You are on page 1of 1

INTEC SG Series - Waste to Energy Synthesis Gas System

Initial Checklist
Phone +49 30 364 1120-00
Fax +49 30 364 1120-99
Mail info@intec-micro-powder.com

Contact Information Your role: Buyer/EPC Mediator/Consultant Operator      


Contact Person Company Name:             Co. Reg.-No.
Name       Co. Reg. Authority      
Function       Phone/Fax      
Address       E-Mail      
Plant Location Data
Country       Latitude/Longitude      
Region       Land Costs       EUR/m² (net) for ~ 30,000 m²
Industrial zone Agricultural Remote – no infrastructure
Current land use Residential area Mixed zone Other:      
Road and/or train access available? Yes No      
Purpose of Installation
Stand-alone: Electricity feed-in to the public grid Power supply for an INTEC RC 400/05 Plant Complex
Approx. distance to nearest entry point       km minimum of approx. 80, 000 t/year organic waste required

Feed-in tariff or selling price       EUR/kWh Dual mode – combination of power supply and feed-in
Other applications Please specify:      
e.g., thermal usage, synthesis gas utilisation, combination, application mix

Available Waste Amounts & Desired Energy Outputs


Overall available amount of waste       t/year You need to pay for waste       EUR/t
or or
Desired energy output       kWh/year You will be reimbursed for waste       EUR/t
Basic Waste Characteristics
Origin
Mostly municipal solid waste Approx.       %
Moisture content Approx.       %
Mostly agricultural waste Approx.       %
Components Estimated overall calorific value Approx.       MJ/kg
Organic material Approx.       % Note: A specific waste characterisation and analysis will be
Inorganic material Approx.       % performed at a later stage of the discussion.
Please indicate, if dedicated governmental waste classification and
Please specify:      
handling regulations exist: Yes No
Administrative
Do you already have the possibility
Does municipal waste
of an organised waste collection Yes No Yes No
separation exist?
and delivery to the site location?

Salary unskilled staff       EUR/month (gross) Salary Management       EUR/month (gross)
Salary skilled staff       EUR/month (gross) Salary General Manager       EUR/month (gross)

Operational
Process Water Supply Electricity parameters
minimum of 10 m³/h sediment free process water required
natural source Distance: High       kV
e.g., a well, sea*), lake or river       km Feed voltage to Medium       kV
Pressure at site: network Low       V
public water supply
      bar Frequency       Hz
Drinking Water supply Distance:
Local electricity handling and safety regulations, emission
Approx. 2,5 m³/h required       km
standards, other legal obligations: Yes No
Overall costs for water supply:       EUR/m³      

Is a loan required?      

Your comments and additional information:      


*)
We can offer dedicated desalination facilities.

INTEC MICRO POWDER AG Phone: +49 30 364 1120-0 ∙ Fax: +49 30 364 1120-99 HRB: 82111 B
Kaiserin-Augusta-Allee 14 info@intec-micro-powder.com ∙ www.intec-micro-powder.com Reg. Court/Registergericht:
10553 Berlin (Sitz d. Gesellschaft) Board Members/Vorstand: Dipl.-Ing. Andreas Krüger (CEO/Vorstandsvorsitzender), Prof. Dr. Franz Josef Schmitt, Amtsgericht
GERMANY Eng Keat Cheah ∙ Chairman of the Supervisory Board/Vorsitzender des Aufsichtsrats: Hans A. Detampel Berlin Charlottenburg
1/1 VAT-ID: DE 218236745

You might also like