You are on page 1of 1

A Guide To Master Dry Dock Operations – Deck Department

Landing Report
Ship's Name: DATE:

Equipment/ Parts: Serial No.: Drawing No. :

Equipment/ Parts Details:


For e.g. Forward life raft of the ship-complete, 1 no. (capacity 6 person)

Reason for Landing Ashore:


Repair/ Rebuilding/ Testing

Details of Job to be Performed:


Complete details of the job to be performed in the shore workshop on the equipment/ parts to be taken ashore

Quantity:
Total number of equipment/ Parts landed ashore

Name of the Shore Workshop:

Master/Chief Officer Shore Workshop Representative


Signature and Name Signature and Name

www.marineinsight.com

You might also like