Professional Documents
Culture Documents
Measurment in ft
Sl no. Description Nos Qty Remarks
Length Breath Depth
Ground floor
4 1/2" thick wall
1 st floor
4 1/2" thick wall
2nd floor
4 1/2" thick wall
1 Bed 01 & 02
Toilets 2 2 7.666 11.5 352.64
Plastering work
2 2 6 11.5 276.00
D/c Door 1 -2 3.5 7.5 -52.50
Existing Door 1 2 3.75 7.5 56.25
2 Dialysis Room
Toilets 2 2 10.83 10 433.20
2 2 6.375 10 255.00
D/c Door 1 -2 3 7.5 -45.00
Existing Door 1 2 6.5 7.5 97.50
3 Nurse Station 1 2 6 7.5 90.00
4 Toilets 2 3 4.5 10 270.00
2 1 4.5 11.5 103.50
2 1 4.335 11.5 99.71
2 1 13.005 10 260.10
D/c Door 2 -4 2.75 7.5 -165.00
James 1 4 17.75 0.375 26.63
Shower room 2 2 4 10 160.00
2 1 2.5 10 50.00
2 1 14.206 10 284.12
D/c Door 2 -3 2.75 7.5 -123.75
James 1 3 17.75 0.375 19.97
Existing Door 2 1 4.25 7.5 63.75
2 1 3.5 7.5 52.50
Female ward
Existing Door 1 2 6 7.5 90.00
1 Bed 01 & 02
Existing Door 1 2 3.75 7.5 56.25
2 Dialysis Room 1 2 25.705 11 565.51
3rd floor
4 1/2" thick wall
1 Bed 01 & 02
Toilets 2 2 7.666 10.5 321.97
2 2 6 10.5 252.00
D/c Door 1 -2 3.5 7.5 -52.50
2 Meeting room
Entrance door 2 2 2.5 10 100.00
Plastering work
1 Bed 01 & 02
Existing Door 1 1 3.75 8 30.00
2 Lift W 1 1 4 6 24.00