01 GA DRAWING SUBMISSION ABBREVATION:-
1) PC :PRADIP CHAVAN
3) DJ: DHANANJAY ABHYANKAR
4)SP: SONALI PAWAR
APPROVAL OF GA DRAWING 5) PG: PRAMOD SIR.
02
NOTE:-
03 COMPLETION OF FINAL INSPECTION WILL
MANUFACTURING DRAWING BE DONE BY :-
PC+DJ+SP+PG SIR.
04 VENDOR FINALISATION
AND PO PLACING
RAW MATERIAL PURCHASE
05
06 MACHNING COMPONENTS:
ST BOX , SHAFT .
LASER CUTTING :-
07
BEARING, G.B. PLATE
08 HOUSING DEVELOPMENT
09 FLANGE ROLLING
10 BRACKET AND SPACER
FOR GEARBOX.
11 SANDERIN AND WELDING
GEAR BOX AT FABRICATION
12 ASSEMBLY MOCK UP
TESTING
13 IF OK DISMANTLE AND ACID
CLEAN AND SOFT WATER.
14 FINAL ASSEMBLY
15 FINAL INSPECTION.
DJ+PC+SP+DB
PACKING AND DISPATCH
DJ+PC+PG+SP
16
DJ+PC
DJ+PC
DJ+PC
DJ+PC
17 STAGE INSPECTION
18 BOX MAKING FOR DISPATCH FINAL DISPTACH:-
19
06 SEPT. 2019
20