Vung Ang 2 Thermal Power Project Document Review Sheet

Drawing No. Revision Purpose Drawing Title Status


VA2-UC02-P0HBC-320001 A FI GENERAL ARRANGEMENT OF INSULATION FOR Approved
☐ Disapproved

Transmittal No. FURNACE AND INTEGRAL A PIPING(LINK) (1 OF 3) Approved with
Comments
☐ Information

T-VA2-DSC-VAP-22-0129
Sheet
Number
VA2 DRS MEC xxxx

No. Related Contract Owner's Comments / Recommendation Contractor's Response Resolution


Clause Status
1 Date: 16th Mar 2022

Please explain the name of this drawing “…and integral A piping”


2 Date: 16th Mar 2022

Please add key plan and orientation


3 Date: 16th Mar 2022

Please indicate thermal conductivity in insulation specification


4 Date: 16th Mar 2022

Please add material for speed clip, wire mesh, L-bar, U-bar, angle
Please specify material codes or properties of steel, not just
carbon or stainless.
Please combine all information of accessories’ materials into a
table in this drawing or in the drawing of insulation details. It is
difficult to check every bit of information scattered all over the
drawing.
5 Date: 16th Mar 2022

Please add insulation data sheet including catalogue


6 Date: 16th Mar 2022

“Notes for Boiler refractory” content should be belong to another


drawing?
7 Date: 16th Mar 2022

Please provide the insulation thickness calculation. Why the


insulation thickness for furnace wall is the same as cage wall’s
and both of them are smaller than penthouse’s
8 OTR 13.9 Date: 16th Mar 2022

Please add indication of access doors to the boiler casing and


note for reference of the detail with removable and replaceable
insulation.
9 Date: 16th Mar 2022

Please add legends for all piping and vessels


10 Date: 16th Mar 2022

Detail 08A and 09A have reference drawing of VA2-UC02-


P0HBC-320008 and 320009, these drawing were not included in
this transmission. Please provide.

Reviewed Contractual Related Clause OTR 3 Boiler and Auxiliaries


OTR 13 General Technical requirements