SCHEDULLE MAINTENANCE ( TAHUN 2020)

BULAN
No. EQUIPMENT STATUS
1 2 3 4 5 6 7 8 9 10 11 12
Bak Kontrol Plan F,G F,G F,G F,G F,G F,G F,G F,G F,G F,G F,G E,F,G

Pompa Transfer POME Plan A,B,C A,B,C A,B,C A,B,C A,B,C A,B,C A,B,C A,B,C A,B,C A,B,C A,B,C A,B,C
1

Cleaning area (SHELTER) Plan F,G F,G F,G F,G F,G F,G F,G F,G F,G F,G F,G F,G

Rotary Screener Plan A,B,C,E,F,G A,B,C,E,F,G A,B,C,E,F,G A,B,C,E,F,G A,B,C,E,F,G A,B,C,E,F,G A,B,C,E,F,G A,B,C,E,F,G A,B,C,E,F,G A,B,C,E,F,G A,B,C,E,F,G A,B,C,E,F,G

Pompa Screened POME Plan A,B,C A,B,C A,B,C A,B,C A,B,C A,B,C A,B,C A,B,C A,B,C A,B,C A,B,C A,B,C
2
Hot Pond Plan F,G F,G F,G F,G F,G F,G F,G F,G F,G F,G F,G E,F,G

Cleaning area (SHELTER) Plan F F F F F F F F F F F F

FAN / KIPAS Plan E,G E,G E,G B,E,G E,G E,G E,G B,E,G G G G B,E,G

Hot Basin Plan F,G F,G F,G F,G F,G F,G F,G F,G F,G F,G F,G E,F,G
Pompa Cooled POME Plan A,B,C A,B,C A,B,C A,B,C A,B,C A,B,C A,B,C A,B,C A,B,C A,B,C A,B,C A,B,C
3
Struktur sirip kayu Plan E,F,G E,F,G E,F,G E,F,G E,F,G E,F,G E,F,G E,F,G E,F,G E,F,G E,F,G E,F,G

Cleaning area (SHELTER) Plan F,G F,G F,G F,G F,G F,G F,G F,G F,G F,G F,G F,G

Combine Steel Tank Plan D,F,G D,F,G D,F,G D,F,G D,F,G D,F,G D,F,G D,F,G D,F,G D,F,G D,F,G D,E,F,G

Pompa Feeding distribusi Plan A,B,C A,B,C A,B,C A,B,C A,B,C A,B,C A,B,C A,B,C A,B,C A,B,C A,B,C A,B,C
4

Cleaning area (SHELTER) Plan F,G F,G F,G F,G F,G F,G F,G F,G F,G F,G F,G F,G
BULAN
No. EQUIPMENT STATUS
1 2 3 4 5 6 7 8 9 10 11 12
Cover Plan D,E,F,G D,E,F,G D,E,F,G D,E,F,G D,E,F,G D,E,F,G D,E,F,G D,E,F,G D,E,F,G D,E,F,G D,E,F,G D,E,F,G
5
Cleaning area (SHELTER) Plan F,G F,G F,G F,G F,G F,G F,G F,G F,G F,G F,G F,G

Buffer Tank Plan D,F,G, D,F,G D,F,G D,F,G D,F,G D,F,G D,F,G D,E,F,G D,F,G D,F,G D,F,G D,F,G
Pompa Sirkulasi Liquid
Plan A,B,C,G A,B,C,G A,B,C,G A,B,C,G A,B,C,G A,B,C,G A,B,C,G A,B,C,G A,B,C,G A,B,C,G A,B,C,G A,B,C,G
BSC
6
BSC Tank Plan D,F,G, D,F,G D,F,G D,F,G D,F,G D,F,G D,F,G D, E,F,G D,F,G D,F,G D,F,G D,F,G

Cleaning area (SHELTER) Plan F,G F,G F,G F,G F,G F,G F,G F,G F,G F,G F,G F,G

Chiller Plan E,F,G E,F,G E,F,G E,F,G E,F,G A,E,F,G E,F,G E,F,G E,F,G E,F,G E,F,G A,E,F,G

Blower Biogas Plan A,B,E,F,G A,B,E,F,G A,B,E,F,G A,B,E,F,G A,B,E,F,G A,B,C,E,F,G A,B,E,F,G A,B,E,F,G A,B,E,F,G A,B,E,F,G A,B,E,F,G A,B,C,E,F,G

Fan / Kipas AIR COOLER Plan E,G E,G E,G B,E,G E,G E,G E,G B,E,G G G G B,E,G
7
Water Seal (Flaring) Plan F,G F,G F,G F,G F,G F,G F,G F,G F,G F,G F,G F,G

Cleaning area BSC &


Plan F F F F F F F F F F F F
FLARE (SHELTER)

Radiator Plan G G G G G B,E,F,G G G G G G B,E,F,G

Tanki Oli Plan G A,G G A,G G A,G G A,G G A,G G A,G

Cek Oli,air,accu Diesel


Plan G G G G G G G G G G G G
8 Engine
Cleaning area (Engine
Plan F,G F,G F,G F,G F,G F,G F,G F,G F,G F,G F,G F,G
Room)

Maintenance full G1&2 Plan H H H


Note :
A : Ganti Oli atau Tambah Oli , Freon G : Daily Check Dibuat Oleh,
B : Grease H Routine maintenance

C : Ganti belting
D : Cek kebocoran,genangan air,over presurre Rein Nasution
E : Maintenance Total Cleaning Equipment Coord. O & M PT PPI
F : Maintenance Area Proses
SCHEDULLE MAINTENANCE TAHUN 2021

BULAN
No. EQUIPMENT STATUS
1 2 3 4 5 6 7 8 9 10 11 12
Bak Kontrol Plan F,G F,G F,G F,G F,G F,G F,G F,G F,G F,G F,G E,F,G

Pompa Transfer POME Plan G,H G,H A,B,C,H,G G,H G,H A,B,C,H,G G,H G,H A,B,C,H,G G,H G,H A,B,C,H,G
1

Cleaning area (SHELTER) Plan F,G F,G F,G F,G F,G F,G F,G F,G F,G F,G F,G F,G

Rotary Screener Plan B B,H B B,H B B,H B B,H B B,H B B,H

Pompa Screened POME Plan G,H G,H A,B,C,H,G G,H G,H A,B,C,H,G G,H G,H A,B,C,H,G G,H G,H A,B,C,H,G
2
Hot Pond Plan F,G F,G F,G F,G F,G F,G F,G F,G F,G F,G F,G E,F,G

Cleaning area (SHELTER) Plan H H H H H H H H H H H H

FAN / KIPAS Plan E,G E,G E,G B,E,G E,G E,G E,G B,E,G G G G B,E,G

Cooling Tower Tank Plan F,G F,G F,G F,G F,G F,G F,G F,G F,G F,G F,G E,F,G

Pompa Cooled POME Plan G,H G,H A,B,C,H,G G,H G,H A,B,C,H,G G,H G,H A,B,C,H,G G,H G,H A,B,C,H,G
3

Struktur sirip kayu Plan E E E E E E

Cleaning area (SHELTER) Plan H H H H H H H H H H H H

Combine Steel Tank Plan G G G G G G G G G G G G

Pompa Feeding distribusi


4 Plan G,H G,H A,B,C,H,G G,H G,H A,B,C,H,G G,H G,H A,B,C,H,G G,H G,H A,B,C,H,G
& Blower Mixing

Cleaning area (SHELTER) Plan F,G F,G F,G F,G F,G F,G F,G F,G F,G F,G F,G F,G
BULAN
No. EQUIPMENT STATUS
1 2 3 4 5 6 7 8 9 10 11 12
5 Digester cover lagoon Plan D,G,H D,G,H D,G,H D,G,H D,G,H D,G,H D,G,H D,G,H D,G,H D,G,H D,G,H D,G,H

Pompa Sirkulasi Liquid


Plan G,H G,H A,B,C,H,G G,H G,H A,B,C,H,G G,H G,H A,B,C,H,G G,H G,H A,B,C,H,G
BSC

Bioscrubber & Buffer Tank Plan G,I G,I G,I G,I G,I G,I G,I G,I E,G,I G,I G,I G,I

Cleaning area (SHELTER) Plan F,G F,G F,G F,G F,G F,G F,G F,G F,G F,G F,G F,G

Chiller Sistem Plan A,G,H G,H G,H A,G,H G,H G,H A,G,H G,H G,H A,G,H G,H G,H

Blower Biogas Plan B, G B, G B, G B, G B, G B, G B, G B, G B, G B, G B, G B, G


7
Flame Arrester Plan H H H H

Water Seal (Flaring) Plan F,G F,G F,G F,G F,G F,G F,G F,G F,G F,G F,G F,G

Radiator Plan G E,G G G E,G G G E,G G G E,G G

Tanki Oli Plan A,G A,G G A,G G A,G G A,G G A,G G A,G
Diesel Genset Plan G G G G G G G G G,K G G G
Transformator Plan K
Panel Room Plan K
8
Lightning Arrester &
Plan K
Grounding
Cleaning area (Engine
Plan F,G F,G F,G F,G F,G F,G F,G F,G F,G F,G F,G F,G
Room)

Maintenance full G1&2 Plan J J J,K J


Note :
A : Ganti Oli atau Tambah Oli ,Cek Freon G : Daily Check Dibuat Oleh,
B : Grease H : Routine maintenance (Ganti & Cek Belting,Cleaning & tambah air)
C : Cek Vibrasi & Temperature Motor I : Cleaning Minor
D : Cek kebocoran,genangan air,over presurre J : Running Hours Maintenance Rein Nasution
E : Maintenance Total Cleaning Equipment K : Inspeksi Tahunan Coord. O & M PT PPI
F :Housekeeping Area Proses