Professional Documents
Culture Documents
Objective
To utilize my potential with utmost dedication and hard work, zest for achieving excellence and apply all that I
have learned to be the part of a value driven dynamic team that ensures professional growth and continuous
learning.
Experience Summary
Major Projects
NIRM G-8 Islamabad:
Repair and maintenance contract of all installed Equipment in NIRM. Main units are
Siemens Fluoroscopy unit “Siregraph CF with Polydoros LX 30/50”
Siemens Fluoroscopy unit “Sireskop CX with BD CX and Polydoros LX 30/50”
Siemens Mobile Fluoroscopy unit “Siremobil 2000”
Siemens Mobile Radiography unit “polymobil III”
Siemens Mobile Radiography unit “Mobilett Plus”
Siemens “Sirecust” Patient Monitor
Siemens Ventilators “Servo 710”
Maquet OT tables
OT Lights “Hanulux 2005 & 2007”
Steam Sterilizers “MMM Securex 669”
Suction Machines, Diathermy Unit, Lab Equipments and Central Gasses.
QIH Islamabad:
Installation, startup and one year warranty of following Siemens Equipments
Mutix top with Polydoros SX
Sireskop SX with Polydoros SX
Mammography Unit mamomat 3000
Service contract of Chinese steam sterilizers “China sterilizer YG 1.5”
Installation and startup of plasma Sterilizers “Baixing”
MDAUK Muzafarabad:
Installation and energization of Siemens X-Ray unit “AXIOM Multix SD”
Installation and energization of Siemens fluoroscopy unit “AXIOM Sireskop SD”
Angiography Installations :
Coroskop Siemens at Abbotabad Dr Abid Hospital
Axiom Artis zee Faisal Hospital Faisalabad.
AXIOM-Artis Sadiq Hospital Sargodha.
Multistar Top HIRA Medical Center Sukkur.
International Experience:
Africa project:
Installations of X-ray units in CONGO:
Philips optimus 50
Siemens Multix TOP
SIEMENS angiography Unit Artis Zee Multi-purpose.
Afghanistan Project:
Installation of Angiography unit SIEMENS Axoiom Artis.
Trainings
X-Ray Fluoroscopy Unit (Siemens) Complete CSSD Training
Sireskope CX & BD CX with X-Ray generator Polydoros LX Scope of work:
Importance of CSSD
Training Location: NIRM (National Institute of Unisteri 336 (MMM) Complete unit
Rehabilitation Medicine) training &
Duration: Two weeks Securex 669 (MMM) Complete unit
training
Installation, start up and
energization of system
Maintenance and part
replacement
Training Location: Army Medical Complex
Duration: One week
Education
Master in Electrical Engineering (power)
Behria University Islamabad
Bachelor of Electrical With Honors (Electronics)
FUUAST Islamabad
Year: 2015
F. Sc (Pre-Engineering)
Professional Membership