Glasgow’s Climate Plan

Our Response to the Climate and Ecological Emergency


Contents References

1.1 Foreword figure 1 - Key components of the Plan


1.2 Executive Summary figure 2 - Glasgow CO2 Emissions (2006 - 2018)
1.3 The Climate Challenge for Glasgow figure 3 - Transport sector emissions 2006-2017
1.4 Recommendations from the Committee on Climate Change (CCC) figure 4 - Housing sector emissions 2006-2017
1.5 Recommendations from the Climate Emergency and Ecological Emergency Working Groups figure 5 - Industry and Commerce sector emissions 2006-2017
2.0 What we propose to do next - Climate Plan figure 6 - Multisectoral approach to Climate and Ecological Emergency
3.1 Climate Plan Theme 1 figure 7 - Stakeholder map
3.2 Climate Plan Theme 2
3.3 Climate Plan Theme 3
3.4 Climate Plan Theme 4
3.5 Climate Plan Theme 5
4.0 Monitoring and Evaluation
5.0 Action Plan
6.0 Appendices

The purpose of this plan is to set out the city’s approach, pathway and strategic actions towards net zero carbon
emissions, healthy biodiversity and climate resilience in Glasgow by 2030.

2 Climate Plan
1.1 Foreword 1.2 Executive Summary

Climate Change is the The City Council acknowledge We recognise that the city The Climate Emergency The Council declared a climate Much work has been there is also a corresponding
greatest challenge of our that we have a key role to council must show leadership Working Group, which and ecological emergency at undertaken across the city to emphasis on working with
play in enabling the city to on this issue. The city council its meeting of 16 May 2019. determine how it can address nature on climate solutions and
lifetime, and one with address the global climate cannot, however, address included representation The working group produced a these recommendations and nurturing our own relationships
potentially devastating and ecological emergency. this challenge alone; it will from all political report, with the input of many how best it can exercise a with the natural environment,
implications for all But Climate Change is not an take commitment from all groups of the Council expert stakeholders, which leadership role for the city in which our social and economic
sectors of society if isolated challenge, and we must of us. This plan, we call upon as well as a range of made 61 recommendations, drawing together the collective systems intrinsically depend on.
ensure a just transition to a existing networks, partnerships, with a target for the city to action of other agencies, Both reports link the city with
we do not rise to that low carbon and resilient city. If organisations and individuals in representation from key achieve carbon neutrality by businesses, and communities other local partners, especially
challenge and act we take considered actions to the city to work with us. sectors, was established the year 2030 at its heart. When across the city. This report through the city’s Sustainable
decisively and quickly. reduce our carbon emissions, at the meeting of the Council declared a climate now provides an update on Glasgow partnership, as well
increase resilience to existing We are under no illusion that the Environment, and ecological emergency, the progress which has been as with national government
risks and climate change reaching carbon neutrality it also agreed that, following made, sets a course for further and its agencies. It sets out a
already locked-in, and reverse and increasing resilience is a Sustainability and presentation of the Climate action, and describes the means timeline of activities against
biodiversity decline, we will also significant undertaking, but the Carbon Reduction City Emergency Working group’s by which a city and its people the 61 recommendations from
enable safer, calmer streets, potential rewards, of better lives Policy Committee on 5 report, a short life process will face the extraordinary the Climate Emergency Working
cleaner air, warmer homes, and a better city, are well worth February 2019. should be put in place in order challenges of the global climate Group and 25 recommendations
reduced flood risk, healthier striving for. to establish whether additional and ecological emergency. from the Ecological Emergency
neighbourhoods and more local, recommendations are required There is an open Working Group, looking to
nutritious food for everyone. to address the ecological acknowledgement of the need ensure that these will help
This implementation plan will aspects of the emergency for more rapid and radical to deliver a healthier, more
help to deliver an improved specifically. The Ecological action to reduce harmful equitable and resilient city as
quality of life for our citizens Emergency Working Group emissions into the environment, a key element of a Glaswegian
and communities, biodiversity produced a report, with input reverse biodiversity decline recovery from the Covid-19
and habitats, supporting a from expert and independent and build a more climate crisis.
sustainable, circular economy to stakeholders, which made 25 resilient city. Whilst there is
thrive in the city. recommendations, with the an understandable focus on The actions which are described
Councillor Anna Richardson ambition to halt and reverse stemming the flow of carbon in this report cover a range
City Convenor for Sustainability biodiversity and habitat decline dioxide in to the atmosphere, of areas - including transport,
and Carbon Reduction in the city.
4 Climate Plan Climate Plan 5
1.3 The Climate Challenge for Glasgow

natural environment and There is global As we seek to recover from in 2019, publishing a set of As a result of the public
biodiversity, the economy and consensus that climate the Covid-19 pandemic, an recommendations which were consultation it is apparent that
energy - with the need for unforeseeable crisis, we know drafted by two working groups there is a wider appreciation of
sustainability and social justice change is the greatest we need to turn once more that included representation the term ‘net-zero carbon’ over
core to their delivery. They have challenge of our lifetime. to the emergency which we from all political groups on the ‘carbon neutrality’.
also been aligned with the Furthermore, it is did see coming. Glasgow, city. Principal amongst these
Sustainable Development Goals acknowledged that if through Sustainable Glasgow, recommendations was one We, therefore, commit to
adopted by the United Nations. has been working to reduce for the city to become carbon achieving net zero carbon
we are to keep global

CLIMATE
These Goals will help to foster its CO2 emissions since 2010 neutral city by 2030, which was emissions by 2030. The city will
a meaningful city conversation warming to safe limits, and declared a Climate and endorsed by the city. continue strive to ensure that
amongst our institutions and major transformative Ecological Emergency all greenhouse gas emissions

PLAN
the communities whom they action and commitment produced and mitigated in the
serve, as well as with other city are in balance.
cities across the world also will be required from a
seeking to tackle this climate range of state actors, Glasgow looks to become one
and ecological emergency. They businesses, individuals, of the most sustainable cities
therefore represent both a and communities. This in Europe. The city has already
response and a rallying call from achieved (and exceeded)
Glasgow City Council to itself is an unprecedented its target of reducing CO2
and to the wider city in tackling global emergency and, emissions by 30% by 2020,
the climate emergency. accordingly, these are achieving this goal by 2015,
unprecedented tasks through a combination of
energy efficiency and local
– and, crucially, time is generation. But this also means
rapidly running out. that many of the quick wins
have been realised. In this light,
the city recognises that there
figure 1 - Key components of the Plan figure 2 - Glasgow CO2 Emissions (2006 - 2018) needs to be a sharp increase in

6 Climate Plan Climate Plan 7


1.3 The Climate Challenge for Glasgow 1.3 The Climate Challenge for Glasgow

the scope, scale, and intensity Environmental Insights for 2020 also improving quality of life set a target for offsetting as 2080 Attention must therefore need to take action to increase century later. This means that a stronger and inclusive
of delivery of projects to set suggests that transportation- and place in the city. The ratio an alternative to reducing and be paid not only to reducing our resilience. ambitious, early interventions economy, and more resilient
Glasgow on course to achieving based emissions in Glasgow of mitigation and offsetting of avoiding emissions through emissions, but to adapting the will make almost double the communities. Climate-smart
its net zero carbon goal for decreased by 39% in 2020. The emissions will require constant mitigation action. city and increasing resilience to The pace of change is central CO2 savings compared with a and low carbon places, while
2030. city will strive to maintain that review as new projects and the effects of climate change to Glasgow being able to meet slower rate of change. Time is of generating thriving economies.
reduction and further reduce initiatives are introduced. It is, We know too that we need to which are already locked-in. its targets and to meaningfully the essence and time is not on Glaswegian communities
The most recent data (2018) for transport sector emissions. however, the city’s ambition build resilience to the local contribute to reversing climate our side unless rapid action is already experience many
city emissions highlights that to maximise the reduction of weather impacts resulting In order to achieve our change. One tonne of CO2 has a taken right now. inequalities around income,
our total area wide emissions The city’s ambition is to emissions and minimise our from global climate change. ambitious carbon reduction persistence of around 100 years opportunity and discrimination.
2,591 kilo-tonnes (ktCO2). This reduce emission through reliance on offsetting, using this Parts of the city are already targets, building adaptive in the atmosphere, so a tonne Effective climate action can
represents a 37 % reduction direct mitigation, while also for residual emissions only. We at risk of flooding and climate capacity to climate change, of CO2 saved now is worth 100 also bring about better, more
on the city’s baseline data adapting to the impacts of will endeavour to measure the change threatens to bring the addressing biodiversity times a tonne of CO2 saved a equitable health and wellbeing,
(2006) and the total emissions climate change and addressing amount of offsetting as a result total number of homes and decline, and bringing about
which will have to be mitigated the ecological emergency, all of ecological emergency and businesses in danger of being a green economic recovery
by avoiding, reducing and of which will provide carbon adaptation projects, reporting flooded from circa 45,000 from Covid-19, bold leadership
offsetting activities, in that offsetting opportunities, whilst on this, but the city will not currently to almost 60,000 by and substantial investment is
order. required. We must acknowledge
openly that our current
Transport emissions are the momentum, though laudable,
biggest challenge for the city, will not result in sufficient
as the sector has seen slower action to ameliorate and reverse
reductions than in other the impacts of climate so clearly
sectors such as Domestic demonstrated in the changing
and Commercial & Industrial. trends in weather in the city.
However, the COVID 19 We must also recognise that
pandemic may have had an the impact that Glasgow can
impact on the city’s emissions, make in global terms to slowing
particularly in the transport climate change is relatively
sector. Data published by Google small, which underlines the
figure 3:Transport sector emissions figure 4: Housing sector emissions figure 5: Industry and Commerce
2006-2017 2006-2017 sector emissions 2006-2017
8 Climate Plan Climate Plan 9
1.3 The Climate Challenge for Glasgow 1.4 Recommendations of the Committee on Climate Change (CCC)

The city believes that who already experience interact with these other Sustainable Development Goals, The whole world was The CCC is an independent, advice forward in responding • The Carbon Management
sustainability and social justice significant inequalities. crises in ways which call for which have been adopted by given stark warning statutory body established to the climate and ecological Plan (CMP3), which will set
are intrinsically linked and Ensuring that any barriers to us all to think and act anew. the United Nations. They ensure under the UK Climate Change emergency. out how the city ’s own
addresses these as single, their transition to net zero At the very least, these recent that what we do can reach of the dangers which Act 2008. Its purpose is to estate can contribute to
combined issues. carbon are understood and events have highlighted our out beyond the traditional climate change presents advise the UK and devolved 1 - Low-carbon retrofits and the achievement of carbon
addressed. ability to act swiftly and with performance monitoring and the urgent actions governments on emissions buildings that are fit for the neutrality by 2030,
The city council recognises determination when reacting approaches of the public sector which need to take reduction targets, progress future:
the scale of the transformation • Actions to create a to an emergency, an ability that and engage other sectors made in achieving those • The city’s first Local Heat
required to address the climate safer, resilient and more needs to be utilised in dealing and our communities in a place to address them by targets and adapting to the Glasgow City Council and its and Energy Efficiency
and ecological emergency, sustainable city should be with the climate and ecological meaningful conversation about the report of the IPCC impacts of climate change. partners will invest in low- Strategy (LHEES) which will
including technological aimed at building a just and emergency. progress and what it means for in October 2018. This carbon infrastructure that present ambitious targets for
innovation, behavioural change, more equal city. the city and its people. They has been embedded in In its recent annual report to will be future and climate- absolute carbon reduction
finance and policy change. As This plan is about a city and its also give us common points of parliament, the CCC has set proof, providing good-quality, across the built environment
such, the City will develop a These are extraordinary times people. The city council is one reference when addressing the Scottish and UK policy out the urgent steps that must low-carbon and affordable in the city and;
Green New Deal for Glasgow for Glasgow, for Scotland and agency amongst others which various actions required to deal through the work of the be taken to begin a green and housing and energy. We will
that will transform the city into for humanity. A global pandemic exists to serve Glaswegians. It with this emergency situation. Committee on Climate resilient COVID-19 recovery. The work to reduce our emission • The City Development Plan
a fair and prosperous society, has revealed in stark relief can, strictly speaking, only act Change (CCC). Glasgow committee states that a green footprint via a series of building (CDP2) which will seek to
with a resource-efficient and the fragility of our social and on those things over which it recovery is the only option rationalisation and retrofitting facilitate those actions
competitive net zero carbon economic systems, whilst at the has direct control - such as City Council’s declaration to ensure that a low carbon, measures, which will see carbon that will enable the city to
economy in 2030. same time underlining the need emissions from its own estate of a climate emergency resilient economy can arise reductions in the order of 50% meet the net zero carbon
for solidarity and community and vehicles, however the city was a key local response from what is expected to be the from current levels. Thereafter target and help build climate
This plan therefore seeks to cohesion. A global movement council can also act in a much to the IPCC report biggest economic shock in a larger-scale, bespoke actions resilience through our land
incorporate two fundamental to challenge racial injustice broader influencing role, as it is generation. will be required. The city use policies.
principles: has uncovered deep-seated the only body in the city with and our local progress The report highlights five key will bring about this change
complicity in racism across a democratic mandate and a towards a safer planet investment priorities. Each of through bold action, which will Our approach to
• Actions to address the society and uncomfortable statutory leadership role. will now incorporate the them is stated below, together be included in the emergence decarbonisation will be
climate crisis must not truths about our own history as recommendations of the with a short response on how of key strategies for leading informed by our work with the
further disadvantage a city. The climate emergency The actions proposed in this Glasgow City Council and the way to a low and net zero UK’s national innovation centre
people, and communities has not gone away and will plan are aligned with the CCC. its partners aim to take this carbon future. These strategies on energy systems to provide a
include:
10 Climate Plan Climate Plan 11
1.4 Recommendations of the Committee on Climate Change (CCC) 1.4 Recommendations of the Committee on Climate Change (CCC)

robust and integrated roadmap formerly CSGNT) on phase two been established to provide The city currently has projects and Energy Efficiency Strategy Glasgow and Umeå to temporary measures provide • Active Travel Strategy setting
for addressing the energy of a strategic tree planting guidance to the city and on the underway to install energy (LHEES) for the city, addressing accelerate the smart city model additional space for physical the ambition and workplan,
transition in the city. Building project. This project will see a specific ecological aspects of efficient LED lighting and the reduction of carbon across Europe. It is working distancing in public places for that will also deliver on the
on work and expertise of our total of 22,000 trees planted, the climate emergency. Their controls, Building Energy emissions across the built to address the challenges people to walk, wheel or cycle city and neighbourhood
partners such as University around 14.5 ha, equivalent to 21 report and recommendations Management Systems (BEMS) environment. The LHEES will Glasgow faces from ageing while COVID-19 restrictions networks.
of Glasgow, University of full size football pitches. This were published in 2020 and and solar photovoltaic (PV) create pathways for the city’s infrastructure, fuel poverty and remain in place.
Strathclyde and Clyde Gateway, will build on the work of: will be combined with this panels in buildings throughout heat and energy systems to air pollution. The key goals of the city
in installing district heating plan to provide a single source its estate. An initial 5-year become low-carbon and highly Glasgow City Council is transport strategies are to
systems and solar PV, to name • The Local Biodiversity Action of information in response to programme has been proposed efficient. The strategy will set This work will be supported preparing three new transport develop a range of policies and
but a few. Plan; the climate and ecological that will reduce the city ’s a new and ambitious absolute by the Sustainable Glasgow strategies which will support interventions that support the
emergency. emissions by approximately carbon reduction target for Partnership through its Green the city’s transition to become city’s transition to a net zero
Buildings that are fit for the • Open Space Strategy; 27,000 tCO2 - which will see 2050, while also considering Infrastructure and Transport carbon neutral by 2030. These carbon city in 2030, to tackle
future will also be resilient to Retrofit green infrastructure the city ’s footprint reduced by a range of measures to Hub, which brings together key strategies include: persistent issues of poverty
exist and future risks, such as • The City Development Plan. will also be delivered though 55% compared to its 2005/06 decarbonise heat and energy stakeholders to develop and and deprivation in the city and
flooding and over-heating. ongoing programmes of work to baseline. systems and increase their design solutions in this area. • The Glasgow Transport maximise the role of transport
This work will be supported The city will continue to reduce flood risk and improve efficiency. It will highlight Strategy which will present in addressing these. A major
by the Sustainable Glasgow work with its partners within public realm, such as surface The new Carbon Management opportunities to use innovative 4 - Improving Infrastructure for an overarching city transport public engagement on transport
Partnership through its Heating Glasgow Clyde Valley Green water management plans and Plan (CMP3) aims to address the approaches to decarbonise, walking, cycling and remote strategy, issues was held in 2020, and
and Housing Hub, which brings Network (GCVGN), GAT, and the Avenues Programme. city ’s direct carbon emissions decentralise and digitise heat working: new transport related strategies
together key stakeholders to the Sustainable Glasgow This work will be supported and will commit Glasgow City and energy production in the • The City Centre mentioned above are planned to
develop and design solutions in partnership. We will invest in by the Sustainable Glasgow Council as an organisation future. The city council has undertaken Transformation plan focusing be published in 2022.
this area. strategic (coordinated) tree Partnership through its to achieve the 2030 net zero substantial work on the Spaces solely on the city centre of
planting, green infrastructure Greening the City Hub, carbon target. The CMP3 will The city council is also one for People programme during Glasgow, Transport and Moving around
2 - Tree planting, peatland creation, and peatland which brings together key include a strong programme of of the partners within the EU the Covid-19 crisis. This has were key issues of concern in
restoration, and green restoration. stakeholders to develop and retrofitting energy efficiency H2020 RUGGEDISED project. led to a significant expansion • A Liveable Neighbourhoods the public survey undertaken
infrastructure: design solutions in this area. technologies and increasing This is a smart city project across the city of active travel Plan, looking to implement on the climate emergency last
This work will encompass renewable energy installations. funded under the EU’s Horizon the segregated cycling and 20 minutes neighbourhoods year. This included active travel
The city is currently working in the recommendations of 3 - Strengthening energy 2020 research and innovation walking infrastructure largely in the city and embed (walking, wheeling and cycling)
collaboration with our partners the Ecological Emergency networks: The city council and partners programme. It includes three separated from motorised sustainable practices and the need to make the city a
at Green Action Trust (GAT- Working Group. This group has are working on a Local Heat lighthouse cities: Rotterdam, traffic across the city. These throughout. better place for pedestrians and
12 Climate Plan Climate Plan 13
1.4 Recommendations of the Committee on Climate Change (CCC) 1.4 Recommendations of the Committee on Climate Change (CCC)

cyclists whilst de-prioritising the what the future of transport will supporting innovation in the the local ecosystem (across and community resilience. The sector). recently appointed Green
private motor car and improving look like. city. Glasgow and Scotland). ‘self-regulating’ market on a Economy Manager will produce
our current public transport global scale creates uncertainty, • Creating new jobs, resulting a detailed plan to support
system. We therefore acknowledge Glasgow is working hard to We aim to make our local increasing price volatility, in major beneficial social the development of a local
the original recommendations develop our ambitions for a economy restorative by concerns over access to raw impacts through localising wellbeing economy, enabling
A part of the climate of the Climate Emergency circular economy in its recently intention and regenerative by materials and rising waste economies with communities the required infrastructural,
emergency working group Working Group in this area approved and adopted its design. In a circular Glasgow, disposal costs. Allied to these and creating and retaining economic and cultural
recommendations, ambitious and will continue to support innovative Circular Economy waste will be eliminated by concerns are also the enormous wealth. transformation required to meet
aspirations were presented work on them, as part of the Route Map, published in 2020. carefully designing products carbon emission impacts from our emissions reduction targets.
in a recommendation for a Glasgow Transport Strategy, and industrial processes in transportation in shipping • Environmental benefits: less
public transport system with its the Regional Transport The route map presents a vision such a way that materials are products and materials across waste, less carbon emissions, Action related to the CCC
future as a zero-emission asset, Strategy and the ongoing for a city which minimises nutrients in a perpetual flow in the world by aeroplane and better air, water, and soil priorities detailed above will
potentially free of charge and Glasgow Metro development, the extraction and use of either the biological cycle or the container tankers. A realignment quality. allow the city to capitalise on
under municipal regulation or particularly in relation to the precious natural resources and technical cycle. of the economy on circular key opportunities to support
even ownership. city’s aims for a green recovery. encourages self-sufficiency principles of sharing, reducing, This work will be supported innovation towards low carbon
and resilience. This resilient reusing, remanufacturing, by the Sustainable Glasgow and adaptation action. The CCC
The City Council are mindful This work will be supported action will be undertaken whilst and repair also presents Partnership through its Green priorities are therefore included
that much of this agenda has by the Sustainable Glasgow supporting local, inclusive and opportunities including: Economy and Private Sector in the five proposed Climate
been significantly disrupted Partnership through its Green community business growth. Hub, which brings together key Emergency Implementation
due to the impact of Covid-19. Infrastructure and Transport • Alleviating potential raw stakeholders to develop and themes outlined further in this
On one hand, the city has taken Hub, which brings together key A circular economy supports material supply risks by design solutions in this area. document.
this opportunity to fast track stakeholders to develop and a more inclusive and resilient shortening complex supply
work to widen street access design solutions in this area. city. The city council, together chains and increasing This hub and all its partners
for cycling and walking across with partners at the Glasgow resource security. will be key stakeholders in the
the city. While on the other, 5 - Moving towards a circular Chamber of Commerce and Zero development of the Green
the pandemic has dramatically economy: Waste Scotland, will continue • Spurring innovation of new New Deal for Glasgow, and
changed the demand for travel to support innovative economic products, technologies agreement has been reached
in general, particularly reducing There are already a number of activity which focuses on and services, creating new to utilise the hub as a critical
peak travel and commuting, good examples of pioneering the continuous circulation of The circular economy can have business opportunities (reuse friend in its development. The
creating uncertainty about businesses going further and products and materials within a major impact on economic
14 Climate Plan Climate Plan 15
1.5 Response to recommendations from the Climate Emergency Working Group 1.5 Response to recommendations from the Climate Emergency Working Group

Following Glasgow City The recommendations cover Our response to the 61 Climate be done. Through collaboration
Council’s declaration of a broad range of policy areas, Emergency recommendations with our citizens and city
including education, estates, and 25 Ecological Emergency and regional stakeholders
a climate and ecological planning and construction, natural recommendations are we must work to address this
emergency in 2019, 61 environment and land use. The presented in full in Appendix unprecedented challenge. It is
recommendations were all-encompassing nature of the 1 and 2 respectively. Both lists only together that we can and
made by a cross-party recommendations necessitate of recommendations are also will achieve a low carbon and
coordinated action not only by the included in appendix 3 and 4 sustainable future for all.
Climate Emergency city council, but by the full range correspondingly.
Working Group, and a of stakeholders in the Glasgow Through work across energy,
further 25 made by the Family and city wide. The responses have been transport, development, land
Ecological Emergency
Working Group. These
We gratefully acknowledge the CLIMATE grouped under the UN
Sustainable Development
use, biodiversity, education,
and other areas, we are already

PLAN
expert guidance and direction Goals (SDGs) in order to reducing the city’s emissions
recommendations provided to us through both illustrate the breadth of work and creating a healthier, greener
informed what the Climate Emergency and Ecological being undertaken in each area Glasgow. While progress has
city council should Emergency working groups. This and to provide a framework been made in these areas, it is
multi-sector, cross party, inclusive through which to understand recognised that a faster pace
consider in order to and collaborative approach the recommendations, and our and broader, transformational
meet sustainability presented a range of thought action on a more global scale. action are urgently required
and carbon-reduction provoking, aspiring and integrated across all sectors.
goals, halt and reverse recommendations. These This response outlines what
recommendations have inspired we have achieved so far, and We believe that Glasgow is well
biodiversity and habitat and motivated real change across what is to come. This does positioned to make the changes
decline in the city both the organisation. Some of the not present the answer to the that are required through
figure 6 - Multisectoral approach to Climate and Ecological Emergency
now and over the coming actions have resulted in direct significant challenge ahead of its strong partnerships and
or indirect action, some have us. Whilst these charts report collective ambition. Resources date is positive and something zero carbon target, accelerate
years. we need to build upon, but it is delivery of its biodiversity action
spawned collaborative policies, upon our positive and innovative and effort now need to be
proposals and initiatives beyond action to date we know that focussed to meeting our targets not in itself sufficient if the city plan and resilience targets.
this plan. there remains much more to and aspirations. Our progress to is to achieve its ambitious net
16 Climate Plan Climate Plan 17
2.0 What we propose to do next - Climate Plan 2.0 What we propose to do next - Climate Plan

In response to the In order to do this the city Many of the actions in this plan
recommendations set council now presents the will require the involvement of
Climate and Ecological multiple partners on a local and
out by the Climate Emergency Plan. The plan aims national scale. This reflects the
Emergency Working to address the climate and leadership role that the city must
Group and Ecological ecological emergency by: take for Glasgow in meeting the
Emergency Working net zero carbon target by 2030,
1 Adjust the council’s own and how this action will require
Group, the Council family working practice and estate the involvement of a range of city
will continue, over the to become climate ready stakeholders from public, private
coming years, to create and future proof. sector and our communities across
transformational change the city adopting a multi sectoral
2 Ensure that all the council’s and collaborative approach. This
which will make Glasgow decisions, policies and plan sets out what we believe
a net-zero carbon, development proposals are needs to be done to effectively
biodiverse, climate- climate ready. address the climate and ecological
resilient, and healthier emergency, making the city a
3 Support organisations better place. It will only succeed
city for people and across Glasgow to become if we all work together to achieve
nature. more climate ready. these goals.
4 Raise public awareness The actions set out in this lay forth
of climate change and
the direction of travel required
associated biodiversity loss.
for the city to combat the climate
and ecological emergency. The
5 Enable and support local
city will work closely with various
climate action to address
stakeholders to identify and utilise
the emissions reduction,
adapt to climate change appropriate funding mechanisms
and halt biodiversity decline. for each of the actions as they
Figure - 7: Stakeholder map are developed. This includes the
18 Climate Plan Climate Plan 19
2.0 What we propose to do next – Glasgow’s Climate Plan 2.0 What we propose to do next - Climate Plan

creation of a Climate Resilience transformation required to the Climate Emergency, the Each of the Climate Emergency Climate Emergency Theme 1
and Sustainability programme achieve a net zero carbon, city commits to action within Theme will present actions Climate Emergency Theme 4
Communication and Community
board, led by the executive sustainable, just, caring, safe and five main themes. The five for taking forward real and Health and Wellbeing
director of Neighbourhoods, thriving city. themes have been developed transformative change beyond Empowerment
Sustainability and Regeneration and refined to respond and this point:
Services, and staffed with senior As a key target is for the city accommodate all the following
representatives from across the to become Net Zero Carbon by key documents: In the following section we will
city council. The programme 2030. It is worth clearly defining explore each Climate Emergency Climate Emergency Theme 2 Climate Emergency Theme 5
board will oversee progress this term again. Net Zero • Climate Emergency Working Theme in more detail. Just and Inclusive Place Green Recovery
and direction of climate Carbon: When carbon emissions Group report and 61
and ecological emergency emitted directly equate to recommendations;
actions, managing risks and those emissions that are offset/
opportunities iteratively. captured or sequestered. In • Ecological Emergency
simple terms, this will mean the Working Group report and 25
The work of the Climate, carbon emissions are balanced. recommendations; Climate Emergency Theme 3
Resilience, and Sustainability Restoring the balance to the Well Connected and Thriving
programme office will require natural carbon cycle. • The City’s Strategic Plan; City
significant investment both
internally and externally to the It is worth clarifying that • The CCC report;
city council. The development of working towards this net zero
a Green New Deal for Glasgow carbon target therefore requires • Just Transition Commission
will be critical in establishing the city to significantly reduce report
the financial landscape from carbon emissions whilst working
which this can be delivered. to implement measures to • The UN Sustainable
Thus, the Green New Deal for capture (or sequester) residual Development Goals.
Glasgow will help achieve a emissions.
vision of a net zero carbon
city, facilitating the cultural, To achieve the level of change
technological and economic that is required to respond to

20 Climate Plan Climate Plan 21


2.0 What we propose to do next - Climate Plan

Climate Emergency Working Group Draft Climate Emergency Implementation Plan & Consul-
Declaration of Climate & Ecological Emergency tation
Publication of Climate Emergency Working Group Publication of Ecological Emergency Working Group
Recommendations Recommendations Report
Ecological Emergency Working Group Publication of Glasgow Open Space Strategy
Sustainable Glasgow Re launch

The city and partners will continue to invest in programmes to enable young Glaswegians to
access and succeed in new green job opportunities. Engaging with further and higher
education institutions, ensuring that the curriculum and training they offer supports green
opportunities.

Figure - 8: 5 pillars of the Sustainable Development


Goals and Glasgow’s Climate Plan Themes

22 Climate Plan Climate Plan 23


2.0 What we propose to do next - Climate Plan

Annual iterative review of the Climate Plan


Significant progress in implementing the Glasgow and Clyde Valley Green Network’s
Annual iterative review of the Climate Plan Blueprint to create green & biodiversity corridors in the city by improving open space
Delivery of energy projects utilising the recovery of heat from geothermal sources learning from Duke Street and provision and increasing tree cover.
Tennent’s Brewery projects. Identify and protect Vacant and Derelict Land for greening and rewilding in combination
Delivery of heat and energy generation projects including distribution of heat from parks in Glasgow based on with renewable energy generation measures, identifying appropriate location, existing
existing feasibility studies. priorities and co-benefits of each intervention.
All households in Glasgow are enabled to minimise waste arisings and to recycle. Develop a Carbon Neutral Innovation and catalyse roll out of this model across the city.
Implement the Fairer Scotland Duty in decisions and actions made in response to the Climate Emergency, Upgrade insulation and heating of all building stock in the city, city council leading by
ensuring that strategic decision-making helps to tackle inequality by following Fairer Scotland Duty’s guidance for example.
public bodies. Ban gas heating systems in all new buildings within the city boundary.
Explore the feasibility of a workplace car park levy, ring fenced to fund sustainable
transport in the city.

Annual iterative review of the Climate Plan Annual iterative review of the Climate Plan Annual iterative review of the Climate Plan
Ensure that historic buildings are resilient to the impacts Significant progress in achieving Glasgow’s Gold Hybrid Increase investment in peatland restoration in the city and city region, to increase
of climate change, protecting Glasgow’s rich heritage. plus 20% low and zero carbon generating technologies capacity for carbon sequestration, habitat and species enhancement.
Adopt an early warning system to prepare for extreme (LZCGT) or better, for all new build new homes. The Council works with partner organisations, adjacent local authorities, the city’s
weather events such as heatwaves and flooding. Significant progress in implementing Glasgow’s Gold academic institutions and other stakeholders will fund and achieve accelerated
Hybrid plus 20% low and zero carbon generating implementation of the Glasgow LBAP and Pollinator Plan, incorporating additional
technologies (LZCGT) or better, to be achieved for all new outcomes regarding connectivity for biodiversity under the Urban Ecosystem Statement.
non-domestic development. To continue to invest in the school estate, enabling its uses for both carbon
Significant progress has been made in accelerating the reduction, biodiversity gain and climate education as core principles.
delivery of Local Biodiversity Action Plan, Pollinator Plan
and Open Space Strategy.

24 Climate Plan Climate Plan 25


3.1 Climate plan Theme 1:
Communication and Community Empowerment

The aims of this theme are: Partners and local communities sustainable, just, resilient and
Annual iterative review of the Climate Plan of interest, identity and place equitable city, where they can
The city and partners will continue to invest in programmes to enable young Glaswegians to • To engage with communities in the city. The strategy will thrive.
access and succeed in new green job opportunities. Engaging with further and higher education about the climate challenge include a renewed presence on
institutions, ensuring that the curriculum and training they offer supports green opportunities • To foster participation and social media, and other channels The city and partners will map
collaboration, and identified by communities, communities of interest, identity
• To enable local action. encouraging participation and and place across Glasgow with
Annual iterative review of the Climate Plan sharing best practice across a view to understanding what
To continue to work with Education The 26th UN Climate Change all city stakeholders including their priorities are, how their
Services in the city, Scottish Government Conference of the Parties our citizens [action 1]. We participation can be supported
and Keep Scotland Beautiful to formally (COP26) will be hosted by aim to co-create the strategy and what type of participation
engage with pupils on the climate and Glasgow in November 2021. This with communities, community they would favour. This will
ecological emergency and the actions is an exciting opportunity not organisations and stakeholders be an opportunity to ask
which can be taken to address them. only to showcase the work the such as Sustainable Glasgow communities what they think of
City has undertaken, through partners, Climate Ready Clyde, the conference and what they’d
initiatives such as ‘Sustainable MGSDP, SPT, GCVN, Glasgow like to see as a legacy from
Glasgow’, ‘Resilient Glasgow’ Centre for Population and COP26.
Annual iterative review of the Climate Plan and ‘People make Glasgow Health, Clyde Gateway, Glasgow
The city makes significant progress in the transition Glasgow's economy from linear to circular, making Greener’ but also to build a Science Centre, Lateral North This legacy has the potential to
it more inclusive and sustainable. greener and climate smart and others. be a better connected, cleaner,
Increase the amount of renewable energy such as solar thermal, PV or heat pumps in the city to legacy for future generations. more accessible, greener,
represent 20 % of total energy demand. This strategy will include heathier and equitable place
Work with bus operators to support rapid transition to cleaner public transport as part of the City’s Low To ensure that we build working with young people where everyone in the city
Emissions Zone. a successful legacy from in the city to co-develop a participates and succeeds in
Transition the fleet of private hire vehicles to zero emission vehicles by 2030. COP26, we will develop a Children’s Climate Charter for the opportunities presented by
Reduce the need to own and use a car through measures in the City Development Plan 3, Locality Plans dynamic Climate Change Glasgow. Committing current a net zero carbon economy.
and Glasgow Transport Strategy. Including, Low Emission Zones, Bus gates. Communications strategy for generations to protecting and
New City Climate Plan is adopted setting out targets and key actions for building a net zero city by the city. This will be co-designed enhancing our city, allowing This communications strategy
2045 and beyond. with our Sustainable Glasgow future generations to inherit a will be an overarching

26 Climate Plan Climate Plan 27


3.1 Climate plan Theme 1:
Communication and Community Empowerment

framework for engaging Significant public engagement Engagement will continue to programme: Climate Ready the ecological emergency and
Glaswegians in the transition will take place across the be undertaken with young Classrooms rolled out by Keep actions that can be taken to
to a climate ready and net zero city to ensure that residents people to include, amongst Scotland Beautiful on behalf of address it [action 4].
carbon city, by providing clear have their say on actions other topics, discussions about the Scottish Government.
and accessible information, to tackle climate change how proposed land use and Finally, the city will continue to
building capacity and fostering and improve their connectivity policies can help to Recognising the importance work with local, national and
local action to address the neighbourhoods, including achieve a resilient and net zero of staff development and international partners to raise
global climate and ecological topics such as food, energy, carbon city by 2030, as part continuous education, the awareness of both climate
emergency. It will include transport, natural environment, of the City Development Plan city council commits itself and ecological emergencies
working with formal education health and climate justice.  2 and the Glasgow’s Transport to become a climate literate fostering collaborative
and schools, but also community This will utilise innovative Strategy. organisation through the roll transformative action. A
institutions, communities of engagement methods, while out of Carbon Literacy and significant first step in doing
place, interest and identity. working collaboratively with the Communications and Ecological Emergency training, this is the creation of a city
arts community, academia, and engagement about the climate while advocating the roll out climate change declaration
According to the Scottish civil society. and ecological emergency of climate literacy training in where local institutions pledge
Government’s Draft Public must also include work with other organisations across to become net zero carbon
Engagement Strategy: Net Zero To support this, the City will Education Services and the the city. The city council by 2030 or sooner, the first
Nation, over 60% of measures roll out climate conversations curriculum for excellence, will continue to roll out its step in achieving this is the
to achieve net zero emissions [action 2] throughout exploring opportunities for carbon literacy and Ecological development of the Sustainable
will require societal change. In Glasgow and enable residents outdoor learning to mainstream Emergency training Course to Glasgow Charter by the Green
this context, it is essential that to access information and climate change awareness and raise awareness of the climate Economy and private sector hub
our communities understand make recommendations for to help foster action [action 25]. and ecological emergencies, [action 3]. The city will also join
the nature and scale of change. In order to connect This will build on the success but above all to foster individual others in signing the Edinburgh
the climate challenge, having with key stakeholders, we of the sustainable development and collaborative action on Declaration on post - 2020
the opportunity to shape and will engage with our partners education programme with climate change from all areas global biodiversity framework as
influence local and national within the Community Planning schools in Glasgow, from of the council family. This part membership of ICLEI cities
decisions about how to address Partnership and Glasgow Life. early years to secondary, as will be expanded to include a for nature [action 12].
the climate and ecological well as learning from the mandatory GOLD course with
emergency.  implementation of the national the aim to raise awareness of

28 Climate Plan Climate Plan 29


3.2 Climate plan Theme 2: 3.2 Climate plan Theme 2:
Just and Inclusive Place Just and Inclusive Place

The aims of this theme are to: the national Just Transition to meet long-term liabilities and (VLR) to voluntarily assess
Commission, while also their members’ ability to live progress toward the global
• Ensure that the transition implementing the Fairer in a world that is worth living goals. This process will help
to a net-zero society is a Scotland Duty in all decisions in [action 34]. We will work monitor and evaluate progress
catalyst for building a fairer, and actions made in response to with local pension funds and on SDG implementation, while
healthier, prosperous, resilient the Climate Emergency, to help investment managers to share also enabling social inclusion,
and greener city for all ensure that no one in Glasgow best practices of responsible and prioritisation in planning
• Ensure that people are at the is disproportionately affected by and climate resilient investment. and budgeting. We will also
centre of the transition to net extreme weather or left behind SPFO will lead by example in work to ensure that the SDGs
zero, creating benefits and in our transition to a greener, their activity to support the are referenced in all council
opportunities for all in the low carbon and resilient city. Task Force on Climate related decisions and actions, thereby
city. This will ensure that strategic Finance Disclosure. building a better understanding
• Equip people with the skills decision-making helps to tackle of our action on a global scale
and education they need to inequality by following Fairer The 2030 Agenda for [action 13].
benefit from the transition to Scotland Duty’s guidance for Sustainable Development
net-zero public bodies [action 20]. provides a shared plan for peace The city and partners
• Empower and invigorate our and prosperity for both people will continue to invest in
communities, strengthening The city will work with and planet. As part of this, the programmes to enable young
local economies Strathclyde Pension Fund UN Sustainable Development Glaswegians and those in
• Share the benefits of climate and other pension investment Goals (SDGs) are a global call sectors most affected by the
action widely, ensuring that funds in the city to encourage to action. Scotland signed up to transition to a net zero carbon
costs are distributed based on the development of climate the SDGs in 2015. economy to access and succeed
ability to pay change strategies, including in new green job opportunities.
divestment from fossil fuels. Glasgow mapped out our 61 Engaging with further and
The City will do this by Exploring how investment recommendations and this higher education institutions,
setting up its own local portfolios are future-proof is proposed implementation ensuring that the curriculum
Actions under this theme align with the
Just Transition Commission critical, ensuring consideration plan in accordance with the and training they offer supports
following UN Sustainable Development Goals:
[action 11] implementing is given to how Climate Change UN SDGs. In order to confirm green opportunities [ action
the recommendations from is likely to impact on their ability Glasgow’s commitment to 5]. The City will work with
the SDGs, we will undertake
30 Climate Plan a Voluntary Local Review Climate Plan 31
3.2 Climate plan Theme 2: 3.2 Climate plan Theme 2:
Just and Inclusive Place Just and Inclusive Place
Case Study 1

Education Services to promote using Adaptation Scotland’s The city and partners will then partnership to create a fairer Using the Place Standard
climate ecological emergency Benchmarking Tool. including develop and adopt an early local economy, reducing poverty tool
learning opportunities, from engagement and capacity warning system to prepare for and inequality, as well as
early years until secondary building with elected members extreme weather events such as becoming more resilient in the The Place Standard tool, further in mitigating the effects
school, as part of the curriculum and senior management teams. heatwaves and flooding [action face of our changing climate. launched in 2015, has since of climate change and reducing
for excellence and outdoor 28]. The city will also ensure The Green New Deal will form been used extensively both in our carbon emissions. It will T
education [action 27]. This work will support how that historic buildings and their a framework for planning for Scotland and internationally, be vital in meeting our city-
we monitor and evaluate rich heritage are resilient to a green recovery and just and has received recognition wide targets, while making
S
The impacts of our changing progress against actions the impacts of climate change, transition to a low carbon from the World Health sure that social, economic R
climate, such a severe weather identified in this plan to build protecting Glasgow’s rich society, with wellbeing and Organisation. It is used to and environmental issues are
events, will affect all of our a more climate resilient city, heritage [action 29]. circular economy principles at facilitate meaningful discussion tackled holistically at a local Q
communities, but it is those while also supporting the The city will work with our its heart. around both physical and level. P
most vulnerable communities development of a Climate partners within Sustainable social aspects of a place,
in Glasgow that will be most Risk Register as part of the Glasgow and Climate Ready allowing often complex issues O
impacted. In this way climate climate adaptation planning Clyde to ensure that we help to to be become accessible. N
impacts become a stress work, reflecting findings from build the capacity of citywide The Place Standard is a key
multiplier, adding additional the UK Climate Change Risk organisations not only to element of participatory place T S R Q P O N
burden upon already existing Assessment for Scotland transition to a zero carbon, making processes, which bring N
stresses, such as poverty or and Climate Ready Clyde circular economy, but also to public bodies, community O
inequality. Regional Risk and Opportunity be in a position to benefit from organisations and residents
As a result, Climate change the opportunities resulting P
Assessment. This will give together, in the most effective
brings huge challenges us a better understanding from that transition, whilst means of building community
Q

for building greater social of risks, vulnerabilities and reducing our carbon emissions resilience to climate change. R
justice and inclusion. The city opportunities for the city, as and providing cleaner energy S
council will work with other well as the priorities for action for all [actions 58, 16]. The The Place Standard, currently T
public bodies in Scotland to in continuing to build our city will adopt a Community under review, will have even
benchmark our policies and resilience to climate change Wealth building approach to greater importance in how
monitor progress over time in [action 19]. supporting our local businesses communities work with
addressing Climate Impacts and communities, working in statutory bodies as we go

32 Climate Plan Climate Plan 33


3.2 Climate plan Theme 2: 3.3 Climate plan Theme 3:
Just and Inclusive Place Well Connected and Thriving City
Case Study 2

Weathering Change This theme aims to: out in the Scottish Government’s distribution formula that applies requiring higher costs technical
Housing Strategy - ‘Housing weighted measures for fuel specifications for works,
Glasgow Centre for Population • Support the development of to 2040’ - with a focus on poverty, building attributes, and housing valuations, comparative
Health (GCPH), together with low-carbon retrofits and new delivering affordable and other factors. Glasgow receives households’ incomes within
Glasgow City Council, Sniffer buildings that are fit for the sustainable housing that can a significant allocation due to target areas and grant
and Greenspace Scotland, future; meet the needs and demand of its comparative deprivation benchmarks.
delivered an action research • Help to strengthen energy Glasgow’s people. This includes and incidence of low-income
project in the north of Glasgow networks and; new supply of high quality low households as well as extensive, A key priority is to maximise the
in 2018. This explored how • Support decarbonisation of and zero-carbon homes the non-traditional and solid wall additional funding and resources
communities and organisations transport systems by helping meet the ‘Glasgow Standard’ as construction housing types, that can be leveraged through
can work together to increase to improve infrastructure for well as an emphasis on meeting including tenements. Glasgow HEEPS: ABS grants, such as
resilience, particularly in the walking, cycling, wheeling the challenges associated with City Council has a successful Energy Company Obligation
face of climate change. The and reducing the need to holistic, whole building approach track record of engaging (ECO). However, it is challenging
team used interviews with travel. to investment and improvements private households, as well as where owners are not able or
community members and to existing homes, particularly Registered Social Landlords, to not willing to make a significant
key stakeholders, workshops, Glasgow is Scotland’s most older tenements, to make them deliver HEEPS: ABS projects in financial contribution. There are
and other methods of data renowned post-industrial city. low and zero carbon fit for the target areas across Glasgow. also eligibility restrictions on
capture, to capture feedback on It is the metropolitan centre of future (‘Safeguarding Pre-1919 Projects are delivered in HEEPS: ABS grants for private
quality of neighbourhood and a unique and diverse regional Tenement Stock’ report March partnership and with consent landlords. Developing viable and
opportunities for improvement housing system which has 2021). of private owners, who are deliverable finance packages
with focus on becoming more changed significantly over the required to make a financial for investment in improving the
climate resilient. past quarter of a century. There A key issue is resources contribution. The projects must sustainability of existing housing
are unique opportunities and and financing available for balance a combination of non- is a key challenge.
challenges linked to Glasgow’s investment in existing homes. traditional construction types
built heritage and industrial The Home Energy Efficiency
legacy. Programmes Scotland: Area
Based Schemes (HEEPS: ABS) is
Glasgow’s Housing Strategy a national fund that is allocated
addresses the key issues set to local authorities based on a

34 Climate Plan Climate Plan 35


3.3 Climate plan Theme 3: 3.3 Climate plan Theme 3:
Well Connected and Thriving City Well Connected and Thriving City

We are faced with a complex set improvement plan for older help accelerate economic, level vision for a decarbonised, efficiency, carbon reduction climate change and address
of challenges and the solutions (pre¬1919) tenements and private environmental and social decentralised and digitised and circularity at its core. This economic and health inequalities.
don’t always address climate sector housing (2020/21) and will impact. The Catapults are part built environment. Currently in will look at ways to support Glasgow, as a Local Authority,
change, energy efficiency and update the Glasgow Standard of the UKRI and Innovate UK’s development, this strategy will local energy schemes, allowing has a significant part to play
fuel poverty simultaneously. to ensure all new affordable Catapult programme, which include an ambitious new target access to sustainable and in ensuring that Glaswegians
homes achieve net zero carbon is a network of world-leading for an absolute carbon reduction. renewable energy sources. can live in warm, dry, energy
The Programme for performance, also including technology centres designed to This strategy will bring together Local developments will be efficient, resilient, low carbon
Government 2020 includes a built in measures to enhance transform the UK’s capability for key priorities around city wide made more sustainable through homes which they can afford to
major commitment to invest biodiversity – e.g. bird and bat innovation in specific areas. This carbon reduction and housing retrofitting existing stock with heat. In order to help strengthen
£1.6billion, over the next 5 years boxes [actions 23, 24 and 39]. approach to net zero will pilot priorities reflecting the urgent highly energy-efficient and low- energy networks in the city,
in heat and energy efficiency a first-of-its-kind, coordinated need to reduce fuel poverty carbon heating solutions and open space across Glasgow
in domestic and non-domestic Building on the valuable work holistic planning and stakeholder and increase energy efficiency considering flood risk. Work will can be harnessed to facilitate
buildings. A key focus of this that the city and its partners engagement approach, to provide of domestic and non-domestic also be undertaken to address the generation and delivery of
investment will be on fabric and have been developing over the city with a robust plan and buildings, it will include reviewing historic buildings and ensure renewable heat and energy. The
insulation of existing homes to the years, the City Council has an effective approach to support he need for an Energy Services they are resilient to the impacts city is working with Sustainable
eliminate poor energy efficiency commissioned a “scoping study the achievement of net-zero Company [actions 14, and 50]. of climate change through Glasgow partners to deliver an
as a driver of fuel poverty. We to Net Zero”. This will pave the emissions. The methodology This plan and the LHEES, will a process of risk analysis in Innovation District in the city
will, therefore, continue to work way for future work where energy required to undertake this work both support Glasgow’s ambition line with recommendations of [action 51] with a view to rolling
with Scottish Government to planning, land-use planning, will involve bringing together of becoming a cooperative city, Historic Environment Scotland. the model across the city.
maximise funding for Area housing planning, and mobility several key city partners that through alignment with the The city will engage with local
Based Schemes to invest in planning are integrated, ensuring are essential to deliver net circular economy principles and developers, landlords and The Open Space Strategy
improving energy efficiency that the city achieves its net zero zero, meaning that the recently a framework of engagement residents to reduce the carbon Delivery Plan will investigate
and tackling fuel poverty in carbon target by 2030. re-launched Sustainable with local energy co-operatives, footprint associated with our the potential opportunities
private sector housing. This Glasgow partnership will play enabling them to be set up and own buildings, ensuring that presented by open spaces across
work will continue while also This work is being undertaken an important part in driving this providing support [action 46]. all Glaswegians have access the city [action 17]. While the
preparing the next Glasgow by Energy Systems Catapult work [action 6]. to clean and affordable energy city council’s own estate will be
Housing Strategy aligned with (ESC) and Connected Places The LHEES is aligned with [actions 9, 14, 23, 24, 39]. made greener and more energy
the national Housing to 2040 Catapult (CPC) who bring The first of its kind Local Heat the development of Glasgow’s efficient through a range of
vision and route map (2021-23). together businesses, scientists, and Energy Efficiency Strategy Circular Economy route map, These actions are key to improvements. This includes
We will prepare an investment and technical specialists to (LHEES) will provide a high- placing the principles of resource help mitigate the impact of installing over 100 charge points
36 Climate Plan Climate Plan 37
3.3 Climate plan Theme 3: 3.3 Climate plan Theme 3:
Well Connected and Thriving City Well Connected and Thriving City

for the city Council’s EV fleet, the City Development Plan for facilities and services that they the climate emergency at its changes are required to how
bringing more schools under priority areas identified in the need within walking distance in forefront, with key questions people move about in the city.
the control of a centralised City Development Plan. These their local neighbourhoods, thus about how place and place Transport is also directly linked
Building Management System, six Strategic Development reducing the need to travel and strategies can reduce carbon to health inequality, deprivation
LED lighting and controls Frameworks (SDFs) and three minimising the impact on the dependency used to shape and economic performance.
installed across the estate, and Local Development Frameworks, environment. They recognise our engagement with local The new transport strategy and
adding to the existing 29 sites once approved become and promote the importance stakeholders and communities. Liveable neighbourhoods plan
currently retrofitted with Solar Supplementary Guidance to of place and placemaking and The outcomes of this will be integral to the success
Photovoltaic panels wherever the Development Plan. To date good design in tackling climate consultation process will be not only in achieving the city’s
viable [actions 10, 41, 51]. three SDFs have been approved change. reflected in the adopted LDF net zero carbon targets, but
In order to help decarbonise for the River Corridor, Govan once complete. Learning from also improving infrastructure for
transport networks and improve Partick and the City Centre, with Each document is, or will be this process will also influence walking, wheeling and cycling,
infrastructure for walking, work ongoing to develop SDFs supported, by an Action Plan the development of future reducing the number of private
wheeling, and cycling, as well for Glasgow North, the Inner which can be updated to spatial strategy documents. vehicles on the road, as well as
as reducing the need to travel East and Easterhouse. Local reflect emerging priorities, In addition to the above, the access to equitable, affordable,
through effective remote Development Frameworks are new legislation or new city are also responsible for clean and reliable public
working and implementation of also being prepared for Pollock, opportunities which emerge. the development and delivery transport.
20-minute neighbourhoods, the Drumchapel and the South- They are prepared with the of Town Centre Action Plans
city has a number of challenges. Central area. climate emergency at the and other smaller scale spatial The Liveable Neighbourhoods
forefront of our thinking. As an guidance such as masterplans, Plan will set out policy regarding
The city will also continue These documents promote example of these we used the all of which reflect the transport infrastructure to
to work to overcome these the delivery of active travel South Central LDF as a pilot in importance of well designed, support a well-connected
challenges and support networks, integrated green partnership with Architecture attractive places in tackling the and low carbon city [action
effective climate action through infrastructure, local biodiversity and Design Scotland to develop climate emergency. 55], this will be supported by
continued improvement networks, the re-use of the LDF under their Place the City Development Plan 2
of Planning and Building brownfield land and in particular Planning for Decarbonisation Transport accounts for a third of (CDP2) which will also help to
Standards. The city council are the concept of 20 minute Programme. This meant that the carbon emissions produced facilitate action proposed by
developing a suite of Spatial neighbourhoods to ensure the consultation programme by the city and if we are to the Regional Transport Strategy,
Supplementary Guidance to that people have access to the for the South Central LDF had decarbonise the sector, major Glasgow Transport Strategy

38 Climate Plan Climate Plan 39


3.3 Climate plan Theme 3: 3.3 Climate plan Theme 3:
Well Connected and Thriving City Well Connected and Thriving City

once completed. Embedding Transport (SPT), bus operators Scotland (CPS) charge card. The to ensure people stayed safe and cycling) over the next supporting a green recovery
this in city-wide policy will and other bus interest groups shift to EVs is an opportunity while being able to continue five years. This will include from the current COVID 19
help to bring about a modal to agree areas of joint work to challenge the concept of serving the city. This adoption £2.75m to support investment pandemic, but also a response
shift in transport while also in developing a bid to the Bus vehicle ownership in Glasgow. of new and more agile working in communities, including to our Climate and Ecological
ensuring that housing sites are Partnership Fund. Additionally, Increasing provision of EV practices strengthens the '20-minute neighbourhoods'. Emergency. The new City
within locations supported by Glasgow will in parallel explore car club vehicles and electric case for a further rationalised This concept will enable people Development Plan will also
sustainable design [actions 50, other options for bus delivery bikes is also part of our wider Council estate, reducing our to live, learn, and meet their align with our Circular Economy
22, 52] and reducing the need to in the City as described in the vision for sustainable transport carbon impact through the needs within a 20-minute walk. Route map, an important step
travel. Transport (Scotland) 2019 Act in Glasgow [action 51]. This is reduced requirement for The city will work towards in reducing carbon emissions
and with the aim of achieving further complemented by the operational buildings and lower sustainable delivery solutions, in the city and making Glasgow
Investment in transport the best bus service possible for city trialling hydrogen powered consumption of utilities. There creating the opportunity carbon neutral by 2030 [actions
infrastructure in the city will the citizens of Glasgow, whilst vehicles, including investment will also be a proportionate for local people to join in 40, 58].
prioritise public transport and contributing to a greener, better in a fleet of 19 hydrogen- reduction in transport the discussion to build back
active travel with a view to connected City [actions 25, 26]. powered refuse collection thus vehicle emissions and better, addressing some of the In order to support the effective
reducing the need to travel, trucks and a green refuelling congestion will be lessened city’s inequalities and support transition to a net zero carbon
improving public transport Decarbonisation of the station in the city following the [action 7]. We do note however, healthier lifestyles for all our economy and appropriately
and active travel networks and transport sector is supported by announcement of £6.3m in UK that we must be careful not to citizens [actions 50, 55]. resource the delivery of
reducing the number of private work with private hire operators government funding. transfer emissions generation transformational action around
vehicles on the road, enabling in the city to enable the from the council estate to the The Circular Economy route buildings, mobility, transport
those vehicles which are on the transition to low carbon vehicles To both reduce our carbon domestic sector, thus we will map has been adopted infrastructure and energy
road to transition to cleaner fuel [ action 54]. This will be further footprint and provide an carefully consider how we best following extensive stakeholder generation in the city, the
alternatives. complemented by extensive inclusive working environment, realise the benefits and impacts engagement and responding to city will develop a Green New
ongoing work to expand the the city will explore continued of changing working practices. issues identified in the Circular Deal for Glasgow. This will
This is supported by the work Electric Vehicles (EV) charging home working and the use of Glasgow Scan. The routemap, include a portfolio of investable
of the Glasgow City Region infrastructure across the city. video-conferencing as part of The city welcomes the recently the first of its kind in Scotland, projects that can stimulate job
Bus Partnership which brings By the end of 2020 there are a standard working practice. published Scottish Government presents a 10-year plan to creation whilst also maintaining
together all eight Glasgow 228 charging bays deployed Due to the Covid-19 pandemic, programme announcing that minimise our consumption encouraging emissions and
City Region local authorities, throughout the city, all of them the Council had to rapidly £500 million will be invested in and maximise the value of our biodiversity trajectories
Strathclyde Partnership for accessible via the Charge Place adopt new ways of working active travel (walking, wheeling resources. Therefore, not only observed as a result of the
Covid-19 pandemic [action 16].
40 Climate Plan Climate Plan 41
3.3 Climate plan Theme 3: 3.3 Climate plan Theme 3:
Well Connected and Thriving City Well Connected and Thriving City
Case Study 1 Case Study 2

Glasgow City Council Housing and


Affordable Warmth Team Regeneration Services -
Passivhaus developments
The award-winning Affordable loans and advice. In addition,
Warmth Team, based in Housing the Council provides the RSL Glasgow City Council’s Housing and efficacy of different had their balconies externally
and Regeneration Services, sector with funding to allow and Regeneration Services, comprehensive treatments. insulated and enclosed
facilitates the installation privately owned properties together with partners from • A 90-unit development in with triple glazing. This is
of external wall insulation in mixed tenure blocks to across housing associations, the Dundashill that is being in addition to the internal
(EWI) as part of the Scottish participate in retrofit projects. private sector, and universities, delivered by West of Scotland installation of Mechanical
Government’s Home Energy To date, the Affordable Warmth are delivering Passivhaus Housing Association. The Ventilation and Heat
Efficiency Programme for Team have delivered over 75 developments around Glasgow. homes will be built to Recovery units, that purify
Scotland: Area Based Schemes projects and £104m worth of Passivhaus is standard of energy- Passivhaus standards with the air with high-grade filters.
(HEEPS:ABS). energy-efficiency measures to efficiency in building, meaning the aim of being zero-carbon.
HEEPS funding offers households in Glasgow. that reduced heat loss in a home • West of Scotland Housing
opportunities for homeowners result in central heating being Association’s 36-unit
and private landlords in the unnecessary. Examples include: development in Dalmarnock,
most deprived parts of the city
due to begin later in 2020,
to install external wall insulation • A Passivhaus retrofit of a pre- which will be built to
and other energy efficiency 1919 tenement block being Passivhaus standards.
measures in their project areas. undertaken by Southside • The refurbishment of three
Energy Company Obligation Housing Association, CCG, high-rise towers in Woodside
(ECO) funding is used to reduce John Gilbert Architects, by Queens Cross Housing
the overall cost of the works Glasgow University (CaCHE) Association, which aims to
for owners. To complement the and Glasgow School of Art meet the EnerPhit standard
EWI programme, GCC works in (MEARU). This project involves of Passivhaus-retrofit. These
partnership with Home Energy refurbishing a typical (eight towers, built in the 1960, have
Scotland and G-HEAT to deliver flat) Glasgow inner-city been wrapped externally in
a comprehensive service sandstone tenement to a Rockwool and finished with a
including energy efficiency standard that tests the cost self-cleaning render, and have
42 Climate Plan Climate Plan 43
3.3 Climate plan Theme 3: 3.3 Climate plan Theme 3:
Well Connected and Thriving City Well Connected and Thriving City
Case Study 3 Case Study 3

Electric Vehicle Public


Infrastructure
In the UK, transport makes up accessible via the Charge Place has to be one of a shift from where small charges are sought the Kingston Bridge by early
about 25% greenhouse gas Scotland (CPS) charge card. ‘gorging’ on fuel to ‘grazing’ on journeys or when the vehicle 2021. This will offer eleven 50kW
emissions and remains the only on electric charges. i.e. where is idle. This is particularly useful rapid chargers and one 150kW
sector where reductions in The shift from ICE vehicles users of petrol or diesel cars for users without a dedicated ultra rapid charger. Taxis and
emissions are not being achieved. to EVs is an opportunity to have tended to fill their fuel parking space. other commercial vehicles will
To combat this, Glasgow City challenge the concept of vehicle tank and drive until it is empty Glasgow are committed to have a quicker turn around with
Council (GCC) is introducing a ownership in Glasgow. There are (‘gorging’). In the case of EVs, giving EV users more places to their charger needs fulfilled in
range of sustainable transport approximately 260,000 vehicles this experience needs to shift charge, with plans to build a approximately 30 minutes. For
options, including the installation registered in the City which is to one of a habit of ‘grazing’, commercial charging hub under non-commercial vehicles there
of electric vehicle (EV) unsustainable from a number are four hubs planned and work
infrastructure for commercial, of perspectives, not least the will be commencing in the near
residential and visitors use. congestion these cause. Add to future. Tollcross International
that, he average vehicle in the Swimming Centre will host
All-electric vehicles produce UK is only used for nine hours a fourteen 22kW chargers while
zero direct carbon dioxide week (5% of their time), hence Glasgow Club Donald Dewar
(CO2) emissions. Glasgow’s aim increasing provision of EV car and Glasgow Club Milton will
is to help people move from club vehicles and electric bikes host a mixture of 7kW and 22kW
internal combustion engines is also part of our wider vision for chargers. This will add thirty-
(ICE) to full EV, by providing sustainable transport in Glasgow. six more bays for public use.
good geographical coverage of Working alongside City Parking,
charging points around the thus Access to chargers is on the GCC have secured a further
helping to reduce emissions. undersanding that drivers use 18 EV charging bays in the Glasgow to date has hosted
the infrastructure fairly and Cathedral car parks adjacent to over 175,912 charging sessions,
By the end 2020 there will be considerately. High Street. This will allow users delivering over 1,700,000 kWh
228 charging bays deployed to charge their cars with only a which equates to over 5 million
throughout the city, all of them The vision for EVs in cities short walk to the city centre. emission-free miles.

44 Climate Plan Climate Plan 45


3.4 Climate plan Theme 4: 3.4 Climate plan Theme 4:
Health and Wellbeing Health and Wellbeing

The aims of this theme are: There is a growing sense, both public health. The Covid-19 the Open Space Strategy will be Sites of Importance for Nature
locally and globally, that climate pandemic has shown just how key to achieving this. Conservation and other
• To protect and enhance local change is also a major public crucial access to good quality biodiverse sites in the city,
habitat connectivity and health issue. It has become natural landscape is, and just Implementation of the Glasgow including peatland restoration
biodiversity in the city. one of the most significant how important Glasgow’s many LBAP is key to addressing the and maintenance of existing
contemporary challenges to parks are to the well-being of its ecological emergency. The sites [action 38 and 20].
• To support creation and health and wellbeing and could citizens. LBAP actions are targeted to
maintenance of good potentially be as serious as the create, protect and enhance
quality, multifunctional open current Covid-19 pandemic, in We will work with our partners the key ecosystems in the city
space to help reconnect its long-term impacts. to address climate change, – woodland, grassland, wetland,
communities with nature. whilst also closing the gap on farmland and urban along with
It has been known for some the health inequalities existing their associated species.
• To support equitable access time that good quality natural in the city. To support this,
to good quality open space landscape in urban areas can we will set up a Glasgow Just The Glasgow Pollinator Plan
and green infrastructure in affect how people feel, affecting Transition Commission, while forms part of the LBAP and
the city. their physical and mental also continuing to work with its actions aim to help halt
health. The benefits are varied, our partners to implement the and reverse the decline in
Climate change presents including physical benefits Fairer Scotland Duty following the city’s pollinators. The
significant challenges from green infrastructure, for consultation and guidance LBAP supports the national
to human health and example improved air quality, from the Scottish Government Biodiversity Strategy and
biodiversity. An increase in less noise pollution and [action 11,20]. therefore contributes more
extreme climate events, such as reduced risks from flooding widely to supporting Scotland’s
heatwaves or flooding, threaten or heatwaves, benefits for The city will work to address ecology. The Open Space
human health and wellbeing, recreation and interaction the ecological emergency, Strategy will help re-set the
both directly and indirectly, with nature. These spaces also protecting and enhancing balance between our health,
through impaired ecosystem have an impact on mental our local biodiversity and our infrastructure and our
functioning and reduced wellbeing, social networks ecosystems services. The Local natural environment, protecting,
ecosystem services. and resilient communities Biodiversity Action Plan (LBAP), enhancing and expanding
supporting evidence that the City Development Plan and Local Nature Reserves, and
urban green space can support
46 Climate Plan Climate Plan 47
3.4 Climate plan Theme 4: 3.4 Climate plan Theme 4:
Health and Wellbeing Health and Wellbeing

The City Development Plan in new developments through on vehicle emissions from the
protects these environmental CDP2 policy. CDP policy also bus feet within the city centre.
designations and other open has a role in ensuring that This has provided measurable
spaces from inappropriate new development which improvements in air quality and
development. generates movement of people will be extended on a phased
will be located in the most basis to include all vehicle
The city will accelerate sustainable locations. This types. The legislative process for
implementation of the Local will also be considered in the expanding the scope of the LEZ
Biodiversity Action Plan (LBAP) Glasgow Transport Strategy was paused due to the focus on
and Pollinator Plan (PP) helping work to consult and review COVID 19. Despite the delay to
to ensure that Glasgow has how roads across Glasgow the original full implementation
clean air, clean water, and a could be repurposed for other date of 1st January 2022,
protected natural environment modes of transport. Similarly, an indicative timescale for
[action 21]. This can have development frameworks such resumption has been prepared.
benefits for the physical as Strategic Development Glasgow City Council remains
and mental health of our Frameworks, Local Development committed to ensuring this
communities. The importance Frameworks and Masterplans, delay is as short as possible
of good quality and accessible in collaboration with the City and commits to continuing
green space became even more Centre Transformation Plan and to improve air quality in the
evident during the COVID 19 the Liveable Neighbourhoods city and addressing carbon
pandemic. Plan, will identify public realm emissions from the transport
improvements to encourage sector [actions 22 and 52].
Reducing the city’s reliance on active travel choices [actions 33
the private motor car will also and 50]. This will also include a focus
play a key role in creating a on expanding the “Spaces
healthier city and reducing our Glasgow implemented the first for people” infrastructure
carbon emissions. This will be Low Emission Zone scheme in and reducing the need for
achieved in part by requiring Scotland at the end of 2018. the private car in the city,
increased space for active travel This was introduced with as part of the Low Emission
(walking, wheeling and cycling) Phase 1 designed to improve
48 Climate Plan Climate Plan 49
3.4 Climate plan Theme 4: 3.4 Climate plan Theme 4:
Health and Wellbeing Health and Wellbeing

Zone implementation and the ambitious targets for creating a global emissions, but they are Glasgow Food Plan will address consumption of healthier and
second iteration of the City more circular economy through also vulnerable to the impacts the environmental, social, sustainable diets, but also
Development Plan [actions 50, the recent adoption of the of our changing climate, such economic and health impacts support for more local food
55]. circular economy route map as extreme weather events, of our food systems, aiming growing opportunities and
and the city’s Resource and droughts and pests and to put equity, sustainability shorter food supply chains [
Furthermore, a renewed Recycling Strategy [actions diseases. Our food system needs and health at the centre of action 31]. We will work with the
focus on the need to adopt 18,43, 45 and 58]. To reduce to be protected against the our food system., the city Scottish Government, Glasgow
the principles of the waste the impact of waste in the city, impacts of climate change and recently developed a Glasgow Food Policy Partnership,
hierarchy (reduce and re- the city will lead by example can also help to reduce our Food and Climate Declaration Glasgow Community Food
use of materials) is one of in phasing out all single use carbon emissions. with the aim of uniting sub- Network, Glasgow City
the most important ways in plastics by 2022. The Plastic national governments and local Council, Sustainable Glasgow
which we can help meet our reduction Strategy will pilot The recently published, “Food authorities with a pledge to Partnership and other key
carbon-reduction targets, while this approach by working to Growing Strategy” and ‘Glasgow accelerate the development of organisations in the city to
creating a more sustainable achieve three plastic-free City Food Plan’ will help address integrated food policies. facilitate access to locally
and circular economy. The schools and delivering a plastic- some of these challenges. The We will support the actions sourced, seasonal food [action
new Resource and Recycling free shopping zone before 2025 Food Growing Strategy will under the ‘Food Growing 30]. This will support the
Strategy addresses these [action 45]. complement the review of the Strategy’ and the vision development of a food system
issues in the light of national Stalled Spaces programme set out by ‘Glasgow City that protects nature, reduces
legislation, including the new Finally, and very importantly, and the Open Space Strategy Food Plan’ by helping to food miles and minimises waste,
deposit and return scheme. The our global food system is under Delivery Plan. Through these increase opportunities for while also promoting healthy,
national Zero Waste Scotland pressure to feed a growing delivery mechanisms we are local growing, building our seasonal and ethically sourced
Strategy aims to embed the human population and to currently working to identify understanding of local food food available to all.
principles of a circular economy help address the climate and deliver new food growing systems and encouraging the
and a zero-waste society. and ecological emergency. areas. Alongside this work, City transition to healthier, more
This means minimising the Agriculture and our entire Development Plan 2 will include sustainable and climate-
population's demand on primary food system are significant land use policies, specifically smart food system in the city
resources and maximising the contributors to climate change, ensuring that new housing [action 32]. This will include
reuse, recycling and recovery with the food system being developments include space a communications campaign
of resources. We will kick start responsible for a quarter of for food growing. While the and guidance to increase the

50 Climate Plan Climate Plan 51


3.5 Climate plan Theme 5: 3.5 Climate plan Theme 5:
Green Recovery Green Recovery

get out of their homes. There Connecting Nature project and job opportunities and build and adapting to the impacts of
is a common thread running as an “ICLEI City with Nature”. resilience. A number of key climate change. To help achieve
through both the Covid-19 and This will see the city develop current projects supporting this this, the best opportunities for
climate emergencies, showing nature-based solutions (NBS) to approach include: greening and rewilding, including
the perilous disruption and address issues in the city. The tree planting and the effective
imbalance between our lives and European Commission define NBS Park Power (in partnership with use of Vacant and Derelict Land
that of other planetary species as those which are “inspired and Green Space Scotland) - this sites, as recommended by the
and eco-systems. We need to supported by nature, which are project is currently considering Ecological Emergency Plan, will be
look again at these relationships cost-effective, and simultaneously how the city can assess implemented via the Open Space
and fundamentally seek to reset provide environmental, social opportunities to use our green Strategy (OSS) Delivery Plan. The
our place within them. The city and economic benefits and and open space for heat and OSS Delivery plan will also to map
are re-thinking their way of help build resilience”. In using energy generation. This would out opportunities to enhance
working whilst supporting post and embedding NBS, Glasgow focus on local generation using Glasgow’s active travel routes,
COVID recovery. This will require will make a just transition to a low carbon technologies such through improved green network
investing in more collaborative cleaner, greener economy; moving as ground and surface water linkages [actions 36 and 37].
approaches and supporting our away from our dependence on source heat pumps.
natural ecosystems to build hydrocarbons, we will create To create a more climate-
This theme aims to support the restoration, and green future resilience. We have been The city is also working to resilient city, we will use the
development of a local wellbeing infrastructure developing action to create collate information on the local biodiversity action plan,
economy to enable a Green • Supporting improved a more balanced relationship potential for using Glasgow’s and open space strategy delivery
Recovery from the COVID 19 infrastructure for walking, between us and other species, greenspace to supply low plan and City Development Plan,
pandemic while also addressing cycling and remote working ultimately leading to a carbon heat from other natural as the means to investigate
the global climate and ecological healthier, more attractive and sources such as air, geothermal opportunities to increase and
emergencies, specifically: Covid-19 has drawn out the equitable city, whilst addressing (mine water), waste water, protect biodiversity. This will
importance of greenspace and our climate and ecological coastal or marine, amongst include the creation of new
• Supporting a transition the natural environment for emergency [actions 21, 35, 37, 38, others [actions 37 and 33]. Local Nature Reserves which
towards a circular economy all of us as a daily walk in the 47 and 50]. will complement the enhanced
• Supporting tree planting park became one of the few Protecting and improving network of open spaces across
and maintenance, peatland opportunities for people to The city will develop its work Glasgow’s natural environment the city in helping to mitigate
as part of the EU H2020 is a major part of mitigating urban heat island effect.
52 Climate Plan Climate Plan 53
3.5 Climate plan Theme 5:
Green Recovery

Alongside this, GCVGN and find nectar sources in the action plan, Glasgow pollinator will develop this approach as
which contains several actions
its partners will plan how to hedgerow trees/shrubs and strategy and Open Space a framework for planning for
that will strengthen a local
deliver a Clyde Climate Forest, from the wildflowers which will Strategy Delivery Plan [actions a green recovery, using our
circular economy, provides
while also developing an Urban grow at the hedgerow base. 35 and 48]. role as host of COP26 to lead,
a view as to how we utilise
Woodland Strategy for the city and learn from others in the
existing vacant properties and
and aligned with Clydeplan’s Our partners at Climate Ready city and beyond on how to
significantly help blossoming
regional forest and woodland Clyde are delivering a climate develop a Green New Deal for
circular businesses, whilst filling
strategy [actions 35 and 36]. adaptation strategy and vision Glasgow further. In developing
vacant properties, boosting
for Glasgow and the Clyde a Green New Deal for Glasgow,
business growth numbers and
By increasing green space valley, helping the city region the Council will seek to bring
employment [action 40].
in the city and introducing to become climate resilient. together all relevant activities
hedgerows and wildflower Glasgow will play its role to help related to a green recovery,
strips, Glasgow can create the city’s people, economy, and identifying new opportunities
and enhance biodiverse green nature to continue to flourish with an overarching approach
corridors, and help to protect Thus, hedgerows provide green, in the face of climate change, being documented through
and enhance our environment. biodiversity-rich corridors for aligning our action with our a series of commitments
Native species hedgerows wildlife to move along and regional partners [actions 11, 19]. published in 2021 [action 16].
provide food and shelter for a within. Additionally, the trees
wide variety of invertebrates, and shrub species making up In order to deliver an effective Part of this work will be
small birds, mammals and the hedgerow will have benefits green recovery, the city will supported by the development
amphibians in Glasgow. Small for carbon capture, air quality develop a Green New Deal for of a strong circular economy, as
birds use hedgerows for nesting. and water retention. The city Glasgow. This will include a adoption of circular principles
Mammals (e.g. hedgehogs, field will endeavour to survey and portfolio of investable projects will also help support health
mouse, voles) and amphibians monitor the hedgerows in the that can stimulate job creation and wellbeing of people and
(common frog, common toad, city, spatially mapping existing whilst also maintaining nature, strengthening the
palmate and smooth newt) hedgerows, monitoring their encouraging emissions and local economy by retaining
use the shelter of the base retention and investigating biodiversity trajectories value within the city economy.
of hedgerows to move about potential for creating new sites observed as a result of the Glasgow’s recently adopted
between habitats. Pollinators in line with the local biodiversity Covid-19 pandemic. The city circular economy routemap, These actions align with the following
UN Sustainable Development Goals:
54 Climate Plan Climate Plan 55
3.5 Climate plan Theme 5: 3.5 Climate Emergency Implementation Theme 5:
Green Recovery Green Recovery
Case Study 1 Case Study 2

North Glasgow Cart and Kittoch New


Integrated Water Woodland Creation
Management System -
Glasgow’s Smart Canal Neighbourhoods and will comprise around 22,000 created for people and wildlife. The trees are all native
Sustainability on behalf of woodland species trees and It is also noted that woodland broadleaf species (complete list
Working in partnership with Glasgow City Council has supporting understory shrubs plantings on such a scale on the following page). This will
Scottish Canals and Scottish collaborated with Central typical of a Clyde Valley have the benefit of supporting create a native woodland which
This innovative use of the
Water, GCC has delivered Scotland Green Network Trust - woodland; oak, birch, hazel, climate mitigation through offers the greatest potential
canal showcases the power
Europe’s first ‘smart surface recently renamed Green Action cherry, sycamore, hawthorn, carbon capture in the timber for improving biodiversity.
of collaborative partnership
water management canal’ to Trust to propose and design a Wych elm, holly, rowan though, of the growing trees those Whilst the longevity of the
working to repurpose an
enable sustainable development new woodland. unfortunately due to ash ability to capture and hold different species can vary (for
existing, historic, asset to enable
and regeneration in North http://www.centralscotlandgreennetwork.org dieback this integral species to atmospheric CO2 is increased as 60 to hundreds of years) the
resilient development, whilst https://greenactiontrust.org
Glasgow. such a woodland mix can not be essential soil biota develop. woodland should be managed
avoiding the financial and
The collaborative approach incorporated. sustainably to ensure it is able
carbon cost of creating new
The ‘smart’ system, using real- allowed for GATrust to submit
drainage assets.
time rainfall forecast data an application to Forestry The woodland is seen as an
The capital funding for this
and autonomous computer Scotland for the appropriate extension of the existing
project comes from Glasgow
control of water level controls, grants to fund the creation woodlands that make up the
City Region City Deal, the
will lower the canal by up to and the initial five years Cart and Kittoch Site of Special
Green Infrastructure Fund and
100mm prior to storm events, maintenance establishment. Scientific Interest (SSSI) and in
allowing it to act as a ‘smart This has been further supported doing so it will make important
sponge’ providing capacity
Glasgow’s Smart Canal - transforming North Glasgow - animation by financial contributions habitat connectivity to adjacent
for surface water runoff from from Neighbourhoods and woodlands and other important
key regeneration sites in an Sustainability. habitats that can be found over
area of Glasgow otherwise Cathkin Braes. Active travel and
constrained by lack of capacity This new woodland is being access to the open country
in the combined sewer network created over 14.5 hectares that is found around the City
and lack of existing natural which is the equivalent of 21 is an important aspect as this
watercourses. full sized football pitches and and similar environments are
56 Climate Plan Climate Plan 57
3.5 Climate plan Theme 5: 3.5 Climate Emergency Implementation Theme 5:
Green Recovery Green Recovery
Case Study 2 Case Study 3

Participatory Budgeting
in Parks and Greenspace
and Openspace

to regenerate and remain as a Complete species list: This initiative of creating a new The Community Empowerment and openspace. Until then, the
woodland in perpetuity woodland on this scale is seen (Scotland) Act 2015, Part 10 Council’s approach had been
The trees that we will plant as a first phase and further requires public authorities to to deliver PB projects in areas
are small (around 50cm high). Common Alder (Alnus Glutinosa) 10% expansion is under investigation “facilitate the participation with high deprivation indexes,
These smaller trees establish and it is the aspiration that the of members of the public in aligned to specific topics
much better than larger trees Downy Birch (Betula Pubescens) 20% collaborative approach with the decisions and activities of tackling poverty and inequality.
and within 10 years should have GATrust will support this and the authority, including in the Allocating funds to parks and
grown sufficiently to make the lead to opportunities of this allocation of its resources”. greenspaces was pushing
site feel like a woodland. Bird Cherry (Prunus Padus) 10% kind across the City. In Glasgow City Council, that the boundaries of how PB
commitment to participatory projects could be delivered and
Holly (Ilex Aquifolium) 5% budgeting (PB) translates mainstreamed across the range
financially to: of council services.
Pendunculate Oak (Quercus Robur) 10% The parks development team
made the initial decision
Sessile Oak (Quercus Patraea) 10% that this project would
evolve through participative
dialogue and decision making
Rowan (Sorbus Aucuparia) 20% In 2019/20, Neighbourhoods and embarked on a series of
and Sustainability was given workshops that set out to
Hawthorn (Cratageous Monogyna) 5% £150,000 of funds to be explain what PB was to groups
specifically spent through and organisations working in
a PB process and to deliver greenspace across Glasgow.
Hazel (Corylus Avellana) 10% a participatory budgeting
project for parks, greenspace Leading from these sessions, a
58 Climate Plan Climate Plan 59
3.5 Climate plan Theme 5: 3.5 Climate plan Theme 5:
Green Recovery Green Recovery
Case Study 3 Case Study 4

PB panel was established which The project has been successful to put their proposals out to Case Study - Surface
would deliberate and make in that it has strengthened an online public vote, part of Water Management
decisions about the allocation the local greenspace the criteria of was to show
of the funding. The essence community groups, promoted how their project would meet Plans
of the decision making was local decision making and the priority themes, several of
that it was deliberative and demonstrated how PB can be which include climate change Enabled by Glasgow City Measures being delivered Retrofit Surface Water
democratic without influence applied in mainstream council and capacity building activity Region City Deal funding, GCC include:- Exceedance Ampitheatre at
from facilitators. service provision, it has been around this area as a focus. is delivering surface water - rainwater downpipe Croftfoot Primary School
commented as a ‘pilot’ for this management plans (SWMPs) attenuation systems;
The outcomes were: kind of work. This work lead by NS has been in several areas across the city - retrofit blue-green Further information on these
recognised as democratically to sustainably drain Glasgow infrastructure (raingardens) projects is available here
• that a proportion of the Throughout the series of initial pioneering, innovative and by slowing the rate at which in existing highways and
funding would be used to workshops and following PB is continuing through this rainfall runoff gets into the areas of hardstanding; http://www.mgsdp.org

commission a project to meetings the Panel came up time of difficulty, change and drainage network, to reduce - retrofit blue-green
strengthen the greenspace with a statement of intent and flood risk and create capacity in infrastructure (basins, ponds
groups to encourage more identified a list of priorities for the combined sewer network for and swales) to enhance
participation. This is the Glasgow’s Parks greenspace and development and regeneration. public open and green space,
sustainable element and openspace. including schools;
delivers on the potential The SWMPs will deliver a range - creating embankments on
for mainstreaming the Climate change, along with of blue-green measures to existing watercourses
participatory approach other themes have been manage surface water in a to manage flow and use
identified as priority work areas resilient and adaptable way, and the natural landscape
• that the remaining funding and supported by the statement reduce reliance on traditional to temporarily impound
would be used for a small has been taken seriously with a ‘grey’ approaches that are floodwater;
grants scheme ‘Wee Green sustainable, community decision carbon heavy, lack potential - deculverting of existing
Grants’ which would assist making approach. for future adaptation and fail watercourses to recreate
local greenspace groups to to deliver multiple benefits for floodplain storage capacity.
strengthen how they operated The ‘Wee Green Grants’ scheme biodiversity, urban cooling and
within their communities. allowed successful applicants air quality that more sustainable Retrofit Highway Raingarden in
approaches do. South East Glasgow
60 Climate Plan Climate Plan 61
EU-funded Initiatives at Glasgow City Council EU-funded Initiatives at Glasgow City Council
Case Study 1 Case Study 2

Connecting Nature RUGGEDISED


smart street district
Connecting Nature is a Horizon
2020-funded, five-year project, As part of the EU Horizon
delivered by a consortium of 2020 programme, Glasgow
over 30 partners across 16 and five other European cities
European countries, as well are collaborating to deliver
as Brazil, China, South Korea, smarter, more sustainable urban
Georgia and Armenia. Glasgow living through RUGGEDISED.
City Council joins a range In 2017, Glasgow was awarded
of organisations, from local €4.1 million to develop a smart
authorities and universities to street district in the city.
communities and NGOs, in come Working with the University
together to development nature- of Strathclyde, SP Energy
based projects in the urban Networks, Siemens, Transport
environment. As a front runner Scotland, Tennents Brewery and
city, Glasgow is leading the Glasgow Housing Association,
way in delivering nature-based a range of innovative and
solutions to the issues that sustainable solutions will be
cities are facing, leading the way developed as part of the smart
for the project’s ‘fast follower street. These include district
cities’ to emulate these methods. heating, EV charging, a solar PV
As part of Connecting Nature, canopy, power storage, ducted
Glasgow City Council is delivering wind turbines, and smart grid
projects such as Stalled Spaces, controls.
the Open Space Strategy and
Building with Nature, which all
contribute to making Glasgow a
healthier, greener city.

62 Climate Plan Climate Plan 63


4.0 Monitoring and Evaluation 4.0 Monitoring and Evaluation

The city will report annually on progress within The city will commence work knowledge. We will embed smart used for critical programmes This programme and PMO will
our five Climate & Ecological Emergency Plan with Adaptation Scotland to climate change action and such as the City Deal delivery support the technical Subject
create a bespoke approach decision making in all that we programme. This programme Matter Experts (SMEs) across
themes. This will also be aligned to report on to benchmark performance do. will be governed by a Climate, the council and beyond in
progress against the delivery of the 17 UN and monitor progress year on Resilience, and Sustainability developing and delivering the
Sustainable Development Goals. Monitoring and year. The city will also benefit The city will work with programme board, led by identified projects to address
disclosing our progress will be an integral part of from the collation of baseline community institutions to the executive director of the climate and ecological
data and the development of a establish a baseline of current Neighbourhoods, Regeneration, emergency.
our communication with Glasgow’s organisations, reporting dashboard currently action, knowledge, data, needs and Sustainability Services,
communities and individuals. being established as part of and successes, establishing and staffed with senior
our work within the EU H2020 jointly agreed indicators and representatives from across the
project Connecting Nature. monitoring progress annually city council. The CRS Board will
Collectively the adaptation against those. oversee progress and direction
benchmark work and the of the actions contained within
connecting nature reporting Lastly, the council will create the Climate and Ecological
dashboard will enable progress a Climate, Resilience and Emergency Plan actions, as well
to be monitored against our Sustainability programme as new actions that will arise as
2020 climate adaptation to coordinate and manage we progress towards Net-Zero
baseline. the work packages resulting Carbon, managing risks and
from the committed actions opportunities iteratively.
We will work with Community stated in the CEIP, deliverables
Planning Partnership, from the Resilient Glasgow The City will report to
Glasgow Life, and community programme and the integration committee annually, adopting
organisations, to better engage with the Sustainable Glasgow an iterative process to revising
with communities in truly partnership. This delivery our target, inclusion of new
collaborative processes. This programme will be supported projects and actions.
will build our understanding by a Programme Management
of community action, risks, Office (PMO) as per the
opportunities and local standard council approach

64 Climate Plan Climate Plan 65


5.0 Action Plan 5.0 Action Plan

No. Description Partners How are we going to get there CEWG EEWG Timescale How will we measure Funded No. Description Partners How are we going to get there CEWG EEWG Timescale How will we measure Funded
progress progress

1 develop a dynamic Sustainable We will establish who we need to 1, 2, 1, 22, 23, 2021 Number of No 2 Glasgow Community GCC, Creative We will work with our partners 1,2, 52,48, 21 2021 Number of No
Climate Change Glasgow, engage with, the principles and 40,41, 25 organisations engaged Planning Partnership, Carbon to enable a conversation about 49, 54 organisations
Communications COP26 purpose of the engagement. 47,48, with. Glasgow Life and Scotland, declaring a climate emergency and participating in
strategy for the city. Collective and 49,54 Glasgow City council SNIFFER, GCPH, communicate clearly progress to conversations
This will be developed Stakeholders, We will launch a Sustainable Number of individuals engage in a series of Greenspace address climate change locally.
with Sustainable Communities of Glasgow Website where clear engaged with. climate conversations Scotland, We will ensure that all equality Number of individuals
Glasgow and aligned interest, place and concise information about across the city, Sustainable groups are included and enabled to participating in the
with COP 26. and identity the challenge of climate change in collaboration Glasgow. participate conversations
and local policy and action can be with community We will ensure that the purposed
found. This will include space for institutions. actions align with the National Number of
collaboration such as blogs and Fostering community Standards for Community recommendations/
collaborative documents confidence, Engagement. proposals referenced in
empowerment and We will align the communication policy development
We will create a network participation using strategy with community Local action taken
that brings communities and the Place Standard conversations, Place Standard Tool forward as a result of
organisations together to share tool and participatory and other democratic participation the engagement.
ideas and projects. budgeting. tools such as participatory
budgeting and community wealth
Co-Develop a Children’s Climate in order to enable community
Change Charter with children and action.
young people in the city We will support and promote, local
environmental volunteering groups
The city will work with local to enhance biodiversity locally,
partners to achieve measurable including working with the SSPCA
progress in embedding children’s to raise awareness of wildlife crime
rights within local systems and and responsible pet ownership.
services, embedding the principles
of the UN Child Friendly City.

Work with partner organisations


and communities to implement the
principles of the City Charter.

66 Climate Plan Climate Plan 67


5.0 Action Plan 5.0 Action Plan

No. Description Partners How are we going to get there CEWG EEWG Timescale How will we measure Funded No. Description Partners How are we going to get there CEWG EEWG Timescale How will we measure Funded
progress progress

3 Create a declaration Sustainable Develop Scope of the declaration 1, 2, 54, 1, 20 2021 Number of partners No 4 The city commits Glasgow Develop and accredit a mandatory 1, 2, 53 25 2021 Number of employees Yes/
for city institutions Glasgow Engage with Sustainable Glasgow 57 signing up to the city itself to become Community carbon literacy course in trained Partially
to pledge to become Partners to develop a City Charter declaration a Climate Literate Planning collaboration with local partners
Carbon Neutral by Partners sign up to the declaration organisation Partnership, Deliver course to elected members Level of climate change
2030 or sooner. Establish a Climate and Ecological Local action reported through the roll out Keep Scotland and senior management action embedded in
Emergency City Awards for (i) of Carbon Literacy Beautiful (KSB), Develop a GOLD course to be decision making
innovative development (reversing and Ecological Sustainable mandatory and complement the
biodiversity decline, net zero Emergency training. Glasgow carbon literacy course.
carbon, net zero emissions) and (ii) The city also commits Assess progress and evaluate
for net zero businesses to advocating the roll course, reflecting on need to
Partners report on commitments out of climate literacy updates.
training in other Deliver train the trainer climate
organisations across literacy course to build capacity
the city. internally for rolling out carbon
literacy
Deliver mandatory course to all in
the Glasgow Family
Develop a mandatory Climate and
Ecological emergency course to
complement the carbon literacy
training

5 The city and partners Skills Engage with early years, primary 42, 44 23 2021 Number of schools Yes
will continue to Development schools, secondary schools, further engaged with
invest in programmes Scotland Local and higher education institutions.
to enable young Universities Work together to ensure that the Number of green job
Glaswegians to and Colleges curriculum and training they offer opportunities taken up
access and succeed Development supports climate and ecological by Glasgow residents
in new green job Scotland emergency awareness and access
opportunities. to green job opportunities in the
city.

68 Climate Plan Climate Plan 69


5.0 Action Plan 5.0 Action Plan

No. Description Partners How are we going to get there CEWG EEWG Timescale How will we measure Funded No. Description Partners How are we going to get there CEWG EEWG Timescale How will we measure Funded
progress progress

6 Develop a first of its Sustainable Engage with Sustainable Glasgow 1,2,4, 5, 1, 2 2021 % Emissions reduction. Partially 8 Continue to work Private Implement HEEPS:ABS 3, 38 2021 £Million budget for Yes
kind Net Zero Plan Glasgow, Partners and other organisations 9,61 with Scottish Landlords HEEPS: ABS
for the city to achieve Connected in the city to understand current Government to Scottish £Million spend achieved
its net zero carbon Places Catapult, challenges and opportunities. maximise funding for Government £ Million additional
emissions target. Energy Systems Establish baseline data and Area Based Schemes RSL’s resources leveraged
Catapult, City information. to invest in improving Owner (ECO funding and
Stakeholders energy efficiency and Occupiers- (in others)
Explore a method for tackling fuel poverty mixed tenure Number of households
benchmarking the city’s yearly in private sector blocks) benefiting from
climate, resources, environmental housing. Contractors improvements
impact and carbon offset data (a ECO providers -
city or community environmental (fuel utilities)
impact assessment) to target net Home Energy
zero criteria. Scotland (HES)
EST - (HEEPS
Publish Net Zero report and Loans)
implement recommendations Energy Advice
provider
7 Promote Scottish Building on effective home working 61 2021 Number of staff Yes
homeworking and Government during the pandemic, city council working remotely 9 Prepare an Housing Data baseline 3 2021 Baseline established Yes
videoconferencing to develop and implement remote % Emission reduction investment Association Retrofit demonstrator
to reduce traffic working policy. improvement plan Development Pilot projects in strategic Demonstrator complete
congestion, as part of The city will enable staff to work for older (pre- Sector partnership initiative area including cost: benefit
a range of effective remotely where possible reducing 1919) tenements Scottish Agree investment improvement analysis
working practices in the need to travel and identifying and private sector Government plan
post COVID 19 world. emissions savings. housing. Private Sector Pilot project completed
Landlords £million total financing
for IIP

Projected number of
households (count)

70 Climate Plan Climate Plan 71


5.0 Action Plan 5.0 Action Plan

No. Description Partners How are we going to get there CEWG EEWG Timescale How will we measure Funded No. Description Partners How are we going to get there CEWG EEWG Timescale How will we measure Funded
progress progress

10 Undertake a Carbon Glasgow City Engage with Internal stakeholders 46,61 2021 Number of strategic Yes 11 Set Up Glasgow's Community Engage with Sustainable Glasgow 38 1,21 2021 Number of local young No
Impact Assessment Council Develop a process for assessing decisions and projects Just Transition Planning Partners to establish a local Just people accessing green
for every key action carbon impact of strategic undertaking carbon Commission to Partnership, Transition Commission job opportunities
taken by the city, decisions impact assessment ensure the burden Scottish Develop an understanding of the
by making it a Develop and deliver staff training Emissions reductions of climate impacts is Government recommendations made by the Number of local
requirement of all on Carbon Impact Assessment as a result of impact shared equitably and Just Transition Commission and businesses supported
committee papers - Explore a method of assessing the assessments that all in Glasgow how they relate to the city through transition
similar to the Equality impact of new development on have equitable Develop a Just transition to zero carbon and
Impact Assessment city’s resources and infrastructure opportunities of implementation plan for Glasgow circular economy
(EQIA) process. aimed at reducing carbon impact access and success in collaboration with Unions,
at planning stage to target net zero in our low carbon employers, academic institutions Number of people
development. economy. and communities of place, identity supported to retrain
and interest in the city and transfer skills
to access green job
opportunities

Number of people with


access to good quality
open and green space

Number of people with


access to accessible,
affordable and efficient
transport.
12 Sign the Edinburgh ICLEI, Scottish Engage with other cities in Europe. 3 1, 20 2021 Level of awareness of Yes
Declaration on Government, Sign the Edinburgh Declaration ecological emergency
post¬2020 global Nature Knowledge exchange with other and potential solutions.
biodiversity Scotland cities in Scotland and beyond
framework as part Report on progress against
membership of ICLEI commitments made
cities for nature.

72 Climate Plan Climate Plan 73


5.0 Action Plan 5.0 Action Plan

No. Description Partners How are we going to get there CEWG EEWG Timescale How will we measure Funded No. Description Partners How are we going to get there CEWG EEWG Timescale How will we measure Funded
progress progress

13 Undertake a Potential for Engage with internal and external 1, 3 1, 20, 2021 Number of groups Partially 15 Deliver projects that Sustainable Engage with Sustainable Glasgow 4, 5 2022 % Renewable heat Partially
Voluntary Local knowledge stakeholders to understand the UN 25,22 engaged in the process utilise the recovery of Glasgow Stakeholders generated
Review (VLR) to exchange with SDG’s and 2030 agenda heat from geothermal Establish learnings from
confirm Glasgow’s Bristol, Helsinki Assess current progress against UN Local climate and sources learning geothermal energy projects % Emissions reduction
commitment to the and Pittsburgh SDG’s sustainability action as from Duke Street and Secure funding and identify
UN SDGs. Prioritise action in collaboration a result of engagement. Tennent’s Brewery appropriate locations in the city
with city organisations and projects.
communities
Publish VLR report and 16 Develop a Green New Scottish Appointment of Green Economy 57 1 2022 £ Millions investment No
commitments to SDG’s. Deal for Glasgow, Government Manager Engagement with
including a portfolio Scottish Government and other
14 Adopt the Local Heat Scottish Undertake stakeholder 59, 61 2022 % renewable energy Partly of investable projects organisations globally, nationally
and Energy Efficiency Government consultation on plans and generated and exploring new and locally.
Strategy (LHEES) Sustainable proposals made by the LHEES green financing Explore and establish new green
which will identify Glasgow All Engage with Sustainable % renewable heat models finance models including green
areas suitable development Glasgow Partners to secure generated affordable loans, green mortgages
for investment in sector funding and resources to support offered to city residents.
renewable energy implementation of LHEES. % Emissions Reduction Develop a Green New Deal for the
generation and Adopt LHEES and implement city.
heating in the city. projects to increase investment in
renewable energy and heat. 17 Deliver heat and Greenspace Engage with the Scottish 4, 5 1 2022 % Renewable heat No
energy generation Scotland Government, Greenspace Scotland generated
projects including Scottish and Sustainable Glasgow to % Emissions reduction
distribution of heat Government develop feasibility studies around
and energy from Sustainable potential for parks to generate
parks in Glasgow Glasgow heat and energy
based on existing
feasibility studies.

74 Climate Plan Climate Plan 75


5.0 Action Plan 5.0 Action Plan

No. Description Partners How are we going to get there CEWG EEWG Timescale How will we measure Funded No. Description Partners How are we going to get there CEWG EEWG Timescale How will we measure Funded
progress progress

18 Enable and Zero Waste Implement and resource the 15 2022 % Recycled materials Yes 20 Implement the Fairer Community Engage with the Scottish 50 20 2022 Number of strategic No
encourage all Scotland, Resource and Recycling Strategy. Scotland Duty in Planning Government’s Fairer Scotland Duty decisions considering
households in Scottish Engage with local communities decisions and actions Partnership, consultation Engage With internal Fairer Scotland Duty
Glasgow to minimise Government to deliver a recycling campaign made in response Sustainable stakeholders and communities
waste arisings and encouraging and enabling to the Climate Glasgow of place, identity and interest
to repair, reuse and recycling Emergency, ensuring to develop implementation plan
recycle. that strategic delivering on Fairer Scotland Duty
decision-making
19 Develop a Climate Sustainable Engage with internal stakeholders 55 1 2022 Number of Yes helps to tackle socio-
Risk assessment Glasgow, including elected members to raise organisations engaged economic inequality
for the City, Climate Ready awareness of climate impacts in with by following Fairer
highlighting risks Clyde the city Number of people with Scotland Duty’s
and opportunities Undertake a climate risk reduced risk of flooding guidance for public
of climate impacts assessment for the city considering and overheating bodies.
on the city and its the findings highlighted in the Number of properties
people. next UK Climate Change Risk with reduced risk of
Assessment and Climate Ready flooding/ overheating
21 Develop a Peat Sustainable The council will engage with 1, 2 16 2023 % peat free products Partially
Clyde Risk and Vulnerability Number of businesses
Free Procurement Glasgow procurement units to understand
Assessment for the city region protected from extreme
Strategy for the city Partnership what products are currently used
Develop a city-wide climate weather events
council and procured.
adaptation strategy embedded in Number of
The council will engage with
city planning policy. infrastructure with
suppliers to establish that 100%
reduced risk of flooding
peat free products will be required
and extreme heat
and what the best alternative
products available might be for
specific projects such as nursery
and bedding plants.
The Council will develop a peat free
procurement strategy.

76 Climate Plan Climate Plan 77


5.0 Action Plan 5.0 Action Plan

No. Description Partners How are we going to get there CEWG EEWG Timescale How will we measure Funded No. Description Partners How are we going to get there CEWG EEWG Timescale How will we measure Funded
progress progress

22 Explore options to Scottish Implementation Low Emission Zone 2, 26 1 2023 % transport emissions Partially 25 Develop a Glasgow SPT Continue to engage with transport 17, 20 2023 Formally Setting Up Yes
utilise the ongoing Government, Bus Partnership GCC operators, neighbouring local the Bus Improvement
development of the Sustainable City Development Plan 2 and in line with the Transport authorities Transport Scotland, SPT Partnership
city centre. Glasgow’s Glasgow Glasgow Transport Strategy provisions of the Scotland and interest groups to set up the
Low Emission Zone to support Low Emission Zone and Transport (Scotland) Transport partnership
contribute towards reduce the number of private Act 2019. Operators Continue to engage with Bus
carbon reductions vehicles on the road Transport partnership to agree and develop a
from transport in the interest groups workplan
city centre. Formally constitute the Bus
Partnership pending Transport
23 Require Glasgow’s All development Engage with developers 3, 51 2018 Number of Yes Scotland regulations to further
Gold Hybrid plus sector Engage with planning professionals Significant developments inform the Act
20% low and zero Develop tools to enable effective progress by implementing
carbon generating monitoring 2023 Glasgow’s Gold Hybrid
technologies (LZCGT) Plus 26 Explore alternative SPT Appraisal of bus ownership options 17, 20 2023 Report highlighting Yes
or better, to be options for bus GCC Publication of findings preferred options and
achieved for all new delivery in Glasgow Transport supporting evidence
build new homes. in line with those Scotland
options laid out in the Transport
24 Require Glasgow’s All development Engage with developers 3, 51 2018 Number of Yes
Transport (Scotland) Operators
Gold Hybrid plus sector Engage with planning professionals Significant developments
Act 2019 Transport
20% low and zero Develop tools to enable effective progress by implementing
interest groups
carbon generating monitoring 2023 Glasgow’s Gold hybrid
technologies plus
(LZCGT) or better, to
be achieved for all
new non-domestic
development.

78 Climate Plan Climate Plan 79


5.0 Action Plan 5.0 Action Plan

No. Description Partners How are we going to get there CEWG EEWG Timescale How will we measure Funded No. Description Partners How are we going to get there CEWG EEWG Timescale How will we measure Funded
progress progress

27 Develops NatureScot To engage with partners in the city, 1 22, 23 2024 Number of schools 29 Ensure that historic Glasgow City Engage with Heritage Trust and 55 2024 % Historic buildings No
opportunities, as part Sustainable including education establishments engaged with buildings are resilient heritage Trust, Glasgow life to understand impacts in the city at reduced
of the Curriculum Glasgow currently participating in Eco Level of awareness to the impacts of Glasgow Life of climate change, including flood risk of damage as a
for Excellence, Active Schools Schools Programme, Climate Ready of the climate and climate change, risk, on historic buildings. result of increased
for all education STEM Classrooms, and implementing ecological emergencies protecting Glasgow’s Implement Historic Environment precipitation and
establishments to Scottish Sustainable Development rich heritage. Scotland guidance on Adaptation longer periods of dry
access outdoor Government Education. of historic buildings to the impact weather
learning, including Eco Schools The city council and partners to of Climate Change.
outreach biodiversity continue to work with Education
work. Services, NatureScot, Scottish
Government and Eco Schools
Scotland to support outdoor
learning and biodiversity outreach
work across all educational
establishments in the city.
30 The city will support GCFP Engage with GCFP, HSCP and 36, 3 12 2024 % Food procured for No
Glasgow’s local food NHSGGC Education services to understand Schools locally sourced
economy by exploring HSCP local food economy and % Food served in
28 Develop and adopt Climate Ready Engage with MGSDP, Corporate 55 1 2024 A working system Partially
ways for procurement Visit Scotland Engage with GCFP and council premises locally
an early warning Clyde Resilience Unit, Climate Ready available and
to support local NFU Procurement Unit at Glasgow City sourced
system to prepare Clyde and neighbouring Local operational.
businesses, ethically Sustainable Council to review procurement
for extreme weather Authorities to establish the need
sourced, sustainable Glasgow strategy.
events such as for an early warning system.
and healthy food. Explore ways for public
heatwaves and Work with partners to develop and
procurement to support local
flooding. adopt an early warning system for
businesses, ethically sourced and
extreme weather in the city
sustainable food.

80 Climate Plan Climate Plan 81


5.0 Action Plan 5.0 Action Plan

No. Description Partners How are we going to get there CEWG EEWG Timescale How will we measure Funded No. Description Partners How are we going to get there CEWG EEWG Timescale How will we measure Funded
progress progress

31 The city and partners Sustainable Engage with GCFP to 36, 3 12 2024 Number of people 33 Undertake a Scottish Engagement with Scottish 20, 21, 22, 2025 A report and No
will develop a Glasgow understand food landscape in engaged with feasibility study Government Government and Local 30, 31,32, recommendations will
communications and HSCP the city, including food growing % plant based diet in about a Workplace stakeholders 33,34 be published
education campaign GFPP opportunities, access to affordable, the city Parking Licensing Undertake a study about
highlighting healthy and sustainable food. (WPL) scheme, ring challenges and opportunities of
the health and fenced to fund a Workplace Parking Licensing
environmental Work with partners to develop an sustainable transport scheme.
benefits of education and communications in the city. Publish report and findings
sustainable lower- campaign raising awareness of the
carbon and plant- health and environmental benefits
based options of sustainable, lower carbon diets.
generally.

32 To understand meat Sustainable  Engage with partners ay GCFP in 36, 3 12 2024 % meat consumption in
consumption in Glasgow the city to undertake a study about the city
the city and better HSCP food habits in the city, including % Access to affordable,
support promotion GFPP establishing a baseline meat healthy and sustainable
of healthy, tasty, low consumption. food
carbon and ethically
sourced food, city Work with HSCP, Sustainable
and partners will Glasgow and other organisations
establish a baseline in the city to promote equitable
meat consumption in access to healthy, tasty, sustainable
the city. and affordable food to all.

82 Climate Plan Climate Plan 83


5.0 Action Plan 5.0 Action Plan

No. Description Partners How are we going to get there CEWG EEWG Timescale How will we measure Funded No. Description Partners How are we going to get there CEWG EEWG Timescale How will we measure Funded
progress progress

34 The city will work SPFO SPFO will specifically develop a 60 1 2025 % investments in local Partly 35 Develop an Urban GCVGN, GAT, A Tree Forum of stakeholders 12, 13, 61 5, 6, 7 2025 % canopy cover in the partially
with Strathclyde Pension Fund Climate change strategy to support renewable energy Woodland Strategy Greenspace is established to oversee the city
Pension Fund and investment transition to net zero carbon % of investments in for the city Scotland, development of the strategy.
other pension fund managers economy, investing in local green Green Infrastructure NatureScot Engagement with internal and
investors in the city infrastructure and renewable projects external stakeholders
to develop and adopt energy projects % reduction in Explore barriers to tree planting
climate change ‘polluting’ investments and maintenance of existing trees
strategies, with a SPFO continues tosupports the With reference to the Develop a costed implementation
view to ensuring TCFD framework and disclosure. full council motion, plan, which delivers increased
that those funds stating that formal canopy cover, considers biodiversity
can, in meeting their commitments to fossil net gain, habitat connectivity and
objectives, align with fuel divestment are carbon management.
the objectives of the made by SPFO ahead of
Paris agreement and COP26, SPFO and their 36 Accelerate GCVGN The city will support engagement 12, 13 9, 10, 11, 2025 % Tree cover Partially
subsequent national Board of trustees will Implementation GAT with our city-region partners. 14, 17, 18
and international consider the motion of the Glasgow Greenspace The city will seek to address Air quality levels
agreements. and publish their and Clyde Valley Scotland existing barriers to implementation
response. Blueprint for a Green NatureScot of green network Blueprint. Length of hedgerows
We will work with Network to create MGSDP The city will ensure that habitat and wildflower strips
pension operators green & biodiversity connectivity, biodiversity corridors planted (Km)
across the city corridors in the city and active travel network enable
(including SPFO) to by improving open better connectivity of people and Length of active travel
respond appropriately. space provision and nature across the city. network
The intention would increasing tree cover, The city will support the green
require pension while also providing network blueprint through
operators across opportunities for accelerating the delivery of the
the city to ensure active travel corridors. Open Space Strategy and Local
divestment is Biodiversity Action plan.
undertaken as quickly
as possible and no later
than 2029.

84 Climate Plan Climate Plan 85


5.0 Action Plan 5.0 Action Plan

No. Description Partners How are we going to get there CEWG EEWG Timescale How will we measure Funded No. Description Partners How are we going to get there CEWG EEWG Timescale How will we measure Funded
progress progress

37 Identify and utilise GCVGN GAT undertake a of vacant and derelict 12, 13 9, 18 2025 % VDL protected by the Partially 39 Encourage and Scottish The City will undertake 3 2025 Number of housing Partially
Vacant and Derelict Greenspace land relating to opportunities CDP enable retrofit of Government engagement with owner occupiers with EPC level C or
Land for greening Scotland for these sites to contribute to all existing owner- Home Energy in the city above
and rewilding in NatureScot renewable energy generation, % VDL used for occupied housing Scotland The city will explore potential
combination with Open Space Strategy and the Local renewable energy to EPC level C or for financial incentives and
renewable energy Biodiversity Action Plan. generation above, and to reduce enforcement powers, subject to
generation measures This will consider potential to flood risk (where national legislation
and reducing flood retain, where present, the priority % VDL used for flood appropriate).
risk. habitat. risk management
Open Space Delivery Plan help 40 The city and partners Glasgow Engagement with local businesses 39 1, 20 2025 Level of awareness of Partially
manage competing demands on OSS will determine best to support the Chamber of and academic institutions sustainable production
land use. future use for Vacant adoption of circular Commerce, Engagement with Schools and and consumption
and Derelict Land practices across the Zero Waste Community organisations % Jobs in circular
to meet targets for city through capacity Scotland (ZWS) Training for public sector and economy
housing, food growing. building programmes, private sector leaders
in line with the new Implementation of Circular
It will ensure that the Circular economy Economy routemap
city protect & develop route map for the
in a way that protects city.
urban biodiversity. 41 Upgrade insulation Sustainable Thermographic survey to identify 3, 45, 61 2025 Number of buildings Partially
38 Support new and GCVGN, The Council engages with other 12, 13 8, 18 2025 Area hectares of LNR’s Partially and heating of all Glasgow where each of the properties are insulated
further extensions GAT, stakeholders in the city to increase per capita building stock in poorly performing. Building performance
to Local Nature Greenspace investment and secure support the city, and install Architectural appraisal and design Number of buildings
Reserves in the Scotland, from landowners and communities measures of proposed with
city, protecting Scottish for protection of existing LNR and
and enhancing Government SINCs, as well as extending and
biodiversity and NatureScot creating new.
habitat connectivity. The city will take forward 30+
Aspirational LNRs

86 Climate Plan Climate Plan 87


5.0 Action Plan 5.0 Action Plan

No. Description Partners How are we going to get there CEWG EEWG Timescale How will we measure Funded No. Description Partners How are we going to get there CEWG EEWG Timescale How will we measure Funded
progress progress

to reduce flood risk, insulation and new windows for property flood 44 Develop a Carbon Sustainable Engage with local stakeholders 60 1, 10, 11, 2025 % Carbon emissions No
city council leading the property to avoid unintended resilience measures Neutral Innovation Glasgow Develop concept of the Carbon 14, 20 saved
by example. consequences in later years. installed District in the GCID. neutral innovation district % Biodiversity gain
Mechanical and Electrical design This will act as a Pilot zero carbon innovation % community’s
for new low energy heating and catalyst and exemplar solutions and nature-based connection to nature
ventilation systems. for rolling out across solutions Number with
Considering where applicable the city. Share lessons learnt and secure sustainable surface
heat networks to join a series of resources to roll innovation water management (i.e.
buildings. districts out across the city’s capture, storage and
localities and adapted to individual local use)
needs.
42 Ban gas heating Scottish The city council will collaborate 3, 61 2025 Number of new No
systems in all new Government, with local partners to implement developments with low
buildings within the Sustainable and enforce guidance established carbon heating systems
city boundary. Glasgow through updated Building 45 Support the delivery Zero Waste Engage with local schools and 14 1, 20 2025 Number of facilities No
Regulations for Housing of the plastic Scotland, businesses where unnecessary
reduction strategy to Scottish Identify a location to pilot banning single use plastics are
43 Introduce appropriate Scottish Implementation of the City’s 15,39 2025 % Materials recycled in No achieve its goal of no Government, use of unnecessary single use banned
resourcing dedicated Government Resource and Recycling Strategy the city unnecessary plastic Glasgow plastics Level of plastic waste
to monitoring and Resourcing of Kerbside recycling by 2030. Chamber of Share lessons learnt reduction
enforcement of education and enforcement Commerce Resource roll out across the city
kerbside waste Engagement with local
recycling in the communities
city in line with the
new Resource and
Recycling Strategy
and Scottish
Government Circular
Economy Bill.

88 Climate Plan Climate Plan 89


5.0 Action Plan 5.0 Action Plan

No. Description Partners How are we going to get there CEWG EEWG Timescale How will we measure Funded No. Description Partners How are we going to get there CEWG EEWG Timescale How will we measure Funded
progress progress

46 Establish a Scottish We will map out local energy 59 20 2025 Number of energy No 47 Increase investment Scottish The City will develop engagement 12 15 2026 Carbon impact of Partially
framework of Government cooperatives active in the city cooperatives engaged in peatland Government with all local and regional peatland restoration
engagement with Sustainable with restoration in the city NatureScot stakeholders, including land owners Increase in indicator
local energy co- Glasgow We will engage with local region to enhance Local to ensure that Glasgow’s peatlands species
operatives, enabling cooperatives to understand Number of energy biodiversity and landowners are restored and protected.
them to be set their needs, challenges and cooperatives created increase capacity for Neighbouring Council and partners recognise
up and providing opportunities carbon sequestration. Local importance of peatlands for carbon
support. Authorities sequestration and biodiversity.
We will engage with Scottish The city and partners commit
Government to develop policy investment to protection and
framework and align with national restoration of peatland to prevent
legislation. carbon emissions and also
biodiversity loss.
We will develop a framework to The city develops proposals to
support local energy cooperatives, ensure that the peatlands are
help overcome challenges and enhanced, including quantifying
capitalise on opportunities carbon capture storage and their
impact.
The city monitors and quantifies
progress

90 Climate Plan Climate Plan 91


5.0 Action Plan 5.0 Action Plan

No. Description Partners How are we going to get there CEWG EEWG Timescale How will we measure Funded No. Description Partners How are we going to get there CEWG EEWG Timescale How will we measure Funded
progress progress

48 The Council works Sustainable Sustainable Glasgow 1, 2 1, 2 2026 Number of actions No 49 To continue to invest Sustainable Continue to engage with Education 1, 2 23, 24 2026 Number of renewable
with partner Glasgow NatureScot within LBAP and PP in the school estate, Glasgow Services energy solutions
organisations, NatureScot GCVGN Number of LNRs and for both carbon City Building Develop an investment and Number of Green walls,
adjacent local GCVGN RSPB SINCs maintained and reduction, biodiversity improvement plan for the roofs and natural play
authorities, the city’s RSPB Butterfly Conservation protected gain, reduce flood education estate areas in local schools
academic institutions Butterfly Neighbouring Local Authorities Level of community risk and climate Embed carbon reduction and Number of retrofit
to fund accelerated Conservation interaction with education as core biodiversity enhancement surface water
implementation of Neighbouring biodiversity principles. measures and surface water management
the Glasgow LBAP, Local through awareness, management in business cases interventions
Open Space Strategy Authorities engagement or local Continue to deliver improvements
Delivery Plan and activity. to the education estate by
Pollinator Plan. investing in low carbon energy
Number of biodiversity technologies
enhancements to Design and implement sustainable
existing open spaces and wildlife friendly green
delivered and recorded landscaping, including planting and
through the OSS greening infrastructure, such as
Delivery Plan process green walls and roofs, with support
for the provision of natural play
areas and school gardens.

92 Climate Plan Climate Plan 93


5.0 Action Plan 5.0 Action Plan

No. Description Partners How are we going to get there CEWG EEWG Timescale How will we measure Funded No. Description Partners How are we going to get there CEWG EEWG Timescale How will we measure Funded
progress progress

50 Review the need Scottish Develop engagement with local 3 1 report Uptake of ESCO No 51 Deliver a Sustrans Develop a proposed network of 31, 34 10 2030 The percentage of No
for an energy Government stakeholders and the Scottish progress Number of Local comprehensive Scottish feasible routes that will connect journeys less than 2
services company Government to understand annually Energy Projects active travel network, Government communities and support habitat miles that are made by
(ESCO) for the city demand for an ESCO. incorporating the connectivity. walking.
as appropriate in Consider ownership; clients; spaces for people Sustrans
relation to local technology; project financing. measures (following Assess active travel routes for
energy generation Publish a report outlining findings consultation) and opportunities to enhance and
and distribution and recommendations enabling 20-minute connect biodiversity.
projects. neighbourhoods Undertake stakeholder
through the liveable engagement on the proposed
neighbourhoods plan network.

Develop Active Travel Strategy and


Action Plan

Design and implementation of


the active travel network at both
city and neighbourhood levels
consistent with the emerging Cycle
by Design guidance for high levels
of service

Utilising the Liveable


Neighbourhoods Toolkit to help
facilitate a bespoke approach in
creating corresponding 20-minute
neighbourhoods

94 Climate Plan Climate Plan 95


5.0 Action Plan 5.0 Action Plan

No. Description Partners How are we going to get there CEWG EEWG Timescale How will we measure Funded No. Description Partners How are we going to get there CEWG EEWG Timescale How will we measure Funded
progress progress

52 Enable a rapid and Scottish Invest in EV infrastructure in the 24, 28, 1 2030 Share of low emission Yes 54 Deliver rapid Scottish Engage with Fleet manager 9, 23 1 2030 Share of low emission Yes
strategic shift to Government, city 29, 30 vehicles in the overall transition of council's Government Accelerate delivery of EV charging vehicles in the overall
electric vehicles Transport modal split – % change fleet to electric, infrastructure in the city modal split – % change
through increasing Scotland, Engage with organisations and supporting the Resource and accelerate the
the current rate Sustainable communities in the city city’s existing fleet transition of the council’s fleet to
of deployment Glasgow strategy's target of low carbon
of EV charging becoming low carbon
infrastructure. by 2030.
55 Transition the fleet of Local Taxi Engage with taxi and private hire 16, 28 1 2030 Share of low emission No
53 Work with transport Scottish Engage with Transport Authorities 16, 33 1 2030 Change in NO2 at each Yes
private hire vehicles Operators vehicles to enable shift vehicles in the overall
stakeholders in the Government in the city monitoring location,
to zero emission Scottish modal split in the
city to support rapid averaged over a three-
vehicles by 2030. Government Engage with the Scottish sector – % change
transition to cleaner Transport Engage with public transport year period.
Government to offer support and
public transport as Scotland operators in the city
encourage the transition locally
part of the City’s Low % change in PM 10
Enable the transition to low carbon
Emissions Zone. SPT Develop consistent carbon at each monitoring
vehicles
Bus Operators emission measurement in the city location, averaged over
a three-year period.
Assess potential for expanding LEZ
in the city Share of public
transport journeys in
Enable and support the transition the overall modal split –
to a cleaner, low carbon transport % change.
in the city

96 Climate Plan Climate Plan 97


5.0 Action Plan 5.0 Action Plan

No. Description Partners How are we going to get there CEWG EEWG Timescale How will we measure Funded No. Description Partners How are we going to get there CEWG EEWG Timescale How will we measure Funded
progress progress

56 Reduce the need to Transport City Development Plan to set out 29, 31, 33, 1, 10 2030 Share of cycling and 58 The City to Community Engagement with Community 1, 2 19 2030 Number of decisions No
own and use a car Scotland how 20-minute neighbourhoods 34, 35 walking journeys in the incorporate planning Planning Partnership and Strategic acknowledging
through measures in SPT can be achieved with the Liveable overall modal split – % the principle of Partnership Board assessment of
the City Development Sustrans Neighbourhoods Plan proposing change. biodiversity net gain NatureScot Co-develop a process for assessing biodiversity net gain
Plan 2, Glasgow Scottish the specific interventions. Share of public into the Community biodiversity impacts and net gain
Transport Strategy Government The Local Transport Strategy will transport journeys Planning Partnership of strategic decision making
and the Liveable to set out how the city will achieve in the overall modal decision making. Training for Key Community
Neighbourhoods decarbonisation of the transport split – % change and/ Partnership staff on Ecological
network and consider proposals to or comparison to the emergency and biodiversity net
pilot free public transport within national average gain and assessment process
the City. Implement Biodiversity net gain
Low Emission Zone to be assessment in all CPP strategic
implemented and extension to be decisions
considered Monitor progress and review
CDP2, to include measures to make process iteratively
using a car less attractive, use of
Public transport, active travel more 59 Work with partners in Scottish Continue to engage and educate 39 1, 2, 21 2030 % of resource demand Partially
attractive. locational policy (vis-à- the city to accelerate Government, internal and external stakeholders in the city.
vis sustainable locations), etc the transition of Zero Waste to support strong leadership,
57 Explore the feasibility SPT Scotrail City Council to identify barriers to 30, 61 1 2030 Level of uptake of the No Glasgow's economy Scotland, communicate the vision and Number of eco-
of subsidised public Bus Operators implementing subsidised public scheme from linear to Sustainable concept set out in the Circular innovation activities
transport through transport Number of staff circular, making it Glasgow Economy Route map for the city, following the principles
salary sacrifice City council to share experiences utilising public more inclusive and Partnership strategically and operationally. of a circular economy
scheme similar to with other organisations in the city transport to travel to sustainable. Uptake of new forms of
that available to on and beyond to identify benefits of work Resource and support projects consumption (sharing,
site staff. the approach identified in the circular economy repair and repurpose.)
City to implement a subsidised routemap in collaboration with the
public transport scheme for staff green finance manager for the city
region

98 Climate Plan Climate Plan 99


6.0 Appendices: Appendix 1 6.0 Appendices: Appendix 1
Response to 61 Recommendations of the Climate Emergency Working Group Response to 61 Recommendations of the Climate Emergency Working Group

What we’ve achieved so far:

Recommendation 16: Glasgow City Council (GCC) is coordinating a Recommendation 27: The Glasgow Transport Strategy (LTS) is under preparation.
response to the recommendations made by the
The city supports the long-term investment as Connectivity Commission. Work is ongoing to The city’s new transport strategy develops our proposals and
proposed by the Connectivity Commission that explore the feasibility of a Glasgow Metro. those of the Connectivity Commission to deliver a more active
is required to build the Glasgow Metro, and to Glasgow.
create new local connections to the suburban GCC is continuing work with partners to
areas. research into how most effectively to connect Recommendation 27, 29 & 30: Work is underway to prepare the new Glasgow Transport
areas of the city that are currently isolated. Strategy. It is proposed that it will have a policy focus on the
27 The city’s new transport strategy develops our proposals sustainable transport hierarchy as stated in Scottish planning
Recommendations 18 & 30: Officers of the city ’s Neighbourhoods and those of the Connectivity Commission to deliver a more and transport policy. The strategy also aims to rebalance
and Sustainability service are currently active Glasgow. the city’s transport network and services, and has tackling
18 The city works with neighbouring local participating in SPT’s Regional Transport inequalities as one of the four draft outcomes (for public
authorities and the Scottish Government to Strategy working group. 29 Transport Scotland’s sustainable transport hierarchy is consultation in late 2020).
clarify the governance of the city region's enforced, including, where necessary, that space currently
transport network. A Strategic Transport Group is also in place dominated by the private car is reprioritised to provide a The Spaces for People programme is accelerating the
which aims to improve communication and fairer transport system. implementation and enforcement of Transport Scotland’s
30 The development of the new local and collaboration between partners on transport sustainable transport hierarchy.
regional transport strategies should include issues facing Glasgow. 30 The development of the new local and regional transport
ambitious targets for modal shift with strategies should include ambitious targets for modal shift
associated delivery plans. Work is ongoing on the new Glasgow Transport with associated delivery plans.
Strategy and modal shift targets will be
considered.

100 Climate Plan Climate Plan 101


6.0 Appendices: Appendix 1 6.0 Appendices: Appendix 1
Response to 61 Recommendations of the Climate Emergency Working Group Response to 61 Recommendations of the Climate Emergency Working Group

Future Action: What we’ve achieved so far:

Recommendation 17: The city council are working to analyse accessibility in the
The city investigates use of the 'franchising' powers set out in city. These issues will be explored through the development Recommendation 15: The current Waste Strategy (including food
the Transport Bill to regulate the city’s bus network and to work of the Glasgow Transport Strategy and ongoing work on waste) expires in 2020. It will be reviewed in
on the principles of one network, one timetable, and one ticket. Bus Service Improvement Partnerships, as required by the A review of current communications with the light of new legislation (including deposit &
Transport (Scotland) Act 2019 and Transport Scotland funding households around food waste bins and the return scheme, circular economy).
programmes. use of recycling bins takes place, with a view to
The city is currently reviewing accessibility of high frequency increasing usage of food waste bins.
bus services through the city centre and will work to prioritise
action where it most needed. Recommendation 36: Glasgow Food Growing Strategy and Glasgow’s
Food Plan are currently in development. This
The city is currently reviewing the accessibility of high The city and its partners publish a sustainable includes thematic working groups on various
frequency bus services through the city centre and will work to food strategy for the city within the next year issues, including Food Waste.
prioritise action where it is most needed. and that the city considers making space for
food growing a requirement of new housing The Food Plan will be a route to making
Recommendation 18: Collaborative work at regional level will be undertaken through developments. connections that can support the city to
The city works with neighbouring local authorities and the the Strategic Transport Group. This will then be used to inform achieve transformational change more quickly.
Scottish Government to clarify the governance of the city both local and regional transport strategies.
region's transport network.
Future Action:
Recommendation 20 & 21: As part of the Glasgow Transport Strategy, these options will be
20 The city engages with interested local authorities and other appraised at a high level. Further work will then be required on
stakeholders to initiate a formal assessment of the potential the technical feasibility of these and funding will be sought to Recommendation 15: The city ’s Waste Strategy is currently being
for making the transition to a public transport system that is support this detailed work. reviewed. Communication will be a core
free to use. A review of current communications with element of this work.
households around food waste bins and the
21 A feasibility study is developed into integrated ticketing and use of recycling bins takes place, with a view to
more physically and digitally accessible travel. increasing usage of food waste bins.

102 Climate Plan Climate Plan 103


6.0 Appendices: Appendix 1 6.0 Appendices: Appendix 1
Response to 61 Recommendations of the Climate Emergency Working Group Response to 61 Recommendations of the Climate Emergency Working Group

What we’ve achieved so far:

Recommendation 36: A Food Growing Strategy is set to be published in late 2020. Recommendation 11 & 13: The Ecological Emergency Working Group
is assessing opportunities for tree planting,
The city and its partners publish a sustainable food strategy The new City Development will include a policy to ensure new 11 A review is undertaken to address existing rewilding, and greening, including the use
for the city within the next year and that the city considers housing developments include space for food growing. barriers to tree planting in order to of Vacant and Derelict Land. The group will
making space for food growing a requirement of new housing significantly increase the number of trees publish its recommendations in late 2020.
developments. The Open Space Strategy to identify existing and proposed food within the city over the next 5 years.
growing areas. Work is under way on the OSS delivery plan,
13 A review takes place to identify vacant which will set out how the city’s open space
Recommendation 36: The new City Development Plan (CDP2) to include a policy and derelict land suitable for greening and needs are to be met, including cooling, flood
to ensure new housing developments include space for food rewilding, with a view to its change of use mitigation, biodiversity, health and wellbeing.
The city and its partners publish a sustainable food strategy growing. as designated open space.
for the city within the next year and that the city considers Together with the Lost Woods project, primary
making space for food growing a requirement of new housing school children across the city have grown
developments. seedlings which will be planted on Vacant &
Derelict Land sites.

Recommendation 12: A draft Clydeplan Forest and Woodland


Strategy has been produced. Glasgow and
A formal audit and costed plan is brought Clyde Valley Green Network (GCVGN) produced
forward by the city and its city-region partners a blueprint to support the city region’s green
on the opportunities for much greater tree infrastructure and help adapt to the impacts
planting and other ways of harnessing the of climate change. GCVGN are now looking at
natural environment to absorb emissions. funding and creating a Climate Forest in the
city region.

104 Climate Plan Climate Plan 105


6.0 Appendices: Appendix 1 6.0 Appendices: Appendix 1
Response to 61 Recommendations of the Climate Emergency Working Group Response to 61 Recommendations of the Climate Emergency Working Group

Recommendation 35: A car-free zones (around schools) pilot is to be rolled out


Recommendation 24: The city ’s Public Health service is undertaking idling across the city, with another 21 schools in the city having been
enforcement and extensive media campaigns in collaboration The early roll out of ‘car-free’ zones to other schools and identified to become car-free zones by October 2020, on a trial
The reduction of illegal parking and engine idling is targeted with the Scottish Government and neighbouring local locations attended by large numbers of potentially vulnerable basis.
through increased enforcement and public awareness and that authorities. This will continue with support of Scottish pedestrians takes place, building on lessons emerging from the
the city should alert members to the resources necessary to Government funding to continue a focus upon to idling current pilot. This action is particularly supported in terms of air quality,
ensure this. enforcement. reducing exposure by vulnerable groups and promoting active
travel options.

Recommendation 27: Work on the Glasgow Transport Strategy is underway. Future Action:
The city’s new transport strategy develops our proposals and Work is underway to prepare a new Active Travel Plan for
those of the Connectivity Commission to deliver a more active Glasgow, to replace the existing Strategic Plan for Cycling. This Recommendation 11: The city and partners are working to develop a woodland
Glasgow. Plan will be associated with the city ’s new Glasgow Transport strategy for the city. CDP2 and the Open Space Strategy will
Strategy. A review is undertaken to address existing barriers to tree facilitate this in identifying potential sites for tree planting.
planting in order to significantly increase the number of trees
The city is also preparing Supplementary Guidance to the City within the city over the next 5 years.
Development Plan to help deliver key aspects of the Open Space
Recommendation 12: The city ’s woodland officer will work with key partners to
Strategy (OSS).
develop its woodland strategy, identifying opportunities for
A formal audit and costed plan is brought forward by the city tree planting, the potential for carbon capture, costs and wider
All should provide for better local access to open space of
and its city-region partners on the opportunities for much societal benefits.
varying types, facilitating better access by sustainable modes of
greater tree planting and other ways of harnessing the natural
travel.
environment to absorb emissions.

106 Climate Plan Climate Plan 107


6.0 Appendices: Appendix 1 6.0 Appendices: Appendix 1
Response to 61 Recommendations of the Climate Emergency Working Group Response to 61 Recommendations of the Climate Emergency Working Group

What we’ve achieved so far:

Recommendation 27 & 29: Work on the new Glasgow Transport Strategy and associated
Active Travel Plan is underway, including data analysis and public Recommendation 44: Partnership working to embed the green
27 The city’s new transport strategy develops our proposals engagement in order to inform actions to deliver on a more economy in education and build skills and
and those of the Connectivity Commission to deliver a more active Glasgow and removing existing barriers. Our schools work closely with local colleges capacity includes:
active Glasgow. and universities to build the skills and capacity • Young Taskforce programme in early year,
CDP2 policy will ensure new development proposals incorporate for a greener economy, including a focus primary and secondary schools.
29 Transport Scotland’s sustainable transport hierarchy is means to increase active travel where appropriate, ensuring on new technologies (such as heat pumps, • Positive Destination Policy, in which all
enforced, including, where necessary, that space currently areas with good accessibility to public transport are developed battery storage, and other forms of low carbon young people have access opportunities to
dominated by the private car is reprioritised to provide a at appropriate densities and that car usage is lowered by technology), and ensuring the provision of further and higher education.
fairer transport system. corresponding reduction in parking levels. apprenticeships and other opportunities. • STEM Sustainable tech programme, where
young people receive support from private
Recommendation 28: CDP2 will make explicit reference to Transport Scotland’s businesses to incentivise innovation.
‘Cycling by Design’ guidance in its active travel policy. • Teachers and school staff receive training as
The city works to deliver an increase in education and part of CPD; climate action is a key aspect
awareness amongst relevant staff and third-parties of design of these programmes
standards such as Transport Scotland’s ‘Cycling by Design’
guidance and records its commitment to have regard to these Future Action:
standards in future changes to the road network.
Recommendation 44: Continue to implement current programmes
to enable young Glaswegians to access and
Our schools work closely with local colleges succeed in new green job opportunities
and universities to build the skills and capacity resulting from a transition to a low carbon city.
for a greener economy, including a focus
on new technologies (such as heat pumps, The Council will engage with further and
battery storage, and other forms of low carbon higher education institutions, ensuring that
technology), and ensuring the provision of the curriculum and training they offer supports
apprenticeships and other opportunities. green opportunities.

108 Climate Plan Climate Plan 109


6.0 Appendices: Appendix 1 6.0 Appendices: Appendix 1
Response to 61 Recommendations of the Climate Emergency Working Group Response to 61 Recommendations of the Climate Emergency Working Group

What we’ve achieved so far:

Recommendation 1: The Sustainable Glasgow partnership has Recommendation 8: PALS (Property and Land Service) is currently working on a
been re-launched, with energy being a core strategy to rationalise Council assets and make them more
The Council commits to working with the area of its remit. This is a multi-sectoral group, There is a Property and Land Strategy to consolidate Council efficient.
business community, third sector and Glasgow’s including representatives from the public, building stock, which can ensure that buildings which are
citizens and communities to achieve a carbon business and academic sectors. retained are retrofitted to the highest possible standards and
neutral Glasgow by 2030. building management systems are in place, and those disposed
of are done so responsibly.
Recommendation 4 & 5: A new LHEES (Local Heat and Energy Strategy)
is currently under development, addressing Recommendation 9 & 61: The Council is working on the next iteration of CMP3 (Carbon
4 The Council continues to seek measures by the production of more locally generated and Management Plan 3), including targets for carbon neutrality and
the Scottish Government to amend non- distributed low-carbon energy and issues 9 The Council takes forward a programme of investment in its net-zero carbon (2030 and 2045 respectively).
domestic rates assessments for domestic relating to non-domestic rates. assets designed to help deliver carbon neutrality for the city
district heating installations to encourage by 2030.
the use of district heating in place of 61 The Council acts as an exemplar organisation for the city and
standalone heating in new build and develops a programme of carbon reduction measures for its
refurbished homes. own estate and activities in response to the target set in this
report.
5 Subject to action on this issue by the
Scottish Government, the Council consults Future Action:
on proposals for the inclusion of district
heating systems where feasible in major
Recommendation 3: The Council is working with partners to establish an energy
new housing developments and renewal or
supply company (ESCO) as part of the forthcoming LHEES.
refurbishment projects.
Acceleration of the establishment of an energy services
company (ESCO) takes place for the city as a necessary step
towards producing more locally generated and distributed low
carbon energy.

110 Climate Plan Climate Plan 111


6.0 Appendices: Appendix 1 6.0 Appendices: Appendix 1
Response to 61 Recommendations of the Climate Emergency Working Group Response to 61 Recommendations of the Climate Emergency Working Group

Recommendations 4 & 5: Continuing to work with the Scottish Government to influence Recommendation 9 & 61:
national legislation change regarding the requirement for
4 The Council continues to seek measures by the Scottish district heating in new and refurbished developments. 61 The Council acts as an exemplar organisation for the city and
Government to amend non-domestic rates assessments for develops a programme of carbon reduction measures for its
domestic district heating installations to encourage the use own estate and activities in response to the target set in this
of district heating in place of standalone heating in new
build and refurbished homes. Recommendation 57: The Council will explore new green financing models such as
Municipal Climate Bonds.
5 Subject to action on this issue by the Scottish Government, The city’s partners work together to develop business cases
the Council consults on proposals for the inclusion of district for low carbon energy and transport investments through
heating systems where feasible in major new housing examination of alternative financing models including the use of
developments and renewal or refurbishment projects. municipal climate bonds.

Recommendation 6: The Council will continue to work with partners in Sustainable Recommendation 59: The Council will establish a framework of engagement with local
Glasgow to identify area-based opportunities to retrofit existing energy co-operatives, enabling them to be set up and providing
New ambitious targets are established to address the low energy housing stock with highly energy-efficient and low-carbon The Council’s business support and planning services are made support.
efficiency and high-carbon heating that are a feature of the heating solutions. available to support community investment in renewable energy,
city’s older housing stock, most of which is in private or mixed- including the Glasgow Community Energy Co-operative.
tenure ownership.
Recommendation 60: The Council will work with Strathclyde Pension Fund (SPF)
Recommendation 9 & 61: CMP3 to include a list of projects to achieve the carbon to undertake a risk analysis of future climate impacts on its
neutral target and provide leadership in addressing the climate The Council works with the other employers and members [of investment portfolio, ensuring that its current investments are
9 The Council takes forward a programme of investment in its emergency. Strathclyde Pension Fund] to make a wholesale shift away from able to provide a return to its members in the next 20, 30, 50
assets designed to help deliver carbon neutrality for the city investment in hydrocarbons and that the fund trustees ask for a years.
by 2030. report at the earliest opportunity on these risks.

112 Climate Plan Climate Plan 113


6.0 Appendices: Appendix 1 6.0 Appendices: Appendix 1
Response to 61 Recommendations of the Climate Emergency Working Group Response to 61 Recommendations of the Climate Emergency Working Group

What we’ve achieved so far: Future Action:

Recommendation 27: The council aims to coordinate investment in Recommendation 37: The Council will continue to work with neighbouring local
the city’s transport infrastructure through the authorities and other key partners to bring about a green
The city’s new transport strategy develops Glasgow Transport Strategy and developing The Council and partners revise the city’s economic strategy recovery, inclusive growth at the regional level through
our proposals and those of the Connectivity CDP2. Inclusive economic success, and to put addressing the climate emergency front and centre of infrastructure development, transport improvements, and in
Commission to deliver a more active Glasgow. transport’s contributing role to that, is one of planning for Glasgow’s future economy. other areas.
four draft outcomes proposed for the Glasgow
Transport Strategy (to be tested through public
consultation in late 2020).

Recommendation 37: The Glasgow Economic Strategy has been


revised to address the climate emergency.
The Council and partners revise the city’s
economic strategy to put addressing the The strategy sets out the ambition to create
climate emergency front and centre of a more cohesive and resilient economy that
planning for Glasgow’s future economy. improves the opportunities, life chances and
wellbeing of every citizen in the city while also
addressing the city’s target of becoming carbon
neutral by 2030.

Recommendation 38: The Council to continue to work with its partners


in Sustainable Glasgow and the Glasgow
The Council and partners develop a local Economic Leadership Board to implement the
version of the Scottish Government’s Just principles of the Just Transition Commission,
Transition Commission and plan actively for the delivering on the ambition to create a more
shift to a carbon neutral economy. cohesive and resilient economy that improves the
opportunities, life chances and wellbeing of every
citizen in the city while also addressing the city’s
target of becoming carbon neutral by 2030.
114 Climate Plan Climate Plan 115
6.0 Appendices: Appendix 1 6.0 Appendices: Appendix 1
Response to 61 Recommendations of the Climate Emergency Working Group Response to 61 Recommendations of the Climate Emergency Working Group

What we’ve achieved so far:

Recommendation 3: The LHEES will set out innovative ways to meet Recommendation 23: An electrical vehicle charging-point policy was approved in
the energy needs of the city and find solutions February, including details of the delivery of EV strategy across
Acceleration of the establishment of an energy to emerging issues, for instance through An updated Electric Vehicle strategy, with reference to the the city.
services company (ESCO) takes place for the establishing an ESCO. recent announcement of Scottish Power’s ambitions to support
city as a necessary step towards producing the city, is produced by the end of 2019. An EV charging tariff for Glasgow will be developed.
more locally generated and distributed low
carbon energy.. CDP2 will support the above strategy by including updated
policy guidance on the installation of EV infrastructure, including
Recommendation 4: The Council is developing the use of district consideration of where pedestrian and cycle infrastructure
heating within housing developments in the should take priority.
The Council continues to seek measures by the city.
Scottish Government to amend non-domestic Recommendation 19: First Bus is no longer for sale. GCC and partners will continue
rates assessments for domestic district heating to work together to improve public transport infrastructure and
installations to encourage the use of district The Council works with partner local authorities to consider the remove existing accessibility barriers.
heating in place of standalone heating in new opportunity presented by First Glasgow being up for sale and for
build and refurbished homes. the business case to be explored, including the financial viability
of re-municipalisation.
Recommendation 13: The Council is currently working on European
funded RUGGEDISED project, working to set up Future Action:
A review takes place to identify vacant a ‘smart street’ in the city centre.
and derelict land suitable for greening and Recommendation 7: Sustainable Glasgow is to facilitate discussions with the Scottish
rewilding, with a view to its change of use as Government, UK Government and energy networks to deliver on
designated open space. The Council supports the creation of a Scottish Grid factor, to a Scottish Grid factor.
more accurately measure the carbon intensity of local energy
consumption.

116 Climate Plan Climate Plan 117


6.0 Appendices: Appendix 1 6.0 Appendices: Appendix 1
Response to 61 Recommendations of the Climate Emergency Working Group Response to 61 Recommendations of the Climate Emergency Working Group

What we’ve achieved so far: What we’ve achieved so far:

Recommendation 17: Glasgow Transport Strategy is currently being Recommendation 22 & 27: GTS and Regional Transport Strategy (RTS)
prepared and will review accessibility to high working to make transport in Glasgow and the
The Council investigates use of the ‘franchising’ frequency bus services through the city, 22 A review of HGV movements within the City region more sustainable, including active
powers set out in the Transport Bill to regulate highlighting areas requiring improvement. city is undertaken with the aim of limiting travel and public transport infrastructure.
the city’s bus network and to work on the their number. This should look at potential The GTS is also going to develop policies on
principles of one network, one timetable, one models for freight consolidation services issues around the movement of goods where
ticket. within the City Centre in order to provide this is within the power of the Council, and
a service to businesses and reduce the approaches to partnership working where it is
Future Action: numbers of vans and HGVs throughout the not.
city centre.
Recommendation 49 & 50: The Council is working with its partners in
the community planning partnership, GCPH, 27 The city’s new transport strategy develops
49 The Council and partners work with SNNIFFER and Creative Carbon Scotland our proposals and those of the Connectivity
community and faith groups to ensure to develop an effective communications Commission to deliver a more active
that the voices of new Glaswegians are plan, fostering community information, Glasgow.
heard as part of a wider community climate empowerment and participation.
conversation. Recommendation 31: Pedestrianisation and active travel
The Council will explore how decisions and infrastructure to be included in the City Centre
50 All decisions made by the Council and actions made by itself and its partners in The Council takes forward the success of Transformation Plan (Avenues+ programme).
its partners in response to the climate response to the climate emergency declaration the pedestrianisation of parts of the city Developer contributions will continue to be
emergency are supported by equality and can be supported by equality and human centre by accelerating the Avenues Projects sought for public realm improvements within
human rights assessments, as well as the rights assessments and in line with the Fairer and by further improving the public realm to the City Centre where development proposals
Fairer Scotland duty, to maximise their Scotland Duty. encourage active travel choices. cannot accommodate on-site open space
positive effects and to reduce any negative requirements.
impacts.

118 Climate Plan Climate Plan 119


6.0 Appendices: Appendix 1 6.0 Appendices: Appendix 1
Response to 61 Recommendations of the Climate Emergency Working Group Response to 61 Recommendations of the Climate Emergency Working Group

Recommendation 31 (continued): The avenues programme is a major part of tackling the city Recommendation 29: Building on existing supplementary guidance and CDP1 policy,
centre air quality issues and has been partially modelled into the the Council will review roads across the city that could be
LEZ programme. Transport Scotland’s sustainable transport hierarchy is enforced, repurposed for other modes of transport.
including, where necessary, that space currently dominated
Recommendation 52: The Community Planning Partnership (CPP) Vision is being by the private car is reprioritised to provide a fairer transport
Partners need to revisit the Community Plan and ensure that reviewed. Officers in Neighbourhoods and Sustainability and system.
climate change informs all of it. Corporate Services are to work with the CPP to include climate
action in the new visioning exercise. Recommendation 32: Register GoBike and Sustrans as CDP2 consultees

Recommendation 55: A climate-impact assessment method for screening of Council The Council ensures that relevant stakeholders such as GoBike
The Council acts in an exemplar role by introducing formal budgets is currently being developed. and Sustrans are notified of, and consulted on developments key
climate screening of all its budgets, with the 2020/21 budget to, or which may have an impact on, Glasgow’s developing cycling
being used to pilot budget setting with a clear description of network.
climate impacts.
Recommendation 31 & 41: Strategic Development Frameworks, Local Development
Future Action: Frameworks and masterplans, in collaboration with City Centre
31 The Council takes forward the success of the Transformation Plan, will identify public realm improvements to
Recommendation 22 & 30: CDP2 is to incorporate RTS and LTS proposals once approved, pedestrianisation of parts of the city centre by accelerating encourage active travel choices. The Council’s new Active Travel
22 A review of HGV movements within the city is undertaken with helping to bring about a modal shift in transport as well as the Avenues Projects and by further improving the public Plan will articulate these in a transparent way to all stakeholders.
the aim of limiting their number. This should look at potential helping to ensure housing sites are in sustainable locations. realm to encourage active travel choices.
models for freight consolidation services within the City
Centre in order to provide a service to businesses and reduce 41 We work with other cities and wider networks to share
the numbers of vans and HGVs throughout the city centre. knowledge, collaborate and use our combined voice to create
30 The development of the new local and regional transport climate resilient strategies, including plans for development
strategies should include ambitious targets for modal shift of Historic Glasgow and transformation of the River Clyde
with associated delivery plans. waterfront.

120 Climate Plan Climate Plan 121


6.0 Appendices: Appendix 1 6.0 Appendices: Appendix 1
Response to 61 Recommendations of the Climate Emergency Working Group Response to 61 Recommendations of the Climate Emergency Working Group

What we’ve achieved so far:

Recommendation 38 & 39: A Circular Economy route map was developed following Recommendation 38 & 39: A City Circular economy route map based
38 The Council and partners develop a local version of the stakeholder engagement and responding to issues identified 38 The Council and partners develop a local on Circular Glasgow Scan to be published in
Scottish Government’s Just Transition Commission and plan in the Circular Glasgow Scan. The plan will be published in late version of the Scottish Government’s Just winter 2020. The routemap will set out how the
actively for the shift to a carbon neutral economy. 2020. Transition Commission and plan actively for city can make the transition to a fairer, more
39 The development of a Circular Economy Route Map for the shift to a carbon neutral economy. equitable and thriving low carbon economy,
the city takes place and support is given for the Circular addressing climate emergency and socio-
Economy Bill in this term of the Scottish Parliament. economic inequalities in the city.

Recommendation 46: The HSCP will work with others to establish a consistent Recommendation 45: PALS is currently developing a strategy for the
All decisions made by the Health and Social Care Partnership methodology for decision making regarding climate and carbon Investment in the school estate and its uses education estate with low-carbon and climate
are assessed on the basis of their climate and carbon impacts impact. has carbon reduction and climate education as resilience at its heart.
and integrated with equality and human rights assessments to core principles.
maximise their positive effects and to reduce any negative impacts.
Future Action:
Recommendation 56: The Council will develop a Climate Risk Register as part of its
A climate risk register is developed by the Council and its climate adaptation planning work, reflecting findings from the Recommendation 38: In complying with the Scottish Climate Change
partners, accommodating the Climate Ready Clyde findings. UK Climate Change Risk Assessment for Scotland and Climate The Council and partners develop a local Bill the city should increase action to reduce
Ready Clyde’s Regional Risk and Opportunity Assessment. version of the Scottish Government’s Just greenhouse gas emissions while taking into
Transition Commission and plan actively for the account “the imperatives of a just transition of
Recommendation 58: Officers in Neighbourhoods and Sustainability to work with shift to a carbon neutral economy. the workforce and the creation of decent work
The Council works with local authority partners and the Scottish officers in the Corporate Procurement unit to enable the and quality jobs.”
Government to consider whether any legislative change is Sustainable Procurement Framework to become more flexible
needed to allow local authorities to embed carbon reduction and agile in the face of our climate emergency. Recommendation 57: In light of the climate emergency declaration
in procurement processes. In the light of the outcome of this The city’s partners work together to develop the council will explore innovative green
exercise, we further recommend that the Council reviews its business cases for low carbon energy and financing models such as Municipal Climate
procurement strategy in response to the climate emergency. transport investments through examination of Bonds.
alternative financing models including the use
of municipal climate bonds.
122 Climate Plan Climate Plan 123
6.0 Appendices: Appendix 1 6.0 Appendices: Appendix 1
Response to 61 Recommendations of the Climate Emergency Working Group Response to 61 Recommendations of the Climate Emergency Working Group

What we’ve achieved so far:

Recommendation 1 & 61: The Sustainable Glasgow Partnership was Recommendation 1 & 61: The Sustainable Glasgow Partnership was relaunched in early
relaunched in early 2020 and partners 2020 and partners committed to working together towards
1 The Council commits to working with the committed to working together towards 1 The Council commits to working with the business achieving carbon neutrality and the city, while also addressing
business community, third sector and achieving carbon neutrality and the city, while community, third sector and Glasgow’s citizens and communities climate resilience and a just transition to a low carbon resilient
Glasgow’s citizens and communities to also addressing climate resilience and a just to achieve a carbon neutral Glasgow by 2030. city.
achieve a carbon neutral Glasgow by 2030. transition to a low carbon resilient city.
61 The Council acts as an exemplar organisation for the city The Council’s Carbon Management Plan is being reviewed and
61 The Council acts as an exemplar The Council’s Carbon Management Plan is and develops a programme of carbon reduction measures for CMP3 aims to support the achievement of the city’s carbon
organisation for the city and develops a being reviewed and CMP3 aims to support the its own estate and activities in response to the target set in this neutrality target by 2030, while also providing leadership and
programme of carbon reduction measures achievement of the city’s carbon neutrality report. influencing others in the city to take action.
for its own estate and activities in response target by 2030, while also providing leadership
to the target set in this report. and influencing others in the city to take Recommendation 2: The Council and Sustainable Glasgow Partners have appointed
action. the Catapult programme to undertake a scoping study and full
The Council works with partner local authorities, the city’s Integrated City Plan to Net Zero. This will help Glasgow achieve
Recommendation 2: The Council and Sustainable Glasgow Partners academic institutions and other stakeholders to design, fund its ambitious carbon-reduction targets for 2030 and 2045.
have appointed the Catapult programme to and commission detailed advice on the timescales, actions and
The Council works with partner local undertake a scoping study and full Integrated budgets needed to meet or better a carbon neutral Glasgow
authorities, the city’s academic institutions City Plan to Net Zero. This will help Glasgow by 2030 and that the Chief Executive provides interim reports
and other stakeholders to design, fund and achieve its ambitious carbon-reduction targets on progress to the Environment, Sustainability and Carbon
commission detailed advice on the timescales, for 2030 and 2045. Reduction City Policy Committee.
actions and budgets needed to meet or better
a carbon neutral Glasgow by 2030 and that Recommendation 6: The LHEES is being prepared, which will identify area-based
the Chief Executive provides interim reports on opportunities to retrofit existing housing stock with high energy
progress to the Environment, Sustainability and New ambitious targets are established to address the low energy efficient and low carbon heating solutions.
Carbon Reduction City Policy Committee. efficiency and high-carbon heating that are a feature of the
city’s older housing stock, most of which is in private or mixed-
tenure ownership.
124 Climate Plan Climate Plan 125
6.0 Appendices: Appendix 1 6.0 Appendices: Appendix 1
Response to 61 Recommendations of the Climate Emergency Working Group Response to 61 Recommendations of the Climate Emergency Working Group

Future Action:

Recommendation 10: Discussions are ongoing regarding resources and the approved Recommendation 2: Key decisions regarding the Catapult scoping study and
budget allocations to address issues related to the Climate Integrated Net Zero plan are set to be made later in 2020.
The Chief Executive reviews current staffing resource Emergency. The Council works with partner local authorities, the city’s
distribution within the Council and brings forward proposals to academic institutions and other stakeholders to design, fund The Transport Bill requires that a mandatory objective of the Low
increase the Council’s focus on the climate emergency. and commission detailed advice on the timescales, actions and Emission Zone is to contribute to carbon reduction plans. The
budgets needed to meet or better a carbon neutral Glasgow council will explore options to utilise the ongoing development
Recommendation 53: The Council, in collaboration with KSB, are delivering carbon by 2030 and that the Chief Executive provides interim reports of Glasgow’s Low Emission Zone to contribute towards carbon
literacy training to its political leaders and senior management on progress to the Environment, Sustainability and Carbon reductions from transport in the city centre.
Community Planning partners work together to ensure that all team. This will be rolled out across the council family and Reduction City Policy Committee.
senior officers in the city’s agencies have undertaken carbon offered to our Community Planning Partners during 2020/ 2021.
literacy training and become climate leaders themselves, with Recommendation 11 & 13: The Open Space Strategy Delivery Plan process will identify
further plans brought forward to leaven these issues throughout the best opportunities for tree planting, greening and rewilding,
the thinking of all sectors. 11 A review is undertaken to address existing barriers to tree including use of Vacant and Derelict Land sites.
planting in order to significantly increase the number of
Recommendation 58: The Council has adopted the Scottish Government’s
trees within the city over the next 5 years.
Flexible Framework Sustainable Assessment Tool (FFSAT)
The Council works with local authority partners and the Scottish and Sustainability Test (ST) which allows it to consider the
13 A review takes place to identify vacant and derelict land
Government to consider whether any legislative change is sustainability risks and opportunities of the procurement
suitable for greening and rewilding, with a view to its change
needed to allow local authorities to embed carbon reduction process, includes carbon reduction opportunities.
of use as designated open space.
in procurement processes. In the light of the outcome of this
exercise, we further recommend that the Council reviews its Recommendation 47: The Community Planning Partnership are to consider
procurement strategy in response to the climate emergency. collaborating with the sustainability team and Glasgow Life
The city engages in climate conversations with residents to roll out climate conversations across the city, fostering
through its Community Planning structures and considers how community confidence, empowerment and participation.
to roll-out the Weathering Change model in the context of its
review of Thriving Places.

126 Climate Plan Climate Plan 127


6.0 Appendices: Appendix 1 6.0 Appendices: Appendix 1
Response to 61 Recommendations of the Climate Emergency Working Group Response to 61 Recommendations of the Climate Emergency Working Group

What we’ve achieved so far:

Recommendation 51: Public engagement for the new City Development Plan Recommendation 14 & 43: A Plastic Reduction Strategy was approved in
will include discussions about how proposed land use and 14 The city works to end single use plastic early 2020, which includes plans to phase out
The new City Development Plan presents a vision for a low connectivity can help to achieve a carbon neutral city by 2030. waste and it commits to developing all single-use plastics throughout Glasgow by
carbon city that can guide the development of proposals and Scotland’s first plastic free shopping zone. the end of 2022.
planning decisions that help our city respond to the climate Ensuring that carbon neutral targets inform the new City
challenge. Development Plan’s strategy, policies and proposals. 43 The Council develops a more sustainable
approach to school meals and pilots the
The new National Planning Framework 4 (NPF4) will also help changes needed to move towards plastic-
inform the plan, which is expected to be adopted in around free school catering.
5 years. There are major implications for energy/heat usage
and generation, transport, built and urban form, local provision Recommendation 15: The Bin Replacement Programme, in which
of services, and ability for future residents to live low-carbon A review of current communications with residents or householders receive new bins and
lifestyles by accessing needs and requirements at local level. households around food waste bins and the refreshed information on waste disposal and
use of recycling bins takes place, with a view to recycling, is ongoing.
increasing usage of food waste bins.

Recommendation 22: The new City Centre Transformation Plan will


A review of HGV movements within the city address freight vehicle traffic through the city
is undertaken with the aim of limiting their centre and the unintended consequences of
number. This should look at potential models potential proposals, and positive proposals for
for freight consolidation services within the sustainable last mile deliveries.
City Centre in order to provide a service to
businesses and reduce the numbers of vans
and HGVs throughout the city centre.

128 Climate Plan Climate Plan 129


6.0 Appendices: Appendix 1 6.0 Appendices: Appendix 1
Response to 61 Recommendations of the Climate Emergency Working Group Response to 61 Recommendations of the Climate Emergency Working Group

Recommendation 26: The public consultation ffor the Low Emission Zone ended in Recommendation 15: Plans to pilot moving residential properties currently in the
late March 2020 and SEPA is currently looking at models at a managed weekly waste collection cycle to a three-weekly cycle,
A process and timescale is established for consulting on a regional level, which will potentially address concerns about A review of current communications with households around targeting 8,000 properties in the east end of the city.
potentially expanded geographical area for the LEZ. unintended consequences or impacts in geographical areas food waste bins and the use of recycling bins takes place, with a
beyond the Low Emission Zone. The final LEZ boundary will be view to increasing usage of food waste bins.
significantly bigger than the area of pollution exceedance.
The current Waste Strategy (including food waste) expires in
Recommendation 34: 20mph speed limits in residential areas have recently been 2020. It will be reviewed in light of new legislation (including
approved by committee and are to be rolled out across the city. deposit and return, circular economy).
The Council delivers more 20mph speed limits on residential
roads. Recommendation 26: The final Low Emission Zone scheme is expected by early 2022
due to COVID 19 delays. Enforcement of LEZ will be in place
A process and timescale is established for consulting on a within one year of the scheme being adopted.
Future Action:
potentially expanded geographical area for the LEZ.

Recommendation 14 & 43: The council’s Plastic Reduction Strategy includes proposals Recommendation 36: The Council is developing a food plan (Sustainable Food Cities)
to pilot three plastic-free schools and take the first steps to for the city. As part of this there are future actions around
14 The city works to end single use plastic waste and it commits delivering a plastic-free shopping zone. The Council and its partners publish a sustainable food strategy education, communication and awareness raising to enable
to developing Scotland’s first plastic free shopping zone. for the city within the next year and that the Council considers higher uptake of food recycling.
making space for food growing a requirement of new housing
43 The Council develops a more sustainable approach to school developments.
meals and pilots the changes needed to move towards
plastic-free school catering.

130 Climate Plan Climate Plan 131


6.0 Appendices: Appendix 1 6.0 Appendices: Appendix 2
Response to 61 Recommendations of the Climate Emergency Working Group The Climate Emergency Working Group’s 61 recommendations

What we’ve achieved so far: We recommend that:


1 The Council commits to place for the city as a 6 New ambitious targets are 9 The Council takes forward
Recommendation 41: Glasgow is working as part of the seven cities working with the business necessary step towards established to address the a programme of investment
in the Scottish Cities Alliance, collaborating community, third sector producing more locally low energy efficiency and in its assets designed
We work with other cities and wider networks to reduce carbon emissions and stimulate and Glasgow’s citizens and generated and distributed high-carbon heating that to help deliver carbon
to share knowledge, collaborate and use our innovation. communities to achieve a low carbon energy. are a feature of the city’s neutrality for the city by
combined voice to create climate resilient carbon neutral Glasgow by older housing stock, most 2030.
strategies, including plans for development of 2030. 4 The Council continues of which is in private or
Historic Glasgow and transformation of the to seek measures by the mixed-tenure ownership. 10 The Chief Executive
River Clyde waterfront. Glasgow is working with other agencies and 2 The Council works with Scottish Government to reviews current staffing
local authorities in ongoing development of a partner local authorities, amend non-domestic 7 The Council supports the resource distribution
River Clyde Flood Model. the city’s academic rates assessments for creation of a Scottish Grid within the Council and
institutions and other domestic district heating factor, to more accurately brings forward proposals to
stakeholders to design, fund installations to encourage measure the carbon increase the Council’s focus
Future Action: the use of district heating intensity of local energy on the climate emergency.
and commission detailed
advice on the timescales, in place of standalone consumption.
Recommendation 25: The Council will continue to contribute actions and budgets heating in new build and 11 A review is undertaken to
to Transport Scotland-led working groups needed to meet or better refurbished homes. 8 There is a Property address existing barriers
As part of the development of the Low regarding the Low Emissions Zone phase 2. a carbon neutral Glasgow and Land Strategy to to tree planting in order to
Emission Zone’s Phase 2, clear guidance for by 2030 and that the Chief 5 Subject to action on this consolidate Council significantly increase the
all vehicles is available within the agreed Executive provides interim issue by the Scottish building stock, which can number of trees within the
timescale. reports on progress to the Government, the Council ensure that buildings which city over the next 5 years.
Environment, Sustainability consults on proposals for are retained are retrofitted
Recommendation 42: Working together with Education Scotland to and Carbon Reduction City the inclusion of district to the highest possible 12 A formal audit and costed
continue to deliver SDE strategy and build on Policy Committee. heating systems where standards and building plan is brought forward by
Glasgow’s schools should formally engage current success, including climate action. feasible in major new management systems are the Council and its city-
with pupils on the climate emergency and the 3 Acceleration of the housing developments and in place, and those disposed region partners on the
actions which can be taken to tackle it. establishment of an energy renewal or refurbishment of are done so responsibly. opportunities for much
services company takes projects. greater tree planting and

132 Climate Plan Climate Plan 133


6.0 Appendices: Appendix 2 6.0 Appendices: Appendix 2
The Climate Emergency Working Group’s 61 recommendations The Climate Emergency Working Group’s 61 recommendations

other ways of harnessing Commission that is required explored, including the to businesses and reduce 26 A process and timescale is sustainable transport as GoBike and Sustrans are emerging from the current
the natural environment to to build the Glasgow Metro, financial viability of re- the numbers of vans and established for consulting hierarchy is enforced, notified of, and consulted pilot.
absorb emissions. and to create new local municipalisation. HGVs throughout the city on a potentially expanded including, where necessary, on developments key to, or
connections to the suburban centre. geographical area for the that space currently which may have an impact 36 The Council and its
13 A review takes place to areas. 20 The Council engages with LEZ. dominated by the private on, Glasgow’s developing partners publish a
identify vacant and derelict interested local authorities 23 An updated Electric Vehicle car is reprioritised to cycling network. sustainable food strategy
land suitable for greening 17 The Council investigates and other stakeholders strategy, with reference to 27 The city’s new transport provide a fairer transport for the city within the
and rewilding, with a view use of the ‘franchising’ to initiate a formal the recent announcement strategy develops our system. 33 The Council makes a next year and that the
to its change of use as powers set out in the assessment of the potential of Scottish Power’s proposals and those of the commitment to the Council considers making
designated open space. Transport Bill to regulate for making the transition to ambitions to support the Connectivity Commission 30 The development of the new Glasgow Connectivity space for food growing
the city’s bus network and a public transport system city, is produced by the end to deliver a more active local and regional transport Commission’s call for the a requirement of new
14 The city works to end single to work on the principles of that is free to use. of 2019. Glasgow. strategies should include completion of a network housing developments.
use plastic waste and it one network, one timetable, ambitious targets for modal of safe, high-quality,
commits to developing one ticket. 21 A feasibility study is 24 The reduction of illegal 28 The Council works to shift with associated delivery segregated cycling arterial 37 The Council and partners
Scotland’s first plastic free developed into integrated parking and engine idling is deliver an increase in plans. routes connecting the revise the city’s economic
shopping zone. Page 24 18 The Council works with ticketing and more targeted through increased education and awareness city centre to suburbs and strategy to put addressing
neighbouring local physically and digitally enforcement and public amongst relevant staff 31 The Council takes peripheral neighbourhoods. the climate emergency
15 A review of current authorities and the Scottish accessible travel. awareness and that the and third-parties of forward the success of front and centre of
communications with Government to clarify the Council should alert design standards such the pedestrianisation of 34 The Council delivers more planning for Glasgow’s
households around food governance of the city 22 A review of HGV members to the resources as Transport Scotland’s parts of the city centre by 20mph speed limits on future economy.
waste bins and the use of region’s transport network. movements within the necessary to ensure this. ‘Cycling by Design’ accelerating the Avenues residential roads.
recycling bins takes place, city is undertaken with guidance and records its Projects and by further 38 The Council and partners
with a view to increasing 19 The Council works with the aim of limiting their 25 As part of the development commitment to have regard improving the public realm 35 The early roll out of ‘car- develop a local version of
usage of food waste bins. partner local authorities to number. This should look at of the Low Emission to these standards in to encourage active travel free’ zones to other schools the Scottish Government’s
consider the opportunity potential models for freight Zone’s Phase 2, clear future changes to the road choices. Page 25 and locations attended by Just Transition Commission
16 The Council supports the presented by First Glasgow consolidation services guidance for all vehicles is network. large numbers of potentially and plan actively for the
long-term investment as being up for sale and for within the City Centre in available within the agreed 32 The Council ensures that vulnerable pedestrians takes shift to a carbon neutral
proposed by the Connectivity the business case to be order to provide a service timescale. 29 Transport Scotland’s relevant stakeholders such place, building on lessons economy.

134 Climate Plan Climate Plan 135


6.0 Appendices: Appendix 2 6.0 Appendices: Appendix 2
The Climate Emergency Working Group’s 61 recommendations The Climate Emergency Working Group’s 61 recommendations

39 The development of a on the climate emergency climate education as core vehicle for taking forward proposals and planning planning to do. local authority partners and 60 The Council works with
Circular Economy Route and the actions which can principles. a dialogue on climate and decisions that help our the Scottish Government the other employers and
Map for the city takes place be taken to tackle it. appropriate action, as well city respond to the climate 55 The Council acts in an to consider whether members [of Strathclyde
and support is given for 46 All decisions made by the as grant funding decisions. challenge. exemplar role by introducing any legislative change Pension Fund] to make a
the Circular Economy Bill 43 The Council develops a more Health and Social Care formal climate screening is needed to allow local wholesale shift away from
in this term of the Scottish sustainable approach to Partnership are assessed 49 The Council and partners 52 Partners need to revisit of all its budgets, with the authorities to embed investment in hydrocarbons
Parliament. school meals and pilots the on the basis of their work with community and the Community Plan and 2020/21 budget being used carbon reduction in and that the fund trustees
changes needed to move climate and carbon impacts faith groups to ensure ensure that climate change to pilot budget setting with procurement processes. In ask for a report at the
40 A sustainable city story towards plastic-free school and integrated with that the voices of new informs all of it. a clear description of climate the light of the outcome earliest opportunity on
should be central to catering. equality and human rights Glaswegians are heard as impacts. of this exercise, we these risks.
accounts of our history and assessments to maximise part of a wider community 53 Community Planning further recommend that
where we see our future 44 Our schools work closely their positive effects and climate conversation. partners work together 56 A climate risk register the Council reviews its 61 The Council acts as an
going. with local colleges and to reduce any negative to ensure that all senior is developed by the procurement strategy in exemplar organisation
universities to build impacts. 50 All decisions made by the officers in the city’s Council and its partners, response to the climate for the city and develops
41 We work with other cities the skills and capacity Council and its partners agencies have undertaken accommodating the emergency. a programme of carbon
and wider networks for a greener economy, 47 The city engages in in response to the climate carbon literacy training and Climate Ready Clyde reduction measures for its
to share knowledge, including a focus on new climate conversations emergency are supported become climate leaders findings. 59 The Council’s business own estate and activities in
collaborate and use technologies (such as heat with residents through by equality and human themselves, with further support and planning response to the target set
our combined voice to pumps, battery storage, its Community Planning rights assessments, as well plans brought forward 57 The city’s partners work services are made available in this report.
create climate resilient and other forms of low structures and considers as the Fairer Scotland duty, to leaven these issues together to develop to support community
strategies, including carbon technology), and how to roll-out the to maximise their positive throughout the thinking of business cases for low investment in renewable
plans for development ensuring the provision of Weathering Change model effects and to reduce any all sectors. carbon energy and energy, including the
of Historic Glasgow and apprenticeships and other in the context of its review negative impacts. transport investments Glasgow Community
transformation of the River opportunities. of Thriving Places. Page 26 54 The Council reports back through examination Energy Co-operative.
Clyde waterfront. 51 The new City Development to the people of Glasgow of alternative financing
45 Investment in the school 48 The Council and third Plan presents a vision for annually on what it has models including the use of
42 Glasgow’s schools should estate and its uses has sector use their recently a low carbon city that can done to address the climate municipal climate bonds.
formally engage with pupils carbon reduction and developed concordat as a guide the development of emergency and what it is 58 The Council works with

136 Climate Plan Climate Plan 137


6.0 Appendices: Appendix 3 6.0 Appendices: Appendix 3
Ecological Emergency Working Group Recommendations Ecological Emergency Working Group Recommendations

No. Recommendation UN SDG's Current Position Future Plans No. Recommendation UN SDG's Current Position Future Plans

1 The Council commits to working with other 17 & 14,15 "Glasgow LBAP made up of 16 Sustainable Glasgow board and Hubs to discuss 3 The Chief Executive reviews current staffing, 13, 14 &15 Currently being considered under CRS PMO to consider and include in work packages
public bodies, third sector, business community, organisations to implement action how this can be progressed and embedded in the resource distribution and training for addressing the the Climate Resilience Project to be resourced and implemented. The CRS
Glasgow’s citizens and communities and adjacent for the city's biodiversity partnership’s activities going forward. ecological emergency within the Council and brings Management Office and board Programme board will be chaired by the executive
local authorities to halt and reverse the decline in over 70 Friends of Parks & forward proposals to increase the Council's focus in director of NRS.
biodiversity. Greenspaces Groups - some of this area.
these carry out biodiversity/
greening projects"

4 The new City Development Plan, and associated 14,15 & 17 In addition to existing guidance The council via the City Development Plan and Open
guidance, strengthens and extends existing under CDP SG7 and IPG 6, NRS Space Strategy - Delivery Plan will use the Open
requirements on the protection and enhancement officers are currently working on Spaces and Vacant & Derelict Land in the city to
of biodiversity and includes a default requirement 'positive effects for biodiversity' both reduce emissions and address the impacts of a
for overall biodiversity net gain, as well as for (Biodiversity Net Gain) guidance changing climate for nature, biodiversity and people.
2 The Council works with partner organisations, 17 & 14,15 Currently LBAP and PP are Sustainable Glasgow board and Hubs to discuss how specific actions such as the provision of swift bricks aligned with national legislation
adjacent local authorities, the city’s academic being implemented to existing this can be progressed and acceleration supported and bird and bat boxes, to guide the development NPF4.
institutions and other stakeholders to fund and timescales 2017-2023 by the partnership’s action plan going forward. of proposals and planning decisions. This should
achieve accelerated implementation of the Glasgow be supported through additional professional
LBAP and Pollinator Plan within a significantly development for all planning officers. The City’s
reduced target time frame and incorporating Open Space Strategy Delivery Plan will identify
additional outcomes regarding connectivity for the open spaces that should be used to provide
biodiversity under the Urban Ecosystem Statement. more opportunities for biodiversity and for habitat
Interim reports on progress to be provided to the connectivity and the Council will act, with its
Environment, Sustainability and Carbon Reduction partners, to deliver these opportunities.
City Policy Committee.

138 Climate Plan Climate Plan 139


6.0 Appendices: Appendix 3 6.0 Appendices: Appendix 3
Ecological Emergency Working Group Recommendations Ecological Emergency Working Group Recommendations

No. Recommendation UN SDG's Current Position Future Plans No. Recommendation UN SDG's Current Position Future Plans

5 A Forestry and Woodland Strategy for Glasgow 15 & 13 A forum has been established in The council and partners will produce a forestry and 6 The Council will use the My Park Scotland 15 & 17 Council currently exploring The council and sustainable Glasgow partners will
will be undertaken, and a costed implementation January 2021 to consider and Woodland Strategy by 2025, aligned with the Open crowdfunding platform to support partnership this model. However, options to continue to explore funding options and adopt
plan prepared, which delivers increased canopy explore the development of an Space Strategy Delivery Plan. This will be developed working with existing charitable trusts to increase increase tree planting or woodland strategic approach to protecting existing trees,
cover, considers biodiversity net gain, habitat Urban Forestry and woodland for Glasgow supporting the regional woodland resources for the protection, planting and creation location for appropriate identifying the most appropriate location and
connectivity and carbon management. Through Strategy, including vision, strategy, Clyde climate forest and GCVGN Blueprint. maintenance of trees through public donations trees in the appropriate location species of tree. This will be associated with the
its contribution to the Clydeplan Draft Forestry objectives, existing barriers and The Strategy will include a costed implementation similar to the “Tree Time Edinburgh City”, “Replant may be more challenging than community engagement as part of the Climate and
and Woodland Strategy and the Blueprint for a opportunities. plan, delivering increased canopy cover, biodiversity Bristol” and Street Trees in New York. funding. ecological emergency plan, but also as part of the
Green Network, it will support engagement with net gain, habitat connectivity and carbon offsetting. development of the Woodland Strategy for the city.
our city-region partners. This strategy will seek to
address existing barriers to tree protection and tree
planting, including any recommendations to national
government related to regulatory matters, and will
be accompanied by a costed implementation plan
7 The Council to support the process to introduce the 15 Council currently exploring how The city will continue to engage with the Scottish
which sets a target for an increase in canopy cover
primary legislation which will safeguard amenity national legislation review can Government to support the review of national
relative to the baseline of 15% in 2015. A Tree Forum
while creating a more efficient and effective support this. legislation enabling future iterations of the City
of stakeholders will be established to oversee both
way to deal with the high number of Section 172 Development Plan to include delivery of this
this recommendation and recommendation number
notifications received by planning authorities. recommendation.
7.

8 The Council supports new, and further extensions 14 &15 There currently 30+ Aspirational LNR and other means to protect habitats, both
to, Local Nature Reserves to improve green corridors LNRs identified and they will to protecting and maintaining existing ones, as well as
and pollinator ways and protect and enhance be taken forward through the creating new
habitats and species throughout the city. City Development Plan. LNR's can (when the council own the land) will be reflected
only be declared if the city council the new City Development Plan.
owns land or has agreement of the
land owner.

140 Climate Plan Climate Plan 141


6.0 Appendices: Appendix 3 6.0 Appendices: Appendix 3
Ecological Emergency Working Group Recommendations Ecological Emergency Working Group Recommendations

No. Recommendation UN SDG's Current Position Future Plans No. Recommendation UN SDG's Current Position Future Plans

9 A review takes place of vacant and derelict 14 &15 This is being considered by the Open Space Delivery Plan help manage competing 10 The Council and its partners ensure that current 14 &15 NRS Biodiversity comment The Council and its partners ensure that current
land relating to opportunities for these sites to urban woodland forum as part of demands on land and land use. It will determine best and proposed active travel routes are assessed on proposals from Planning and proposed active travel routes are assessed
contribute to the Open Space Strategy, the Local the woodland strategy and Open future use for Vacant and Derelict Land to meet for opportunities to enhance their biodiversity, for Applications for opportunities to enhance their biodiversity, for
Biodiversity Action Plan and managing flood risk. Space strategy delivery plan. targets for housing, food growing, SWMW. It will example through creation/retention of hedgerows example through creation/retention of hedgerows
This must consider potential to retain, where ensure that the city protect & develop in a way to and wildflower strips. Opportunities should be taken and wildflower strips. Opportunities should be taken
present, the priority habitat ‘Open Mosaic Habitat on In Cadder Fields, there is woodland protect urban biodiversity. Balancing the needs for to maximise the potential of the green network, to maximise the potential of the green network,
Previously Developed Land’ as outlined in: Habitats management and community transport, development, habitat connectivity, access including river corridors, the canal corridor, through including river corridors, the canal corridor, through
On Previously Developed Land engagement underway. to open space, food growing, energy generation. parks and on former rail formations, to provide parks and on former rail formations, to provide
routes that provide for engagement with nature. On routes that provide for engagement with nature. On
In Dawsholm Park, LNR VDL site, more direct commuter routes, e.g. on road-space, more direct commuter routes, e.g. on road-space,
there is wildflower planting and opportunities should be taken to maximise nature opportunities should be taken to maximise nature as
path works ongoing. Work to map as part of a wider placemaking approach and part of a wider placemaking approach and managing
V&DL can link existing habitats managing surface water to reduce flood risk. surface water to reduce flood risk.
and has the potential to support
good quality open space for nature,
biodiversity and active travel.

11 The new City Development Plan identifies the 13 & 15 Green roofs and walls can provide The new City Development Plan identifies the
benefits of green roofs / walls and sets out a strong multiple functions-the function benefits of green roofs / walls and sets out a strong
presumption that new buildings will include green desired will dictate the type of presumption that new buildings will include green
roofs / walls, wherever possible, to deliver benefits green roof. There is competing roofs / walls, wherever possible, to deliver benefits
for biodiversity and surface water management. demand for roof space for low for biodiversity and surface water management. The
The Council actively promotes the installation of carbon energy generation & Council actively promotes the installation of green
green roofs/green walls on appropriate new and renewables, biodiversity, water roofs/green walls on appropriate new and existing
existing city buildings. management, cooling. city buildings.

142 Climate Plan Climate Plan 143


6.0 Appendices: Appendix 3 6.0 Appendices: Appendix 3
Ecological Emergency Working Group Recommendations Ecological Emergency Working Group Recommendations

No. Recommendation UN SDG's Current Position Future Plans No. Recommendation UN SDG's Current Position Future Plans

12 Food growing sites (allotments and community 13 &15 The city published its first Food The council and partners will continue to deliver the 14 Installation of Sustainable Drainage Systems (SuDS) 14 & 15 Under the current City Installation of Sustainable Drainage Systems (SuDS)
gardens) are located out with biodiversity diverse Growing Strategy to identify food growing strategy. in new developments or re-developments should Development Plan, SuDS, similarly in new developments or re-developments can
sites and are supported to deliver biodiversity net and provide local food growing provide biodiversity net gain through provision of to other developments, require provide biodiversity net gain through provision of
gain and habitat connectivity. opportunities, while also Food growing will not be permitted in LNR, or sites habitats identified within the LBAP. biodiversity net gain. habitats identified within the LBAP.
contributing to biodiversity net of importance for nature conservation. The City
gain. Development Plan will continue to be supportive of Retrofit surface water management for biodiversity
local food growing, but this will not be permitted in net gain should be considered in all public realm /
LNR’s or SINC’s. streetscape projects – following the example of the
Avenues Programme approach and ensuring that no
opportunities for net gain are being missed.

13 The Council’s wildflower meadow and grassland 15 A 5-year Wildflower/Green The city will implement Wildflowr/Green Connectors
management across the city is increased for Connectors Action Plan has Action Plan.
pollinators, and a five-year action and engagement been developed which includes
plan for wildflower creation is developed. In addition, wildflower creation, hedgerow and
engage with other large landowners in Glasgow to trees to create habitat linkages. 15 The Council seeks further resources to develop 13, 15 &17 Peatland restoration carried out by Council and partners to recognise importance
encourage similar habitat creation and consult with engagement with all stakeholders to ensure that Seven Lochs Wetland Park of peatlands for carbon sequestration but also
communities and neighbours. Cart & Kittoch Woodlands Phase 1 Glasgow’s peatlands are restored and protected. Commonhead Moss. This included biodiversity. Committing investment to protection
& 2 carried out with Green Action In addition, the Council develops proposals to installation of over 50 dams and and ongoing restoration to prevent carbon
Trust. ensure that the peatlands are enhanced, including birch regen removed over several emissions and biodiversity loss.
quantifying carbon capture storage and their year to increase water levels.
impact.

144 Climate Plan Climate Plan 145


6.0 Appendices: Appendix 3 6.0 Appendices: Appendix 3
Ecological Emergency Working Group Recommendations Ecological Emergency Working Group Recommendations

No. Recommendation UN SDG's Current Position Future Plans No. Recommendation UN SDG's Current Position Future Plans

16 The Council develops a peat-free procurement 13 & 15 The council will now be purchasing The council to produce peat-free procurement 17 Strategic mapping and operational planning, should 15 The city is working with the This work will continue, while the Open Space
policy. all* compost as peat free. policy by 2023. be carried out to enable parks and greenspaces, Open Space strategy Team Strategy Delivery plan will include mapping of
cemeteries, former landfill sites, and green/grey/ to map current provision and opportunities and actions to enhance biodiversity
Except for some plants in the blue corridors in the city to highlight opportunities where opportunities to enhance and habitat connectivity in the city.
nursery or Botanic Gardens where to enhance biodiversity, provide space for nature, biodiversity exist.
peat-based compost is essential, encourage pollinator-friendly planting in formal
albeit small scale. areas and creating habitat mosaics in larger parks/
greenspaces as part of multi-functional usage.
The council’s current bedding
plant producing contractor
(Pentland Plants) have reduced
their compost peat levels by 15%
and there is ongoing discussion to
increase this to 25%.
18 The Council continues to implement its policy on 14 & 15 This recommendation is currently This work is to continue to progress as part of the
This contract will end in 6 months, Invasive Non-Native Species INNS and carry out being addressed by the NRS LBAP, Pollinator Plan and OSS acceleration.
and the council will specify in treatment programmes and develops mapping operations team.
their new tender that 100% peat of INNS city-wide to allow for monitoring and
free grown bedding plants will be future treatment programmes as appropriate; and
required. works with partner organisations with the aim of
controlling/managing INNS along the city’s river
corridors, LNRs and at other key sites.

19 Work with Community Planning to incorporate the 14, 15 & 17 Discussions with CPP are yet to This will be included as an action in the Climate and
principle of biodiversity net gain into their decision take place. Ecological Emergency Plan for the city.
making

146 Climate Plan Climate Plan 147


6.0 Appendices: Appendix 3 6.0 Appendices: Appendix 3
Ecological Emergency Working Group Recommendations Ecological Emergency Working Group Recommendations

No. Recommendation UN SDG's Current Position Future Plans No. Recommendation UN SDG's Current Position Future Plans

20 Ecological issues should be mainstreamed 13, 14, 15 LBAP, Pollinator Plan and Open Further work aligned with the LBAP, PP, OSS will of an online newsletter, Parklife, to encourage
throughout the Council and other public bodies. & 17 Space Strategy are currently being help to mainstream ecological considerations into further participation.
implemented and help mainstream decision making for the council and Sustainable
ecological emergency, fostering Glasgow partners. Other organisations such as RSPB (Scotland), SWT
coordinated action and GNHS are represented on the LBAP Partnership
and these either have, or are, local environmental
21 Support and promote, using various means, local 13, 14 & 15 The city council currently supports The city council will continue to work with national volunteering group
environmental volunteering groups to enhance and promotes over 70+ parks and wildlife organisations such as SSPCA to promote 22 Work in partnership with Education Services, 13, 14, 15 Education Services currently The city council and partners to continue to
biodiversity in their localities including working with greenspace groups who carry responsible pet ownership and will look at various support Glasgow’s teachers to access training and & 17 participating in Eco Schools work with Education Services, Skills Development
the SSPCA to raise awareness of wildlife crime and out activities in their local park options to enhance this message at various points resources to formally and informally engage with Programme, Climate Ready Scotland and Scottish Government and Eco Schools
responsible pet ownership. or greenspace, many of those throughout the year. pupils on the ecological emergency and the actions Classrooms, and implementing Scotland to support outdoor learning across all
activities include biodiversity e.g. which can be taken to tackle it; with development Sustainable Development educational establishments in the city.
putting up bird and bat boxes, of support for outdoor learning across all staff in Education, STEM and ‘Outdoor
planting wildflowers and trees for educational establishments including Early Years. Now’ guidance for teachers.
pollinators and other wildlife.
23 The Council develops opportunities, as part of 13, 14, 15 Education Services currently The Council develops opportunities, as part of
This includes the Participatory the Curriculum for Excellence, for all education & 17 participating in Eco Schools the Curriculum for Excellence, for all education
Budgeting and Wee Green Grants establishments to access outdoor learning and Programme, Climate Ready establishments to access outdoor learning and
programmes which have funded undertake outreach biodiversity work. Classrooms, and implementing undertake outreach biodiversity work.
some biodiversity projects and Sustainable Development
development Education, STEM and ‘Outdoor
Now’ guidance for

teachers. Retrofit surface water


management also being delivered
at a number of schools.

148 Climate Plan Climate Plan 149


6.0 Appendices: Appendix 3 6.0 Appendices: Appendix 3
Ecological Emergency Working Group Recommendations The Report and Recommendations of Glasgow City Council’s
Ecological Working Group (DRAFT)

No. Recommendation UN SDG's Current Position Future Plans

24 Investment in and improvement of the education 13 & 15 The city is working with Education The city will continue to invest in the Education
1.0 Introduction change likely to be one of to prepare a report and Pollinator Plan links to
the most important drivers recommendations. the LBAP and supports
estate should protect and enhance biodiversity Services to invest in Education Estate, enhancing green infrastructure and
through sustainable and wildlife friendly green estate, including renewable biodiversity connectivity while also investing in 1.1 Globally, biodiversity is in the future. the national Pollinator
landscaping, associated planting and greening energy technologies and greening renewable energy technologies, such as solar PV and declining. One million 2.2 When the Council declared Strategy for Scotland.
infrastructure, including green walls, with support the infrastructure as part of the others. species are at risk of 1.3 The State of Nature a climate and ecological
for the provision of natural play areas and school Energy and carbon masterplan and extinction from human Scotland 2019 report emergency, it agreed that, 2.4 The ecological emergency
gardens. Open Space Strategy. highlighted a 24% following presentation of working group
activities. Climate change
25 teachers. Retrofit surface water management also 13, 14 & 15 The council developed a carbon The city council will build on the development of the is intensifying biodiversity reduction in average the climate emergency acknowledges the existing
being delivered at a number of schools. literacy training course for staff. carbon literacy training and develop an additional loss. There is evidence to species abundance working group’s report, good work of the LBAP
mandatory climate and ecological emergency since 1994 and a 14% a short life process partnership at the local
suggest that the world
course to be delivered on GOLD. reduction in average should be put in place authority level which was
is currently experiencing
its sixth mass extinction species distribution since in order to establish set up following the Rio
event. 1970. The State of the whether additional Earth Summit in 1992,
UK’s Butterflies report recommendations are in response to the UK
1.2 The Intergovernmental 2015 showed that 75% required to address the becoming a signatory
Science-Policy Platform on of butterfly species had ecological aspects of the to the Convention on
Biodiversity and Ecosystem declined in range or emergency specifically. Biological Diversity.
Services (IPBES) Global abundance over the past Glasgow City Council works
Assessment Report 2019 40 years. 2.3 Glasgow currently has over in partnership with both
shows 5 main drivers for 6000 species recorded national environmental
biodiversity loss: land- 2.0 Glasgow’s Approach and a variety of priority agencies and local
use change, impact of habitats within the urban biodiversity organisations
climate change, pollution, 2.1 Glasgow City Council setting. The Glasgow Local to deliver local biodiversity
invasive alien species and announced a climate and Biodiversity Action Plan action plans. It employs
the exploitation of natural ecological emergency (LBAP) sets out aims and dedicated biodiversity
resources. Changes in on 16th May 2019. The objectives to protect and officers who support the
land-use is the major driver, Council set up a climate enhance local biodiversity partnership. The focus
with the impact of climate emergency working group in the city. The Glasgow

150 Climate Plan Climate Plan 151


is on three actions in The Woodland Trust, Giving Nature a Home and areas of concern were can be created and and for more open space to strategy and restoration It was agreed by the group
relation to nature in the Seven Lochs Wetland Park, the state of butterflies and particularly prominent maintained, for example be allocated for nature in of peatlands looked at that planting the right
local area: conservation, NatureScot (previously moths in Scotland. in these responses and through reduced grass the city (50%). land use in the city and trees in the right places
communication Scottish Natural Heritage), 3.3 We also commissioned they are reflected in our cutting, wildflower strips There was also enthusiasm the contributions that has benefits not only for
and education for Royal Society for the a public survey to get recommendations. and hedgerows and by the for grassland management woodlands and peatlands carbon capture and climate
biodiversity through the Protection of Birds a better sense of how creation of green roofs with 53% of respondents make to biodiversity, change mitigation, but also
implementation of the (Scotland), and Butterfly Glaswegians feel about 3.4 Discussion on the LBAP, and green walls which are wanting to ‘restore carbon sequestration, for people’s health and
LBAP and Pollinator Plan. Conservation (Scotland). these issues. Although the city-wide grassland biodiverse for bees and and extend wildflower shade provision and rain community engagement
This was highlighted in the We are grateful to all the end of the consultation management and the other pollinators. meadows’ when asked and flood management. opportunities. Maintenance
report from the climate presenters for taking the period coincided with Glasgow Open Space ‘which of the following do The group felt that VDL of trees and woodlands is
emergency working time to meet with us and the start of the Covid-19 Strategy and Connecting 3.5 Survey respondents backed you consider important?’ sites should be assessed essential.
group, ‘the group is highly discuss areas of interest lockdown, it received 917 Nature project looked up the group’s discussions with options to restore for their potential as 3.8 This was backed up by
supportive of the Council’s to the group. They have responses and a wealth of at the quality of when they said that the and extend woodlands greenspaces and this survey respondents who,
lead role on biodiversity helped to stimulate our information and opinion. greenspaces in the city, the Council should support and hedgerows; increase should include surveying when asked which actions
issues.” thinking and to shape our The consultation was multifunctional nature of planners and developers the urban tree canopy for existing biodiversity the Council and the city
recommendations. carried out between city greenspaces and how to step up protection and cover; restore and extend interest before any should do to address the
3.0 Ecological Short Life February and March 2020, space for nature can be enhancement of green wildflower meadows; ‘greening’ takes place. VDL ecological crisis, said to
3.2 Presentations were given and was made available incorporated and mapped space and biodiversity protect soil by reducing sites could contribute increase planting of native
Working Group on the following topics: the to the general public for monitoring. It also (55%); that the Council disturbance and fertiliser space for tree planting trees and plant species on
LBAP, city-wide grassland and all stakeholders highlighted the importance should work with other use; reduce carbon in across the city. and around active travel
3.1 The working group management, Glasgow’s through the council’s of the planning process public sector land owners management of the natural routes (49%).
considered a number open space strategy website (www.glasgow. and city development plan to maximise green environment i.e. less cuts 3.7 It was discussed that a Additionally, in terms of
of presentations from a and Connecting Nature, gov.uk/consultations). in protecting greenspaces corridors and pollinator of grass per year; restore tree planting strategy how the city can achieve
range of speakers and the vacant and derelict The consultation was and biodiversity and the ways through the city and extend wetlands and should identify spaces carbon neutrality by 2030,
organisations covering: land (VDL) strategy, extensively promoted principle of biodiversity (53%); that we should restore peatlands. across the city where survey respondents feel
Neighbourhoods tree planting strategy, through the Council’s net gain in developments. increase connections there is potential for tree that priorities should be
and Sustainability, restoration of peatlands, social media channels, Importantly there was across the city between 3.6 Discussion on the planting which does not to restore and extend
Development and the State of Nature report, including Twitter discussion about habitat green spaces, for both vacant and derelict land damage existing valuable woodlands and hedgerows
Regeneration Services, and Facebook. Some linkages and how these people and wildlife (51%) strategy, a tree planting habitat such as meadows. (78%) and increase the
152 Climate Plan Climate Plan 153
urban tree canopy cover unaware of the existence are nationally and with respondents were worried Most respondents feel regarding their level of recommendations within A review takes place
(56%). of peatlands, more often respect to Glasgow. The about the effects of this could best be done worry about a range of the climate emergency to identify vacant and
a rural feature, within the IPBES main drivers are biodiversity loss on them through social media (69%) ecological issues. Here working group’s report and derelict land suitable for
3.9 The working group’s Glasgow boundary (see relevant to Glasgow as personally compared to and holding community respondents mentioned recommendations relate greening and rewilding,
discussion on peatlands Appendix C, Q1). An issue well as nationally and it 84% being worried about workshops/community a level of despair at the to the natural environment with a view to its change
looked at the need to for Glasgow is that though was agreed that restoring the effects of biodiversity drop-ins (59%) while a continued failings of and are directly relevant to of use as designated open
redress previous poor many peat-rich areas are habitats, habitat linkages loss on future generations further 59% are keen for governments, organisations the ecological emergency. space.
management of raised protected for their nature and the health and which suggests that people opportunities to volunteer. and businesses to take These recommendations
bogs in the city and conservation value they function of ecosystems care more widely about Partnership working with the issue seriously and are thus incorporated into 4.2 It is important that any
to protect them from are not owned by the is vital to reversing these societal and community schools and colleges is felt to implement actions the ecological working tree planting is of native
development. It was Council so appropriate declines. It was agreed effects than simply about to be of benefit by 55% of to tackle the problem. group’s recommendations: species with a diversity
highlighted that Scotland’s management will require that it was important to themselves. Large numbers respondents and 49% want There was also concern and mix of species
peatlands are its single communication and keep biological records of respondents were also increased opportunities that sections of the A formal audit and costed being chosen to benefit
most important terrestrial engagement with land in Glasgow up-to-date worried about the effects to join ‘Friends of Parks & population still failed to plan are brought forward invertebrates, birds and
carbon store- over 20 owners. for site monitoring and of biodiversity loss on Greenspaces’ groups and understand the issue or by the Council and its other wildlife. There may be
times that of its forests. management. human health (68%); the food growing groups. grasp the seriousness city-region partners on the differences in management
Interestingly, only 25% 3.10 Discussion on the State effects of biodiversity loss of the situation. As a opportunities for much approaches in designing
of survey respondents of Nature Report, Giving 3.11 The majority of survey on the environment (85%) 3.14 Respondents also result of this, there was greater tree planting and woodland for biodiversity
thought that restoring peat Nature a Home and the respondents agreed that and the loss of wildlife highlighted active travel strong support for greater other ways of harnessing and woodland for carbon
bogs should be a priority State of Butterflies our biodiversity is declining due to habitat destruction (walking and cycling), parks education about the the natural environment to offsetting and it is vital
for the Council and the city and Moths in Scotland and being lost (96%). When (85%). and greenspaces, and food importance of action and absorb emissions. that biodiversity is fully
to address the ecological focussed on the alarming asked about the main growing (allotments and how the environment, considered in any decision-
crisis. However, this may decline in species causes, 98% agreed that 3.13 Our survey work community gardens) as nature and the role we play A review is undertaken to making on tree and
be an artefact of the way abundance and distribution human activity, changes in demonstrates an appetite important for ‘greening’ in it are linked. address existing barriers woodland management.
the question was worded, across Scotland and land use and pollution have amongst Glaswegians and reducing carbon to tree planting in order to
with respondents only looked at reasons why our an impact on biodiversity for more involvement footprint. 4.0 Recommendations significantly increase the 4.3 Any review of vacant
allowed to choose their biodiversity is declining loss. in conversations about number of trees within the and derelict land with
top five priorities. It may and being lost; and what biodiversity and the 3.15 Respondents were asked 4.1 Three of the city over the next 5 years. a view to greening and
also be that residents are the main causes of this 3.12 Interestingly, only 39% of ecological emergency. for additional comments re-wilding must include
154 Climate Plan Climate Plan 155
ecological surveys of what Areas, but also as part of A formal audit and costed public bodies, third sector, target to increase canopy through public donations reports. development plan in
already exists at a site the Ecological and Climate plan that fully considers business community, cover with reference to similar to the “Tree Time protecting greenspace
and consider the priority Emergencies. This loss is and integrates biodiversity Glasgow’s citizens and the existing baseline of Edinburgh City”, “Replant Our recommendation: The and biodiversity and
habitat ‘Open Mosaic exacerbated by the fact enhancement is brought communities and adjacent 15% for 2015, assisted Bristol” and Street Trees in Council works with partner survey respondents
Habitat on Previously that even if replacement forward by the Council and local authorities to halt by a tree forum to bring New York. organisations, adjacent (55%) said that the
Developed Land’ before trees are planted, the trees its city-region partners on and reverse the decline in together plans for city local authorities, the city’s council should support
any ‘greening’ measures are chosen for planting are the opportunities for much biodiversity. trees and to increase 4.5 The Glasgow LBAP and academic institutions and planners and developers
put in place. much smaller species that greater tree planting and awareness with target Pollinator Plan contain other stakeholders to fund to step up protection
will never reach the stature other ways of harnessing A review is undertaken to areas linked to schools. actions to implement their and achieve accelerated and enhancement
4.4 Biodiversity, encompassing of the original trees. the natural environment to address existing barriers Support the work of the main aims and objectives. implementation of of green space and
both habitats and species, It is necessary that absorb emissions. to tree protection and Open Space Strategy and The Plans run for a 10- the Glasgow LBAP biodiversity. It is vital
does not stop at the city biodiversity enhancement tree planting in order to Glasgow and Clyde Valley year period. However, in and Pollinator Plan that the planning process
boundaries and therefore it is fully considered and A review takes place of significantly increase the Green Network Partnership light of the Ecological within a significantly takes cognisance of the
is important to work with integral to the audit, vacant and derelict land number of trees within the which contributes to Emergency, and with time reduced target time importance of biodiversity
partner organisations out costed plan and review relating to opportunities city over the next 5 years. understanding where tree running out to make the frame and incorporating in making decisions about
with Glasgow to ensure noted in the first two for these sites to planting will be particularly changes needed globally, additional outcomes developments and land-
that habitats, habitat recommendations. It is contribute to the Open The Council to support the beneficial for nature by nationally and locally, the regarding connectivity use changes across the
linkages and species and also essential that any Space Strategy and the process to introduce the providing better habitat group recommends that for biodiversity under city supported by relevant
their local populations are new planting must have Local Biodiversity Action primary legislation which connections. funding and resources the Urban Ecosystem models such as Building
protected and enhanced appropriate revenue Plan. This must consider will safeguard amenity are made available to Statement. Interim reports with Nature certification.
more widely. contributions assigned potential to retain, where while creating a more The Council will use implement the Plans on progress to be provided
The loss of tree cover from to ensure adequate present, the priority habitat efficient and effective the My Park Scotland more quickly. In addition, to the Environment, Our recommendation: The
many large trees planted management is in place. ‘Open Mosaic Habitat on way to deal with the high crowdfunding platform monitoring and review of Sustainability and Carbon new City Development
in the 19th and early 20th Previously Developed Land’ number of Section 172 to support partnership progress made is essential Reduction City Policy Plan, and associated
Century must be viewed in As an outcome of the as outlined in: Habitats On notifications received by working with existing at a local level in Glasgow Committee. guidance, strengthens
the wider context of the working group’s activities, Previously Developed Land planning authorities. charitable trusts to to feed into national and extends existing
reduction in the amenity, our additional and related increase resources for biodiversity strategies and 4.6 The working group requirements on
cultural and historic value recommendations: The Council commits Also increase support for the protection, planting provide accurate national discussed the the protection and
within the Conservation to working with other tree planting by setting a and maintenance of trees monitoring and progress importance of the city enhancement of
156 Climate Plan Climate Plan 157
biodiversity and includes shown to provide suitable 4.8 Survey respondents (50%) 4.9 Active travel was one of Green Network Partnership provide for engagement when certain triggers connectivity.
a default requirement for habitat for bees and other asked for more open space the most frequent issues to identify opportunities with nature. On more around waiting lists are
overall biodiversity net invertebrates. There is to be allocated for nature raised by respondents to for delivering better direct commuter routes, activated. There is great 4.11 Managing grasslands and
gain, as well as for specific great potential for green in the city. This could be the climate emergency active travel opportunities e.g. on road-space, potential for allotments, wildflower meadows across
actions such as the roofs to be installed achieved by declaring more survey, alongside broader through “green space” opportunities should community gardens the city for pollinators
provision of swift bricks on existing and new Local Nature Reserves concerns about transport. as part of the GCVGNP be taken to maximise and other food growing and other wildlife are
and bird and bat boxes, to buildings in the city. Green (LNRs) throughout the It was also a concern of Green Network Blueprint. nature as part of a wider initiatives to contribute to key actions within the
guide the development of roofs also play a role in city. Glasgow currently ecological emergency This analysis will be placemaking approach. creating, protecting and LBAP and Pollinator Plan
proposals and planning water management and has 12 LNRs. Designating survey respondents incorporated into the OSS enhancing biodiversity and vital to protecting
decisions. This should sustainable urban drainage LNRs in strategic locations with comments received Delivery Plan. 4.10 Food growing (allotments especially where food is and hopefully increasing
be supported through systems contribute to would also help to increase about increasing cycling and community gardens) grown organically without pollinator populations in
additional professional climate mitigation and green corridors, pollinator infrastructure; and the Our recommendation: The is seen by survey herbicide usage, and this Glasgow. It is essential
development for all temperature regulation. pathways and allow for promotion of walking and Council and its partners respondents as important should be supported. Site that this work continues
planning officers. The woodlands, hedgerows and cycling options. Active ensure that current and for ‘greening’ and there is locations should have no to be maintained and
City’s Open Space Strategy Our recommendation: The wildflower meadows to be travel has benefits to proposed active travel a wish for food growing adverse impact on priority extended and beneficial for
Delivery Plan will identify new City Development Plan maintained, established or public health and to routes are assessed for sites to be expanded. habitats and/or species and the Council to work with
the open spaces that identifies the benefits of enhanced. help mitigate climate opportunities to enhance The Council is currently site investigations should others to do so to ensure
should be used to provide green roofs and sets out change and this has their biodiversity, for producing its Food Growing include an ecological connectivity and a full
more opportunities for a strong presumption that Our recommendation: The been addressed through example through creation/ Strategy for the city and survey prior to any network of pollinator ways
biodiversity and for habitat new buildings will include Council supports new, the Climate Emergency retention of hedgerows there is a high level of decisions being made. and that local communities
connectivity and the green roofs, wherever and further extensions to, Working Group’s and wildflower strips. interest in community are fully engaged with the
Council will act, with its possible, to deliver benefits Local Nature Reserves to recommendations with Opportunities should be groups for food growing Our recommendation: process and consulted.
partners, to deliver these for biodiversity and surface improve green corridors regard to the city’s taken to maximise the locally. Each Scottish Food growing sites
opportunities. water management. The and pollinator ways and new transport strategy. potential of the green Local Authority also has (allotments and community Our recommendation:
Council actively promotes protect and enhance However, active travel network, including river a statutory duty under gardens) are located out The Council’s wildflower
4.7 Green roofs with biodiverse the installation of green habitats and species routes are not currently corridors, the canal Part 9 of the Community with biodiversity diverse meadow and grassland
planting (including a roofs/green walls on throughout the city – see all biodiverse. The council corridor, through parks and Empowerment (Scotland) sites and are supported management across
wide range of wildflower appropriate city buildings. Appendix D. has been working with the on former rail formations, Act 2015 to address to deliver biodiversity the city is increased for
species) have been Glasgow and Clyde Valley to provide routes that allotment provision net gain and habitat pollinators, and a five year
158 Climate Plan Climate Plan 159
action and engagement from development and in the city to highlight economy, our health or were non-native. The WANE and develops mapping of
plan for wildflower Our recommendation: the damage by previous 4.14 Glasgow is known as the opportunities to enhance the way we live.’ There are Act (2011) brought in INNS city-wide to allow
creation is developed. Installation of Sustainable poor management needs ‘dear green place’ due to biodiversity, provide space many well documented new provisions governing for monitoring and future
In addition engage with Drainage Systems (SUDS) to be addressed. Lowland its large number of parks, for nature, encourage cases of notorious species the introduction of non- treatment programmes
other large landowners in new developments or raised bogs are located in cemeteries and other pollinator-friendly planting which are, or are perceived native species in Scotland. as appropriate; and works
in Glasgow to encourage re-developments should North East Glasgow. Large greenspaces and survey in formal areas and as being, problematic. For In Glasgow we have a with partner organisations
similar habitat creation and provide biodiversity net areas of the peatland- respondents see these as creating habitat mosaics in plants, such cases mainly ‘Policy on invasive non- with the aim of controlling/
consult with communities gain through provision of rich land are privately important to ‘greening’ the larger parks/greenspaces relate to tall and vigorous native plant species in managing INNS along the
and neighbours. habitats identified within owned and there are city as well as for carbon as part of multi-functional growing high profile Glasgow’ but currently no city’s river corridors, LNRs
the LBAP. damaged peatlands due to capture. Many parks and usage. species such as Giant specific non-native animal and at other key sites.
4.12 Water management and abandonment and fires. greenspaces already Hogweed. However there policies. The Council runs
flood alleviation schemes 4.13 The working group contain some biodiversity 4.15 The Intergovernmental are many more species a Japanese Knotweed 4.16 The Climate Emergency
are essential to climate had a presentation Our recommendation: habitats and species but Science-Policy Platform on which are not viewed as annual treatment Working Group report
change mitigation in and discussion on The Council seeks further there is potential for most, Biodiversity and Ecosystem problems and many species programme which uses has already noted that
Glasgow. There is great peatlands. According to resources to develop if not all, of them to further Services (IPBES) Gobal which people think of as herbicide spraying and ‘the climate emergency
potential for sustainable the International Union engagement with all contribute to halting and Assessment Report 2019 being part of the native stem injection to control demands commitment and
drainage systems (SUDS) for the Conservation of stakeholders to ensure reversing the decline in shows one of the main flora, are in fact non- the species. Giant Hogweed comprehension from all
to benefit biodiversity Nature (IUCN) ‘peatland that Glasgow’s peatlands biodiversity and providing drivers for biodiversity natives. is also controlled where levels of our organisations.
if they are designed conservation is a prime are restored and protected. opportunities for ‘re- loss is invasive non-native it is considered a threat. The working group wishes
with nature in mind. For example of a nature-based In addition, the Council wilding’. species (INNS). The Audit of Alien Species There has been large scale to see leadership from
example, SUDs can have solution to climate change’. develops proposals to in Scotland report (2001) Rhododendron ponticum senior officials of our
shallow permanent ponds, During the presentation, ensure that the peatlands Our recommendation: The Department for the suggested that 988 removal from key sites. public bodies, as well as
wildflower banks and the group heard that are enhanced, including Strategic mapping and Environment, Food and non-native species were elected members. Climate
accessible perimeters for Scotland’s peatland is its quantifying carbon capture operational planning, Rural Affairs (DEFRA) established in Scotland. Our recommendation: issues are everyone’s
animals, however some single most important storage and their impact. should be carried out (2009) has defined INNS Studies for the flora of The Council continues business and they need to
SUDS such as dry swales terrestrial carbon store- to enable parks and as ‘Any non-native animal Glasgow show that out to implement its policy be genuinely and tangibly
seeded with grass or over 20 times that of its The Council develops a greenspaces, cemeteries, or plant that has the ability of some 1560 species on Invasive Non-Native mainstreamed through
underground systems have forests. Yet, in Glasgow, our peat free procurement former landfill sites, and to spread causing damage recorded as ‘growing wild’ Species INNS and carry organisational life’ and the
little or no benefit. peatlands need protection policy. green/grey/blue corridors to the environment, the in the city, more than half out treatment programmes same holds true for the
160 Climate Plan Climate Plan 161
ecological emergency. survey respondents early years.) could do which can be taken to sustainable and wildlife of biodiversity’. It makes
highlighted interest in more to increase children’s tackle it; with development friendly green landscaping, sense to raise awareness
Our recommendations: volunteering with 59% knowledge of ecology of support for outdoor associated planting and of the ecological
Work with Community ‘keen for opportunities to and causes of biodiversity learning across all staff in greening infrastructure, emergency to all council
Planning to incorporate the volunteer’. Additionally, loss and to increase educational establishments including green walls, with staff.
principle of biodiversity almost 49% want children’s experience and including Early Years. support for the provision
net gain into their decision increased opportunities understanding of nature of natural play areas and Our recommendation:
making. to join ‘Friends of Parks & around them. It was noted The Council develops school gardens. the Council develops
Greenspaces’ groups and that schools already do a opportunities, as part ecological and climate
Ecological issues should be food growing groups. lot of good educational of the Curriculum 4.20 When survey respondents emergency awareness
mainstreamed throughout work on the environment for Excellence, for all were asked what else do mandatory training for all
the Council and other Our recommendation: but also that teachers education establishments they thought the city’s staff through its online
public bodies. Support and promote, should have the time, to access outdoor learning private and public sector training platform (GOLD).
using various means, training and resources and undertake outreach organisations should be
4.17 Volunteers and active local environmental needed to ensure children biodiversity work. doing to help support
community groups are volunteering groups to and young people have 4.19 When asked to provide Glasgow’s biodiversity,
vital to carry out local enhance biodiversity in the opportunities to learn any further comments respondents highlighted
action for the environment their localities including about the environment and about their children and that ‘the Council should
and biodiversity. There working with the SSPCA to nature. education, it was noted lead by example both
are already existing raise awareness of wildlife that every school should to the public and as an
opportunities to do crime and responsible pet Our recommendations: have access to good employer’ and that ‘the
so through Friends of ownership. Work in partnership quality useable greenspace. Council should practice
Parks and Greenspaces with Education Services, the same actions and
groups and third sector 4.18 Over 90% of survey support Glasgow’s teachers Our recommendation: recommendations with
organisations such respondents who were a to access training and Investment in and its land and green space
as The Conservation parent, guardian or carer resources to formally and improvement of the as it asks the public to
Volunteers (TCV) working of school age children informally engage with education estate should do’. As a public body the
in partnership with said that educational pupils on the ecological protect and enhance Council has a legal duty to
the Council. However, establishments (schools, emergency and the actions biodiversity through ‘further the conservation
162 Climate Plan Climate Plan 163
6.0 Appendices: Appendix A
The Short Life Working Group Recommendations

1. The Council commits connectivity for biodiversity enhancement of opportunities. to regulatory matters, and 7. The Council to support the consider potential to retain, for engagement with nature.
to working with other under the Urban Ecosystem biodiversity and includes will be accompanied by a process to introduce the where present, the priority On more direct commuter
public bodies, third sector, Statement. Interim reports a default requirement 5. A Forestry and Woodland costed implementation plan primary legislation which habitat ‘Open Mosaic routes, e.g. on road-space,
business community, on progress to be provided for overall biodiversity Strategy for Glasgow which sets a target for an will safeguard amenity Habitat on Previously opportunities should be
Glasgow’s citizens and to the Environment, net gain, as well as for will be undertaken, and a increase in canopy cover while creating a more Developed Land’ as outlined taken to maximise nature as
communities and adjacent Sustainability and Carbon specific actions such as costed implementation plan relative to the baseline of efficient and effective in: Habitats On Previously part of a wider placemaking
local authorities to halt Reduction City Policy the provision of swift bricks prepared, which delivers 15% in 2015. A Tree Forum way to deal with the high Developed Land approach.
and reverse the decline in Committee. and bird and bat boxes, to increased canopy cover, of stakeholders will be number of Section 172
biodiversity. guide the development of considers biodiversity net established to oversee both notifications received by 10. The Council and its partners 11. The new City Development
3. The Chief Executive reviews proposals and planning gain, habitat connectivity this recommendation and planning authorities. ensure that current and Plan identifies the benefits
2. The Council works with current staffing, resource decisions. This should and carbon management. recommendation number 7. proposed active travel of green roofs and sets out
partner organisations, distribution and training for be supported through Through its contribution 8. The Council supports new, routes are assessed for a strong presumption that
adjacent local authorities, addressing the ecological additional professional to the Clydeplan Draft 6. The Council will use and further extensions to, opportunities to enhance new buildings will include
the city’s academic emergency within the development for all Forestry and Woodland the My Park Scotland Local Nature Reserves to their biodiversity, for green roofs, wherever
institutions and other Council and brings forward planning officers. The Strategy and the Blueprint crowdfunding platform to improve green corridors and example through creation/ possible, to deliver benefits
stakeholders to fund proposals to increase the City’s Open Space Strategy for a Green Network, it will support partnership working pollinator ways and protect retention of hedgerows for biodiversity and surface
and achieve accelerated Council's focus in this area. Delivery Plan will identify support engagement with with existing charitable and enhance habitats and and wildflower strips. water management. The
implementation of the the open spaces that our city-region partners. trusts to increase resources species throughout the city. Opportunities should be Council actively promotes
Glasgow LBAP and 4. The new City Development should be used to provide This strategy will seek to for the protection, planting 9. A review takes place of taken to maximise the the installation of green
Pollinator Plan within Plan, and associated more opportunities for address existing barriers and maintenance of trees vacant and derelict land potential of the green roofs/green walls on
a significantly reduced guidance, strengthens biodiversity and for habitat to tree protection and through public donations relating to opportunities for network, including river appropriate city buildings.
target time frame and and extends existing connectivity and the tree planting, including similar to the “Tree Time these sites to contribute to corridors, the canal corridor,
incorporating additional requirements on Council will act, with its any recommendations to Edinburgh City”, “Replant the Open Space Strategy through parks and on 12. Food growing sites
outcomes regarding the protection and partners, to deliver these national government related Bristol” and Street Trees in and the Local Biodiversity former rail formations, to (allotments and community
New York. Action Plan. This must provide routes that provide gardens) are located out

164 Climate Plan Climate Plan 165


with biodiversity diverse gain through provision of cemeteries, former landfill managing INNS along the 22. Work in partnership 24. Investment in and
sites and are supported to habitats identified within sites, and green/grey/ city’s river corridors, LNRs with Education Services, improvement of the
deliver biodiversity net gain the LBAP. blue corridors in the city and at other key sites. support Glasgow’s teachers education estate should
and habitat connectivity. to highlight opportunities to access training and protect and enhance
15. The Council seeks further to enhance biodiversity, 19. Work with Community resources to formally and biodiversity through
13. The Council’s wildflower resources to develop provide space for nature, Planning to incorporate informally engage with sustainable and wildlife
meadow and grassland engagement with all encourage pollinator- the principle of biodiversity pupils on the ecological friendly green landscaping,
management across stakeholders to ensure friendly planting in formal net gain into their decision emergency and the actions associated planting and
the city is increased for that Glasgow’s peatlands areas and creating habitat making which can be taken to greening infrastructure,
pollinators, and a five year are restored and protected. mosaics in larger parks/ 20. Ecological issues should be tackle it; with development including green walls, with
action and engagement In addition, the Council greenspaces as part of mainstreamed throughout of support for outdoor support for the provision
plan for wildflower creation develops proposals to multi-functional usage. the Council and other learning across all staff in of natural play areas and
is developed. In addition ensure that the peatlands public bodies. educational establishments school gardens.
engage with other large are enhanced, including 18. The Council continues including Early Years.
landowners in Glasgow to quantifying carbon capture to implement its policy 21. Support and promote, 25. The Council develops
encourage similar habitat storage and their impact. on Invasive Non-Native using various means, 23. The Council develops ecological and climate
creation and consult Species INNS and carry local environmental opportunities, as part emergency awareness
with communities and 16. The Council develops a out treatment programmes volunteering groups to of the Curriculum for mandatory training for staff
neighbours. peat-free procurement and develops mapping of enhance biodiversity in Excellence, for all education through its online training
policy. INNS city-wide to allow their localities including establishments to access platform (GOLD).
14. Installation of Sustainable for monitoring and future working with the SSPCA to outdoor learning and
Drainage Systems (SUDS) 17. Strategic mapping and treatment programmes raise awareness of wildlife undertake outreach
in new developments or operational planning, should as appropriate; and works crime and responsible pet biodiversity work.
re-developments should be carried out to enable with partner organisations ownership
provide biodiversity net parks and greenspaces, with the aim of controlling/

166 Climate Plan Climate Plan 167


6.0 Appendices: Appendix B 6.0 Appendices: Appendix C
Membership of the Ecological Working Group Public Ecological Emergency Survey Summary (March 2020)

Cllr Martha Wardrop (Chair) Glasgow City Council Introduction Action Rank Percentage (%)
Support planners and developers to step 1 55%
Cllr Kyle Thornton Glasgow City Council This report provides a summary of the online public consultation up protection and enhancement of green
Cllr Matt Kerr Glasgow City Council into the Ecological Emergency. space and biodiversity
Cllr Laura Doherty Glasgow City Council Work with other public sector land own- 2 53%
Background ers to maximise green corridors and polli-
Seamus Connolly NS Glasgow City Council nator ways through the city
The consultation was carried out between February and March
Rachel Smith NS Glasgow City Council Increase connections across the city be- 3 51%
2020, and was made available to the general public and all
tween green spaces, for both people and
Carol MacLean NS Glasgow City Council stakeholders through the council’s website (www.glasgow.gov.
wildlife
uk/consultations). The consultation was extensively promoted
Rachel Morrison NS Glasgow City Council Allocate more open space for nature in 4 50%
through the Council’s social media channels, including Twitter and
Gavin Jackson NS Glasgow City Council Facebook. In total, there were 917 responses received. the city
Alan Duff DRS Glasgow City Counci Increase planting of native trees and 5 49%
This report contains a number of charts and tables, where plant species on and around active travel
Sean Kelly DRS Glasgow City Counci percentages do not sum to 100%, this may be due to computer routes
Dave Lang NatureScot rounding, the exclusion of ‘don’t know’ categories or multiple Plant trees and hedgerows 6 48%
answers. Plan for tree succession to ensure there 7 45%
Paul Walton Royal Society for the Protection of Birds
are enough trees of different ages and
Scott Shanks Royal Society for the Protection of Birds Question 1: Which of the following actions do you think the sizes
Council and the city should do to address the ecological crisis?
Fiona Weir Royal Society for the Protection of Birds Create more wildflower meadows 8 44%
(Please select your top five priorities)
Paul Kirkland Butterfly Conservation Scotland Increase numbers of street trees 9 38%
Anthony McCluskey Butterfly Conservation Scotland Install green roofs on new buildings 10 37%
Make sure maintenance is provided for 11 37%
Arina Russell The Woodland Trust to sustain public support for biodiversity
Rebecca Strofton The Conservation Volunteers measures

168 Climate Plan Climate Plan 169


Respondents suggested a range of further actions that the Action Rank Percentage (%) Another area where respondents highlighted action around Finally, respondents wanted to address the issue of recycling,
Council and the city should take to address the ecological crisis. Increase public awareness of the benefits 12 37% was public transport. To encourage greater use of public both in terms of reducing the amount of waste produced and to
to physical and mental health of being in transport, it was suggested action should be taken to improve the improve the availability of recycling. Respondents highlighted
There was support for action which promoted food growing contact with nature infrastructure and integration, as well as reduce cost. There was other cities which had banned the use of all single use plastics as
opportunities, particularly existing and new allotments and Maximise support for wild bird popula- 13 35% also comment made that public transport could be made greener, an example which Glasgow should follow.
community growing spaces across the city. Respondents tions through provision of established through the introduction of more electric vehicles.
highlighted other areas which could be used including parks, solutions such as nesting bricks for swifts, Question 2: Are you aware of actions that other cities have taken
vacant and derelict buildings and land, as well as shared back and house sparrow meadow plots The improvement in public transport was seen in parallel with
court areas. It was also suggested that action be taken to action to reduce the amount of private vehicles on the city’s roads.
Talk to other local authorities in the UK 14 34%
address the issue of herbicides and pesticides, which damage the Respondents thought action should be taken to discourage the
and abroad about measures to address 60%
environment and wildlife, being used both in food production and use of cars by:
the ecological emergency in urban set-
in landscaping to control weeds, etc. 50%
tings
• banning most polluting cars
As well as encouraging more growing spaces, some respondents Designate more Local Nature Reserves 15 33% • reducing parking spaces available 40%

wanted to see action which would create more general green Install green walls on city buildings 16 30% • pedestrianising city centre streets 30%
spaces across the city, including re-wilding and the introduction of Create more ponds/wetlands 17 28%
green walls/roofs and rain gardens. The reduction of car usage was also seen as an opportunity to 20%
Install rain gardens in city streets 18 25%
encourage active travel options, including cycling and walking.
Restore peat bogs 19 25% 10%
Respondents particularly wanted to see action to address the Action was identified to increase the cycling infrastructure within
issue of green belt land being used for housing and industrial Eradicate invasive non-native species 20 21% the city including segregated cycle lanes, more cycle stations and 0%
Yes No Don’t know/No opinion
development when there was already a substantial amount of Base: 904 improved cycle hire scheme. % 28% 42% 30%
unused brownfield land within the city.
‘provide schemes to incentivise cycling in the city (improved Base 882
‘Perhaps using brownfield sites for development of housing cycle lanes, better provision for bicycle parking at stations and on
instead of allowing the destruction of green belt as a priority! street, day hire bicycles/ebikes, bike to work purchase scheme),
There’s loads of unused land in the city that should be prioritised introduce measures to reduce the use of internal combustion
for housing first before destroying more green land at the edges engines within city limits.’
of the city.’
170 Climate Plan Climate Plan 171
Question 3: If yes, which city? Please provide any information/or Question 4: How can we involve you in discussions about Question 5: The Council has currently set a target year of 2030 As well as those listed above, respondents highlighted three main
links on specific approaches that might be useful ecological issues? for the city to achieve carbon neutrality (key actions could include areas which they thought were missing from the list, including;
Methods of involvement Percentage (%) carbon capture and carbon storage by the natural environment)
Respondents highlighted a range of other cities across the UK, as • Transport
Through social media 69%
well as in Europe and beyond which have approaches to active Which of the following do you consider important? Please tick • Parks and green spaces
travel, public transport, city greening, food growing, recycling, etc. Hold community workshops/community drop 59% your top three priorities: • Food growing and production
The main cities mentioned, included: -ins
Promote opportunities for ecological 59% Action Rank Percentage (%) Respondents highlighted promoting active travel options such as
volunteering walking and cycling, reducing or banning private cars, particularly
Restore and extend woodlands and 1 78%
Partnerships with schools and colleges 55% hedgerows high polluting vehicles, while improving the reliability and
Increase opportunities to join Friends of Parks & 49% affordability of public transport.
Increase the urban tree canopy cover 2 56%
Greenspaces groups, food growing groups
Restore and extend wildflower meadows 3 53% Again, the issue of parks and green spaces was highlighted, in
I don’t want to be involved 2%
Protect soil by reducing disturbance and 4 43% terms of both the protection of what currently exists in the city
Base: 856 fertiliser use as well as expanding it along roads and path verges and on roof
Respondents highlighted several other ways how they could be Reduce carbon in management of the 5 40% tops. There was strong support for the re-purposing of existing
kept involved in the discussion about ecological issues. As well as natural environment i.e. less cuts of grass brownfield sites and under used spaces across the city. These
methods such as events, workshops and community assembly’s, per year was also a clear indication that there should be no more building
respondents emphasised the role of existing community groups, on greenfield areas around the city. There was again support for
Restore and extend wetlands 6 33%
including community councils and 3rd sector organisations as a banning the use of chemicals (herbicides and pesticides) in food
way of getting more people involved. The role of employers and Restore peatlands 7 31%
growing and in controlling weeds.
businesses was also mentioned to encourage involvement among Base: 836
their staff and customers. Finally, respondents wanted food growing given greater
importance through the expansion of allotments and community
It was also stated that better information about opportunities to gardens, which would help with the greening of the city and
get involved should be used including through churches, schools reduce the carbon footprint of the food we buy and eat.
and other community facilities such as libraries and community
centres.
172 Climate Plan Climate Plan 173
Question 6: To what extent do you agree/disagree with the following statements: Question 7: To what extent, or otherwise, are you worried about the following...

Statements Agree Neither nor Disagree Don’t know/No Base Statements A great deal A fair amount Not very much None/ Not at all Don’t know/ Base
opinion No opinion
Our biodiversity is declining and being lost 96% 2% 1% 1% 837 The effects of biodiversity loss on me 39% 46% 14% - 1% 831
Many animal and plant species are facing extinction 95% 3% 2% 1% 830 personally
Our biodiversity is declining due to human activity 98% 1% 1% - 836 The effects of biodiversity loss on future 84% 14% 1% 1% - 833
generations
Changes in land use have an impact on our 98% 1% 1% - 833
biodiversity The effects of biodiversity loss on human 68% 27% 5% - 1% 831
health
Pollution has an impact on our biodiversity 98% 1% - - 832
The effects of biodiversity loss on the 85% 13% 1% - - 831
Invasive non-native species have an impact on our 80% 14% 3% 3% 831
environment
biodiversity
The loss of wildlife due to habitat destruction 85% 14% 1% - - 824
Exploitation of animals and plants are having an 84% 11% 2% 3% 831
impact on our biodiversity The loss of wildlife due to climate change 80% 17% 2% 1% - 825
I have a good knowledge about the causes of 78% 16% 5% 1% 832 The effects of pollinator loss on agriculture 77% 20% 2% 1% - 827
ecological change and horticulture
Base: 836 The effects of biodiversity loss on the 35% 37% 21% 4% 2% 828
economy
Other people not understanding the 70% 24% 4% 1% 1% 828
importance of biodiversity loss
Base: 836

174 Climate Plan Climate Plan 175


Respondents were asked for additional comments regarding Question 8: Are you a parent, guardian or carer of school aged Question 9: How much do you agree or disagree with the following statements?
their level of worry about a range of ecological issues. Here children?
respondents mentioned a level of despair at the continued failings Statements Agree Neither nor Disagree Don’t know/No Base
of governments, organisations and businesses to take the issue 100% opinion
seriously and to implement actions to tackle the problem. There 90% 75% 19% 237
My children have a good knowledge about the causes 15% 1%
was also concern that sections of the population still failed to 80% and effects of biodiversity loss
understand the issue or grasp the seriousness of the situation. As 70%
a result of this, there was strong support for greater education My children’s concerns about biodiversity loss have 48% 32% 19% 1% 235
60% made me more concerned about an ecological
about the importance of action and how the environment, nature
50% emergency
and the role we play in it are linked.
40%
My children want me / our household to take action 67% 21% 10% 2% 235
30% to fight biodiversity loss
There were comments received that we should no longer be
20%
debating these issues where there is scientific evidence and that Educational establishments (schools, colleges etc.) 92% 6% 2% 1% 236
it was now important to commit to taking action. 10%
could do more to increase children’s knowledge of
0% ecology and causes of biodiversity loss
Yes No
Respondents also highlighted the need for not just individuals to % 29% 71% Educational establishments (schools, colleges etc.) 95% 2% 2% 1% 237
take action but for businesses and governments to act to address could do more to increase children’s experience and
Base: 845
the ecological emergency. It was stated that currently too much understanding of nature around them.
emphasis is being placed on protecting the economy and profits,
Invasive non-native species have an impact on our 80% 14% 3% 3% 831
as a reason for not addressing the current emergency.
biodiversity
‘All too often biodiversity loss is put on a low priority in the Exploitation of animals and plants are having an 84% 11% 2% 3% 831
pursuit of profits by big business/developers or is treated in impact on our biodiversity
a tokenistic way.’ I have a good knowledge about the causes of 78% 16% 5% 1% 832
ecological change
Base: 836

176 Climate Plan Climate Plan 177


When asked to provide any further comments about their children ‘Children need to be outside far more, science and art subjects Question 10: How much do you agree or disagree with the following statements?
and education, it was noted that every school should have access can easily take place outdoors and do so in other countries such
to good quality useable greenspace, and that teachers should as Denmark, Finland and Norway. Being outdoors decreases Statements Agree Neither nor Disagree Don’t know/No Base
have the time, training and resources needed to ensure children obesity, reduces depression, increases general happiness and opinion
and young people have the opportunities to learn about the creates greater respect and understanding of nature.’ 95% 1% 816
Tackling the ecological emergency should be a 3% -
environment and nature.
priority for Glasgow
Respondents also stated that children and young people, through
‘Glasgow schools have a good record of delivering the curriculum schools currently do a lot, and in fact it is adults who are not Tackling the decline of animal and plant species 92% 7% 1% - 809
for excellence through outdoor learning but teachers need more taking action and setting a bad example for younger generations. should be a priority for Glasgow
confidence and time and knowledge to be able to take children Creating, restoring and enhancing wildflower 91% 7% 2% - 813
out of doors for lessons in Greenspaces.’ meadows for pollinators should be a priority for
Glasgow
It was also highlighted that by allowing children to play and learn Public sector organisations have a responsibility 96% 3% 1% - 813
outside in nature, there are clear benefits to both mental and to make it easier for individuals to make
physical health, as well as giving them a better understanding and environmentally-friendly choices
appreciation of their environment. Businesses have a responsibility to protect 98% 1% 1% - 812
biodiversity on their land
Invasive non-native species have an impact on our 80% 14% 3% 3% 831
biodiversity
Exploitation of animals and plants are having an 84% 11% 2% 3% 831
impact on our biodiversity
I have a good knowledge about the causes of 78% 16% 5% 1% 832
ecological change
Base: 836

178 Climate Plan Climate Plan 179


Question 11: How much do you agree or disagree with the following statements regarding tackling the Ecological Emergency? Question 12: In the next 12 months, how likely/unlikely are you to do the following:

Statements Agree Neither nor Disagree Don’t know/No Base Statements Agree Neither nor Disagree Don’t know/No Base
opinion opinion
My actions can help protect the diversity of animals 92% 5% 2% - 814 Leave an area of grass long/weeds/dead wood in my 66% 6% 6% 22% 794
and plants on our planet garden
Reducing my own impact on biodiversity is not a 13% 5% 80% 1% 813 Plant wildflowers for pollinators in my garden/ 77% 6% 6% 11% 792
personal priority balcony/window box
Businesses can help 97% 2% 1% - 810 Put up bird boxes and/or bird feeders in my garden 67% 7% 9% 16% 723
Public sector organisations can help 99% 1% - - 811 Create a garden pond 18% 11% 45% 25% 784
Actions of politicians at a local level can help 96% 3% 1% - 810 Grow my own herbs or food on my balcony, windowsill 73% 8% 12% 7% 790
Actions of politicians at a national level can help 98% 1% 1% - 808 or garden
Actions of third sector organisations can help 95% 3% 1% 1% 807 Use fewer chemicals in the home and garden 82% 6% 4% 8% 792
Actions of educational establishments (schools, 97% 2% 1% - 810 Use peat-free compost 64% 10% 4% 22% 788
colleges) can help Plant native berry bearing shrubs and/or trees to help 48% 16% 5% 1% 832
Base: 836 feed birds
12% 17% 23% 785
Avoid disturbing breeding/nesting areas for wildlife in 78% 4% 1% 17% 789
the garden
Help out at one of the city’s local nature reserves or 46% 23% 25% 5% 789
parks and greenspaces
Drop litter or dump rubbish as it can kill small animals 6% - 83% 11% 787
Join a wildlife charity or other organisation that 47% 25% 23% 5% 786
supports biodiversity

180 Climate Plan Climate Plan 181


Question 13: Thinking about any areas where you personally would Question 14: What else do you think the city’s private and public
be willing to change if there were not barriers – what are those sector organisations should be doing to help support Glasgow’s
Statements Agree Neither nor Disagree Don’t know/No Base barriers? biodiversity?
opinion
Buy souvenirs that exploit the natural world here or 2% 4% 82% 12% 787 I have strong personal preferences or habits which
would be difficult to c hange
Respondents highlighted that the Council should lead by example
abroad The options mentioned aren’t possible in my both to the public and as an employer. The Council should
current home
Contact a political representative to request action 50% 21% 26% 3% 784 I’m not convinced some changes would be worth practice the same actions and recommendations with its land and
on biodiversity loss
the effort green space as it asks the public to do. The Council, as a larger
Health or dis ability reasons prevent me from
making this change employer within the city, should also put into practice schemes
Submit a response to a planning application due to 53% 20% 21% 5% 787 which it promotes to other employers around travel, energy
I don’t know how to make these changes
greenspace or biodiversity issues Childcare or other caring respons ibilities prevent efficiency and waste.
me from making this c hange
Other people would need to be persuaded the
change was a good idea ‘They should be setting an example for everyone in allowing
Making changes would take a lot of time
more areas to be less-intensively managed - so many public
Making changes would cost me more greenspaces are kept constantly mown, but there's no need
I don’t have the space at home/garden required for this as it's very bad for wildlife, and wastes a lot of money
to make this change
The options mentioned aren’t possible with my and fuel in mowing them.’
current job

0% 5% 10% 15% 20% 25% 30% 35% 40% There was strong support for action to be take through the
planning process to prevent the further reduction of the natural
environment by protecting green space, trees or wildlife. Where
this was not possible it was suggested that planning be used to
enforce any loss or reduction is replaced.
Base: 699
‘Insist that ALL planning applications must replace all lost
and enhance biodiversity in line with statutory undertakers
biodiversity duties. Insist that ALL planning applications must
have a positive environmental impact equal to or better than
182 Climate Plan Climate Plan 183
the capital carbon impact from construction of any Food growing and waste reduction were also mentioned by Question 16: What barriers might the city’s private and public lack of drive, enthusiasm and motivation and combined with an
development.’ respondents as actions which could be taken or implemented sector organisations be facing that prevent them doing more to unawareness and lack of knowledge was preventing action being
further by both private and public sector organisations. protect and enhance biodiversity? taken.
Respondents highlighted the need for additional funding to be
made available to support the initiatives needed. Funding needed The main barrier highlighted by respondents was resources, both ‘apathy, conflicting priorities, worrying about the challenges
to be increased and be provided long term to ensure that projects in terms of funding and people. happening today, hard to find time to prevent a crisis tomorrow.’
and schemes would be sustainable and effective. Respondents
also mentioned the idea of financial rewards and incentives ‘Lack of financial resources, lack of skilled personnel’ ‘Lack of awareness, lack of knowledge of how to make these
for residents and businesses who implemented green projects/ Changes.’
schemes. Respondents believed that resources being available and used
correctly was critical in address the ecological emergency ‘lack of knowledge on where to get resources or information
Similarly, with previous answers provided, respondents wanted to and would pose the greatest risk to its success. Respondents about how and why they should protect and enhance
see the Council increase the amount of green space across the identified the previous and ongoing cuts to Council budgets biodiversity
city, through rewilding and re-purposing derelict and underused and the impacts it has had and will continue to have on the in the first place.’
spaces. environmental services, such as park maintenance, rangers and
education provision. Respondents believed that the current economic system acted
Again, there was clear support for private and public sector as a barrier to private companies tackling the ecological issues
organisations tackling the issues of transport within the city by Respondents saw this lack of funding and resources as a clear we face. With the focus on short term profits, especially where
reducing car usage, improving public transport and promoting indication of a lack of political will to address to environmental shareholders were involved, limiting their willingness to protect the
active travel. and ecological issues facing the city. It was highlighted that environment.
there was greater need for political leadership both nationally and
The use of education was again raised, both within schools locally. ‘Fear of economic implications - focus on profit not environment
and among the general public. There was support for raising for private businesses.’
awareness of the importance of action, especially the positive There was also a feeling that there was a level of apathy among
impact it would have on the environment and nature. people and organisations, both public and private, towards the
challenges facing the city and beyond. This apathy causes a

184 Climate Plan Climate Plan 185


About You Question 18: Which of the following describes how you think of Question 19: Do you have any long-term illness, health problem or Question 20: Which of the following best describes your ethnicity?
yourself? disability which limits your daily activity or the work you can do?
Respondents were asked to provide demographic information. The main barrier highlighted by respondents was resources, both
This information was optional and can be used for both additional 1% in terms of funding and people. Ethnicity Percentage
analysis and equalities monitoring. (%)
100%
Scottish 62%
Respondents of the consultation were self-selecting, and the 90%

following information provides further breakdown of those 80% British 27%


34% Irish 4%
respondents. 70%
60% Other white background 10%
Question
40% 17: Age 50% Mixed background -
35% 65% 40%
Indian 1%
30%
30% Pakistani *
20%
25% Bangladeshi -
10%
20% Other Asian background -
0%
Yes No Don’t know/No opinion
15% Caribbean -
% 11% 86% 3%
10% African *
Other black background -
5% Female Male In another way Base: 739
0%
Chinese *
16 - 24 25 - 34 35 - 44 45 - 54 55 - 64 65+
%
Any other background -
8% 18% 24% 21% 16% 12%
Submit a response to a planning application due 53%
to greenspace or biodiversity issues
Base: 731 Base: 744
Base: 733 (* less than 1%)

186 Climate Plan Climate Plan 187


6.0 Appendices: Appendix D 6.0 Appendices: Appendix E
Public Ecological Emergency Survey Summary (March 2020) Biodiversity Duty Report.

The Short Life Working Group, having heard about: Glasgow City Council will be submitting its Biodiversity Duty
Report to the Scottish Government in January 2021.
• The recently designated Claypits Local Nature Reserve, Binghams Pond Early Braes
As required by the legislation, this report covers the three years
and how the LNR designation process could be Bishop Loch LNR Festival Park
April 2017- March 2018,
progressed as part of wider proposals to address Vacant Blairtummock Park Garscadden Burn Park April 2018- March 2019 and
& Derelict Land, provide for active travel and Sustainable
Castlemilk Park Hamiltonhill Claypits LNR April 2019-March 2020.
Urban Drainage for a particular site, and deliver the Open
Space Strategy locally, and Cathkin Braes LNR Househill Park
Cadder Wood Hurlethill
• The current or potential ‘natural interest and/or Cardowan Moss LNR Malls Mire
educational value’ of the following locations have asked Cleddans Burn Red Road
officers to engage with stakeholders with regard to the
Commonhead Moss Todd’s Well
potential for land near the following locations to be
brought forward in future as proposed Local Nature Cranhill Park Dawsholm Park