A: Productivity
Example: Determine the productivity for four workers installed 720 square yards of carpeting
in eight hours.
"
Sol
productivity ะ Yards of carpet installed
Iabour -
hoyrs worked
ะ
720 Sqyare yards
4 wotkenrsx8hrslworke.cl
ะ
22.5 Yards / hrs #
Example: Calculate the productivity for a machine produced 68 usable pieces in two hours.
ะ 68 Piece
2 hrs .
=
34 PI ece / hrs . #
Only for teaching 01213477 course, Materials Engineering, Kasetsart University 2
ไ ห วย
Example: Determine the multifactor productivity for a situation in which 300 pieces have
LC MC
been produced at a standard price of 60 baht each, with a labor cost of 250 baht, 600 baht of
materials, and 3,000 baht of overhead.
ป มาณ × ราคา st d.
r
Sol
"
Productivity
ะ
G otstandard price
LC + Mอ t OV erhead
= 30 01 60 1
2 50 + 000 t 3000
= 1800A
\
3 8 50
= 4.68
มี
ม่
ริ
น่
Only for teaching 01213477 course, Materials Engineering, Kasetsart University 3
B: Strategy กล ท
Example: Mr.A wants to have a career in education, have a good job, and earn enough
income to live comfortably. However now he is in a secondary school. What is the possible
scenario for achieving his goals?
Mission: Live a good lif e.
>
Plah
Tactics: า .se/ectacolHgeandamajor.
>
action 2. Pecide how to tihacei
mission
organization
strategy
functional strategies