ABOUT THIS GANTT CHART

Visualize and track your projects using this Gantt chart template. To start, enter the tasks you
Milestone Description section and then enter details for each task. The data will automatically
insert new tasks or use the scrollbar to scroll through the timeline.

• Use Progress to add how much of the project you finished by adding a percentage number.
• Add the day you started your project in the Start Date.
• Finish your calculations by filling in the number of days you need to complete your project in
t, enter the tasks you're working on in the
ata will automatically update and it’s easy to

percentage number.
mplete your project in the No. of Days field.
BET / V2M

ARCA Legend: On track Low risk Med risk High risk Unassigned

SL
Project Start Date: 3/10/2022 April May
Scrolling Increment: 25 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29

Milestone description Category Assigned to Progress Start Days M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S

KICK OFF
Coordinacon Equipo Ivolutia Low Risk 0% 3/10/2022 6
Ambiente de Back-End
Ambiente Back-End Low Risk 0% 2
Diseño de tablas resultado V2M Low Risk 0% 3/11/2022 5
Diseño de tablas resultado BET Low Risk 0% 3/13/2022 6
Ambiente de Front-End Low Risk 3/11/2022 5
V2M
Front-End
Mapeo tamaño cliente Low Risk 0% 3/15/2022 8
Mapeo Indicadores de Ejecución Low Risk 0% 3/23/2022 11
Mapeo ciclo de vida Low Risk 0% 4/3/2022 12
Ejecuciones y corridas por periodo Low Risk 0% 4/15/2022 15
Hito V2M - Tablas de Configuración Milestone 0% 4/30/2022 1
Back-End
A API Low Risk 3/15/2022 40
Resolución Tamaño Low Risk 3/30/2022 5
Resolución Ind Ejecución Med Risk 4/3/2022 8
Resolución Ciclo de Vida High Risk 4/11/2022 10
TITLE 3
Task 1 On Track 3/25/2022 0
Back Med Risk 3/28/2022 0
Task 3 On Track 4/12/2022 0
Task 4 Goal 5/7/2022 0
Task 5 Low Risk 12/30/1899 0
TITLE 4
Task 1 5/10/2022 0
Task 2 5/24/2022 5
Task 3 Milestone 7/5/2022 1
Task 4
Task 5

To add more data, Insert new rows ABOVE this one

Page 3 of 6
MAR ABR
ITEM Hs. Estimadas
S1 S2 S3 S4 S1 S2 S3
KICK OFF
Coordinacon Equipo Ivolutia 8
Ambiente de Back-End 8
Diseño Preliminar de tablas resultado V2M 10
Diseño Preliminar de tablas resultado BET 12
Ambiente de Front-End 8
V2M
Front-End
Mapeo/Objetivos tamaño cliente 50
Mapeo/Objetivos Indicadores de Ejecución 60
Mapeo/Objetivos ciclo de vida 65
Ejecuciones/Descargas y corridas por periodo 60
Hito V2M01 - Tablas de Configuración
Visualizaciónes de Tablas de Segmentos 110
Hito V2M02 - Visualización de Tablas de Segmentos
Integración con OT 20
Back-End
API 80
Calculo Tamaño 60
Caculco Ind Ejecución 40
Resolución Ciclo de Vida (Depende Share BET) 100
Ajustes Generales 100
BET
Front-End
Definiciones de Control de Calidad 90
Configuracion de Metricas 150
Hito BET01 - Pantallas de Configuración
Tableros de Productividad 110
Importación de datos 100
Hito BET02 - Tableros de Productividad y Datos
Descarga de Datos con filtros 50
Tablero de Share de Volumen basado en metricas de ve 80
Hito BET03 - Descarga y Tablero Share de Ventas
Back-End
API 100
Proceso Control de Calidad 80
Proceso de Importacion de datos 300
Calculo de Share y Paretto 80
Ajustes Generales 80

Hitos
Hito BET01 - Pantallas de Configuración 6 de Junio
Hito BET02 - Tableros de Productividad y Datos 11 de Julio
Hito BET03 - Descarga y Tablero Share de Ventas 15 de Agosto
Hito V2M01 - Tablas de Configuración 8 de Agosto
Hito V2M02 - Visualización de Tablas de Segmentos 26 de Septiembre
Horas del proyecto : 2700