Project: Establishment Of 200 Beds Center of Excellence for Gynaecology and Obstetrics at

Rawalpindi
Cable's Details Used at site & ware house
Al-Awan Electric Works and Construction Co.
Cable Qty Date; 28/01/2021

S # Description Unit Size Qty Rate

1 4 Core 35 mm Silver Mtrs 35 mm 60 Wapda Meter to Change Over

2 4 Core 35 mm Silver Mtrs 35 mm 90 Ware House

3 4 Core 16 mm Silver Mtrs 16 mm 250 Used for Site's Power Supply

4 Single Core 4 mm Copper Mtrs 4 mm 45 + 45 For Extension Lead (Piping Team)

5 Single Core 2.5 mm Copper Mtrs 2.5 mm 90 Extension Lead for Electrical Works

6 Single Core 2.5 mm Copper Mtrs 2.5 mm 90 Basement Area's Lighting Power

Submitted By ; Site's Team