BILL OF QUANTITIES for Compound Paving, Landscaping,


Gardening & redesigning.

ITEMS DESCRIPTION AMOUNT(UGX)


Bill No 1

PRELIMINARIES AND GENERAL CONDITIONS OF CONTRACT FOR


SMALL WORKS
Care of city
A. Grading engineer

B. Site levels

C. Setting out

D. Materials, tools 1,000,000

E. Local regulations and by-laws (provisional)

F. Transport

G. Security

H. Water available

I Lighting and power available

J Testing Not required

K Access to site and temporary roads Clear


L Temporary buildings

M Communication

N Sanitation of the work

O Notice board

P Hoardings

Q Protection of work

R Removal of plants

S Health and safety regulations 200,000

Total to be carried to summary at the end of bill no.1

item description unit Qty Rate (ugx) Amount (ugx)

The work in this element includes all


works :Leveling, scaping of
land,paving,Gardening ,designing, building flower
boxes and finishing

Bill No.2

3 D PLANS (artistic impression)


500,000 500,000 500,000

EXCAVATION : Mass excavation to reduce levels


commencing from required levels of ground Care of city
(Excavate oversight average ) engineer
A

Landscapes ,flower boxes (brick work and curb


stones set up) materials bricks

Clay bricks :Solid clay brickwork jointed and 4000pcs


C pointed in cement sand (1:3) mortar: with and 500 2,000,000
including hoop iron wall ties every alternative
course (flower boxes and designs areas)

Hoop iron 6 rolls


D 45,000 270,000
Cement 70
E Ceme 33000 2,450,000
nt
Building Sand Lake
F 200,000 400,000
Sand , lake sand 4
G
Black soil (back filling)
H 80,000 400,000
Manure (for both flowers and grass 5
I 120,000 600,000
Garden Curbs 5
J 15,000 2,250,000
Grass 150
K
Black soil for the gardens (grass) 12 cars
L 80,000 960,000
12

labor 8,000,000
M
Total carried to collection 19,030,000

Bill no. 3

GROUND ,LEVLING , PAVING (Summarized to


materials& labor ) 550 Square meters

550m2 40,000 22,000,000


N Pavers

O Paving sand (Yellow sample to be requested 1cinotruck 2,000,000 2,000,000


before supply)

P Building sand 2 200,000 400,000

Q Plaster sand 1 140,000 140,000


Sand

R Aggregated stones (for both curbs & flower boxes 2 100,000 200,000
plinth blinding

S Compactor machine 1,000,000 1000,000

T Plate machine 400,000 1,000,000 1,000,000

U Transport ?? ? ??

v labor 7,000,000
TOTAL CARRIED TO COLLECTION 33,740,000
FINISHING , 1,200,000 1,200,000

Plastering , moulds , copying


TOTAL CARRIED TO COLLECTION

TOTAL CARRIED TO SUMMARY 54170000