Drawing no : Proposed House for page number : 01 Item No.

Discription Quantity Unit Rate Amount


Mr.L.Rajapakshe in Ratnapura. Project : Proposed House for Mr .L.Rajapakshe in Ratnapura.
T.O. : S.M.E.H.Subasinghe Work section : (D) Excavation & Earthwork
Date : 10/02/2012 Substructure
Work Section : (D) Excavation & Earth work
Site Preparration Earthwork support Surface treatment
S/Cliering site vegetation S/Earthwork support total S/Leveling & compacting Site Preparation
Substructure & cutting away rubbish depth<1m & between bottom of excavation
from site. opposing faces<2m 9.21(04) Clearing Site
Take off List 216.09 (02) 83.2(03) 8.88(04) Clearing site vegetation & cutting away rubbish from site 216 m 10 2160
83.20m 10.53(04)
Removing trees 216.00m 28.60m Removing trees & Stumps
Excavating topsoil Girth>500mm<1000mm 3 Nr 1000 3000
Disposal topsoil
Excavating trenches S/Leveling & Compacting
Excavating column base Disposal ground Excavating
Filling to excavation Removing trees & stumps Item/Disposal of water 54.19(06) Excavating topsoil for preservation averag in150mmdepth 76.9 m 20 1538
Earthwork support Nr.girth>500mm<1000mm surface & ground level 54.20m
Leveling & Compacting Excavating trenches width >300mm & depth <1m cmmncng 8 m 1000 8000
bottom of excavation 3 (02) Item (03) from bottom of top soil layer
Concrete in foundation 03 Nr Item
Concrete in column base S/Leveling & Compacting Excavating column base 16 m 1000 16000
Concrete in column hardcore bed blind with
DDT sand
Filling to excavation 54.19(07) Disposal
ADD Excavating C/Disposal excavated 54.20m Disposal excavated material on site 28 m 500 14000
Disposal of site S/Excavating topsoil for material from site
Rainforstment preservation average in 11.54 11.54(02) Disposal of water surface & ground level Item 500
Formwork 150mm 15.96 15.96(02)
Rubble work in foundation 76.92 (02) 28.00m
DDT 76.90m Filling
Filling to excavation filling to excavation 75mm average thknss with excavated 36.8 m 1500 55200
ADD materials compact with vibrating rammer
Disposal of site C/Excavating trenches Filling
Damp proofing course width>300mm & depth<1 C/Filling to excavation 75mm
Leveling & Compacting ground m commencing from bott average thkness with excavat
Dry Earth filling om of topsoil layer ed materials compact with Earth work
Blindimg surface of hardcore bed 8.13 (02) vibrating rammer Earth work support total depth >1m distance between 83.2 m 100 8320
Damp proofing membranances 0.06 (02) 15.96(03)
Concrete bed 8.00m 20.05(06)
Top soil adjestment 0.78(08) Surface Treatment
C/Excavating column base 36.80m Leveling & Compacting bottom of excavation 28.6 m 100 2860
15.96(02)
16.00m Leveling & compacting grounnd 54.2 m 150 8130

Compacting surface of hardcore bed & blinding with sand 54.2 m 200 10840
130548

T D S Description
8.7 8.7 Page Number : 02 Item No. Description Quantity Unit Rate Amount
6 6 Project : Proposed House for Mr. L.Rajapakshe in Ratnapura
14.7 14.7 Work section : (F) Concrete works

14.7 Clearing site vegetation & cutting away Substructure. Supersructure. Work Section : (F) Concrete work
14.7 rubbish from site. Lintol
216.09 D1.1.1.1 Concrete work
S/Mass concrete in column C/Mass concrete in column C/Mass concrete in Lintol C/Mass concrete in Lintol Mass concrete in column base 1:3:6 10.5 m 6200 65100
base 1:3:6 Shaft from FFL to UFL 1:2:4 for Door type D1 1:2:4 for Window type F 1:2:4
3 1 3 Removing trees & stumps,Girth>500mm 10.53(03) 1.69( ) 0.03( ) 0.10( ) Mass concrete in column base 1:2:4 2.8 m 4000 11200
& <1000mm. (Nr) 10.50m 1.7m 0.03m 0.10m
D1.1.2.1 Mass concrete lin column shaft 1.9 m 11200 21280

C/Mass concrete in column C/ Mass concrete in Slab C/Mass concrete in Lintol


375 8700 8700 base 1:2:4 1:2:4 for Door type D2 1:2:4
225
2/ 150 150 1.24(03) 5.97( ) 0.06( )
75 8850 8850 1.57(03) 6.00m 0.06m
2.80m
8.85 Excavating top soil for preservation on site
8.85 78.32 average depth in 150mm C/Mass concrete in column C/Mass concrete in Lintol
D2.1.1 C/Mass concrete in column Shaft from UFL to Roof Levelfor Door type D3 1:2:4
Shaft to FFL 1:2:4 1:2:4 0.05( )
1.5 DDT 1.24(04) 0.53( ) 0.05m
0.9 1.35 0.62(04) 0.5m
76.92 1.90m
C/Mass concrete in Lintol
C/Mass concrete in Beam for Window type W1 1:2:4
76.92 Disposal excavation topsoil on site. C/1:2:4 in site concrete bed 1:2:4 0.05( )
0.15 11.54 in hard core bed 1.81( ) 0.05m
3.46(08) 1.8m
3.50m
24.9 Excavating trenches width>300mm<1m C/Mass concrete in Lintol
0.37 commencing from bottom of top soil forWindow typeW2 1:2:4
0.45 4.14 layer. 0.05( )
24 D2.2.5.1 0.05m
0.37
0.45 3.99
8.13 C/Mass concrete in Lintol
13 0.9 Excavating column base width>1m for Window type W3 1:2:4
0.9 0.47( )
0.75 7.89 0.50m
6 0.37 DDT
0.07
0.45 0.06 C/Mass concrete in Lintol
15.96 for Window type W4 1:2:4
0.07( )
0.07m

Project : Proposed House for Mr. L.Rajapakshe in Ratnapura Page Number : 03 Item No. Description Quantity Unit Rate Amount
15.96 15.96 Filling to excavation 75mm average thickness Work section : Floor/ Wall/ Celing Finishing
with excavated materials compact with Work Sub Section : Floor Finishing
vibreting.
D5.9.1.1 S/12mm thick 1:3 c/s motar Work Section : (G) Masanary work
laid on concrete floor &
finish semi rough Rubble work
2 24.9 Earthwork support total depth<1m,distance 61.09( ) Rubble work in foundation cement sand motar 1:5 in 300 52 m 13000 676000
0.45 22.41 between opposing faces<2m. 61.1m mm thick
2 24 D4.7.1.1
0.45 21.6
24.9 S/ 300mmx300mm non slip
0.15 3.73 approved quality floor tile
laid on 12mm thick 1:3 c/s
13 4 0.9 motar floor rendering
0.9 42.12 backing with cement putty
89.86 with apply grout to match
the tile
40 0.37 DDT 61.09( )
0.45 6.66 for "T" 61.1m
83.2

S/ 100mmx 16mm thick tile


skerting laid on vertical 12
Item Item Disposal of water surface & ground level. mm thick 1:3C/S motar
D4.8.1.1&2 plastered wall backing with
cement putty finish with
applied grout to match the
tiles
24.9 Leveling & Compacting bottom of excavation 86.84( )
0.37 9.21 D5.10.2&4.3 86.8m
24
0.37 8.88
13 0.9 S/19mm thick plinth plaster
0.9 10.53 with 1:3 C/S motar applied
collerd cement putty
18.09( )
18.1m
13 0.9 1:3:6 mass concrete in column base,screed
0.9 10.53 mass concrete 75mm thick
F2.2.1&2.1 S/ slab soffit plastering with
1:3 C/S motar applied
13 0.9 1:2:4 mass concrete bed in column base collerd cement putty
0.9 61.09( )
0.15 1.57 61.1m

Page Number : 04 Item No. Description Quantity Unit Rate Amount


13 0.9 DDT Project : Proposed House for Mr. L.Rajapakshe in Ratnapura
0.9 Filling to excavated a.b.d. Work section : (G) Masonary work
0.05 0.52 Rubble work
13 0.9 ADD S/Rubble work infoundation Work Section : (H) Water Proofing
0.9 Remove excavated material from site. cement sand motar 1:5 in
0.15 1.57 300mm thick Damp Proofing Course
51.97(04) Damp Proofing course width <300mm horizontal 12mm thk 65.4 m 2000 130800
52.00m cement sand 1# with coat of hot tar on tpo lined with sand
13 4 1 Timber Formwork in column shaft up to FFL
0.22 11.44 Damp Proofing Membranes width<300mm vertical of 1000 54.2 m 20 1084
column base S/225mm thick brick wall gage polythne laid between polythn & concrete bed width
10 13 0.85 110.5 with 1:5 C/S motar in com 150mm end & side laps
column shaft -mon brick in English bond
13 4 1.3 67.6 from D.P.C level to U.F.L Damp Proofing Membranes width <300mm vertical of 1000 95.7 m 20 1914
stirups 170.5( ) 23.7( ) gage polythn laid between polythn & concrete bed width
13 8 0.85 88.9 146.8m 150mm end & side laps

110.5 110.5 16mm for steel in column base @ 150mm


both ways. S/225mm thick brick wall
with 1:5 C/S motar in com
67.6 67.6 12mm for steel in column shaft -mon brick in English bond
from Slab level to Roof level
88.9 88.9 6.5 mm R links @150c/c in center in column 145.66( ) 34.67( )
shaft. 111m

S/225mm thick brick Gable


13 1 1:2:4 concrete in column shaft up to FFL wall with 1:5 C/S motar in
0.22 common brick in English
0.22 0.62 bond
5.32( )
5.30m

24.9 Rubble work in foundation with 1:5 cement


0.9 22.41 sand motar RRM
24
0.9 21.6
13 0.9 DDT
0.9 2.57
51.97

51.97 DDT
0.37 19.22 Filling to excavation with excavated material

Page Number : 05
51.97 ADD project : Proposed House for Mr. L.Rajapakshe in Ratnapura
0.37 19.22 Disposal excavated materials Work section : (H) Water proofing
Damp Proofing Course
L/Width not exceeding 300
35.1 35.1 Damp proofing course with<300mm horizontal mm horizontal 12mm thick L/"U"PVC gutter fixed to the
30.32 30.32 12mm thickness 1:3 cement sand motar cement sand 1:3 with coat of valance board
65.42 uppired cout of hot tar blind with sand hottar o top lined with sand 19.27( )
65.42(06) 19.30m
65.40m

375
225 S/DampProofing Membranes L/PVC down pipe
2 1/2 / 150 width not exceeding 300mm 16.86( ) 3.6( )
1.95 vertical of 1000gage polythn 16.8
1.35 2.63 Leveling & Compacting ground laid between polythene & 3.6
2.85 concrete bed width 150mm 20.4m
2.55 7.26 end & side laps
1.05 54.19(07)
5.47 5.74 54.20m Nrs/Extra over 4"x5" PVC
3.45 end caps
2.55 8.79 3( )
3.45 L/Damp Proofing membranes 3Nrs
2.55 8.79 width not exceeding 300mm
2.85 vretical of 1000gage polithn
3.45 9.83 laid between polythene & Nrs/Extra over 4"x5" PVC
2 1.8 concrete bed width 150mm Shoes
2.25 8.1 end & side laps 6( )
1.25 95.74(07) 6Nrs
2.25 2.81 95.70m
1.12
0.22 0.24 Nrs/Extra over 4"x5"PVC rain
54.19 water outlet fpr gutters
6( )
6Nrs
54.19 Filling to make up levels 375mm average
0.37 20.05 thicknesss in 150mm wellramp watered &
consolidate.

1.95 Leveling & Compacting hardcore core bed


1.35 2.63 blinding with sand.
2.85
2.55 7.26

1.8
2.25 4.05 Project : Proposed House for Mr. L.Rajapakshe in Ratnapura Page Number : 04
1.05 Work section : Floor/ Wall/ Celing Finishing
5.47 5.74 Work Sub Section : Wall Finishing
3.45
2.55 8.79 S/12mm thick 1:1:5 C/L/S L/Revel Plaster 12mm thick
3.45 motar plastering in internal 1:1:5 C/L/S motar plastering
2.55 8.79 walls & finish smooth with & finish soomth with lime
2.85 lime putty putty
3.45 9.83 225.78( ) 52.68( ) 276.8( )
1.8 173.1m 276.8m
2.25 4.05
1.25
2.25 2.81
1.12 S/ Preparing & apply two L/Preparing & apply two coat
0.22 0.24 coat of emulsion paint of emulsion paint on Revel
on plaster wall internal. 276.8( )
225.78( ) 52.68( ) 276.8m
173.1m

1.95 Damp proofing membranance width exceed


1.35 2.63 ing 300mm horizontal,1000gage polythene S/12mm thick 1:1:5 C/L/S S/12mm thick 1:1:5 C/L/S
2.85 layed on lined hardcore bed with 150 mm motar plastering in External motar plastering in External
2.55 7.26 side an end lap. walls & finish semi rough walls & finish semi rough
1.05 H1.2.2.1 with lime putty with lime putty
5.47 5.74 90.48( ) 52.68( ) 88.03( )
3.45 37.8m 88.m
2.55 8.79
3.45
2.55 8.79 S/ Preparing & apply two S/ Preparing & apply two
2.85 coat of based paint coat of based paint
3.45 9.83 on plaster wall external & on plaster wall external &
2 1.8 one coat of weather sheild one coat of weather sheild
2.25 8.1 paint paint
1.25 90.48( ) 52.68( ) 120.66( )
2.25 2.81 37.8m 120.7m
1.12
0.22 0.24
54.19 S/slab soffit plastering with
1:3 C/S motar applied
collerd cement putty
61.09( )
35.1 35.1 Damp proofing membranance width not 61.1m
2 30.32 60.64 exceeding 300mm vertical of 1000gage laid
95.74 polythene between polythene & concrete
bed width 150mm end & side laps.
H1.1.2

1.95 Concrete bed in site concrete 1:3:6 (25mm Project : Proposed House for Mr. L.Rajapakshe in Ratnapura Page Number : 04
1.35 agg) bed slab on ground on hardcore thick Work section : Floor/ Wall/ Celing Finishing
0.07 0.18 not exceeding 150mm mass concrete. Work Sub Section : Celing Finishing
2.85 F2.3.1
2.55
0.07 0.5
1.05
5.47
0.07 0.4
3.45
2.55
0.07 0.61
3.45
2.55
0.07 0.61
2.85
3.45
0.07 0.68
1.8
2.25
0.07 0.28
1.25
2.25
0.07 0.19
1.12
0.22
0.07 0.01
3.46

13 0.9 Top soil ajustment,Filling to excavation


0.26 150mm average thickness with top soil.
0.15 0.45
5 0.63
0.26
0.15 0.12
21 0.26
0.26
0.15 0.21
0.78

END OF SUBSTRUCTURE

Project : Proposed House for Mr. L.Rajapakshe in Ratnapura


Work section : (F) Concrete works
T D S Description

Superstructure
From D.P.C. Level to Upper Floor Level

Take Off List

225mm thick Brick wall


225mm thick column shaft
100mm thick concrete slab

steel in shaft
13 4 2.7 140.4
stirups
13 19 0.85 209.95

13/4/ 2.7 Timber form work in column shaft from FFL to


0.22 28.08 upper floor level

13/4/ 2.7 140.4 12mm steels in column shaft

13/19/ 0.85 209.95 6.5mm r links @ c/c in column shaft

13 2.7 1:2:4 concrete in column shaft from D.P.C. to


0.22 slab level
0.22 1.69

63.15 225mm thick brick wall with 1:5 c/s motar in


2.7 170.5 common brick in English bond from D.P.C.
level to U.F.L.

8700
6075
52.8
ddt-1.75*1.75 3.06
49.74
add- 2.62*4.35 11.39
61.13
61.13 61.13 Timber formwork edge of slab not exceeding
150mm height

10mm steel
59 6.02 355.47
42 8.65 363.3
30 2.57 77.25
19 4.3 81.7
877.72
ddt 20 1.5 30
847.72
847.72 847.72 10mm steel 150mm c/c in slab

61.13 1:2:4 Concrete in slab


0.1 6.11
1.5 DDT
0.97 For Stair case void
0.1 0.14
5.97

Floor, Wall & Celing finishes

T.O. List
Cement Rendering
Floor tile
Internal Plaster & paint
External Plaster & paint
Skerting
Plinth Plaster
Slab plastering

2.1 12mm thick 1:3 c/s motar laid on concerte


1.5 3.15 floor & finish semi rough
3
2.7 8.1
2 3.6
2.7 19.44 &
3.6
3 10.8
2 2.4
1.95 9.36 300mmx300mm non slip approved quality
5.62 floor tile laid on 12mm thick 1:3 c/s motar
1.2 6.74 floor redering backing with cement putty with
1.35 apply grout to match the tile
2.4 3.24
1.2
0.22 0.26
61.09

2700
ddt - for skerting- 100 2600

7.2 12mm thick 1:1:5 C/L/S motar plastering in


2.6 18.72 internal walls & finish smooth with lime putty
11.4
2.6 29.64
2 12.6
2.6 65.52
13.2 &
2.6 34.32
2 8.7
2.6 45.24 Preparing & apply two coat of emulsion paint
12.44 on plaster wall internal.
2.6 32.344
225.784

34.8 12mm thick 1:1:5 C/L/S motar plastering


2.6 90.48 external wall & finish semi rough

&

preparing & apply two coat of based paint on


plaster wall external & one coat of weather
sheild paint
7.2 7.2 100mmx 16mm thick tile skerting laid on
11.4 11.4 vertical 12mm thick 1:3 C/S motar platered
2 12.6 25.2 wall backing with cement putty finish with
2 8.7 17.4 applied grout to match the tiles.
13.2 13.2
12.44 12.44
86.84

34.8 19mm thick plinth plaster with 1:3 C/S motar


0.52 18.096 applied collerd cement putty

61.09 61.09 slab soffit plastering with 1:3 C/S motar


applied collerd cement putty

From Upper Floor level to Roof

Take Off List

225mm thick column shaft


225mm thick beam
225mm thick brick wall

11/4/ 2.7 Timber Formwork in column shaft from Upper


0.22 26.13 floor level to Roof level

11/4/ 2.7 118.8 12mm steel in column shaft

11/19/ 0.85 177.65 6.5mm R links @ c/c 150mm in column shaft

11 2.7 1:2:4 concerte in column shaft from upper


0.22 floor level to roof level
0.22 0.53
steel 355.47
363.3
ddt 15+15 30
688.77
30 2.57 77.25
19 4.3 81.7
Timber formwork in Beam 847.72
Nrs 64 64 Props
211.2 211.2 2"x4" headtree with wastage 10%
492.8 492.8 2"x1" Bairs
2.93 2.93 2"x4" Adjestable plate
70.4 70.4 1"thk Slove Plate (sqrft)
275 275 2"x2" Runners
176 176 2"x2" Post
52.8 52.8 2"x2" Battens
140.8 140.8 2"x1" Struckt
Nrs 42 42 Plywood sheets
256 256 Nuts & Bolts

847.72 847.72 12mm steel in Beam

250 0.85 212.5 6.5mm R links in Beam

37.5 1:2:4 concrete in Beam


0.22
0.22 1.81

53.95 225mm thick brick wall with 1:5 C/S motar in


2.7 145.66 common brick in english bond from U.P.L. to
Roof Level

2/0.5/ 8.6 Gable wall


0.62 5.32
150.98

Floor Wall & Celing finishes.

Cement rendering
Floor tile
Internal Plaster & Paint
External Plaster & Paint
Skerting
Asbastose celing & timber frame

2.1 12mm thick 1:3 C/S motar laid on concrete


1.5 3.15 floor & finish semi rough
3
2.7 8.1
1.5
0.97 1.45 &
5.62
1.2 6.74
2 3.6 300mmx300mm nonsilp approved quality
2.7 19.44 floor tile laid on 12mm thick 1:3 C/S motar
4.35 floor rendering backing with cement putty
2.62 11.39 with apply grout to match the tile
50.27

7.2 12mm thick 1:1:5 C/L/S motar plastering


2.6 18.72 internal wall & finish smooth with lime putty
11.4
2.6 29.64
7.94
2.6 20.64 &
4.65
2.6 12.09 Preparing & apply two coat of emulsion paint
8.02 on plaster wall internal
2.6 20.85
2 3.6
2.6 18.72
120.66

29.54 12mm thick 1:1:5 C/L/S motar plastering exter


2.8 82.71 nal wall & finish semi rough
5.32 5.32
88.03 &

Preparing & apply two coat of based paint on


plaster wall external & one coat of weather
sheild paint
7.2 7.2 100mmx16mm thick tile skerting laid on
11.4 11.4 vertical 12mm thick 1:3 C/S motar plastered
7.94 7.94 wall backing with cement putty finish with
4.65 4.65 applied grout to match the tiles
8.02 8.02
3.6 3.6
42.81

1.5 Asbastas ceiling sheets fixed to timber frame


2.1 3.15 & finished with 25mmx6mm with heading &
3 32mmx32mm curve molding
2.7 8.1
2 3.6
2.7 19.44
1.2
5.62 6.74
3
0.97 2.91
40.34

3 1.5 4.5 2"x4" timber frame


3/4 2.7 32.8
6 1.2 7.2
4 0.97 3.88
47.98

4 2.1 8.4 2*2 timber frame


6 3 18
8 3.6 28.8
2 5.62 11.24
66.44

120 0.15 18 2"x1" timber frame

Adjestment For Openings


DOOR

01 Nrs Door type D1 size 2100x1200mm hight ovrall


compensine 75x100mm class 1 treated timber
fram 31.25mmthk class one timber panneled
Door size 2100x1200mm hight 11/2 pear of
75x100 hinghes,1no lock.6no holdfast &apply
2 under & 2 glass paint

DDT
2.1 for wall
1.2 2.52
1.8 Lintal
0.1 0.18
2.1 External Plaster & paint
1.2 2.52
1.2 1.2 Skerting
1.2 Internal Plaster & Paint
2.1 2.52
1.2 1.2 Skerting

ADD
2 1.8 Formwork in lintal
0.22 0.792
4 1.9 7.6 10o R Rainforstment in Lintal
13 0.85 11.05 6.3o stirups in Lintal
1.8 1:2:4 Concrete in Lintal
0.22
0.1 0.03
2 5.4 10.8 revel
& paint in revel
0.1 0.1 External Skerting
0.1 0.1 Internal Skerting
1.2 12mm thk 1:3 C/S motar laid on concrete floor
0.3 0.36 & finish semi rough
&
300x300mm non slip approved quality floor
tile

08 Nrs Door type D2 size 2100x800mm hight overall


compensine 75x100mm class one treated tim
-ber frame.31.25mm thk class one timber pan
-neled Door size 2100x800mm height 1 1/2
pear of 75x100 hinghes,1no lock,6no holdfast
& apply 2 under & 2 glass paint

DDT
8 2.1 225mm thk brick wall
0.8 13.44
8 1.4 225mm thk brick wall for lintal
0.1 1.12
8 2.1 External plaster
0.8 13.44 & paint
8 0.8 6.4 External Skerting
8 2.1 Internal plaster
0.8 13.44 & paint
8 0.8 6.4 Internal skerting

ADD
16 1.1 formwork in lintal
0.1 1.76
8/4/ 1.5 48 10o R Rainforstment in lintal
8/10/ 0.85 68 6.3o stirups in Lintal

8 1.1 1:2:4 concrete in Lintal


0.22
0.1 0.16
2/8/ 5 80 revel
& paint in revel
8 0.1 0.8 External Skerrting
8 0.1 0.8 Internal Skerting
8 0.8 12mm thk 1:3 C/S motar laid on concrete floor
0.3 1.92 & finish semi rough
&
300x300mm non slip approved quality floor
tile

03 Nrs Door type D3 size 1800x600mm height overall


compencine 75x100mm class 1 treted timber
frame 31.25mm thk class 1 treted timber
panneld Door size 1800x600mm height 11/2
pear of 75x100mm hinges 1no lock 6no hold
-fast& apply 2under & 2 glass paint

DDT
3 1.8 225mm thk brick wall
0.6 3.24
3 1.2 225mm thk brick wall for Lintal
0.22 0.792
3 1.2 External plaster
0.6 3.24 &
paint
3 0.6 1.8 External skerting

ADD

3 0.9 Timber formwork in lintal


0.22 0.59
3/4/ 1.3 15.6 10o R Rainforstment in Lintal
3/9/ 0.85 22.95 6.3o Stirups in Lintal

3 0.9 1:2:4 concrete in lintal


0.22
0.1 0.05
3/2/ 4.2 25.2 Revel
& revel paint
3 0.1 0.3 External Skerting
3 0.1 0.3 Internal Skerting
3 0.6 12mmtkh 1:3 C/S motar laid on concrete floor
0.3 0.54 & finish semi rough
&
300x300mm non slip approved quality floor
tile

WINDOW

01 Nr Window type W1 size 8'x6' high olall compy


2"x4" class 1 tr timber 1no trasome 3no
mullions 3"x1"class 1tr.timber slat fix @3"cts
on top 4no.1"thk class1tr.timber glazed
window slash an incloding 4.68mm thk clear
sheet glass 12.5x12.5 beadings.4no pear75x
62.5mm hinges.4 no 300mm long casement
4no casement pasner.4no hold fast & appile
1court primerm2court glass paint.

DDT

2.4 225mm brk wall


1.8 4.32
3
0.1 0.3 225mm thk wall for Lintal
2.4 External plaster
1.8 4.32 &
paint
2.4 Internal plaster
1.8 4.32 &
paint

ADD

4 4.2 16.8 Revel plaster


&
paint

2 2.7 form work in Lintal


0.1 1.18
4 3.1 12.4 10o R Rainforsstment in Lintal
20 0.85 17 6.3 o stirups in Lintal
2.7 1:2:4 concerte in Lintal
0.22
0.1 0.05

01 Nr Window type W2 size 6'x6' high olall compy


2"x4" class 1 tr timber 1no trasome 3no
mullions 3"x1"class 1tr.timber slat fix @3"cts
on top 4no.1"thk class1tr.timber glazed
window slash an incloding 4.68mm thk clear
sheet glass 12.5x12.5 beadings.3no pear75 x
62.5mm hinges.3 no 300mm long casement
3no casement pasner.3no hold fast & appile
1court primerm2court glass paint.

DDT

1.8 225mm brk wall


1.8 3.24
2.7 225mm thk wall for Lintal
0.1 0.27
1.8 External plaster
1.8 3.24 &
paint
1.8 Internal plaster
1.8 3.24 &
paint

ADD

2/2/ 3.6 14.4 Revel plaster


&
paint

2 2.7 form work in Lintal


0.1 0.54

4 2.8 11.2 10o R Rainforsstment in Lintal


18 0.85 15.3 6.3 o stirups in Lintal
2.7 1:2:4 concerte in Lintal
0.1
0.22 0.05

08 Nrs Window type W3 size 6'x5' high olall compy


2"x4" class 1 tr timber 1no trasome 3no
mullions 3"x1"class 1tr.timber slat fix @3"cts
on top 3no.1"thk class1tr.timber glazed
window slash an incloding 4.68mm thk clear
sheet glass 12.5x12.5 beadings.3no pear75 x
62.5mm hinges.3 no 300mm long casement
3no casement pasner.3no hold fast & appile
1court primerm2court glass paint.

DDT

8 1.8 225mm brk wall


1.5 21.6
8 2.7 225mm thk wall for Lintal
0.1 2.16
8 1.8 External plaster
1.5 21.6 &
paint
8 1.8 Internal plaster
1.5 21.6 &
paint

ADD

8 13.2 105.6 Revel plaster


&
paint

16 2.7 form work in Lintal


0.1 4.32
8/4/ 2.8 89.6 10o R Rainforsstment in Lintal
8/18/ 0.85 122.4 6.3 o stirups in Lintal
8 2.7 1:2:4 concerte in Lintal
0.22
0.1 0.47

02 Nrs Window type W4 size 4'x4' high olall compy


2"x4" class 1 tr timber 1no trasome 3no
mullions 3"x1"class 1tr.timber slat fix @3"cts
on top 2no.1"thk class1tr.timber glazed
window slash an incloding 4.68mm thk clear
sheet glass 12.5x12.5 beadings.2no pear75x
62.5mm hinges.2 no 300mm long casement
2no casement pasner.2no hold fast & appile
1court primerm2court glass paint.

DDT

2 1.2 225mm brk wall


1.2 2.88
2 1.8 225mm thk wall for Lintal
0.1 0.36
2 1.2 External plaster
1.2 2.88 &
paint
2 1.2 Internal plaster
1.2 2.88 &
paint

ADD

2 2.4 4.8 Revel plaster


&
paint

4 1.8 form work in Lintal


0.1 0.72

4 1.9 7.6 10o R Rainforsstment in Lintal


26 0.85 22.1 6.3 o stirups in Lintal
2 1.8 1:2:4 concerte in Lintal
0.1
0.22 0.0792

04 Nrs Window type F size 2'x2' high olall compy


2"x4" class 1 tr timber 1no trasome 3no
mullions 3"x1"class 1tr.timber slat fix@3"cts
on top 1no.1"thk class1tr.timber glazed
window slash an incloding 4.68mm thk clear
sheet glass 12.5x12.5 beadings.1no pear75x
62.5mm hinges.1no 300mm long casement
1no casement pasner.1no hold fast & appile
1court primerm2court glass paint.

DDT

4 0.6 225mm brk wall


0.6 1.44
4 1.2 225mm thk wall for Lintal
0.1 0.48
4 0.6 External plaster
0.6 1.44 &
paint
4 0.6 Internal plaster
0.6 1.44 &
paint

ADD

8 2.4 19.2 Revel plaster


&
paint

8 2.4 form work in Lintal


0.1 1.92
16 1.3 20.8 10o R Rainforsstment in Lintal
52 0.85 44.2 6.3 o stirups in Lintal
4 1.2 1:2:4 concerte in Lintal
0.22
0.1 0.1

Roof Covering &


Roof Plumbing

8.26 8.26 6"x2" class 1 tr.timber Ridge Plate

197.88 197.88 4"x2" clsaa 1 tr.timber Rafters

20.23 20.23 4"x3" class 1 tr.timber Wall plate

252 252 2"x2" class 1 tr.timber Rippers

46.4 46.4 9"x1" class 1 tr,timber Vallence board

22Nrs 15" Ridge Tile

44Nrs 4'x10'corrugated Asbestos Roofing Sheet fixed


on timber roof structure

19.27 19.27 "U" PVC gutter fixed to the valance board

3 5.62 16.86 PVC down pipe


3 1.2 3.6
03 Nrs Extra over 4"x5" PVC end caps

06 Nrs Extra over 4"x5" PVC shoes

06 Nrs Extra over 4"x5"PVC rain water outlets for


gutters