You are on page 1of 1

FOR TENDER ONLY

CONTINUED A-A
30 NOVEMBER 2020

JNK Consultant Sdn. Bhd.


( 410503-V )

60

BOUNDARY
LALUAN DALAMAN BANGUNAN

50

FRL 43.50 FFL 43.80


FGL 43.55
FGL 43.05

40
9
8
7
6
5
4
3 TANDA TANGAN PEMILIK TANAH
(Signature of Land Owner)
2
DATUM 30 1

123.85

134.37
101.65
DISTANCE IN METRE
8.442

16.40

27.88

39.00

52.75

64.12

67.75

94.05
0.00

43.831

43.705
43.985

43.369
EXISTING GROUND LEVEL
64.00

62.00

60.00

55.00

50.00

45.00
PERBADANAN KEMAJUAN NEGERI KEDAH
(PKNK) TINGKAT 14, WISMA PKNK,

43.80
FINISHED FLOOR LEVEL

43.55

43.55
43.80
JALAN SULTAN BADLISHAH,
ALOR SETAR, 05000 KEDAH.

43.05
43.05
43.50

43.50
FINISHED ROAD LEVEL

43.50
43.05
TANDA TANGAN PEMILIK BANGUNAN
(Signature of Building Owner)

KERATAN A - A
(scale 1 : 600)
NAMA PENGARAH : QASIM BIN ZUBAIR
NOMBOR PASSPORT : BE5096393
60 NAMA SYARIKAT : AXIN MALAYSIA SDN. BHD.
NOMBOR SYARIKAT : 202001017649 (1373969-H)
CONTINUED A-A

ALAMAT SYARIKAT : LOT 8 & 9, SMI PARK PHASE 2, JALAN HI-TECH


4, KULIM HI-TECH PARK, 09090 KULIM KEDAH.
NO. TEL : +604-4031846 NO. FAX : +604-4031850

BANGUNAN TEMPAT LETAK KERETA DAN LALUAN DALAMAN ARCHITECT

BOUNDARY
50 ADM DESIGN & MANAGEMENT SDN. BHD.
(351128-V)

19, JALAN ZAINAL ABIDIN, GEORGETOWN, 10400 PULAU PINANG.


TEL: 604-2270318 FAX: 604-2270320 EMAIL: admsb1@gmail.com

TANDATANGAN JURUTERA
1920
2000
FFL 43.80 FRL 43.50 (Signature of Engineer)
FGL 43.55 slope 1:2
FGL 43.05 I hereby certify that the details as shown in the plans are in accordance

with the Bye-Laws and Regulations of the Council and accept full

responsibility for the design and supervision of the works.


40
9
8
7 simpanan sungai
6
5
4 Foo Chee Boon Director
3
B.Eng (AUST), M.I.E.M. P.Eng.
2
DATUM 30 1
PROJEK
(Project) PELAN KERJA TANAH

204.78
192.33
162.56
123.85

173.68

175.90

220.58
181.88
139.55

233.18
DISTANCE IN METRE CADANGAN MEMBINA SEBUAH KILANG
ELEKTRONIK 2 TINGKAT YANG MENGANDUNGI:

38.920
43.077
43.369

43.084

41.580

36.540
EXISTING GROUND LEVEL
40.00

35.50

35.85
a) 1 UNIT KILANG SETINGKAT DENGAN PEJABAT 2
43.50

FINISHED FLOOR LEVEL


43.55

TINGKAT
43.80

b) 1 UNIT PONDOK PENGAWAL


c) 1 UNIT KEBUK SAMPAH
FINISHED ROAD LEVEL
43.50
43.05

43.05
43.50

DI ATAS LOT PT 3935, JALAN HI-TECH 4


SAMBUNGAN, SMI PARK PHASE 2, KULIM HI-TECH
PARK, SEKSYEN 39, MUKIM BANDAR KULIM, KEDAH

KERATAN A - A (CONTINUED) DARUL AMAN.

(scale 1 : 600) UNTUK: TETUAN AXIN MALAYSIA SDN. BHD.

LUKISAN

BOUNDARY
(Drawing)
BOUNDARY

50
KERATAN
LALUAN DALAMAN BANGUNAN LALUAN DALAMAN

slope 1:1.5
FRL 43.50 FFL 43.80 FRL 43.50
FGL 43.05 FGL 43.55
FGL 43.05

JNK
40
9 JNK Consultant Sdn. Bhd.
8 CONSULTING ENGINEERS (410503-V)
7
6
5 253G-5-5, PREMIER CENTRE, JALAN BURMA, 10350 PULAU PINANG.
4 TEL. : 04 - 2276688
3 FAX : 04 - 2277077
2 email : jnkcsb @ gmail.com
DATUM 30 1

SCALE
DISTANCE IN METRE
53.10

62.30

72.70

88.20
21.20

37.30
17.10

79.82

83.70

98.10
0.00

8.90

DRAWN BY
43.405

43.835
43.240

43.981
43.951
43.717
42.740

43.160

43.263

44.019

43.611

EXISTING GROUND LEVEL CHECKED BY


APPROVED BY
43.80
43.35
43.35
43.80

FINISHED FLOOR LEVEL DRAWING NO.


JOB NO. SHEET NO. REVISION
43.05

43.05

43.05
43.50

43.50

43.50
43.50

FINISHED ROAD LEVEL


43.05

220011 EW2/3

KERATAN B - B FILE NAME DATE


(scale 1 : 600) 1:600
PLOTING SCALE 08/9/2020

You might also like