Taking Off for proposed 16.85 Clear site of all bushes and
residential building No. 2, Along dispose them off site
11.90
GRA road Idah Kogi state.
200.52
Sub structured work all TOP SOIL EXCAVATION
provisional BESM4®
TAKING OFF LIST: L = 14.85
1. Plant Add 2/225 0.45
2. Site clearance 15.30
3. Top soil excavation
4. Disposal W = 9.90
5. Trench excavation Add 2/225 0.45
6. Surface treatment 10.35
7. Earthwork support 15.30 Excavation over site to remov
8. Concrete blinding vegetable top soil at averag
9. Formwork 10.53
dept of 150mm
10. Reinforcement
158.36
11. Concret in foundation DISPOSAL (M3)
12. Block work in foundation Disposed from site excavate
13. Hardcore filling 15.30 material in a temporary spo
14. Concrete slab heap for reused in away from
10.35
15. Laterate filling site
16. Disposal of water 0.15
17. Damp proof memberen EXTERNAL TRENCH EXCAVATION
18. Protection 23.75
L = 14.85
PLANT W 9.90
24.75
Item Allow for bringing and removed X 2
from site all plants required for 49.50
this section of work. INTERNAL TRENCH EXCAVATION
CONCRETE IN FOUNDATION
Plain insitu mass concrete in
foundation not exceeding 300mm
thick
3
4