TAKING OF SHEET

TIMSING DIMENSION SQUARING TIMSING DIMENSION SQUARING


DESCRIPTION DESCRIPTION

Taking Off for proposed 16.85 Clear site of all bushes and
residential building No. 2, Along dispose them off site
11.90
GRA road Idah Kogi state.
200.52
Sub structured work all TOP SOIL EXCAVATION
provisional BESM4®
TAKING OFF LIST: L = 14.85
1. Plant Add 2/225 0.45
2. Site clearance 15.30
3. Top soil excavation
4. Disposal W = 9.90
5. Trench excavation Add 2/225 0.45
6. Surface treatment 10.35
7. Earthwork support 15.30 Excavation over site to remov
8. Concrete blinding vegetable top soil at averag
9. Formwork 10.53
dept of 150mm
10. Reinforcement
158.36
11. Concret in foundation DISPOSAL (M3)
12. Block work in foundation Disposed from site excavate
13. Hardcore filling 15.30 material in a temporary spo
14. Concrete slab heap for reused in away from
10.35
15. Laterate filling site
16. Disposal of water 0.15
17. Damp proof memberen EXTERNAL TRENCH EXCAVATION
18. Protection 23.75
L = 14.85
PLANT W 9.90
24.75
Item Allow for bringing and removed X 2
from site all plants required for 49.50
this section of work. INTERNAL TRENCH EXCAVATION

& Horizontal Vertical


3/3.60 = 10.80 3/3.60 = 10.80
Allow for maintaining on site all 1.35 3/1.80 = 5.40
Item
plant required for this section of 5/1.80 = 9.00 1.50
work 2.00 2/2.00 = 4.00
5.63 2.03
SITE CLERANCE (M2) 1.30 3.53
L = 14.89 30.16 0.98
Add 2/100 2.00 3.00
16.85 3.40
34.64
W = 9.90
Add 2/1000 2.00
1
11.90
CONCRETE IN COLUMN BAS
TOTAL GIRT Reinforced insi-tute concre
maximum ratio 1:2:4 – 19mm
49.40 aggregate in column base
1.00
30.16
34.64 9 1.00
114.30 0.23 FORMWORK TO COLUMN
- BASE
Less column 9/1000 = 9.00 2.07 Sawn treated hardwood for work to
column base
To main girt = 105.30
1.00
105.30 Excavation for trench starting
0.68 REINFORCE IN COLUMN BAS
from strip level maximum depth 9 4 0.28 8.28
0.85 L = 1.00
not exceeding 2m Less c/c 2/25 0.05
60.88 0.95
Add bend 0.216
SURFACE TREATMENT 1.166
LEVEL AND Compartment
Quantity required
105.30 Level and compact the bottom of
0.68 1.17
excavation to receive in
71.60 foundation +1 =6
0.25
ANTI-TERMITE TREATMENT Y12 high yield reinforcement bars in
71.60 1.17 straight and bend to BS4449
105.30
0.68
Prepare and apply diedrex 20
solution to bottom and side of 9 6 CONCRETE IN COLUMN STARTE
105.30 89.50 excavation
0.85 L = 1.00
9 9.00 Ditto column bottom side 63.81 Less blinding 0.05
1.00 0.90
1.00 Less conc. Base 0.23
9 4 36.00 0.72
1.00 Add hardcore 0.15
1.00 206.10 1.32
Add over site conc. 0.15
EARTH WORK SURPPORT 1.47
Earthwork support to bothe side
181.12 of excavation maximum depth not REINFORCEMENT INSTITUT
105.30 exceeding 2m away between CONCRETE IN COLUMN
0.86 Starter maximum 1:3:6 -19mm
36.00 opposite faces
aggregate
1.00
217.12 Stirrups 8mm O
1.00
1.50
CONCRET BLINDING L = 0.225
0.23
3.58 50mm thick concrete blinding 9 Less c/c 0.05
9 0.23
105.30 poured on the face of the 4x 0.700
0.68 excavation
0.05 0.71 1.44
9 4 Add bend 2/9/ 0.08
1.80 Ditto pit 2.14
1.00
1.00 5.38
2
0.05 1.65
Quantity required + 1= 8
0.25
2.41 8mm O high yield bars stirrups in NRS
column starter

FORMWORK IN COLUMN STARTER


Sawn form work to side of
column

CONCRETE IN FOUNDATION
Plain insitu mass concrete in
foundation not exceeding 300mm
thick

BLOCK WORK IN FOUNDATION


225x225x450 hollows sancrete
block with cement and mix (1:3)

3
4