The document contains an internal exam for a Civil Engineering course on Contracts and Accounts. It has two sections - the first section contains 6 true/false or fill-in-the-blank questions worth 5 marks total. The second section contains 3 long-answer questions worth 5 marks and asks students to either provide a flow chart of the PWD organization, describe the duties of a Sub-Assistant Engineer, or prepare a list of contract documents. The test is worth a total of 10 marks and students have 30 minutes to complete it.
The document contains an internal exam for a Civil Engineering course on Contracts and Accounts. It has two sections - the first section contains 6 true/false or fill-in-the-blank questions worth 5 marks total. The second section contains 3 long-answer questions worth 5 marks and asks students to either provide a flow chart of the PWD organization, describe the duties of a Sub-Assistant Engineer, or prepare a list of contract documents. The test is worth a total of 10 marks and students have 30 minutes to complete it.
The document contains an internal exam for a Civil Engineering course on Contracts and Accounts. It has two sections - the first section contains 6 true/false or fill-in-the-blank questions worth 5 marks total. The second section contains 3 long-answer questions worth 5 marks and asks students to either provide a flow chart of the PWD organization, describe the duties of a Sub-Assistant Engineer, or prepare a list of contract documents. The test is worth a total of 10 marks and students have 30 minutes to complete it.
Subject- Contracts and Accounts Stream-CIVIL ENGINEERING
Time: 30 min FM: 10
1. Answer any five from the following: 5×1=5
1 The amount of Earnest money is about __________% of the estimated value.
2 The smallest unit of PWD organization is under charge of____________. 3 The full form of NIT is___________________. 4 Item rate contract is also known as, unit rate contract. (True/False) 5 Technical Sanction is required before Financial Sanction. (True/False) 6 The time of completion is mentioned in tender form. (True/False)
2. Answer any one from the following: 5×1=5
a) Give the flow chart of PWD Organization.
b) State the duties and responsibilities of Sub-Assistant Engineer.