Professional Documents
Culture Documents
MWD Retrievability Confirmation: General Information - Section 1
MWD Retrievability Confirmation: General Information - Section 1
Yes No
Schlumberger MWD Engineer has physically measured all ID's of the drillstring components.
Schlumberger MWD Engineer was provided with ID's of the drillstring components by the rig.
Signatures - Section 4
Please confirm your understanding of the details provided above by signing in the appropriate position below: