1 CONCEPT SHEET
6 LIGHTING LAYOUT ANY GRID, PATTERN OR LEVEL DIFFERENCES IN THE FALSE CEILING
SHOULD BE REFLECTED IN THIS PLAN.
POSITION OF LIGHTS WITH THE DIMENSIONS
LEGEND OF LIGHTS USED ALONG WITH SIZE,COLOUR TEMPERATURE,
BEAM ANGLE, CRI VALUE, BRAND, CATALOGUE NO. WITH IMAGE
EMERGENCY LIGHTS
7 HVAC LAYOUT ANY GRID, PATTERN OR LEVEL DIFFERENCES IN THE FALSE CEILING
SHOULD BE REFLECTED IN THIS PLAN.
TONNAGE CALCULATIONS OF THE AHU AND CASSETTE UNITS
DUCTING LAYOUT INDICATING LOCATION OF SUPPLY / RETURN AIR
GRILLES / DIFFUSERS
CASSETTE UNITS WITH CHILLED WATER SUPPLY AND DRAINAGE PIPES
AND FRESH AIR IF REQUIRED.
EXHAUST SYSTEM IN TOILETS EITHER THROUGH EXHAUST FANS OR
FORCED VENTILATION THROUGH DUCTED EXHAUST.
STANDBY AC IN SERVER ROOM
8 SPRINKLER LAYOUT ANY GRID, PATTERN OR LEVEL DIFFERENCES IN THE FALSE CEILING
SHOULD BE REFLECTED IN THIS PLAN.
LOCATION OF WET RISER - FROM THE FIRE FIGHTING SHAFT
HEADER AND BRANCHES ALONG WITH COVERAGE
SPRINKLERS TO BE SHOWN IN TOILETS ALSO.
IF THE GAP ABOVE THE FALSE CEILING UP TO THE SLAB IS MORE THAN
750MM, A SECCOND SET OF SPRINKLERS TO BE SHOWN ABOVE FC
SR.NO. NAME OF DRAWING WHAT ALL NEEDS TO BE SHOWN
9 SMOKE DETECTOR LAYOUT ANY GRID, PATTERN OR LEVEL DIFFERENCES IN THE FALSE CEILING
SHOULD BE REFLECTED IN THIS PLAN.
LOCATION OF SMOKE DETECTORS WITH COVERAGE.
IF THE GAP ABOVE THE FALSE CEILING UP TO THE SLAB IS MORE THAN
750MM, A SECCOND SET OF SMOKE DETECTORS TO BE SHOWN ABOVE FC
FALSE CEILING
LOCATION OF MAIN FIRE PANEL, MANUAL CALL POINTS, HOOTERS,
FIRE DOORS WITH PANIC BARS, FIRE EXTINGUISHERS.
CLEAN AGENT FIRE FIGHTING SYSTEM TO BE USED FOR THE SERVER
ROOM, ELECTRICAL ROOM AND UPS ROOM.
10 PA + CCTV + ACCESS ANY GRID, PATTERN OR LEVEL DIFFERENCES IN THE FALSE CEILING
CONTROL LAYOUT SHOULD BE REFLECTED IN THIS PLAN.
LOCATION OF SPEAKERS WITH COVERAGE.
LOCATION OF CCTVs WITH COVERAGE AND DVR LOCATION.
POSITION OF READER AND EXIT BUTTON TO BE INDICATED FOR DOORS
WITH ACCESS CONTROL