Step 7: Specify The developer coordinates with Determine which The process of directing A series of jobs costs Rp. 2.5
Production the construction authorities buildings will be built first and dividing tasks in Jt
Process regarding the location of the in accordance with the accordance with the
kaveling, consumer data, wake type and standard of ability of workers
schedule, work plan drawings, physical development. adapted to the
building technical specifications, management tasks of
and rules during the construction developers and the
process and quality assurance. initial work of buildings
Work closely with the in the form of land
construction boss, make initial clearing and
preparations for construction environmental analysts
starting from the bowplang
(reference point of the house
building), determine the elbow,
determine the zero point /
elevation of the building
The Coordinator of marketing
directs the construction in
determining the building to be
built first.
Step 8: The production part carries out Finished product based on The average cost spent The average cost of basic
Production construction that starts from management tasks in building a house is goods is obtained from the
Process preparation and ground work to adjusted to the type of total cost of materials spent in
yard work. house with a budget of the process of building houses
The production process consists Rp. 120 Jt covering an consisting of the process of
of 18 points of work carried out area of 120 m2, while soil work to the finishing
by 10 construction workers with the average construction process, while for the cost of
a deadline of 4 months. cost per ruma type is construction workers
Rp. 35 - 50 Jt and calculated Rp. 90 rb / day and
developer costs per the boss of the funnel Rp. 120
housing unit of 10 - 15 rb / day with a maximum
Jt length of 2 months for one
unit of house with 10
construction workers
Step 9: Sell Compiling a list of promotional Distributed various Total accumulated cost Marketing costs can reach Rp
Product / targets in the form of promotional tools in the for promotional tools 7.5 Jt for rose-type housing
Marketing exhibitions, presentations and form of print brochures, distributed amounted to units (Rp.250 Jt x 3%), while
Process other face-to-face meetings leaflets, billboards, Rp. 5 - 10 Jt, while legality costs are required in
Plan sales targets, enforcement, signboards, marketing fee of 2 - 3% signing AJB
cash flow marketing flow to advertisements in depending on the owner
SHM signatories through newspapers, exhibitions, of the company and
coordination and communication banners, events and so on legality costs can reach
with finance and construction in Rp 2.5 - 3 Jt per housing
the field unit
Step 10: Receive complaints and make Completion of the report Building maintenance The cost of upgrading and
Customer improvements according to on the implementation of costs, building repair repairing due to damage is
Service consumer submissions ranging repair work in the form of costs and upgrading determined directly in the
from complaints of physical complaints and upgrading costs are adjusted to Building Cost Budget Plan
problems of buildings to legal until the news of the last building conditions that with a scale / m2, while for
and financial complaints key handover event to are fully managed by repair costs due to damage the
Receive building upgrade consumers construction and company is fully responsible
/upgrading submissions in building developers. for risk management where
accordance with consumer the construction gets half the
demand wages
The Balanced Scorecard Analysis for a Construction Company
Perspective Measures Indicator Classification Level Score / Points
Environmental
Perspective:
Demography Looking at the population growth rate Population growth The Level of Population 4.0 / 5.0
and characteristics of the Probolinggo rate : 1.1 % per Year Growth Rate at Probolinggo
Regency Community ( Pt = Po + (L-M) is 1,1 % so it can be
Population classified as Medium
characteristic : total Growth Rate
population, age, etnic, Rapid growth rate, if the
education, and average population growth rate
number of children reaches more than 2 %
per year
Medium growth rate, if
the population growth
rate ranges from 1% - 2
% per year
Low growth rate, if the
population growth rate
is less than 1 % per year
Economic Savings, NPL, Credit, Inflation, and Inflation : 7.8 % ( CPIn The level of Inflation at 5.0 / 6.0
Per capita Income – CPIn-1 / CPIn-1 x Probolinggo is 7,8 % so it
100 % ) can be classified as
Per capita Income : Rp. Creeping Inflation
861.000 ( Percapita Creeping Inflation : < 10
Income = PDRB / Total % per a year
Population ) Walking Inflation : 10%
- 30% per a year
Running Inflation : 30%
- 100% per a year
Hyper Inflation : > 100
% per a year
Nature Raw Materials, Electricity Grid Raw Materials, Electricity The Level of Nature effectivity 4.0 / 4.0
Trajectory, Environmental Change and Grid Trajectory etc in and efficiency in suporting the
Expectations for the Role of supporting company company development was
Government development conducted by using quisioner
where the result are classified
into five responden opinion, as
follow : 72 % are strongly
agree, 21 % agree, 4,37 % say
enough, 2,63 % are disagreed,
and 0 % said very don`t agree
Technology Cable Telephone Network, Wireless Cable Telephone Network, The Level of Technology 4.5 / 5.0
Telephone Network, Internet Network Wireless Telephone Network, Resources was conducted by
and Television Network Internet Network and using quisioner where the result
Television Network stated that the level of
effectivity and optimalization in
using technology are classified
into five responden opinion, as
follow : 51,67 % are strongly
agree, 40,83 % agree, 6,67 %
say enough, 0,83 % are
disagreed, and 0 % said very
don`t agree
SubTotal Enviromental 17.5 / 20.0
(1)
Financial Perspective
Profitability Use more Financial Leverage, by Return on Equity : Rp. The value resulting from the 6.2 / 6.5
increasing the amount of debt capital 543.450.332 / Rp. calculation of Return on Equity
relative to its Equity Capital, A 2.879.265.574, is 18,65 %
company can increase its Return On (ROE=Net Profit after
Equity (ROE) Tax / Self Capital) x
100 %
Increasing Tap a new market segment with Return on Investment : The value resulting from 5.0 / 6.0
Contract innovative in Research & Development Rp. 543.450.332 / Rp. the calculation of Return
Quantity and also maintain continuous customer 12.439.832.128, on Investment is 3,25 %
( ROI=Net Profit after The value resulting from
Tax / Total Assets) x the calculation of
100% Current Rationis 220,24
Current Ratio : Rp. %
7.106.225.520 / Rp.
3.232.646.789,
(CR=Current Assets /
Current Liability ) x
100%
Cost Efficiency Finding best formula operating ratio to Total Assets Turn Over The value resulting from 7.2 / 7.5
meet most cost efficiency ratio of the : Rp. 3.703.153.866 / the calculation of Total
company Rp. 12.439.832.128 Assets Turn Over
(TATO=Sales / Total is12,56 %
Assets ) x 100 % The value resulting from
Inventory Turnover : the calculation of
Rp. 2.921.007.765 / Inventory Turnover is
Rp. 1.102.655.304 54,84
(IT=Total Inventory /
Total Operating
Income ) x 365 Days
SubTotal Financial (2) 18.4 / 20.0
Customer Perspective
High Ratio Implement Customer Relationship Customer Satisfaction : The Result of the assessment of 5.0 / 5..0
Customer Management system to build and Customer Compalain 0, Customer Satisfaction is 100 %
Satisfaction Index strengthen relationship between Total Customer 909 ,
customers and also can identify and (CS = ∑ Customer
provide services to meet the needs of Complain / ∑
the customers Customer ) x 100%
Increase New Dividing customers up based on Customer Acquisition : The Result of the assessment of 3.5 / 5.0
Customer common characteristic effectively Total Customer n 909, Customer Satisfaction is 38 %
Segment Total Customer n-1 is
659, (CA = ∑
Customer in a year (n) -
∑ Customer in a year
(n-1) / ∑ Customer in a
year (n-1)) x 100 %
Good After Sales Develop after sales service strategy Customer Profitability : The Result of the assessment of 5.0 / 5.0
Service plan Total Customer 909 Customer Satisfaction is 95 %
from the total 959,
( CP = Profit in the
Market Segment
Served / Number of
Customers in the
Market Segment
Served )
Enhance Creating an MoU with other developers Customer Retention : The Result of the assessment of 3.0 / 5.0
Strategic Total Customer n 909, Customer Satisfaction is 138 %
Cooperation with Total Customer n-1
Other 659, ( CR = ∑
Development Customer in a year (n) /
Companies ∑ Customer in a year
(n-1)) x 100 %
SubTotal Customer (3) 16.5 / 20.0
Internal Process
Perspective
High Quality Implement Total Quality Management Innovation Process, which is New concept in terms of shape 4.0 / 5.0
Products & and Good Corporate Governance as a the company`s creativity in and size, the location of project
Management foundation in operation of a company developing new products or is very strategic, the number of
management services to meet consumer facility designs and ergonomic
needs area
Effective Process Fulfilled Search Engine Optimizer data Operation Process : Processing The Result of the assessment of 5.0 / 5.0
entry time (month) 17, througput Operation Process is 52 %
time (month) 33, (OP =
Processing Time / Throughput
Time ) x 100 %
Competitive Improvement in Performance with Developing Criteria for Developing Criteria for 5.0 / 5.0
Prices Developing Criteria for Superior Superior Performance Superior Performance
Performance Assessment (KPKU) as a Assesment (KPKU) Assesment will be measured by
measure performance doing a secondary data using
Kuisioner
Develop an Conduct coaching and supervision on After-Sales Service Process Customer gathering and several 4.2 / 5.0
Integrated the spot and increase supervision of events related to customer,
Project Quality implementation reminder regarding monthly
Management payment, and the other way to
System establish a good relationship
between the company and
customers
SubTotal Internal 18.2 / 20.0
Process (4)
Learning and Growth
Perpective
High Quality Implement Competences Training Quality Human Resources in The Level of Quality Human 5.0 / 6.0
Human here was measured through Resourc was conducted by
Resources several dimension, namely : using quisioner where the result
satisfaction, salary, co- stated that the worker
workers, promotions, and satisfaction level are classified
supervision into five responden opinion, as
follow : 44 % are strongly
agree, 38 % agree, 14 % say
enough, 2,67% are disagreed,
and 1,33 % said very don`t
agree
High Quantity Forecast a Number of Human Quantity Human Resources in The Level of Quantity Human 7.0 / 7.5
Human Resources requirement by project here was measured through Resources was conducted by
Resources several dimension, namely : using quisioner where the result
intensity, affinity and stated that the worker retention
identification and productivity level are
classified into five responden
opinion, as follow : 45 % are
strongly agree, 39,17 % agree,
8,33% say enough, 5,83 % are
disagreed, and 1,67 % said very
don`t agree
Optimizing Optimizing the use of technology to Artificial Inteligence (AI) and The Level of Technology 6.0/ 6.5
Technology support the company's operations Machine Learning, Mobile Resources was conducted by
Resources ERP, and Real Time using quisioner where the result
Operations stated that the level of
effectivity and optimalization in
using technology are classified
into five responden opinion, as
follow : 51,67 % are strongly
agree, 40,83 % agree, 6,67 %
say enough, 0,83 % are
disagreed, and 0 % said very
don`t agree
SubTotal Learning & 18.0 / 20.0
Growth (5)
Total Score (1+2+3+4+5) 87.6 / 100.0
FINANCIAL
PERSPECTIVE
Increasing Contract
Profitability Cost Efficiency
Quantity
CUSTOMER
PERSPECTIVE Enhance Strategic
High Ratio Customer Increase New Good After Sales Cooperation with
Satisfaction Index Customer Segment Service Other Development
Companies
INTERNAL PROCESS
PERSPECTIVE