Professional Documents
Culture Documents
MODEL: BP2006
Pro.:2006.12.Rev.:2007.08
http://www.olb.kr
- 2 -
2. Parts Names.
5. Exchange fuse.
8. Specification.
9. Time Charts.
15. Output Method of Equipment main panel & PLC burner operation status.
20. Jumper checking method when use oil and gas burner.
4. Temperature setting method. (Option) 5. Change Fuse. (Extra fuse 2ea/inside of panel cover)
1. Change method of Temperature setting.: 1. Use regular (standard) fuse.
when you push and button, displayed setting 2. When fuse broken, check wire first and change fuse.
temperature and you can change temperature up and 3. When plate emergency fuse broken, when plate indicate
down. A or B, you can use one more after lead welding.
2. Change method of 1st position damper temperature.:
When power off, push down button and when you ON
switch, you can change 1st position damper
temperature.
3. Change method of 2nd position damper temperature.:
When power off, push down button and when you ON
switch, you can change 2nd position damper
temperature.
4. When status of power off, push reset button and
switch ON after you can change 2nd overheat
temperature.
6. Caution when you installation and operation. 7. Caution When you use.
1. Please avoid, small place for installation, closed place, 1. Do not touch with wet hand.
no ventilation area, inflammable substance, etc. 2. When do not use long time, you need to close fuel
2. Please avoid, rain, water, humidity against goods. valve and power off.
3. When installation or change, you have to close goods 3. Please check initial operation and regularly each safety
and work if not it has dangerous against explosion. device operation or not.
4. You need to install overheat safety device to power 4. When occur something wrong operation, you have to
supply N inlet. stop operation and contact to distributor.
5. When you use, have to check power and fuel. 5. Do not put anything in side of control panel.
6. Please check motor rotation way. 6. Be careful to enter dirty substance in side of control
7. Please check 2 times more all of safety device. panel.
7. If you do not use long time, switch off and shut the
fuel valve.
8. When occur problem, switch off and shut the valve
immediately and contact to branch and engineer.
9. Time Chart.
* For Incineration Mode: Post purge time operate basically, It sets every 5 minutes and
within 20 hours.
OLYMPIA INDUSTRIAL CO., LTD. http://www.olb.kr
- 5 -
1. Release A position 4 bolts slightly and case will be raised and separation.
2. After separation rubber cap from the B position and insert the driver to the hole directly and you
can separate the bolts and setting. (When you use F, Do not use C)
3. After change front PCB plate, Main PCB plate is careful not to touch 15pin connecting wire
casing.
4. After change, insert rubber cap.
DIP1 ON OFF
1 GAS OIL
2 Gas leakage, checking Gas leakage, No checking
3 Heater control Pump control
4 Use Temp. sensor No use Temp sensor
5 for Incinerator for Normal
Function of No.
1 COM terminal
2 Burner operation/Signal output
3 Flame catch(1st combustion)/Signal output
4 Hi (2nd combustion) Signal output
5 Alarm
6 AC(R) :When you use as power.
7 AC(N) :When you use as power.
* Connect CON2 No.6, 7, when you use
earth.
A. B. C.