TITLE PAGE

THE BUILDING MAINTENANCE /RENOVATION OF WORKSHOP B LECTURE


HALL, FOR DEPARTMENT OF BUILDING TECHNOLOGY
FEDERAL POLYTECHNIC IDAH

By

Group II

Name Reg. Number

1. MUSA MUTARI UGBEDA FPI/ND/BLD/19/006


2. EGBUNU IBRAHIM FPI/ND/BLD/19/004
3. USMAN NEZIRU MUHAMMED FPI/ND/BLD/19/002
4. ALIH JACOB FPI/ND/BLD/19/003
5. UMORU YUSUF FPI/ND/BLD/19/024
6. ALEKE AUGUSTINE FPI/ND/BLD/19/025
7. AKOR PUAL MSUGHTER FPI/ND/BLD/19/026
8. NOAH JONH EDEJE FPI/ND/BLD/19/027
9. OJILE EJOYI MONDAY FPI/ND/BLD/19/050

FEDERAL POLYTECHNIC IDAH


BEING A PROJECT REPORT SUBMITTED TO THE DEPARTMENT OF BUILDING
TECHNOLOGY IN PARTIAL FULFILLMENT OF THE REQUAIREMENT FOR THE
AWARD OF NATIONAL DIPLOMA (ND), IN BUILDING TECHNOLOGY, OF THE
FEDERAL POLYTECHNIC IDAH, KOGI STATE
APRIL, 2022

i
APPROVAL PAGE

This project work has been supervised and approved as meeting the requirement of the

department of Building Technology, Federal Polytechnic, Idah Kogi State.

_____________________________ _________________________
BLDR. ODAWN GOWIN Date
Supervisor

______________________________ _________________________
BLDR. ADERIBIGBE Y. WASIU Date
Head of Department (H.O.D)

______________________________ _________________________
External Supervisor Date

ii
DEDICATION

This project is dedicated to Almighty God, and to all academic and Non- academic

staff in building department. For their moral and spiritual support in ensuring the

success of this project

We also dedica te it to our brothers and sisters, to mention but a few, Egbunu

Ibrahim, Joseph Samson, Joseph Elijah and Inaju Goodness etc. who in one way of

the other supported us f or completion of our National Diploma programn1e. We

say a big thanks to you and may God in His infinite goodness reward and bless you

all. (Amen)

iii
ACKNOWLEDGEMENT

Our gratitude goes to the Almighty God for His love, wisdom and understanding

for helping us throughout our National Diploma programme.

We would like to express our gratitude and appreciation to all those who gave us

their possibility to complete this report. Special thanks is due to our supervisor Bldr.

Odawn Gowin whose help, stimulating suggestions and encouragement helped us in

all time of fabrication process and in writing this report. We also sincerely thanks

for the time spent proofreading and correcting our many mistakes.

We would also like to acknowledge with much appreciation the crucial role of the

staff in Building Department, who gave us a permission to use the workshop

equipment and also the machine and giving a permission to use all the necessary

tools in the workshop.

Many thanks go to all lecturer and supervisors who have given their full effort in

guiding the team in achieving the goal as well as their encouragement to maintain

our progress in track. My profound thanks go to all classmates, especially to our

friends for spending their time in helping and giving support whenever we need it

in fabricating our project.

Our special thanks also go to our H.O.D in person of Bldr. Aderibigbe Y. Wasiu for is

advice and support for the completion of this project, may Almighty God bless him

abundantly. (Amen)

iv
ABSTRACT

A work (project) of this type broadly is focused at exposing students to both

practical and theoretical idea of their chosen or selected profession. To obtain

this goal the maintenance/renovation of workshop of Building Technology

department of FPI was chosen for discussion. This works hall

comprehensively look at or cover the need to maintain the workshop B, the

materials for the maintenance of workshop B renovation. In addition, this

works hall deal extensively on the basic or fundamental maintenance

procedure sup to the finishing stage.

v
TABLE OF CONTENT

Title page - - - - - i

Approval page - - - - - ii

Dedication - - - - - iii

Acknowledge - - - - - iv

Abstract - - - - - v

CHAPTER ONE

1.0 INTRODUCTION - - - - 1

1.1 Scope of the project - - - - 2

1.2 Need for the project - - - - 2

1.3 Aim and Objectives of the project - - - 3

1.4 The Objective of the Project - - - - 3

1.5 Methodology - - - - - 3

1.6 Method of Data Collection - - - 4

CHAPTER TWO

Literature review - - - - - 5

2.0 Introduction - - - - - 5

2.1 Classification of maintenance of buildings - - - 6

2.1.1 Planned maintenance - - - - 7

2.1.2 Unplanned maintenance - - - - 9

vi
2.2 Objectives of maintenance of buildings- - - 10

2.3 Functions of maintenance - - - - 11

2.3.1 Servicing - - - - - 11

2.3.2 Rectification - - - - - 12

2.3.3 Repairs. - - - - - 12

2.3.4 Replacement - - - - - 12

2.3.5 Renovation - - - - - 12

2.4 Purpose of maintenance - - - - 13

2.5 Causes of maintenance - - - - 13

2.6 Types of material used - - - - 13

2.7 Types of windows - - - - 14

2.8 Tools used for the work - - - - 14

CHAPTER THREE

3.0 painting defect - - - - 17

3.1 Introduction - - - - - 17

1.2 Defects in paint work - - - - 17

3.3 Procedure for paint application on wall- - - 23

3.4 procedure of fixing louvre window - - - 23

3.5 Taking off sheet - - - - 27

3.6 Billing - - - - - 28

vii
3.7 Bill of quantity for the maintenance of the workshop b, - - 33

3.8 Program of works - - - - 34

CHAPTER FOUR

4.0 Methods of installing louvres assembly- - - 35

4.1 Introduction - - - - - 35

4.2 Method of installing louvre- - - - 35

4.3 Procedure in painting wall- - - - 38

CHAPTER FIVE

5.0 Conclusion/recommendation

5.1 Conclusion

5.2 Recommendation

5.3 Reference