You are on page 1of 4

CONSTRUCTION COST ESTIMATE FOR SUBDIVISION WORK

Project Details
(a) Property Location
(b)
(c)
(d) Site area (m2)
Item Description Quantity Unit Unit Rate
1 General
Site Establishment, disestablishment, restoration & clean up
Survey setout
Environmental controls
Traffic control
2 Site Preparation
Clear approved trees, chip, stockpile and/or dispose No. Trees PHP 200.00
Clear approved vegetation, chip, stockpile and/or dispose m2 PHP 10.00
Demolish and dispose of structures m 2 PHP 100.00
Decommission, backfill and compact dam m2 PHP 90.00
Decontamination or remediation m3 PHP 250.00
3 Earthworks
Balanced cut and fill m3 PHP 12.00
Excavate for roads, driveways, pathways, batters and site regrade areas m2 PHP 5.00
Import & compact fill m 3 PHP 50.00
Dispose surplus material off-site to an approved location (including tipping fees) m3 PHP 25.00
4 Drainage
Interallotment Drainage - excavate trench, supply, bed, lay, cap, joint and backfill PVC pipe
(a) 225mm dia or less m
(b) >225mm dia m
(c) Junction pit No
Concrete Pipe - excavate trench, supply, bed, lay, cap, joint and backfill
(a) 750mm dia or less m
(b) >750mm dia m
(c) Junction pit No
(d) Curb inlet pit No
Stormwater Pollution Control & Water Sensitive Urban Design
(a) Gross Pollutant Trap No. PHP 28,000.00
(b) Litter basket/Pit insert No. PHP 800.00
(c) Raingarden No. PHP 2,500.00
(d) Bioswale m PHP 200.00
5 Roadworks
Curb and gutter m PHP 110.00
Subgrade, sub-base, basecourse m2
Roundabout (standard single lane) No. PHP 140,000.00
Roundabout (dual lane) No. PHP 500,000.00
6 Concrete footpaths, cycleways, layback and driveways
1.5m wide concrete footpath m
2.5m wide concrete cycleway m
Laybacks m PHP 135.00
Driveways m2 PHP 105.00
7 Service Utilities
Water m
Sewer m
Sewer manhole No PHP 5,000.00
Electricity, Telecommunications No of lots PHP 6,500.00
Relocate existing pole and cable No. PHP 15,000.00
8 Landscaping
Retaining Walls
(a) Timber (Max 1200mm high) m2 PHP 220.00

Version 1 Issued 1 July 2012 Page 1 of Cost estimate generated on 08/17/2022


(b) Masonry (Max 1200mm high) m2 PHP 320.00
(c) Concrete retaining wall system (e.g. Loc-A-Bloc, Keystone) (Max 1200mm high) m 2 PHP 380.00
Fencing
(a) 1.8m high timber lap & cap or colourbond m PHP 85.00
(b) Acoustic fencing (2.1m high masonry) m PHP 250.00
Street trees (45l) No of lots PHP 500.00
Turf (1.2m strip behind kerb and selected areas) m2 PHP 8.50
Shrubs and ground cover m 2 PHP 8.50
9 Other items
Integrated Housing
Standard project home m2 PHP 995.00
Premium project home m 2 PHP 1,100.00
Landscaping, driveway, paving, letterbox, clothes line etc No of lots PHP 15,000.00
Specify others

DIRECT COSTS
Contingency & professional construction related fees Item PHP 0.10
Economies of scale factor Item PHP 1.10
SUB-TOTAL

TOTAL ESTIMATED CONSTRUCTION COST

10 Declaration
(a) I am a suitably qualified person with experience in costing development work of this scale and nature.
(b) I confirm this is a genuine construction cost estimate of the proposed project subject to the accompanying Development Application.

Name:

Signature:

Date:

Version 1 Issued 1 July 2012 Page 2 of Cost estimate generated on 08/17/2022


STIMATE FOR SUBDIVISION WORK

Amount

PHP 0.00
PHP 0.00
PHP 0.00
PHP 0.00
PHP 0.00

PHP 0.00
PHP 0.00
PHP 0.00
PHP 0.00

and backfill PVC pipe


PHP 0.00
PHP 0.00
PHP 0.00
fill
PHP 0.00
PHP 0.00
PHP 0.00
PHP 0.00

PHP 0.00
PHP 0.00
PHP 0.00
PHP 0.00

PHP 0.00
PHP 0.00
PHP 0.00
PHP 0.00
ays
PHP 0.00
PHP 0.00
PHP 0.00
PHP 0.00

PHP 0.00
PHP 0.00
PHP 0.00
PHP 0.00
PHP 0.00

PHP 0.00

Version 1 Issued 1 July 2012 Page 3 of Cost estimate generated on 08/17/2022


PHP 0.00
PHP 0.00

PHP 0.00
PHP 0.00
PHP 0.00
PHP 0.00
PHP 0.00

PHP 0.00
PHP 0.00
PHP 0.00
PHP 0.00
PHP 0.00
PHP 0.00
PHP 0.00
PHP 0.00
PHP 0.00
PHP 0.00

PHP 0.00

opment work of this scale and nature.


osed project subject to the accompanying Development Application.

Version 1 Issued 1 July 2012 Page 4 of Cost estimate generated on 08/17/2022