Professional Documents
Culture Documents
Equipment Booking Form MV
Equipment Booking Form MV
Jonathan Bailey
Total
Date Time
Issue 27th January 2022 2:40 pm
Return 3rd
February 2022 9:50am
Production team
Names Roles Contact details
Corey Director xxxxxxxx
Jonathan Clapper loader xxxxxxxx
Jonathan/Ryan/Corey/Emilie Camera operator xxxxxxxx
xx
Actors
Jonathan Protagonist 3 xxxxxxxx
Corey Protagonist 2
Ryan Protagonist 1
Emilie Protagonist 4
Location: Melksham
Times
Meet time at base 12pm
On location 1:00pm
Shoot time (s) and scene numbers All except the last scene: 9.30pm-10pm
Everyone – but in particular Jay. VERY LOW Turn lights off during breaks. Keep exposure to the heat source VERY LOW
Hot environment (lights) LOW to a minimum. Regular breaks. Water. LOW x
MEDIUM x MEDIUM
HIGH HIGH
EXTREMELY HIGH EXTREMELY HIGH
VERY LOW Lights have been professionally fitted and are regularly serviced; VERY LOW x
Object falling or moving Heavy lights could fall on anyone LOW x have safety chains on them. LOW
(lights) in studio. MEDIUM MEDIUM
HIGH HIGH
EXTREMELY HIGH EXTREMELY HIGH
Everyone – but in particular Jay. VERY LOW Make sure floor is clear. Keep cables out of actor’s path. Keep VERY LOW x
Trip hazard (cables) LOW x kit tidy. Make sure everyone is aware of tripod position and any LOW
MEDIUM tracking camera moves (rehearse these). MEDIUM
HIGH HIGH
EXTREMELY HIGH EXTREMELY HIGH
Crew moving green floor pieces VERY LOW Only lift one at a time – make sure fingers do not get trapped VERY LOW x
Manual handling LOW x while assembling. LOW
MEDIUM MEDIUM
HIGH HIGH