You are on page 1of 14

SITE JUSTIFICATION

1.Site Location and Description


2.Lot description
3.Land Use & Zoning Requirement
4. Target User
4.1Population
4.2 Catchment area
5.Transportation
6.Availability of utility Systems:
6.1 Power & Water source,
6.2 Sewage & Solid waste
disposal,
6.3Communication lines
7.Topographical data of the site
7.1Site section
7.2Vegetation
8.Existing structures, etc.
9.Climatic Conditions of the
Site (micro & macro)
10. Site Pictures – panoramic
view
AR DESIGN 8
CPC 2022 1
AR.CHRISTOPHER P. COMA,UAP,Mscm
SITE JUSTIFICATION
1.Site Location and Description SITE JUSTIFICATION
2.Lot description 1.Site Location and Description
3.Land Use & Zoning
Requirement
4. Target User
4.1Population
4.2 Catchment area
5.Transportation
6.Availability of utility Systems:
6.1 Power & Water source,
6.2 Sewage & Solid waste
disposal,
6.3Communication lines
7.Topographical data of the site
7.1Site section
7.2Vegetation,
8.Existing structures, etc.
9.Climatic Conditions of the
Site (micro & macro)
10. Site Pictures – panoramic
view
CPC 2022 2
SITE JUSTIFICATION
1.Site Location and Description SITE JUSTIFICATION
2.Lot description 2.Lot Description
3.Land Use & Zoning
Requirement
4. Target User
4.1Population
4.2 Catchment area
5.Transportation
6.Availability of utility Systems:
6.1 Power & Water source,
6.2 Sewage & Solid waste
disposal,
6.3Communication lines
7.Topographical data of the site
7.1Site section
7.2Vegetation,
8.Existing structures, etc.
9.Climatic Conditions of the
Site (micro & macro)
10. Site Pictures – panoramic
view
CPC 2022 3
SITE JUSTIFICATION
SITE JUSTIFICATION 3.Land Use & Zoning Requirement
1.Site Location and Description
2.Lot description
3.Land Use & Zoning
Requirement
4. Target User
4.1Population
4.2 Catchment area
5.Transportation
6.Availability of utility Systems:
6.1 Power & Water source,
6.2 Sewage & Solid waste
disposal,
6.3Communication lines
7.Topographical data of the site
7.1Site section
7.2Vegetation,
8.Existing structures, etc.
9.Climatic Conditions of the
Site (micro & macro)
10. Site Pictures – panoramic
view
CPC 2022 4
SITE JUSTIFICATION SITE JUSTIFICATION
1.Site Location and Description 4. Target User
2.Lot description 4.1Population
3.Land Use & Zoning 4.2 Catchment area
Requirement
4. Target User
4.1Population
4.2 Catchment area
5.Transportation
6.Availability of utility Systems:
6.1 Power & Water source,
6.2 Sewage & Solid waste
disposal,
6.3Communication lines
7.Topographical data of the site
7.1Site section
7.2Vegetation,
8.Existing structures, etc.
9.Climatic Conditions of the
Site (micro & macro)
10. Site Pictures – panoramic
view
CPC 2022 5
SITE JUSTIFICATION SITE JUSTIFICATION
1.Site Location and Description 5.Transportation - Public Transport Links and
2.Lot description Access/routes
3.Land Use & Zoning • Bus’s
Requirement • Train’s
4. Target User • Taxi’s
4.1Population
4.2 Catchment area
5.Transportation
6.Availability of utility Systems:
6.1 Power & Water source,
6.2 Sewage & Solid waste
disposal,
6.3Communication lines
7.Topographical data of the site
7.1Site section
7.2Vegetation,
8.Existing structures, etc.
9.Climatic Conditions of the
Site (micro & macro)
10. Site Pictures – panoramic
view
CPC 2022 6
SITE JUSTIFICATION
SITE JUSTIFICATION 6.Availability of utility Systems:
1.Site Location and Description 6.1. Power & Water source,
2.Lot description 6.2. Sewage & Solid waste disposal,
3.Land Use & Zoning 6.3.Communication lines
Requirement
4. Target User
4.1Population
4.2 Catchment area
5.Transportation
6.Availability of utility Systems:
6.1 Power & Water source,
6.2 Sewage & Solid waste
disposal,
6.3Communication lines
7.Topographical data of the site
7.1Site section
7.2Vegetation,
8.Existing structures, etc.
9.Climatic Conditions of the
Site (micro & macro)
10. Site Pictures – panoramic
view
CPC 2022 7
SITE JUSTIFICATION
SITE JUSTIFICATION 7.Topographical data of the site
1.Site Location and Description 7.1Site section
2.Lot description
3.Land Use & Zoning
Requirement
4. Target User
4.1Population
4.2 Catchment area
5.Transportation
6.Availability of utility Systems:
6.1 Power & Water source,
6.2 Sewage & Solid waste
disposal,
6.3Communication lines
7.Topographical data of the site
7.1Site section
7.2Vegetation
8.Existing structures, etc.
9.Climatic Conditions of the
Site (micro & macro)
10. Site Pictures – panoramic
view
CPC 2022 8
SITE JUSTIFICATION
SITE JUSTIFICATION 7.Topographical data of the site
1.Site Location and Description 7.2Vegetation
2.Lot description
3.Land Use & Zoning
Requirement
4. Target User
4.1Population
4.2 Catchment area
5.Transportation
6.Availability of utility Systems:
6.1 Power & Water source,
6.2 Sewage & Solid waste
disposal,
6.3Communication lines
7.Topographical data of the site
7.1Site section
7.2Vegetation
8.Existing structures, etc.
9.Climatic Conditions of the
Site (micro & macro)
10. Site Pictures – panoramic
view
CPC 2022 9
SITE JUSTIFICATION SITE JUSTIFICATION
1.Site Location and Description 8.Existing structures-
2.Lot description • Derelict Buildings
3.Land Use & Zoning • Unfinished building works
Requirement
4. Target User
4.1Population
4.2 Catchment area
5.Transportation
6.Availability of utility Systems:
6.1 Power & Water source,
6.2 Sewage & Solid waste
disposal,
6.3Communication lines
7.Topographical data of the site
7.1Site section
7.2Vegetation,
8.Existing structures, etc.
9.Climatic Conditions of the
Site (micro & macro)
10. Site Pictures – panoramic
view
CPC 2022 10
SITE JUSTIFICATION SITE JUSTIFICATION
1.Site Location and Description 9.Climatic Conditions of the
2.Lot description Site (micro & macro)
3.Land Use & Zoning • Sun path
Requirement
4. Target User
4.1Population
4.2 Catchment area
5.Transportation
6.Availability of utility Systems:
6.1 Power & Water source,
6.2 Sewage & Solid waste
disposal,
6.3Communication lines
7.Topographical data of the site
7.1Site section
7.2Vegetation,
8.Existing structures, etc.
9.Climatic Conditions of the
Site (micro & macro)
10. Site Pictures – panoramic
view
CPC 2022 11
SITE JUSTIFICATION SITE JUSTIFICATION
1.Site Location and Description 9.Climatic Conditions of the
2.Lot description Site (micro & macro)
3.Land Use & Zoning Wind pattern
Requirement
4. Target User
4.1Population
4.2 Catchment area
5.Transportation
6.Availability of utility Systems:
6.1 Power & Water source,
6.2 Sewage & Solid waste
disposal,
6.3Communication lines
7.Topographical data of the site
7.1Site section
7.2Vegetation,
8.Existing structures, etc.
9.Climatic Conditions of the
Site (micro & macro)
10. Site Pictures – panoramic
view
CPC 2022 12
SITE JUSTIFICATION SITE JUSTIFICATION
1.Site Location and Description 10. Site Pictures – panoramic
2.Lot description view
3.Land Use & Zoning
Requirement
4. Target User
4.1Population
A
4.2 Catchment area
5.Transportation B
6.Availability of utility Systems:
6.1 Power & Water source,
6.2 Sewage & Solid waste
disposal,
6.3Communication lines
7.Topographical data of the site
D A

7.1Site section
7.2Vegetation,
8.Existing structures, etc.
C
9.Climatic Conditions of the
Site (micro & macro)
10. Site Pictures – panoramic
view
CPC 2022 13
SITE JUSTIFICATION
1.Site Location and Description
2.Lot description
3.Land Use & Zoning
Requirement
4. Target User
4.1Population
4.2 Catchment area
5.Transportation
6.Availability of utility Systems:
6.1 Power & Water source,
6.2 Sewage & Solid waste
disposal,
6.3Communication lines
7.Topographical data of the site
7.1Site section
7.2Vegetation,
8.Existing structures, etc.
9.Climatic Conditions of the
Site (micro & macro)
10. Site Pictures – panoramic
view
CPC 2022 14

You might also like