SCOPE:
The scope of the SOP of repair procedure is to establish the steps/guidelines to repair the
piping/ tubes.
EXTENT OF REPAIR:
During the boiler testing/process like hydro test, water flushing, pneumatic test & other
process, found any leakages on the pipe/tube. Location marked drawing should be attached.
Location: _______________________________________________________________
REFERENCE DOCUMETS
Drawing No:
Drawing Name:
WPS No:
Page 1 of 3
REPAIR PROCEDURE
Item/spool description:
Specification of material/size:
Insert Length/Details:
PROCEDURE:
e) Carry out full welding with GTAW/SMAW process as per WPS No:
_________________________________________________________________
f) As per WPS the following welding consumables shall be used for welding process.
*
*
*
*
g) Carry out visual inspection of welded joints and the joints shall be NDT100%.
h) Joint set-up, welding & NDE shall be properly documented.
RESPONSIBILITY:
It shall be the responsibility of Company to make all necessary arrangements for repairing of
pipe/ tubes, visual and NDT clearance as per our approved QAP.