• Formalized system to ensure consistency.
• TBM- Duty to protect our employees and contractors working on specific
tasks.
How?
• Give authorized permission to work on SARB Package-4 (ZIRKU) site.
Health, Safety & Environment
TYPE OF PERMITS HDEC HSE
19.5% To 23.5%
1. Humans can survive for weeks without food, days without
water, but only few minutes without air.
2. Air contains a mixture of gases but is composed primarily
of nitrogen (78%) and oxygen (20.9%).
3. When levels of oxygen are reduced below 19.5%, serious
health problem begins to occur very quickly.
4. Oxygen is consumed by a variety of chemical processes:
5. Aerobic bacterial growth. (consume oxygen to live)
6. Oxidation of rusting of metals
7. Combustion and displacement by other gases. (welding and
cutting.
PERFROMING AUTHORITY
(PA) MANAGER
HEAN SUP, SHIM
PREPARE PTW ARCHITECTURE
SITE SUPT.
24 Hrs IN ADVANCE SANG WON, SEO
MANAGER
YAE YONG, KIM
Approval from concerned CIVIL SECTION
SITE SUPT.
Section Manager / Site Supt. SANG HYUN, LEE
APPROVAL
MANAGER
DONG RYUNG, KIM
MECHANICAL
SITE SUPT.
WON JOON, JEON
REVIEW BY MANAGER
HDEC HSE YOUNG WOON, KIM
PIPING
SITE SUPT.
JOO WOO, KANG
MANAGER
SU YONG, HA
ELECTRICAL
SITE SUPT.
ISSUEING AUTHORITY (IA) Work Proceed HYUN JUN, YOON
PART I
Performing Authority (PA) prepares the PTW, 24 hours in advance with proper coordination with the
Issuing Authority (IA) and HSE Authority (HSE).
HSE will review the Risk Assessment associated with the description of the work and its surroundings.
PART III
Approving Authority (AA) is the Site Area Manager.
AA shall foresee the whole PTW system in his area of responsibility.
AA shall clearly identify all persons responsible under the PTW including the authenticity of the
signatories.
AA shall approved the PTW when all the requirements under the PTW system including safety
precautions as per Risk Assessment..
Sloped or
Benched
No Material Within
1 Meter of Edge
Proper Access
Health, Safety & Environment
HDEC HSE
PART V
PA, after getting all required signatories in Section 2 he will confirms his signatures on section 5.
STOP WORK
Critical activities include but not limited to the following shall require stage 2
TRA and shall be approved by the COMPANY:
Hot Tapping.
Night Works.
HDEC will utilize night work dispensation for every night activity or
activities beyond the normal working hours which is 6H30Hrs – 18H30Hrs
after 18H30Hrs need to be separate night work permit required.
The following shall be considered during night works:
Routine activities which does not require PTW are the following but not
limited to:
Site housekeeping and facility cleaning ( E.g. Toilets and rooms
cleaning).
Activities not requiring permits shall not relieves the Area Manager/Site
Superintendent or whoever authorized the work to carried out, his
responsibility to control the job effectively.
The Area Manager/Site Superintendent must ensure in Toolbox Talk to a
competent person /Sup’v to carry the job safely and that the work must not
be hazardous to either the employees who carries it out or to anyone else.
Confirming that the work site is safe for the work to proceed.
Continuously monitoring work activity.
• PTW records must be kept until the end of the SARB4 Project.