE DEVELOPED: NUMBER:
NC II JUNE 2019 EIM—NCII-
—0014--001
DATE REVISED:
INSTALL WIRING DEVICES OF FLOOR AND WALL DEVELOPED BY: COMPETEN
MOUNTED OUTLETS, LIGHTING FIXTURE/SWITCHES CY BASED
AND AUXILLIARY OUTLET JOHN AMEIL R. LEARNING
YASAY MODULE
specification specification Criteria Checklist
3.1.2-1
Performance Criteria
Checklist 3.1.2-2

Outlet & Switches


Wire
Pliers
Screw

Read Information Sheet Answer Self Check Compare Answer Information Key 3.1.3-1 1 Hour
 Types and uses of Individual study 3.1.3-1 on Types and 3.1.3-1 on Types Key 3.1.3-1 Self Check 3.1.3-1
uses of electrical wiring and uses of Answer Key 3.1.3-1
electrical wiring
devices, tools and devices, tools and electrical wiring
equipment devices, tools and
equipment
equipment
Listen to trainer’s Answer trainer’s oral Trainer evaluates LCD projector 1 Hour
Lecture/ powerpoint presentation questions answers to oral Laptop
discussion on Types and uses of questions Smart board
electrical wiring devices, Data show
tools and equipment Computers
Windows server

Observe trainer perform 1. Perform Task Compare to Task Key 3.1.3-2 1 Hour
Demonstration on Types and uses of Sheet 3.1.3-1 on Performance
electrical wiring devices, Types and uses Criteria
tools and equipment of electrical Checklist Performance Criteria
wiring devices, 3.1.3-1 Checklist 3.1.3-2
tools and Wire
equipment
DATE DOCUMENT
ELECTRICAL INSTALLATION AND MAINTENANCE DEVELOPED: NUMBER:
NC II JUNE 2019 EIM—NCII-
—0014--001
DATE REVISED:
INSTALL WIRING DEVICES OF FLOOR AND WALL DEVELOPED BY: COMPETEN
MOUNTED OUTLETS, LIGHTING FIXTURE/SWITCHES CY BASED
AND AUXILLIARY OUTLET JOHN AMEIL R. LEARNING
YASAY MODULE
Pliers
Screw
Drill

 Read Information  Answer Self Compare Answer Information Key 3.1.4-1 1 Hour
 Procedures in Individual study Sheet 3.1.4-1 on Check 3.1.4-1 on Key 3.1.4-1 Self Check 3.1.4-1
interpreting job Procedures in Procedures in Answer Key 3.1.4-1
requirements of wiring interpreting job interpreting job
devices requirements of requirements of
wiring devices wiring devices

Listen to trainer’s Answer trainer’s oral Trainer evaluates LCD projector 1 Hour
Lecture/ PowerPoint presentation questions answers to oral Laptop
discussion on Procedures in questions Smart board
interpreting job Data show
Computers
requirements of wiring
devices Windows server

Demonstration Observe trainer Perform Task Sheet Compare to Task Key 3.1-1.2 1 Hour
perform on 3.1.4-1 Procedures Performance
Procedures in in interpreting job Criteria Checklist
interpreting job 3.1.4-1 Performance Criteria
requirements of
requirements of wiring devices Checklist 3.1-1.2
wiring devices
Wiring Diagram
Wire
Pliers
Screw
LO 2 Install wiring devices

DATE DOCUMENT
ELECTRICAL INSTALLATION AND MAINTENANCE DEVELOPED: NUMBER:
NC II JUNE 2019 EIM—NCII-
—0014--001
DATE REVISED:
INSTALL WIRING DEVICES OF FLOOR AND WALL DEVELOPED BY: COMPETEN
MOUNTED OUTLETS, LIGHTING FIXTURE/SWITCHES CY BASED
AND AUXILLIARY OUTLET JOHN AMEIL R. LEARNING
YASAY MODULE
 Read Information  Answer Self Compare Answer Information Key 3.2.1-1 1 Hour
 procedures in Individual study Sheet 3.2.1-1 on Check 3.2.1-1 on  Key 3.2.1-1 on Self Check 3.2.1-1
procedures in procedures in procedures in Answer Key 3.2.1-1
Installation of various
wiring devices Installation of Installation of Installation of
various wiring various wiring various wiring
devices devices devices

Listen to trainer’s Answer trainer’s oral Trainer evaluates LCD projector 15 Min.
Lecture/ powerpoint presentation questions answers to oral Laptop
discussion on procedures in questions Smart board
Installation of various Data show
wiring devices Computers
Windows server
Observe trainer perform Perform Task Compare to Task Key 3.2.1-2 1 Hour
Demonstration on procedures in Sheet 3.2.1-1 on Performance
procedures in procedures in Criteria Checklist
Installation of various Installation of 3.2.1-1 Performance Criteria
wiring devices various wiring Checklist 3.2.1-2
devices

Pliers
Screw
 Read Information  Answer Self Compare Answer Information Key 3.2.2-1 1 Hour
 DOLE Department Individual study Sheet 3.2.2-1 on Check 3.2.2-1 on Key 3.2.2-1 Self Check 3.2.2-1
Order No. 13 s. 1998 DOLE Department DOLE Answer Key 3.2.2-1
Guidelines Governing Order No. 13 s. 1998 Department
Occupational Safety and Guidelines Governing Order No. 13 s.
Health in the Occupational Safety 1998 Guidelines
Construction Industry and Health in the Governing
Construction Industry Occupational
Safety and
Health in the
DATE DOCUMENT
ELECTRICAL INSTALLATION AND MAINTENANCE DEVELOPED: NUMBER:
NC II JUNE 2019 EIM—NCII-
—0014--001
DATE REVISED:
INSTALL WIRING DEVICES OF FLOOR AND WALL DEVELOPED BY: COMPETEN
MOUNTED OUTLETS, LIGHTING FIXTURE/SWITCHES CY BASED
AND AUXILLIARY OUTLET JOHN AMEIL R. LEARNING
YASAY MODULE
Construction
Industry

Listen to trainer’s Answer trainer’s oral Trainer evaluates LCD projector 1 Hour
Lecture/ powerpoint presentation questions answers to oral Laptop
discussion on DOLE Department questions Smart board
Order No. 13 s. 1998 Data show
Guidelines Governing Computers
Occupational Safety and Windows server
Health in the
Construction Industry

PEC requirement  Read Information Answer Self Check Compare Answer Information Key 3.2.3-1 1 Hour
regarding installation of Individual Sheet 3.2.3-1 on 3.2.3-1 on PEC Key 3.2.3-1 Self Check 3.2.3-1
wiring devices study PEC requirement requirement Answer Key 3.2.3-1
regarding installation regarding installation
of wiring devices of wiring devices

Listen to trainer’s power Answer trainer’s oral Trainer evaluates LCD projector 1 Hour
Lecture/ point presentation on questions answers to oral Laptop
discussion PEC requirement questions Smart board
regarding installation of Data show
wiring devices Computers
Windows server

LO.3 Install lighting fixture/ switches

DATE DOCUMENT
ELECTRICAL INSTALLATION AND MAINTENANCE DEVELOPED: NUMBER:
NC II JUNE 2019 EIM—NCII-
—0014--001
DATE REVISED:
INSTALL WIRING DEVICES OF FLOOR AND WALL DEVELOPED BY: COMPETEN
MOUNTED OUTLETS, LIGHTING FIXTURE/SWITCHES CY BASED
AND AUXILLIARY OUTLET JOHN AMEIL R. LEARNING
YASAY MODULE
Read Information Answer Self Check Compare Answer Information Key 3.3.1-1 1 Hour
 Types of lighting Individual study Sheet 3.3.1-1 on 3.3.1-1 on Types of Key 3.3.1-1 Self Check 3.3.1-1
Types of lighting lighting fixtures and Answer Key 3.3.1-1
fixtures and installation
fixtures and installation technique
technique
installation technique

Lecture/ Listen to trainer’s Answer trainer’s oral Trainer evaluates LCD projector 1 Hour
discussion powerpoint questions answers to oral Laptop
presentation on questions Smart board
Types of lighting Data show
fixtures and Computers
installation technique Windows server
Observe trainer perform Perform Task Compare to Task Key 3.3.1-2 1 Hour
Demonstration on Types of lighting Sheet 3.3.1-1 on Performance
fixtures and installation Types of lighting Criteria Checklist Performance Criteria
technique fixtures and 3.3.1-1 Checklist 3.3.1-2
installation
technique
Outlet & Switches
Wire
Pliers
Screw
 Read Information  Answer Self Compare Answer Information Key 3.3.2-1 1 Hour
 Procedures in Individual study Sheet 3.3.2-1 on Check 3.3.2-1 on Key 3.3.2-1 Self Check 3.3.2-1
Procedures in Procedures in Answer Key 3.3.2-1
Installation of various
lighting Installation of various Installation of
fixtures/switches lighting various lighting
fixtures/switches fixtures/switches

DATE DOCUMENT
ELECTRICAL INSTALLATION AND MAINTENANCE DEVELOPED: NUMBER:
NC II JUNE 2019 EIM—NCII-
—0014--001
DATE REVISED:
INSTALL WIRING DEVICES OF FLOOR AND WALL DEVELOPED BY: COMPETEN
MOUNTED OUTLETS, LIGHTING FIXTURE/SWITCHES CY BASED
AND AUXILLIARY OUTLET JOHN AMEIL R. LEARNING
YASAY MODULE
Listen to trainer’s Answer trainer’s oral Trainer evaluates LCD projector 1 Hour
Lecture/ powerpoint presentation questions answers to oral Laptop
discussion on Procedures in questions Smart board
Installation of various Data show
lighting fixtures/switches Computers
Windows server

Observe trainer perform Perform Task Compare to Task Key 3.3.2-2 1 Hour
Demonstration on Procedures in Sheet 3.3.2-1 on Performance
Installation of various Procedures in Criteria Checklist
lighting fixtures/switches Installation of 3.3.2-1 Performance Criteria
various lighting Checklist 3.3.2-2
fixtures/switches

Outlet & Switches


Wire
Pliers
Screw
Read Information Answer Self Check Compare Answer Information Key 3.3.3-1 1 Hour
 Ratings of lighting Individual study Sheet 3.3.3-1 on 3.3.3-1 on Ratings Key 3.3.3-1 Self Check 3.3.3-1
fixture Ratings of lighting of lighting fixture Answer Key 3.3.3-1
fixture

Listen to trainer’s Answer trainer’s oral Trainer evaluates LCD projector 1 Hour
Lecture/ powerpoint presentation questions answers to oral Laptop
discussion on Ratings of lighting questions Smart board
fixture Data show
Computers
Windows server
Observe trainer perform Perform Task Compare to Task Key 3.3.3-2 1 Hour
Demonstration on Ratings of lighting Sheet 3.3.3-1 on Performance
fixture Ratings of Criteria Checklist
3.3.3-1 Performance Criteria
DATE DOCUMENT
ELECTRICAL INSTALLATION AND MAINTENANCE DEVELOPED: NUMBER:
NC II JUNE 2019 EIM—NCII-
—0014--001
DATE REVISED:
INSTALL WIRING DEVICES OF FLOOR AND WALL DEVELOPED BY: COMPETEN
MOUNTED OUTLETS, LIGHTING FIXTURE/SWITCHES CY BASED
AND AUXILLIARY OUTLET JOHN AMEIL R. LEARNING
YASAY MODULE
lighting fixture Checklist 3.3.3-2

Tester
Bulb
Outlet
 Read Information  Answer Self Compare Answer Information Key 3.3.4-1 1 Hour
 PEC requirement Individual study Sheet 3.3.4-1 on PEC Check 3.3.4-1 on Key 3.3.4-1 Self Check 3.3.4-1
regarding installation of requirement PEC requirement Answer Key 3.3.4-11
various lighting regarding installation regarding
fixtures/switches of various lighting installation of
fixtures/switches various lighting
fixtures/switches

Listen to trainer’s Answer trainer’s oral Trainer evaluates LCD projector 1 Hour
Lecture/ powerpoint presentation questions answers to oral Laptop
discussion on PEC requirement questions Smart board
regarding installation of Data show
various lighting Computers
fixtures/switches Windows server

LO.4 Notify completion of work

 Read Information  Answer Self Compare Answer Information Key 3.4.1-1 1 Hour
 Processes, Operations, Individual study Sheet 3.4.1-1 on Check 3.4.1-1 on Key 3.4.1-1 Self Check 3.4.1-1
Processes, Processes, Answer Key 3.4.1-1
Systems
o Maintenance of Operations, Systems Operations,
o Maintenance of Systems
tools
tools
DATE DOCUMENT
ELECTRICAL INSTALLATION AND MAINTENANCE DEVELOPED: NUMBER:
NC II JUNE 2019 EIM—NCII-
—0014--001
DATE REVISED:
INSTALL WIRING DEVICES OF FLOOR AND WALL DEVELOPED BY: COMPETEN
MOUNTED OUTLETS, LIGHTING FIXTURE/SWITCHES CY BASED
AND AUXILLIARY OUTLET JOHN AMEIL R. LEARNING
YASAY MODULE
o Storage of tools o Storage of tools o Maintenance
of tools
o Storage of
tools
 Listen to trainer’s Answer trainer’s oral Trainer evaluates LCD projector 1 Hour
Lecture/ powerpoint questions answers to oral Laptop
discussion presentation on questions Smart board
Processes, Data show
Operations, Systems Computers
o Maintenance of Windows server
tools
o Storage of tools

Observe trainer  Perform Task Compare to Task Key 3.4.1-2 1 Hour


Demonstration perform on Processes, Sheet 3.4.1-1 on Performance
Operations, Systems Processes, Criteria Checklist
o Maintenance of Operations, 3.4.1-1 Performance Criteria
tools Systems Checklist 3.4.1-2
o Storage of tools o Maintenance
of tools
o Storage of
tools

 Read Information  Answer Self Compare Answer Information Key 3.4.2-1 1 Hour
 Checking and Individual study Sheet 3.4.2-1 on Check 3.4.2-1 on Key 3.4.2-1 Self Check 3.4.2-1
Checking and Checking and Answer Key 3.4.2-1
conforming procedures
for installation based on conforming conforming
job requirement procedures for procedures for
installation based on installation
job requirement based on job
requirement
Listen to trainer’s Answer trainer’s oral Trainer evaluates LCD projector 1 Hour

DATE DOCUMENT
ELECTRICAL INSTALLATION AND MAINTENANCE DEVELOPED: NUMBER:
NC II JUNE 2019 EIM—NCII-
—0014--001
DATE REVISED:
INSTALL WIRING DEVICES OF FLOOR AND WALL DEVELOPED BY: COMPETEN
MOUNTED OUTLETS, LIGHTING FIXTURE/SWITCHES CY BASED
AND AUXILLIARY OUTLET JOHN AMEIL R. LEARNING
YASAY MODULE
Lecture/ powerpoint presentation questions answers to oral Laptop
discussion on Checking and questions Smart board
conforming procedures Data show
for installation based on Computers
job requirement Windows server
Observe trainer perform Perform Task Compare to Task Key 3.4.2-2 1 Hour
Demonstration on Checking and Sheet 3.4.2-1 on Performance
conforming procedures Checking and Criteria Checklist
for installation based on conforming 3.4.2-1 Performance Criteria
job requirement procedures for Checklist 3.4.2-2
installation based
on job
requirement Wiring Diagram
Wire
Pliers
Screw

 Good housekeeping Individual study Read Information Answer Self Check Compare Answer Information Key 3.4.3-1 1 Hour
Sheet 3.4.3-1 on 3.4.3-1 on Good Key 3.4.3-1 Self Check 3.4.3-1
Good housekeeping housekeeping Answer Key 3.4.3-1

Lecture/ Listen to trainer’s Answer trainer’s oral Trainer evaluates LCD projector 1 Hour
discussion powerpoint questions answers to oral Laptop
presentation on Good questions Smart board
housekeeping Data show
Computers
Windows server

Demonstration Observe trainer perform Perform Task Compare to 1 Hour


on Good housekeeping Sheet 3.4.3-1 on Performance Task Key 3.4.3-2
Good Criteria Checklist
housekeeping 3.4.3-1

DATE DOCUMENT
ELECTRICAL INSTALLATION AND MAINTENANCE DEVELOPED: NUMBER:
NC II JUNE 2019 EIM—NCII-
—0014--001
DATE REVISED:
INSTALL WIRING DEVICES OF FLOOR AND WALL DEVELOPED BY: COMPETEN
MOUNTED OUTLETS, LIGHTING FIXTURE/SWITCHES CY BASED
AND AUXILLIARY OUTLET JOHN AMEIL R. LEARNING
YASAY MODULE
Performance Criteria
Checklist 3.4.3-2

C. ASSESSMENT PLAN

Assessment Condition
Workplace location
Tools and equipment appropriate for installation of wiring devices and lighting fixtures/switches
Materials relevant to the proposed activity
Drawings and specifications relevant to the task

Venue of Assessment Institutional Assessment Area


Type of assessment Interview
Written Test
Demonstration w/ oral Question

Type of Evidence
 Written test or examination Make final checks to ensure that work conforms with instructions and to requirements
 Direct observation and questioning Notify supervisor upon completion of work
 Demonstration (able to impart knowledge and skills) Clean work area and made safe
 Practical Lab/ Exercises Clean, check and return tools, equipment and any surplus resources and materials
appropriate, to storage in accordance with established procedures

DATE DOCUMENT
ELECTRICAL INSTALLATION AND MAINTENANCE DEVELOPED: NUMBER:
NC II JUNE 2019 EIM—NCII-
—0014--001
DATE REVISED:
INSTALL WIRING DEVICES OF FLOOR AND WALL DEVELOPED BY: COMPETEN
MOUNTED OUTLETS, LIGHTING FIXTURE/SWITCHES CY BASED
AND AUXILLIARY OUTLET JOHN AMEIL R. LEARNING
YASAY MODULE
D. TEACHER’S SELF-REFLECTION OF THE SESSION
90% of the students passed the practical and written assessment. This batch of 20 students developed their skills and knowledge in procedures in
Installation of various wiring devices particularly in Ratings of lighting fixture The students excelled in all learning objectives

DATE DOCUMENT
ELECTRICAL INSTALLATION AND MAINTENANCE DEVELOPED: NUMBER:
NC II JUNE 2019 EIM—NCII-
—0014--001
DATE REVISED:
INSTALL WIRING DEVICES OF FLOOR AND WALL DEVELOPED BY: COMPETEN
MOUNTED OUTLETS, LIGHTING FIXTURE/SWITCHES CY BASED
AND AUXILLIARY OUTLET JOHN AMEIL R. LEARNING
YASAY MODULE

You might also like