Checkup procedure:
fter first sea trials, and of operation check tightness on all nuts.
Mount the hydraulic tensioner over the bolt at the long thread end.
Pressurize first the hydraulic tensioner to ½ the specified tensioning pressure: 655,5 [bar].
If nut is tight pressurize the hydraulic tensioner to ¾ the specified tensioning pressure: 983,25
[bar].
If nut is tight pressurize the hydraulic tensioner to the specified tensioning pressure: 1311 [bar].
If loose nut is observed at specified tensioning pressure 1311 [bar], tightening the nut and release
pressure on hydraulic tensioner and remove tools.
If loose nut is observed at ½ or ¾ the specified tensioning pressure, then loosen and remove nuts,
bolt and sleeve in the particular connection, clean and apply new anti-seize compound then
proceed with the fitting procedure from top.