2) The 15 min Unit Hydrograph for a 2.1 km2 basin is given by:
Tim e (m in) Runo ff (m ³ /s) Tim e (min) Runo ff (m³ /s)
0 0.00 210 1.66
30 2.40 240 1.49
60 4.20 270 1.36
90 2.50 300 1.28
120 2.20 330 1.25
150 2.10 360 1.17
180 2.00 390 0.00
Runo ff Runo ff
To ta l Runo ff
Time (min) Runo ff (m ³ /s) Eve nt 1 Eve nt 2
(m³/ s)
(m³/ s) (m³/ s)
0 0.00 0.00 0.00 0.00
15 1.20 3.36 0.00 4.56
30 2.40 6.72 23.52 32.64
45 3.30 9.24 32.34 44.88
60 4.20 11.76 41.16 57.12
75 3.35 9.38 32.83 45.56
90 2.50 7.00 24.50 34.00
105 2.35 6.58 23.03 31.96
120 2.20 6.16 21.56 29.92
135 2.15 6.02 21.07 29.24
150 2.10 5.88 20.58 28.56
165 2.05 5.74 20.09 27.88
180 2.00 5.60 19.60 27.20
195 1.83 5.12 17.93 24.89
210 1.66 4.65 16.27 22.58
225 1.58 4.41 15.44 21.42
240 1.49 4.17 14.60 20.26
255 1.43 3.99 13.97 19.38
270 1.36 3.81 13.33 18.50
285 1.32 3.70 12.94 17.95
300 1.28 3.58 12.54 17.41
315 1.27 3.54 12.40 17.20
330 1.25 3.50 12.25 17.00
345 1.21 3.39 11.86 16.46
360 1.17 3.28 11.47 15.91
375 0.59 1.64 5.73 7.96
390 0.00 0.00 0.00 0.00
3) Create a 10-min Synthetic Espey Altman Unit Hydrograph for the following basin:
Basin dimensions 28 km x 10km
Length of concrete lined main channel: 45 km
Slope: 2%
Area urbanized: 60% (asphalt)
Area 280 km2 108.11 mi2 TP 82.81 min
4.1∗1476450.23∗0.6 1.57
T p= 0.25 0.18
=82.81
0.02 ∗0.6
0.96
359∗108.11
Q p= =285.27
82.811.07
1645∗108.11
T B= =827.05
285.270.95
252∗108.110.93
W 50= 0.92
=108.16
82.81
95∗108.110.79
W 75= =46.71
82.81 0.78