Version V1.0
Revision date 2016-04-25
BOM 31013493
Emerson Network Power provides customers with technical support. Users may contact the nearest
Emerson local sales office or service center.
Chapter 1 Overview
This chapter mainly introduces the naming rules, main components and technical parameters of the Liebert.CRV+
condenser (condenser for short).
L SF 12 -R3
R410A System
Applicable to 12kW Unit
220V/1ph/50Hz Chopper speed-governing
Liebert
394
374
R6
680
787
Figure 1-3 Dimensions of mounting holes of the base of the condenser (top view, unit: mm)
This chapter introduces the moving, unpacking, inspection, installation notes, space requirements and installation
procedures.
F
dir orklif
ec t
tio
n
Unpacking
Remove the paper package and foam of the condenser but reserve the protection cardboard of fins. The protection
cardboard of fins should be removed after the condenser is in its installation position.
Note
When moving the condenser by hand, to avoid distortion and system leakage, do not touch the copper pipes.
Inspection
After receiving the product, you should check the accessories against the packing list. If any parts are found missing or
damaged, please report to the carrier immediately. If any covert damage is found, please report to the carrier and the
local office of the product supplier.
7. Prepare a base that can withstand the weight of the outdoor unit (see table 1-1 for the specific weight). The height of
the base should be at least 50mm above the ground and should be higher than the base of outdoor unit by 50mm, as
shown in Figure 2-2.
8. When multiple outdoor units need to be placed in overlap mode, install according to the mode as shown in Figure
2-2.
4m 0.5m
Out-
door
unit
Airflow
Note:
1. Use 5# angle iron for bracket, when
two units are installed with one above
the other.
2. Use 6.5# channel steel for bracket, when
three units are installed with one above the Bracket
other.
Out-
Airflow door
unit
50mm 50mm
Min. 50mm
The condenser needs sufficient installation and service space around the installation place.
Installing pipelines
Note
1. The copper pipes should be heat preserved. When the copper pipes pass through the wall or other obstacles, take isolation
measure such as using the shock pad to avoid direct contact with the wall. Prevent the dust, water vapor and solid particles from
entering the copper pipes.
2. To ensure the quality of welding, the silver-based solder with good quality is required to weld the elbow- pipe. The nitrogen
protection should be done while welding.
Connecting cables
Note
1. The protected tube or shielded line is required for the outdoor part of the connection cable between the indoor unit and the
condenser. The ground cable should be connected to the ground nearby, and the length cannot exceed 3m.
2. The cables cannot contact with hot objects, such as the copper tube and water pipe without insulation, to avoid damaging the
insulation layers.
3. The cables should be connected in accordance with the local regulations.
4. The power supply of the equipment should be installed by professional personnel on site. If the power supply soft cables are
damaged, to avoid risk, they must be replaced by the professional personnel from the manufacturer, maintenance department or
similar department of the manufacturer.
The specifications of the power supply cables of the outdoor unit is (L+N+PE), the recommended cable diameter is no
2
less than 18AWG(0.75mm ). Connect one end of the power supply cables from the accessories to the power output
terminals of the indoor unit as shown in Figure 2-3, and connect the other end to the power terminals of the condenser
as shown in Figure 2-4.
Power output
terminals
Power cable
connection Cable
terminal entry hole
Cable clip
A A amplified
This chapter introduces the maintenance and troubleshooting of the condenser. Users should check the condenser
regularly and solve the problems in time.
Note
1. The maintenance of the condenser must be done by technicians.
2. Except for the commissioning items that must be carried out with power on, during maintenance, the power of the indoor unit
must be cut off.
3.1 Maintenance
Refrigeration system
1. Check that the refrigeration pipes are firmly fixed. The refrigeration pipes shall not shake with the vibration of wall,
earth or equipment frame. Otherwise reinforce the refrigeration pipes with fastening objects.
2. Check that there is no oil on the accessories of all refrigeration pipes, and make sure that the pipes do not leak.
Heat exchanger
1. Clean the fin of heat exchanger regularly.
2. Clean the fin of heat exchanger with compressed air or fin detergent (weakly alkaline) if the condenser air flow is
blocked. The direction of inverse air flow is good when the compressed air is used.
3. Check for damaged or reversed fins and maintain them in time.
4. Avoid snow accumulation around the condenser in winter.
Fan
Check that the fan runs normally and check it for problems such as abnormal noise, vibration and bearing failure.
3.2 Troubleshooting
Perform troubleshooting according to Table 3-1.
Table 3-1 Table of alarm troubleshooting
Fault phenomenon Possible causes Handling method
Equipment does not Equipment does not connect to the
Check the input voltage
start up power supply
Clean away the ailen objects on the coil surface or near the
Insufficient condenser air flow air inlet, and check the fan speed regulation function of the
control board
High pressure alarm Check if the cable connection between the control board
and outdoor unit terminals is loosened, check if the outdoor
Condenser fan does not run
uinit cable connection is loosened, and check if the
condenser pressure sensor is normal
Hazardous Substances
6+
Parts Plumbum Hydrargyrum Cadmium Chrome PBB PBDE
Pb Hg Cd Cr6+ PBB PBDE
Cabinet × ○ ○ ○ ○ ○
Fan unit × ○ × ○ ○ ○
Electric control unit × ○ × ○ ○ ○
PCBA × ○ ○ ○ ○ ○
Heat exchanger × ○ ○ ○ ○ ○
Copper pipe × ○ ○ ○ ○ ○
Cables × ○ ○ ○ ○ ○
○: Means the content of the hazardous substances in all the average quality materials of the part is within the limits specified in
SJ/T-11363-2006;
X: Means the content of the hazardous substances in at least one of the average quality materials of the part is outside the
limits specified in SJ/T11363-2006
Emerson Network Power Co., Ltd. has been committed to the design and manufacturing of environment-friendly products. It will
reduce and eventually eliminate the harzardous substances in the products through unremitting efforts in research. However,
limited by the current technical level, the following parts still contain harzardous substances due to the lack of reliable substitute or
mature solution:
1. Reason that the above parts contain lead: Some of the copper alloys contain lead, high temperature soldering materials contai n
lead and the high temperature soldering materials of diodes contain lead;
2. The contacts of the distribution switches contain Cadmium and Cadmium compound
About Environment Protection Period: The Environment Protection Period of the product is marked on the product. Under normal
working conditions and normal use of the products observing relevant safety precautions, the hazardous substances in the
product will not seriously affect the environment, personnel safety or property in the Environment Protection Period st arting from
the manufacturing date.
Applicable product: Liebert.CRV+ condenser series products