BUILDING CONSTRUCTION-Vv
Max. Marks: 50
Time: 5 hours
Answer any FIVE questions
marks.
All questions carry equal
section.
At least two from each
Assume any suitable data further required
Section-A (Theory)
explain how to
Draw and
. In a row houses one house is to be demolished.
to restore the
RCC
how
2. One balcony of RCC was sagging. Draw and explain
to the original term.
balcony
Section-B (Drawing
to prevent the damages.
5. What are causes that reduce strength of timber? How
7. The floor in a living room has sunk in the center, how to repair and restore.
repair and
8. What are the factors that contribute do dmages in brick wall. How to
restore.
***
Code No R10/52/BA
BUILDING CONSTRUCTION-VV
Max. Marks: 50
Time: 5 hours
Answer any FIVE questions
All questions carry equal marks.
At least two from each section.
Assume any suitable data further required
Section-A (Theory)
how
in building and
for the decay in the timber elements
a
1. Explain the reasons
and how
methods to avoid failures in RCC slabs, beams and columns
2. Suggest
to avoid decay in brick walls.
ways to restore
them.
flooring
in two bed roomed flats of three flooring
building inspection repair
a
7. Prepare a
walls. Draw
in the mosaic tiles flooring and dado on
on it developed problems
and explain the following:
****
Code NO KR-2/15A
BUILDING CONSTRUCTION-Iv
Max. Marks: 50
Time: 3 hours
Answer any FIVE questions
equal marks.
All questions carry
channels.
1. Draw different standard sections of angles and
of stanchions and
2. Explain with the help of neat sketches the interconnection
beams.
a) Dome light
b) Riveting
c)Lanternlight
a) Lattice girder
b) Plate girder
detail.
a) Portal frame
b) Tees
c) Bolt connections.
****
Code No R10/52/BA
November-2020
B. Arch V Semester Supplementary Examination,
BUILDING cONSTRUCTION-V
Max. Marks: 50
Time: 5 hours
Section-A (Drawing)
Section-B (Theory)
walls? What are the reasons and how to remedy them?
5. What is ageing of brick
****
Code No: R10/52/BA
B. Arch V Semester Regular/Supplementary Examination, January-2018
BUILDING coNSTRUCTiON
Section-A (Theory)
1. Explain the causes of decay and damage in old building and write their
remadie to conserve the old building.
6. Draw the jack arch madras roof terrace assume the suitable size and scale.
8. Draw the typical water proof toilet and label the components, assume the
Section-A (Theory)
1. Explain the important point to be noticed in preliminary and general
observation in building failures.
4. Explain the different concrete mixing methods and write the precautions to
Section-B (Drawing)
5. Draw the propping and strutting for R.C.C structures.
*****
Code No: R10/52/BA
BUILDING cONSTRUCTION
Section-A (Theory)
1. What are the causes and decay and damage in old buildings. What is the
2. What are the factors reducing the strength of the timber? Explain the
Se tion-B (Drawing)
5. Explain with neat sketches Repair works for large span structure like steel
roof truss.
6. Explain with neat drawing the temporary support system proivded for
details of (to a suitable scale), the same if the opposite wall is 4mts away
****
de No: R10-52/BA
SECTION-A (Theory
about them.
A. Enumerate the causes
of decay in old buildings and write briely
maintained?
Section-B Drawing
3What is underpinning? Draw and explain.
6.What are the ways of supporting and repairing sagging in cantilever balconies? Explain
the procedure with neat sketches.
8. Write the detailed method for repairing the roof of a large auditorium and water proofing
it. Illustrate with neat sketches.
de No: R10-52/BA
BUILDING CONSTRUCTION-V
Max. Marks: 50
Time: 5 hours
SECTION-A(Theory
brickwork.
3. Enumerate the effects of ageing and weathering on
Section-B Drawing
brickwork.
5. Illustrate the construction defects in
Max. Marks: 50
Time: 5 hours
SECTION-A (Theory)
these
old buildings and explain how
and damage in
1. Explain the causes of decay
can be repaired.
sketches.
treated with neat
the defects in timber and
how they are
2. Explain
and
Write the precautions
factors in brick work.
3. Explain the strength reducing
treatment for brick work.
SECTION-B (Drawing
arch roof of room size 10m X 20m
5. Draw the plan and section of Madras Jack
7. Draw plan and section of a toilet in a residence, of size 2.75m X 1.75m. Explain
the water proofing techniques in toilets.
SECTION-A (Theory)
1. Explain the method would you following the preparation of the REPORT OF BUILDING
INSPECTION_of an old office building consisting of three floors, regarding condition of
various parts of building and safety of the structure. How do you
distinguish between the
following deleterious effects for rehabilitation and restoration?
i. Decay of elements of the building and reasons
ii. Damage of elements of the building and reasons.
2. Explain the effect of moisture levels on decay of timber. What are the
strength reducing
factors in buildings built with different timber elements? An old
palace building in coastal
areasuffered extensive damage due to the effecis of weather and
needs remedial
measures. Explain methods to
carry out repairs and preventive maintenance to the
following.
i. Wooden roofing system
ii. Wooden staircase
wet walls. With help of neat drawings explain methods you propose to carry out repair
works to restore the following in detail:
i. Strengthening of the walls and DPC
ii. Replacement and water proofing of tiled floor
6. A recently constructed RCC residential building was entirely lifted by almost 2 meters in
height at Nagole, a residential locality of Hyderabad without suffering any damage.
Explain with help of neat drawings of plans and sections any one of the following in
detail.
a. Under pinning and replacing the
damaged lintels on existing openings
b. Propping and repairing the sagging balconies
7. With help of neat drawings explain the methods of remedial measures and
repairs
undertaken for solving major problems encountered in
buildings studied as a part of the
studio exercise.
b. Sinking foundations
c. Leaking terraces
****