New York State Department of Transportation NYSDOT
QUALITY CONTROL CHECKLIST Revised: March 9, 2018
BRIDGE WASHING D# CHECKBOX SUBTITLE YES NO N/A COMMENTS
Review contract documents, Bridge Inspection reports, EI 07-032
Do Special Specifications match bridge conditions: 641.3200nn16, 641.3300nn16, 641.3400nn16? Are bridges currently under another contract? Review contractor work schedule, conflicts, date conflicts, WZTC Review stream classification, paint rating, migratory birds, bats for restrictions Outside agency coordination: NYSDEC, NYCDEP, ACOE, Utilities, Municipalities Check bridges for presence of homeless people. Notify Area Const Supervisor if present. Review seasonal/weather restrictions: Specification or Manufacturer, use more restrictive Water source/Disposal site approved? Review equipment cleaning requirements when on-site water source is used Pressure washer meets specification Review bridge sealing items
SUBTITLE YES NO N/A COMMENTS
Review contractor's daily schedule of bridges
Review WZTC plan with contractor Review for utilities on/under bridge, migratory birds, bats, stream restrictions Review existing paint condition - see EI 07-032 All loose rust removed from weathering steel bridges with 3000 psi - See EI 07-032 Prior to washing, all trash/debis collected and removed, unblock all drains/scuppers Pressure wash only when temperature is 40 degrees F and above. Check that equipment is operating at correct pressure. If pressure is causing damage to bridge, have contractor lower pressure and notify EIC. All visible dirt, salt, animal waste and similar debris removed Make sure bridge drainage system is not damaged during cleaning After cleaning, thoroughly inspect bridge for missed areas After cleaning, bridge drainage system shall be checked for proper functioning Waste/debris disposed of at approved location?