You are on page 1of 1

DESIGN / MANUFACTURED / SUPPLIED / M ARKETED BY

PARTH VALVES AND HOSES LLP. PARTH DAMPERS


PROGRESS
DATASHEET NO.PVDQ 2019028 PR
BAR
DATE : 27 AUGUST 2019
CHART
CLIENT : MMPIL
SS BUTTERFLY DAMPER :
PO DATED :-03 / 08 / 2019
AUGUST 2019 SEPT. 2019 REMARK
SR. DESCRIPTION REFERENCE DRG. NO. MATERIAL SIZE QTY. thu. fri. sa t. sun. m on. tue. we d. thur. fri. sa t. sun. m on. tue. we d. thur. fri. sa t. sun. m on. tue. we d. thur. fri. sa t. sun. m on. tue. we d. thur. fri. sa t. sun. m on. tue. we d. thur. fri. sa t.
NO.

20
21
01
02
03
04
05
06
07
08
09

01
02
03
04
05
06
07
31
10
11
12
13
14
15
16
17
18
19

22
23
24
25
26
27
28
29
30
01 GA DRAWING SUBMISSION ABBREVATION:-
1) PC :PRADIP CHAVAN
3) DJ: DHANANJAY ABHYANKAR
4)SP: SONALI PAWAR
APPROVAL OF GA DRAWING 5) PG: PRAMOD SIR.
02
NOTE:-
03 COMPLETION OF FINAL INSPECTION WILL
MANUFACTURING DRAWING BE DONE BY :-
PC+DJ+SP+PG SIR.
04 VENDOR FINALISATION
AND PO PLACING
RAW MATERIAL PURCHASE
05
06 MACHNING COMPONENTS:
ST BOX , SHAFT .
LASER CUTTING :-
07
BEARING, G.B. PLATE
08 HOUSING DEVELOPMENT
09 FLANGE ROLLING
10 BRACKET AND SPACER
FOR GEARBOX.
11 SANDERIN AND WELDING
GEAR BOX AT FABRICATION
12 ASSEMBLY MOCK UP
TESTING
13 IF OK DISMANTLE AND ACID
CLEAN AND SOFT WATER.
14 FINAL ASSEMBLY
15 FINAL INSPECTION.

DJ+PC+SP+DB
PACKING AND DISPATCH

DJ+PC+PG+SP
16

DJ+PC

DJ+PC

DJ+PC

DJ+PC
17 STAGE INSPECTION
18 BOX MAKING FOR DISPATCH FINAL DISPTACH:-
19
06 SEPT. 2019
20

You might also like