You are on page 1of 12

Legacy

System Syzer Help Center

New Products SITE INFORMATION


CONDITIONS
Legacy offers FREE design
engineering support.
PROCESS INPUT
NEW! Chiller System Sizing & troubleshooting
Slide Chart Tool. SUPPLY IS LIMITED
DATA OUTPUT
Get a copy of our Terms of use: DISCLAIMER: THE INFORMATION PROVIDED HEREIN IS FOR THE PURPOSES OF
ESTIMATES ONLY. THIS INFORMATION SHOULD NOT BE USED FOR FINAL DESIGN PURPOSES. LEGACY
NEW Chiller Energy CHILLER SYSTEMS, INC RECOMMENDS THAT FINAL SYSTEM DESIGN BE REVIEWED BY A QUALIFIED
Legacy offers the most extensive Knowl
Usage Audit Tool DESIGN BUILD CONTRACTOR OR ENGINEER FAMILIAR WITH ALL LOCAL CODE REQUIREMENTS FOR
CHILLER AND ASSOCIATED WATER DISTRIBUTION SYSTEMS. LEGACY CHILLER SYSTEMS SHALL NOT BE on the net.
HELD LIABLE (EXPRESSED OR IMPLIED) FOR THE ACCURACY OF THIS INFORMATION NOR ITS
COMPLIANCE WITH LOCAL/STATE AND/OR FEDERAL CODES . SystemSyzer version (v3.0).

Mission Critical Applications


Fluid Cooling Solutions
Help Center

Legacy offers FREE design


engineering support.

gacy offers the most extensive Knowledgebase


on the net.
Legacy Chiller Systems
System Syzer

Home Site Information Conditions Process Input Data Output


SystemSyzer
Contact Information Project Information
Help Center
Company Project name:
Contact Prepared by: About this page
Work phone Site address: It is important that you input basic
information about your project into
Cell phone Site city: SystemSyzer in order for the system
Email Site zip to accurately perform your
calculations.
Address
City
State
Zip

Rev v3-beta 02/28/202207:48:57


Legacy Chiller Systems
System Syzer

basic
t into
ystem

Rev v3-beta 02/28/202207:48:57


Legacy Chiller Systems
System Syzer

Home Site Information Conditions Process Input Data Output


SystemSyzer
Help Center
1. If you are running your chiller outdoors, what is 60F ?
the coldest outdoor temperature you expect? 50F
40F About this page
30F In order to perform
20F
10F
computations for application
0F SystemSyzer needs some basic
2. What percentage glycol would you like to run? 0%
-10F
? information on your operating
5%
-20F conditions.
10%
-30F
15%
20%
25%
3. At what voltage and phase would you like your 208/230/1ph/60HZ
30% ?
chiller to run? 208/230/3ph/60HZ
35%
460/480/3ph/60HZ
40%
575/3ph/60HZ
45%
380/3ph/50HZ
50%

Rev v3-beta 02/28/202207:48:57


Home Site Information Conditions Process Input Data Output SystemSyzer
Load> 1 2 3
Help Center
Max flow(GPM)
Temp to load(F) About this page
Est load temp rise(F) Use this universal layout graphic to
Pressure to load (PSI) input information about your syste
Left click on the cell and select inpu
Load pressure drop(PSI) date from the drop down box.
Tolerance range +/-(F)
Branch pipe length(FT)
Branch fittings count

>>> >>>
Supply Header
<<<< 50 >>>> <<<< >>>> <<<< >>>>
<<< <<<
Return Header
yzer
nter

ut graphic to
ut your system.
d select input
wn box.
SystemSy
Load> 1 2 3 Help Cen
Branch Load BTUH
Branch Load KWH
Branch Load TONS
Branch PD (PSI)
Branch PD (FT)
Branch Fluid Volume

" Supply

" Supply

" Supply
" Return

" Return

" Return
"Pipe "Pipe "Pipe
GPM
>>> GPM
>>> GPM
>>>
"Pipe "Pipe "Pipe
<<< GPM
<<< GPM
<<< GPM
Total BTUH Needed: 0.00 System Pump GPM: 0.00
Total tons needed: 0.00 System Pump Head: 0.00
Go to Quote Wizard

Quote Request
Please fax to: 240-214-8303
IMPORTANT: Please make sure to write your contact information in below or click on the "Site Information" link above to input your contact and
project information.

Contact Information Project Information


Company - Project name: 0
Contact - Prepared by: 0
Work phone - Site address: 0
Cell phone - Site city: 0
Email - Site zip 0
Address - Comments: <Enter any comments / questions here. >
City -
State -
Zip 0
Chiller Performance Requirements Chiller Pump Requirements
BTUH Requirement - System pump GPM -
Tonnage - System pump HEAD -
Variance Allowance(F)
Glycol (%) 20%
Design LWT (F)
Instructions : Based on the information you have provided to SystemSyzer Legacy can now provided you with a quote should you need
one. If you wish to get a quote you have two options to chose from:

Option #1: Print and fax this page to the number provided at the top of the screen. Within 24-48 hours one of our Engineers will provide
you with a written quote. If there are any follow-up questions we will be in contact.

Option#2: You can log into our on-line Quote Wizard system. I access our on-line Quote Wizard system click the "Go To Quote Wizard" link
above.

Legacy Chiller Systems SystemSyzer v2.1 02/28/202207:48:58


Step#4 - Data input sheet
Branch load# 1 2 3
Branch load name
Max flow(GPM)
Temp to load(F)
Est load temp rise(F)
Supply header

Pressure to load (PSI)


Load pressure drop(PSI)
Tolerance range +/-(F)
Branch pipe length(FT)
Branch fittings count
Branch pipe size
Branch pipe gallons
Branch pressure drop(PSI)
Branch BTUH
Point header GPM>
Headers

Point header pipe size>


Distance(FT)> 50.00 - -
From/To> Chiller -1 1-2 2-3
Branch load# 1 2 3
header
Return

Temp out(F)
Pressure (PSI)
SYSTEM INFORMATION CHILLER SYSTEM ADJUSTMENTS COMMENTS
Chiller BTUH - Chiller BTUH (Water) -
Important information:
Chiller TONS 0.00 Glycol concentration 20%
Chiller flow rate(GPM) - Glycol factor in (BTUH) 0.014 1. Total Adjusted (BTUH) does not take into account the ambient temperature
Glycol loss(BTUH) - the chiller will be exposed to. If outdoor ambient temperature is expected to be
Total header piping 100.00 Glycol capacity(BTUH) - warmer than 95F the chiller capacity will need to be higher to produce the
Total branch piping - Glycol capacity(TONS) - same amount of capacity.
Total piping 100.00
Total system drop(PSI) - 2. Total pump (HEAD) does not include internal pressure drop of the chillers
internal piping or components. Customers who wish to purchase TANKLESS
Total header gallons - Glycol factor on (PSI) 1.08
chiller platforms such as the PAC or ES (split) need allow for the chillers
Total branch gallons - Added glycol head(PSI) - internal pressure drop. Customer who wish to purchase chiller with internal
Total loop gallons - Total external(Head) - tank sections such as the PACT or EST do NOT need to allow for internal
chiller pressure drop.
Total header drop(PSI) - Average load approach(F)
Max branch drop(PSI) - Change from ARI(F) For more in depth technical information visit www.legacychillers.com and go to
Total system drop(PSI) - ARI btuh adjustment our Knowledgebase system or call Legacy Engineering support toll free at
877-988-5464.
Total system drop(Feet) -
TOTAL Adjusted (BTUH) ************** Please review additional information below **************
Avg Loop tolerance(F) TOTAL Adjusted (TONS)
TOTAL system flow rate(GPM) -
TOTAL pump (HEAD) -

You might also like