32.

L
Length, L= 6.5 ft
Width, B= 6.5 ft
Side soil Cutting= 12 in
Side Clear Cover= 3 in
GROUND LEVEL
Calculation
Calculate Nos
of Rebar
4 ft
Estimating
Φ

Reinforcement Do you have Top Rebar?


13 Nos 16 mm Φ L - Direction 10 Nos
13 Nos 16 mm Φ B - Direction 10 Nos

Ratio Aggrigate Types=


C S K/S
12 in RCC 1.0 : 1.5: 3.0
3 in CS 1.0 : 3.0: 6.0
0 in BS 1.0 : 5.0
Calculate Nos
of Rebar

Yes Yes
12 mm Φ No
12 mm Φ

Stone Stone
Brick
Total Shuttering Work= 32.50 sq.ft
Total Earthwork Volume= 295.31 cft Yes
Total Footing Concrete Volume= 42.25 cft
Total Footing CC Soling Volume= 10.56 cft
Total Footing Brick Soling Volume= 0.00 cft
Top Reinforcement (L Direction)= 67.09 ft 12 mm Bar 18.12
Top Reinforcement (B Direction)= 67.09 ft 12 mm Bar 18.12
Bottom Reinforcement (L Direction)= 90.28 ft 16 mm Bar 43.36
Bottom Reinforcement (B Direction)= 90.28 ft 16 mm Bar 43.36

Data Sheet
Concrete Work
Cement Sand Khoa/Stone
Requred Ratio of Morter= 1 1.5 3

Enter The Total wet Volume Of RCC= 42.25 cft 63.375 Enter The Total wet Vo
kg
kg Requirment Of Cement= 9.2 Bags
kg Requirment Of Sand= 17.3 cft
kg Requriment Of Khoa= 34.6 cft

heet Estimating
1.5

CC Work Brick Work


Cement Sand Khoa/Stone
Requred Ratio of Morter= 1 3 6 Enter the ratio of Morter Have to us
Enter The total volume of Brick Wor
Enter The Total wet Volume Of RCC= 10.56 cft 15.84375
Total Bricks Nee
Requirment Of Cement= 1.3 Bags Requirment Of Cemen
Requirment Of Sand= 4.8 cft Requirment Of San
Requriment Of Khoa= 9.5 cft
Brick Work
Cement Sand
the ratio of Morter Have to use = 1 5
The total volume of Brick Work = 0.00 cft

Total Bricks Need= 0 Nos


Requirment Of Cement = 0.00 Bags
Requirment Of Sand = 0.0 cft
Inovative Engineering & Construction Consaltant
Project:
Location:
Estimator: Engr Hedaetullah
Desinger: Engr Hedaetullah
Contract Us: 8801763603339

Total Foundation Cost


Sr. No. Material List Quantity Aprx. Prices Toral
1 Cement 10 Bags 450 TK 4719 TK
2 Sand (Coarse) 22 cft 35 TK 771 TK
3 Sand (Local) 0 cft 15 TK 0 TK
5 Stone chips 44 cft 171 TK 7537 TK
6 Brick chips 0 cft 90 TK 0 TK
7 12 mm 0.01812 Tons 72000 TK 1305 TK
8 12 mm 0.01812 Tons 72000 TK 1305 TK
Used Steel Bar
16 mm 0.04336 Tons 72000 TK 3122 TK
9 16 mm 0.04336 Tons 72000 TK 3122 TK
10 Bricks 0 Nos 10 TK 0 TK
Shuttering Work 33 Sq.ft 15 TK 488 TK
11 Earthwork 295 cft 5 TK 1477 TK
Total cost 23845 TK
Stone

Data Sheet

Calculation
L/B= 6.5 ft Nos of bar=
CC= 3 in
Dia of bar= 12 mm
Spacing of bar= 8 in

Data Shee
Nos of bar= 9.94

Data Sheet

You might also like