You are on page 1of 3

Measurment in ft

Sl no. Description Nos Qty Remarks


Length Breath Depth
Ground floor
RCC Lintel Concrete Beam Dismandaling

1 Labour Ward 1 2 3.5 0.375 0.5 1.31

Total Qty of R C C Concrete 1.31 Cft

9" Thick Brick Work

1 CT Scan Room 1 1 3.5 8 0.75 21.00


2 Ladies Toilets 1 1 3 8 0.75 18.00
3 Casulty 1 1 6 8 0.75 36.00
4 Consulting 1 1 3.5 8 0.75 21.00
5 OTS 1 2 12.5 1.75 0.75 32.81
1 1 21.5 1.75 0.75 28.22

Total Qty of 9" Thick Brick Work 157.03 Cft

Measurment in ft
Sl no. Description Nos Qty Remarks
Length Breath Depth
In 1st floor
4 1/2" Thick Brick Work
1 Labour ward 1.00 2.00 3.50 10.00 70.00

Total Qty of 4 1/2" Thick Brick wall 70.00 Sft


RCC Lintel Concrete Beam Dismandaling

1 Labour Ward 1 2 3.5 0.375 0.5 1.31


3 Monitor Room 1 1 17.25 0.75 0.5 6.47

Total Qty of R C C Concrete 7.78 Cft

9" Thick Brick Work

1 Labour ward toilet 1 1 3.75 8 0.75 22.50


Monitor room 1 1 4 8 0.75 24.00
1 1 17.25 11.5 0.75 148.78

2 Hand wash 1 1 8.083 8 0.75 48.50


Nurse Station 1 1 4.333 8 0.75 26.00
I.C.U 1 1 6.5 8 0.75 39.00
3 Toilet 1 1 2.75 8 0.75 16.50
Ventilatior 1 2 2 2 0.75 6.00

Total Qty of 9" Thick Brick Work 331.28 Cft

Measurment in ft
Sl no. Description Nos Qty Remarks
Length Breath Depth
In 2nd floor
4 1/2" Thick Brick Work
1 Female ward wall 1.00 1.00 22.25 11.00 244.75
Door opening 1.00 1.00 1.50 8.00 12.00
Toilet Entrance wall 1.00 1.00 4.41 11.50 50.72
2 Existing Toilet wall 1.00 1.00 9.00 12.00 108.00
1.00 1.00 5.33 12.00 63.96
D/c Door 1.00 -1.00 3.50 8.00 -28.00
-
Dialysis Room Door 1.00 2.00 6.50 8.00 104.00
-
Bed room Door wall 1.00 1.00 0.38 8.00 3.00
3 Female ward Door opening 1.00 1.00 6.50 8.00 52.00

Total Qty of 4 1/2" Thick Brick wall 610.43 Sft


RCC Lintel Concrete Beam Dismandaling

1 Female ward wall 1 2 22.25 0.375 0.5 8.34


Toilet Entrance wall 1 2 9 0.375 0.5 3.38
1 1 13 0.75 0.5 4.88
2 Existing Toilet wall 1 2 9 0.375 0.5 3.38
1 2 5.33 0.375 0.5 2.00
D/c Door 1 1 -3.5 0.375 0.5 -0.66

Dialysis Room Door 1 2 6.5 0.375 0.5 2.44

3 Female ward Door opening 1 2 7 0.375 0.5 2.63

Total Qty of R C C Concrete 26.37 Cft

9" Thick Brick Work

1 Nurse Stations 1 1 8.75 8 0.75 52.50


Bed room wall 1 1 0.5 8 0.75 3.00

2 Existing Toilet wall 1 1 13 11.5 0.75 112.13


1 1 3.5 11.5 0.75 30.19
Dialysis Room opposite 1 1 4.75 8 0.75 28.50

Total Qty of 9" Thick Brick Work 226.31 Cft

Measurment in ft
Sl no. Description Nos Qty Remarks
Length Breath Depth
In 3rd floor
4 1/2" Thick Brick Work
1 Male ward wall 1.00 1.00 22.25 11.00 244.75
Toilet Entrance wall 1.00 1.00 4.41 11.50 50.72
1.00 1.00 1.50 8.00 12.00
2 Existing Toilet wall 1.00 1.00 9.00 12.00 108.00
1.00 1.00 5.33 12.00 63.96
D/c Door 1.00 -1.00 3.50 8.00 -28.00
-
Meeting room 1.00 1.00 2.50 8.00 20.00
Insurance & Lab 1.00 2.00 3.00 8.00 48.00
Back office room 1.00 1.00 3.50 8.00 28.00
Molicular Room 1.00 1.00 4.75 8.00 38.00
-
Bed room Door wall 1.00 1.00 0.38 8.00 3.00
3 Male ward Door opening 1.00 1.00 6.50 8.00 52.00

Total Qty of 4 1/2" Thick Brick wall 614.88 Sft


RCC Lintel Concrete Beam Dismandaling
1 Male ward wall 2.00 1.00 22.25 0.38 0.50 8.34
Toilet Entrance wall 2.00 1.00 4.41 0.38 0.50 1.65
2.00 1.00 2.33 0.38 0.50 0.87
-
2 Existing Toilet wall 2.00 1.00 9.00 0.38 0.50 3.38
2.00 1.00 5.33 0.38 0.50 2.00
-
Meeting room 1.00 1.00 2.50 0.38 0.50 0.47
Insurance & Lab 1.00 2.00 3.00 0.38 0.50 1.13
Back office room 1.00 1.00 3.50 0.38 0.50 0.66
Molicular Room 1.00 1.00 4.75 0.38 0.50 0.89
-
Bed room Door wall 1.00 1.00 0.38 0.38 0.50 0.07
3 Male ward Door opening 1.00 1.00 6.50 0.38 0.50 1.22
4 Existing Toilet wall 1.00 1.00 13.00 0.75 0.50 4.88

Total Qty of R C C Concrete 25.55 Cft

9" Thick Brick Work

1 Nurse Stations 1 1 8.75 8 0.75 52.50

2 Existing Toilet wall 1 1 13 11.5 0.75 112.13


1 1 3.5 11.5 0.75 30.19
Meeting Room opposite 1 1 3 8 0.75 18.00

Total Qty of 9" Thick Brick Work 212.81 Cft