New York State Department of Transportation NYSDOT

QUALITY CONTROL CHECKLIST Revised: March 9, 2018


ARMORLESS BRIDGE JOINT (ABJ) INSTALLATION
D#
CHECKBOX
Preliminary Review YES NO N/A COMMENTS
Read item Specification and review plans, record plans and inspection reports.
Develop contingency plan to cover open joint if unforseen conditions encountered.
Who will install the joint: Contractor, Sub, Manufacturer? Installer:
What experience does that installer have with this joint system?
Manufacturer's Competent Technical Representative to be on site for all phases of work. Name:
All materials on DOT Materials Approved List? Materials not past expiration date? Date:
Review seasonal/weather restrictions: Specification or Manufacturer, use more restrictive
Take lots of photos before, during and after all work!

Construction Details - Joint Preparation YES NO N/A COMMENTS


Existing joint removed to required depth and width as shown in plans?
Entire open joint cavity has sound concrete? If not, notify EIC/RE before proceeding.
Additional concrete removed from joint cavity as directed by EIC?
Joint cavity repairs completed as directed by EIC?
Entire joint gap has been cleaned of all debris for entire depth?

Construction Details - Header Installation YES NO N/A COMMENTS


Foam board block out for joint opening is correct width and securely installed?
Joint cavity prepped to the satisfaction of the EIC?
Aluminum drain tube installed on high side of joint per detail? Ensure tube is secure and won't
move or be plugged by header material installation.
Follow manufacturer's instructions for material mixing and placing.
Make sure material is not past expiration date.
Allow material to cure before removal of forms.

Construction Details - Compression Seal Installation YES NO N/A COMMENTS


Check that seal is on Approved List and is the proper size for the joint
Review manufacturer's installation instructions and Specification requirements
Make sure joint opening is cleaned and prepped before installing seal
Seal manufacturer's representative on site? Name:
Perform Watertight Integrity test per section 567 specification