PROJECT:R1048/1 BILL OF QUANTITIES


IMPROVEMENTS OF SECTION
EXPO 2020 ROADS NETWORK LIST OF PRINCIPAL QUANTITIES
a

ITEM DESCRIPTION QUANTITY

The following is a general list of the approximate


6
quantities of major work items within the
scheme so the contractor can gauge the size
and scope of works. This list should not be
used as a basis for the pricing of the works

Section (a) - List of principal quantities

Part 2 - Ground Investigation

Trial Pits 535


Rotary Drilled Boreholes 10

Part 3 - Demolition & Site Clearance

General Clearance 68
Removal of Trees 24
Removal of Palm Trees 40
Demolition of kerbs 6,140
Removal of existing interlock tile paving 4,900
Removal of existing guide sign structure 6
Removal of existing Concrete Barrier 400
Removal of Guard Rail 12,100
Removal of signs 31
Removal of advertisement board 80
Removal of Fences 13,750
Removal of Fences gate 14
Removal of survey monuments 20
Removal of Grass 1,000
Removal of flag post 2
Removal of stone pitching 200
Removal of existing foundations 8
Removal of existing camera 7
Removal of Brickwall 100
Removal of Signal System Removal 42
Removal of existing Ducts & Fittings 700

5 Part 4 - Earthworks

Excavation for cutting 123,560


Excavation for cutting -rock 500
Excavation for artificaial hard material 40,519
Excavation for concrete foundation 200
Trimming of excavated surfaces 424,354
Preparation of excavated surfaces 396,200
Filling from excavated material 120,000
Filling 164,450
Preparation of Filled Surfaces 196,300
Disposal 3,560
Rev - 01 NTT - 04
Trans Plantation of Trees 24
Slope Protection 400

REV-03
BILL
PROJECT:R1048/1 BILL OF QUANTITIES
IMPROVEMENTS OF SECTION
EXPO 2020 ROADS NETWORK LIST OF PRINCIPAL QUANTITIES
a

ITEM DESCRIPTION QUANTITY

Section (a) - List of principal quantities

Part 5 - Structural Metal works

Monotube Sign Structure 60


Ground Mounted Sign Structure 16
Piles 56

5 Part 6 - Roads and Pavings

Cement Stabilized granular subbase 217,880


Aggregate Sub base 562,100
AC Wearing Course 570,900
Wet mix macadam 566,000
Base Course 557,900
Kerb 2,500
Lightduty pavement 2,500
Warning and Regulatory Signs 199
Guide Signs 2,300
Pavement letters/arrows 400
Hatching 16,205
Continous/ intermidiate lines 212,329
Barriers 61,770
Fences 7,050
Rip Rap to side slopes 31,640
Slope protection with cement slab 13,560
Tying to existing pavement 13,170

Part 7 - Bridge Works

Concrete 72,716
Reinforcement 15,608
Form Work 92,010
Excavation 23,939
Filling 7,803
Replaceble pot bearings 244
Voids in Bridge Decks 9,564
Pile 1200mm 829
Pile 2000mm 16
Bridge Barrier (Single Face) 8,547
Tanking self adhesive waterproofing membrane to buried concrete 25,610
Rev - 01 NTT - 04
Protection to waterproofing membrane not less than 6mm thick 21,538
Sheet linings membrane 6,803
Bituminous Asphaltic concrete wearing course 50mm thick 54,702
Access Doors 900x900mm 544
Access Doors 1200x1200mm 20

REV-02
BILL
PROJECT:R1048/1 BILL OF QUANTITIES
IMPROVEMENTS OF SECTION
EXPO 2020 ROADS NETWORK LIST OF PRINCIPAL QUANTITIES
a

ITEM DESCRIPTION QUANTITY

Section (a) - List of principal quantities

Reinforced Soil Wall

Excavation 4,050
Filling 3,812
Concrete In-situ 2,987
Reinforced soil wall 30,626
Bridge Barrier (Single Face) 6,979
Reinforcement 395
Tanking self adhesive waterproofing membrane to buried concrete 18,253
Protection to waterproofing membrane not less than 6mm thick 9,709
Form Work 10,943

Part 8 - Culvert Works

Concrete 3,636
Reinforcement 724
Form Work 4,834
Excavation 376
Filling 18
Pile 1200mm 36
Bridge Barrier (Single Face) 177
Tanking self adhesive waterproofing membrane to buried concrete 4,068
Protection to waterproofing membrane not less than 6mm thick 1,976
Sheet linings membrane 1,781

Part 9 - Works for DEWA - Water Division

Removal of pipes 14,340


Removal of Valves & Fittings 83
GRE pipes in trench 14,912
GRE pipes not in trench 1,793
Pipe Fittings 117
Valves 104
Extention of existing ducts 160
Electromagnetic Flow Meter Chamber 4
Connection to existing 128
NDRC 1,210
Steel sleeve 583
Rev - 01 NTT - 04
Thrust block 117
Precast Concrete 600

BILL
PROJECT:R1048/1 BILL OF QUANTITIES
IMPROVEMENTS OF SECTION
EXPO 2020 ROADS NETWORK LIST OF PRINCIPAL QUANTITIES
a

ITEM DESCRIPTION QUANTITY

Section (a) - List of principal quantities (Cont'd...)

Part 10 - Works for DEWA - Electricity Division


KV Cable
Removal of cables 1,722
uPVC ducts 29,535
Extension of existing uPVC ducts (in trench) 1,417
Laying and joint cables ducts 845
NDRC 845
Road Crossing Ducts 3,282
Supply of Cables 89,500
Laying of cables in trench 18,531
Cable joint for diversion of existing cables 125
Spilt ducts 442
132 KV
Removal of cables 2,077
uPVC ducts 2,002
Precast concrete 385

Part 11 - Works for Etisalat

Removal of existing duct 6,645


Joint boxes 25
Laying of uPVC ducts 7,405
Extension of existing uPVC ducts (in trench) 924
Connection to existing 11
Demolish Existing Manhole 18
NDRC 225

Part 12 - Works for DM Irrigation

Removal of existing pipe/duct 1,575


Removal of existing Valve 7
Precast reinforced concrete 2845

Rev - 01 NTT - 04
Supply and lay GRP Pipes 685
Fittings 29
Valves 7
uPVC Duct 2305
Extension of existing uPVC ducts (in trench) 390
Connection to Manhole and Ducts 11
NDRC 50
Concrete Thurst Blocks 29

Part 13- Dubai Municipality - Drainage Works

Removal of pipeline 1,317


uPVC pipe 7,680
Gully pipe 8,037
Gullies 336
slotted drain 1,116
Precast concrete 145
GRP pipeline in trench 9,020
GRP pipeline not in trench 610
fittings 122
Manholes 129
Land Drain 10,057
Connection to Existing pipe 11
BILL
PROJECT:R1048/1 BILL OF QUANTITIES
IMPROVEMENTS OF SECTION
EXPO 2020 ROADS NETWORK LIST OF PRINCIPAL QUANTITIES
a

ITEM DESCRIPTION QUANTITY

Section (a) - List of principal quantities (Cont'd...)

Part 13- Dubai Municipality - Drainage Works (Cont'd…)

Work on existing manhole 6


Hydro brake 4
NDRC 610

Part 15 - RTA - Road Lighting Works

Removal of lighting columns 83


Removal of existing cables 4,480
Removal of Feeder Pillar 4
uPVC Ducts (various ways) 1,240
HDPE cable Ducts 355
Duct along Bridge Deck 11,000
NDRC 420
New Lighting Columns (various ways) 851
New Feeder Pillar 13
LED Luminaries 45
Installation of Main Distribution Board 11
Installation of Distribution Board 2
Junction Boxes/Manholes 53
Power Cabling in Trench 149,002
Power Cabling Not in Trench 1,875
Earthing System 99
Connection to existing 9
Bridge Lighting 280
Rev - 01 NTT - 04
Tunnel Lights 172

Part 16 - RTA - Spare Ducts

uPVC spare ducts 1,090


uPVC ducts extension 210
Existing spare ducts to abandoned 305

Part 17-EITC - DU/ITS Utility Works

Removal of existing ducts 6,184


Work on existing Manhole/chamber 16
Ducts 8,340
Extension of Existing Ducts 320
Manholes 34
Connection to Manholes / Ducts 12
NDRC 585

Part 18- DUSUP Gas Pipeline

Precast Pedestral and Precast Slab 5,365


Removal of existing 16" dia DUSUP pipe 725
Proposed of existing 16" dia DUSUP pipe 1,725

Rev - 01 NTT - 04
PAGE Nr.

a/1

UNIT

nr
nr

ha
nr
nr
m
m2
nr
m
m
nr
m
m
nr
nr
m2
nr
m2
nr
nr
m
nr
m

m3
m3
m3
m3
m2
m2
m3
m3
m2
m3
Rev - 01 NTT - 04
nr
m3

NTT-06
PAGE Nr.

a/2

UNIT

nr
nr
nr






m

nr

nr

m
m
m


m


t



nr
m
nr
nr
m

Rev - 01 NTT - 04



nr
nr

NTT-05
PAGE Nr.

a/3

UNIT





m
t



t



nr
m


m
nr
m
m
nr
nr
m
nr
nr
m
m
Rev - 01 NTT - 04
nr
nr

PAGE Nr.

a/4

UNIT

m
m
m
m
m
m
m
m
nr
m

m
m
nr

m
nr
m
m
nr
nr
m

m
nr
nr

Rev - 01 NTT - 04
m
nr
nr
m
m
nr
m
nr

m
m
m
nr
m
nr
m
m
nr
nr
m
nr
PAGE Nr.

a/5

UNIT

nr
nr
m

nr
m
nr
m
m
m
m
nr
nr
nr
nr
nr
nr
m
m
nr
nr
nr
Rev - 01 NTT - 04
nr

m
m
m

m
nr
m
m
nr
nr
m

m
m
m

Rev - 01 NTT - 04
BILL
PROJECT:R1048/1 BILL OF QUANTITIES
IMPROVEMENTS OF SECTION
EXPO 2020 ROADS NETWORK DAYWORKS
c
ITEM ITEM DESCRIPTION

Section (c) - Dayworks

A Generally

Daywork will be administered strictly in accordance with the Conditions of Contract, Clause 13.6

The Contractor will be paid for Daywork carried out during the course of the contract while other operations are in
progress at the rates set down in this schedule. Profit and overheads are not to be included in the actual rates but
stated as percentage addition in the item provided for same at the end of the labour, Material and Plant Sections of
this Schedule of Rates. The percentage addition should not only be for "Profit and Overheads" but also for specific
procurement for Daywork requirements.

Time engaged in the actual works only will be allowed. In the event of labour or plant having to be brought
to site especially for the item of Daywork then a reasonable allowance may be made for travelling time, but
the allowance for travelling time is to be agreed before the Daywork item is executed.

The Quantities stated in the daywork schedule 1, 2 and 3 are estimated and may be encountered totally, or part or
not at all as Engineer may direct.

No work carried out on a Daywork basis will be measured unless, before starting work, the Contractor has obtained
the written approval of the Engineer.

B Rates for Labour

The Daywork rates quoted for labour are to be the inclusive NETT amounts payable including for use and
waste of hand tools and of all ordinary non-mechanical plant, stagings, scaffolding, tarpaulin, use of
electrical light and water for the works, etc. and all special inducements for working in Dubai. The rates shall also
be deemed to include the extra cost of public holidays other holidays with pay, medical costs, bonus, sick leave,
termination indemnity pay and the like. Unless specifically authorised in writing by the Engineer,
non-productive overtime or special rates for overtime will not be admissible. The cost of all supervisory staff
including engineers, foremen, charge hands, clerks, storemen and other supportive staff etc., is to be included
in percentage addition for Labour

C Rates for Materials

Materials used on Daywork shall be as specified for the Work. The rates are to include delivery to the site. Should
materials be required for use on Daywork which are not included in the Schedule, the lowest current Nett
market prices shall apply, plus a reasonable allowance for collecting, loading and off loading and transporting to
the Work.

D Rates for Plant Hire

Plant hire rates shall include for the cost of maintaining in proper working order, attendance in starting up and
shutting down, refueling and all fuel power, oils grease and cleaning materials, replacement and/or sharpening
of tools, provision of tools and all other ancillary items including consumable spares. Idle time in maintenance or
travelling to the Site will not be allowed.

Drivers and attendants shall be charged for at the rates as laid down for Labour.
BILL
PROJECT:R1048/1 BILL OF QUANTITIES
IMPROVEMENTS OF SECTION
EXPO 2020 ROADS NETWORK DAYWORKS
c
ITEM ITEM DESCRIPTION

Section (c) - Dayworks (Cont'd...)

A Labour & Plant - Hourly, Weekly & Monthly Rates

Following method will be applied for payment of Dayworks

1. Dayworks carried out based on Hourly; the hourly rate priced in Tender shall be applicable maximum upto 8 hours
per day

2. Dayworks continued beyond 8 hours the hourly rate to be 80% of the hourly rate priced in Tender shall be applicable
maximum upto 6 days

3. Dayworks continued beyond 6 hours the hourly rate to be 60% of the hourly rate priced in Tender shall be applicable
maximum upto One Month

4. Dayworks record for labour, plant & material to be recorded on the same day and obtain the signature by the
concerned RMS Engineer

5. Any adjustment item % in Grand Summary of the BOQ will be applicable to the priced Day Work rates in the
Tender at the execution stage.
BILL
PROJECT:R1048/1 BILL OF QUANTITIES
IMPROVEMENTS OF SECTION
EXPO 2020 ROADS NETWORK DAYWORKS
c
ITEM ITEM DESCRIPTION UNIT QUANTITY RATE

Section (c) - Dayworks (Cont'd...)

Schedule 1: Labour

A Labourer h 640

B Banksman/Greaser h 320

C Carpenter h 160

D Mason/Concrete finisher h 160

E Driver: Heavy Duty h 320

F Driver: Light Duty h 640

G Pipe fitter h 160

H Plant operator: Heavy h 640

J Plant operator: Light h 480

K Steel fixer h 160

L Welder h 160

M Jointer h 180

N Painter h 160

P Electrician h 240

Q Plumber h 160
Carried to Part Summary Dhs.

BILL
PROJECT:R1048/1 BILL OF QUANTITIES
IMPROVEMENTS OF SECTION
EXPO 2020 ROADS NETWORK DAYWORKS
c
ITEM ITEM DESCRIPTION UNIT QUANTITY RATE

Section (c) - Dayworks (Cont'd...)

Schedule 2: Materials

A Concrete Class 30/20 SR cement m3 20

B Concrete Class 15/40 SR cement m3 20

C Concrete Class 40/20 SR cement m3 10

D Concrete Class 40/20 OP cement m3 10

E 100mm uPVC pipe Class C m 60

F 150mm uPVC pipe Class C m 60

G 200mm uPVC pipe Class C m 60

H 150mm GRP Class 18 pipe m 30

J 200mm GRP Class 18 pipe m 48

K 225mm GRP Class 18 pipe m 36

L 400mm GRP Class 18 pipe m 30

M 550mm GRP Class 18 pipe m 24

N 600mm GRP Class 18 pipe m 24

P 900mm GRP Class 18 pipe m 24

Q 1200mm GRP Class 18 pipe m 12


R Hardwood m3 4

S Softwood, treated m3 4

T Bitumen 60/70 t 20

U Bitumen 40/50 t 20

V Fresh Water (Excluding Water Tanker) ltr 200,000

W Sea Water (Excluding Water Tanker) ltr 200,000

X Subbase Material m3 300

Y Wetmix Macadam m3 300

Z Aggregate Base Material m3 120

AA O.P. Cement t 10

Carried to Part Summary Dhs.

BILL
PROJECT:R1048/1 BILL OF QUANTITIES
IMPROVEMENTS OF SECTION
EXPO 2020 ROADS NETWORK DAYWORKS
c
ITEM ITEM DESCRIPTION UNIT QUANTITY RATE

Section (c) - Dayworks (Cont'd...)

Schedule 2: Materials (Cont'd…)

A M.S.R. Cement t 10

B S.R. Cement t 10

C Coarse Aggregate (dry) t 210

D Fine Aggregates (dry) t 210

E 200mm thick hollow blocks nr 480

F 100mm thick hollow blocks nr 480

G 200mm Solid blocks nr 400

H 100mm Solid blocks nr 300

J Asphalt Concrete base course t 90

K Bituminous Asphaltic Concrete wearing course t 90

L Bituminous Asphaltic Concrete base course t 90

M Interlocking Paving Blocks 60mm thick m2 180


N Interlocking Paving Blocks 80mm thick m2 180

P Upstand road kerb 150 x 305 mm m 200

Q Heel kerb 75 x 150 mm m 80

R Drop kerb 185 x 150 mm m 20

S Standard grade plywood thickness 12mm m2 100

T Standard grade plywood thickness 20mm m2 60

Carried to Part Summary Dhs.

BILL
PROJECT:R1048/1 BILL OF QUANTITIES
IMPROVEMENTS OF SECTION
EXPO 2020 ROADS NETWORK DAYWORKS
c
ITEM ITEM DESCRIPTION UNIT QUANTITY RATE

Section (c) - Dayworks (Cont'd...)

Schedule 2: Materials (Cont'd…)

A Mild steel reinforcement, epoxy coated t 4

B High tensile steel reinforcement, epoxy coated t 4

C Granular material for pipe bedding m3 60

D Stone material for land drains (max. size 100mm) m3 60

E Geotextile m2 20

F Imported rock; size : 20mm t 15

G Imported rock; size : 50- 150mm t 15

H Imported rock; size : 75 - 250mm t 15

J Imported rock; size : 250mm t 15


K Imported rock; size : 10 - 500kg t 15

L Stainless steel ladders nr 5

M Mooring rings nr 10

N Bollards; capacity : 5t nr 5

P Bollards; capacity : 10t nr 5

Carried to Part Summary Dhs.

BILL
PROJECT:R1048/1 BILL OF QUANTITIES
IMPROVEMENTS OF SECTION
EXPO 2020 ROADS NETWORK DAYWORKS
c
ITEM ITEM DESCRIPTION UNIT QUANTITY RATE

Section (c) - Dayworks (Cont'd...)

Schedule 3: Plant

A Self-propelled elevating manlift platform 30m high reach h 20

B Bulldozer up to 100 HP h 370

C Bulldozer from 100 to 200 HP h 420

D Bulldozer over 200 HP h 20

E Grader up to 140 HP h 370

F Grader over 140 HP h 420

G Motor scraper up to 10m3 h 20


H Motor scraper over 10m3 h 20

J Vibratory roller up to 3 tons h 30

K Vibratory roller over 3 tons h 30

L Tandem roller up to 10 tons h 30

M Tandem roller over 10 tons h 20

N Pneumatic roller over 10 tons h 20

P Bucket loader up to 3m3 h 390

Q Bucket loader over 3m3 h 440

R Dump truck up to 5 tons h 490

S Dump truck from 5 tons to 10 tons h 390

T Dump truck over 10 tons h 430

U Generator up to 50 KW/Hr. h 360

V Generator; 50 - 100 KW/Hr. h 410

W Generator; 100 - 150 KW/Hr. h 360

X Generator; 150 - 200 KW/Hr. h 20

Y Compressor 5000-6000 litres capacity with small tools h 415

Z Excavator up to 1m3 h 440

AA Excavator over 1m3 h 490

AB Water tanker, minimum 10,000 litres (Excluding water) h 440

Carried to Part Summary Dhs.

BILL
PROJECT:R1048/1 BILL OF QUANTITIES
IMPROVEMENTS OF SECTION
EXPO 2020 ROADS NETWORK DAYWORKS
c
ITEM ITEM DESCRIPTION UNIT QUANTITY RATE

Section (c) - Dayworks (Cont'd...)

Schedule 3: Plant (Cont'd…)

A Concrete vibrator (poker/screed) up to dia 50mm h 40

B Bob cat, capacity < 1m3 h 60

C Fork lift, capacity < 5t h 30


D Hiab truck, 6 tonne or greater capacity with lifting arm h 40

E Concrete mixer, 6m3 h 330

F Concrete mixer, 9m3 h 30

G Concrete distribution truck 6m3 h 380

H Concrete pump, 50m3/hr h 20

J Concrete pump, 70m3/hr h 20

K Plate compactor h 100

L Water pump 2 inch h 360

M Water pump 3 inch h 310

N Dumper up to 1m3 h 60

P Asphalt paver h 40

Q Lorry mounted crane up to 25 tons h 780

R Lorry mounted crane 25 - 50 tons h 350

S Pick up truck up to 2 tonnes h 380

T Pick up truck over 3 tonnes capacity h 340

U Asphalt coring machine (up to dia. 200mm) h 30

V 600mm wide cold planner h 30

W Spray tanker for tack or prime coat minimum 10,000 litres h 40

X Milling machine width less than 1.0m h 20

Y Milling machine width 1.0 - 2.5m h 370

Z Milling machine width greater than 2.5m h 30

Carried to Part Summary Dhs.

BILL
PROJECT:R1048/1 BILL OF QUANTITIES
IMPROVEMENTS OF SECTION
EXPO 2020 ROADS NETWORK DAYWORKS
c
ITEM ITEM DESCRIPTION UNIT QUANTITY RATE

Section (c) - Dayworks (Cont'd...)

Schedule 3: Plant (Cont'd…)

A Welding plant h 50
B Sand blasting unit (with operator) h 30

C Asphalt/concrete saw h 40

D Pneumatic breaker h 80

E Portable lighting set with generator h 60

F Mechanical road broom h 40

G Portable traffic signal set with generator h 60

H Wheeled excavator with backhoe and shovel


(JCB) h 60

Carried to Part Summary Dhs.

BILL
PROJECT:R1048/1 BILL OF QUANTITIES
IMPROVEMENTS OF SECTION
EXPO 2020 ROADS NETWORK DAYWORKS
c
ITEM ITEM DESCRIPTION RATE
Section (c) - Dayworks (Cont'd...)

PART SUMMARY

Schedule 1: Labour

Page c/3

Sub total for labour

Percentage addition for Profit and Overhead on Daywork


Labour
Total for Schedule 1 : Labour

Schedule 2: Material

Page c/4

Page c/5

Page c/6

Sub total for material

Percentage addition for Profit and Overhead on Daywork


Material
Total for Schedule 2 : Material

Schedule 3: Plant

Page c/7

Page c/8

Page c/9

Sub total for plant

Percentage addition for Profit and Overhead on Daywork


Plant
Total for Schedule 3 : Plant

Total for Section c - Dayworks (1 + 2 + 3) Dhs.


Carried to Part 19 - Provisional Sums
PAGE Nr.

c/1

her operations are in


d in the actual rates but
and Plant Sections of
s" but also for specific

having to be brought
r travelling time, but

ered totally, or part or

ontractor has obtained

luding for use and


paulin, use of
ai. The rates shall also
ts, bonus, sick leave,
Engineer,
ll supervisory staff
c., is to be included

ery to the site. Should


west current Nett
and transporting to

e in starting up and
nt and/or sharpening
e in maintenance or
PAGE Nr.

c/2

maximum upto 8 hours

Tender shall be applicable

Tender shall be applicable

e signature by the

Work rates in the


PAGE Nr.

c/3

AMOUNT
U.A.E. Dhs.

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
0.00

PAGE Nr.

c/4

AMOUNT
U.A.E. Dhs.

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

PAGE Nr.

c/5

AMOUNT
U.A.E. Dhs.

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
0.00

0.00

0.00

0.00

0.00

0.00

0.00

PAGE Nr.

c/6

AMOUNT
U.A.E. Dhs.

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
0.00

0.00

0.00

0.00

0.00

0.00

PAGE Nr.

c/7

AMOUNT
U.A.E. Dhs.

0.00

0.00

0.00

0.00

0.00

0.00

0.00
0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

PAGE Nr.

c/8

AMOUNT
U.A.E. Dhs.

0.00

0.00

0.00
0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

PAGE Nr.

c/9

AMOUNT
U.A.E. Dhs.

0.00
0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

PAGE Nr.

c/10

AMOUNT
U.A.E. Dhs.
0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF GENERAL ITEMS SECTION Nr.
EXPO 2020 ROADS NETWORK d 1

ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE


REF.

PART 1 - GENERAL ITEMS

Contractual requirements

A Performance security. A110 sum

B Insurance of the Works. A120 sum

C Third party insurance. A130.1 sum

D Workmen's compensation insurance. A130.2 sum

Specified requirements

Accommodation for the Engineer's staff

E Establishment of office for the Engineer's staff. A211.1 sum

F Maintenance of office for the Engineer's staff. A211.2 day 940

G Removal of offices for the Engineer. A211.3 sum

Services for the Engineer's staff

H Double cabin (four wheel drive w/AC) pickups with


4 drivers. (Rate is for 1 Nr.) A221 day 3,640

J Telephone and Telefax. A222 day 940

K Set of progress photographs. A229 nr 30

Equipment for use by the Engineer's staff

L Establishment of office equipment. A231.1 sum

M Maintenance of office equipment. A231.2 day 940

N Removal of office equipment. A231.3 sum

P Establishment of surveying equipment. A233.1 sum

Q Maintenance of surveying equipment. A233.2 day 910


R Removal of surveying equipment. A233.3 sum

Carried to Part Summary Dhs.

REV-01
BILL PART
PROJECT:R1048/1 BILL OF QUANTITIES
IMPROVEMENTS OF SECTION Nr.
EXPO 2020 ROADS NETWORK GENERAL ITEMS 1
d
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
Ref.

PART 1 GENERAL ITEMS (Cont'd…)

Attendance upon the Engineer's staff

A Chainmen (Rate is for 1 Nr.) A242 day 1,820

B Office attendance. (Rate is for 1 Nr.) A249 day 1,880

Testing of Materials

C Specified Tests for Bridge bearings. A250.1 sum

D Specified Tests for prestressing tendons. A250.2 sum

Allow for all specified testing to be carried out in


accordance with specification Clause 1/7

E All testing relating to Bill Part 4 - Earthworks. A250.3 sum

F All testing relating to Bill Part 5 - Structural Metal


Works. A250.4 sum

G All testing relating to Bill Part 6 - Roads and


paving. A250.5 sum

H All testing relating to Bill Part 7 - Bridge Works.


A250.6 sum

J All testing relating to Bill Part 8 - Culvert Works.


A250.7 sum

K All testing relating to Bill Part 9 - Works for DEWA


- Water Division. A250.8 sum

L All testing relating to Bill Part 10 - Works for


DEWA - Electricity Division. A250.9 sum

M All testing relating to Bill Part 11 - Etisalat. A250.10 sum

N All testing relating to Bill Part 12 - DM Irrigation


Works. A250.11 sum
P All testing relating to Bill Part 13 - DM Drainage
works. A250.12 sum

Q All testing relating to Bill Part 15 - RTA Road


Lighting works. A250.13 sum

Carried to Part Summary Dhs.

BILL PART
PROJECT:R1048/1 BILL OF QUANTITIES
IMPROVEMENTS OF SECTION Nr.
EXPO 2020 ROADS NETWORK GENERAL ITEMS 1
d
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
Ref.

PART 1 - GENERAL ITEMS (Cont'd...)

Testing of Materials (Cont'd…)

Allow for all specified testing to be carried out


in accordance with specification Clause 1/7
(Cont'd....)

A All testing relating to Bill Part 16 - RTA Spare


Ducts. A250.1 sum

B All testing relating to Bill Part 17 - EITC-DU/ITS


Works. A250.2 sum

C All testing relating to Bill Part 18 - DUSUP Gas


Pipeline A250.3 sum

D Allow for any other testing required as per


specifications not listed above (the Tender shall
separately list and price below any other clause
considered to have a monetary value) A250.4 sum

Testing of materials; as directed by the


Engineer, to be carried out within or outside
U.A.E by independent Specialist Laboratories
as required by relevant specifications

E
Testing of material finer than 0.075 mm BS 1377
Pt 2 CI 9.2. A250.5 nr 90

F MDD Test BS 1377 Pt 4 Test 3.5 or 3.6-1990. A250.6 nr 90

G CBR Test BS; 1377 Pt 4 CI 7-1990. A250.7 nr 90

H Atterberg Limits Test; BS 1377 Pt 2 Test


4.5/5,3. 5/4-1990. A250.8 nr 80
J Water soluble Salt content, CI & SO3 Test; BS
1377 Pt 3 Method 5 & 7 - 1990. A250.9 nr 80

K
Organic Impurities Test; BS 1377 Pt 3
Method 3-1990. A250.10 nr 70

Rock fill

L Plate Bearing Test ASTM D1994/1996. A250.11 nr 25

Wet Mix Road Base

M
Bulk Density of sand (for E/W Material testing) BS
1377 Pt 9 2.2-1990. A250.12 nr 50

Carried to Part Summary Dhs.

BILL PART
PROJECT:R1048/1 BILL OF QUANTITIES
IMPROVEMENTS OF SECTION Nr.
EXPO 2020 ROADS NETWORK GENERAL ITEMS 1
d
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
Ref.

PART 1 - GENERAL ITEMS (Cont'd...)

Testing of materials (Cont'd…)

Aggregates - Stockpile Samples

A Coating Stripping Test; ASTM D 1664. A250.1 nr 20

Coarse Aggregate for Concrete

B Petrographical Analysis. A250.2 nr 4

C
Clay, Silt & Dust BS 812 Pt 1 Test 7.2 & AMD 487. A250.3 nr 15

D
Soaked & Unsoaked 10% fines and Rotation
Tests BS 182 Pt 111. A250.4 nr 10

Fine Aggregate for Concrete

E
Clay, Slit & Dust BS 812 Pt 1 Test 7.2 & AMD
487. A250.5 nr 10

Hardened Concrete

F Compressive Strength of Concrete Cores BS


1881 Pt 120.
A250.6 nr 20

G ISAT BS 1881. A250.7 nr 10


H Rapid Chloride Permeability Test; ASTM C 1202. A250.8 nr 10

Testing of the Works; as specified, including


tests at manufacturer's works

J All testing relating to Bill Part 4 - Earthworks. A260.1 sum

K All testing relating to Bill Part 5 - Structural Metal


Works.
A260.2 sum

L All testing relating to Bill Part 6 - Roads and


paving.
A260.3 sum

Carried to Part Summary Dhs.

BILL PART
PROJECT:R1048/1 BILL OF QUANTITIES
IMPROVEMENTS OF SECTION Nr.
EXPO 2020 ROADS NETWORK GENERAL ITEMS 1
d
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
Ref.

PART 1 - GENERAL ITEMS (Cont'd...)

Testing of the Works; as specified, including


tests at manufacturer's works (Cont'd....)

A All testing relating to Bill Part 7 - Bridge works. A260.1 sum

B All testing relating to Bill Part 8 - Culvert works. A260.2 sum


5

C All testing relating to Bill Part 9 - Works for DEWA


- Water Division.
A260.3 sum

D All testing relating to Bill Part 10 - Works for


DEWA - Electricity Division.
A260.4 sum

E All testing relating to Bill Part 11 - Etisalat. A260.5 sum

F All testing relating to Bill Part 12 - DM Irrigation


Works.
A260.6 sum

G All testing relating to Bill Part13 - DM Drainage


works.
A260.7 sum

H All testing relating to Bill Part 15 - RTA Road


Lighting works.
A260.8 sum
J All testing relating to Bill Part 16 - RTA Spare
Ducts.
A260.9 sum

K All testing relating to Bill Part 17 - EITC-DU/ITS


Telecom Works.
A260.10 sum

L All testing relating to Bill Part 18 -DUSUP Gas


Pipeline A260.11 sum

M Allow for any other testing required as per


specifications not listed above (the Tender shall
separately list and price below any other clause
considered to have a monetary value) A260.12 sum

Carried to Part Summary Dhs.

REV-01
BILL PART
PROJECT:R1048/1 BILL OF QUANTITIES
IMPROVEMENTS OF SECTION Nr.
EXPO 2020 ROADS NETWORK GENERAL ITEMS 1
d
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
Ref.

PART1 - GENERAL ITEMS (Cont'd...)

Specified requirements (Cont'd...)

Temporary Works

Traffic Diversion

A Traffic Diversions as Specification Clause 1/17 *A271


Traffic Management

B Traffic management, safety and control as per


specification Clause 1/16
*A272

Carried to Part Summary Dhs.

BILL PART
PROJECT:R1048/1 BILL OF QUANTITIES
IMPROVEMENTS OF SECTION Nr.
EXPO 2020 ROADS NETWORK GENERAL ITEMS 1
d
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
Ref.

PART1 - GENERAL ITEMS (Cont'd...)

Specified requirements (Cont'd...)

Temporary Works (Cont'd...)

A Protection and upkeep of site, adjacent areas and


properties, as Specification Clause 1/15
A279.1 sum

B Tidying and cleaning the site, as Specification


Clause 1/25
A279.2 sum

C Cover and barricade open excavations and other


hazards including provision and maintenance of
warning lamps and signs A279.3 sum
D Allow for environmental protection requirements
as per Particular Specification Section PS 1/34
A279.4 sum

E Allow for health and safety requirements as per


Particular Specification Section PS 1/35
A279.5 sum

F Allow for coordination with the Service Authorities


and provide all necessary fascilities as required
A279.6 sum

G Allow for coordination with the DM Horticulture


Department and provide all necessary facilities as
required. A279.7 sum

H Allow for control dust emission during


5 construction as per Particular Specification
Section PS 1/36 A279.8 sum

J Allow for all obligations related to Automatic


Irrigation / Landscape / Parking Areas Affected by
Temporary / Permanent Works as described
under Preamble items b/14 A thru G and b/15 A &
B.
A279.9 sum

K Allow for Health & Safety requirements as per


EXPO2020 Worker Welfare Standards A279.10 sum
1

Carried to Part Summary Dhs.

REV-01
BILL PART
PROJECT:R1048/1 BILL OF QUANTITIES
IMPROVEMENTS OF SECTION Nr.
EXPO 2020 ROADS NETWORK GENERAL ITEMS 1
d
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
Ref.

PART1 - GENERAL ITEMS (Cont'd...)

Specified requirements (Cont'd...)

Temporary Works (Cont'd...)

5 Project Sign Boards as shown on drawings

A Establishment of project sign board A279.1 nr 4


B Maintenance of project sign board (Rate for 4 nr.) A279.2 Day 910

C Removal of project sign board A279.3 nr 4

Method Related Charges


(inserted by the Tenderer)

Accommodation and buildings for the A31*


Contractor

D Establishment (Fixed) Sum

E Maintenance (Time Related) Sum

F Removal (Fixed) Sum

Note:
The Tenderer shall specify "Fixed" or
"Time Related" next to the item description
of each Method Related Charge, inserted
by him.

Carried to Part Summary Dhs.

REV-01
BILL PART
PROJECT:R1048/1 BILL OF QUANTITIES
IMPROVEMENTS OF SECTION Nr.
EXPO 2020 ROADS NETWORK GENERAL ITEMS 1
d
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
Ref.

PART 1 - GENERAL ITEMS (Cont'd...)

Method Related Charges (Cont'd...)


(inserted by the Tenderer)
Services A32*

A Establishment (Fixed) sum

B Maintenance (Time Related) sum

C Removal (Fixed) sum

Note:
The Tenderer shall specify "Fixed" or
"Time Related" next to the item description
of each Method Related Charge, inserted
by him.

Carried to Part Summary Dhs.

BILL PART
PROJECT:R1048/1 BILL OF QUANTITIES
IMPROVEMENTS OF SECTION Nr.
EXPO 2020 ROADS NETWORK GENERAL ITEMS 1
d
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
Ref.
PART 1 - GENERAL ITEMS (Cont'd...)

Method Related Charges (Cont'd...)


(inserted by the Tenderer)

A Plant A33*

Establishment (Fixed) sum

Maintenance (Time Related) sum

Removal (Fixed) sum

Note:
The Tenderer shall specify "Fixed" or
"Time Related" next to the item description
of each Method Related Charge, inserted
by him.

Carried to Part Summary Dhs.

BILL PART
PROJECT:R1048/1 BILL OF QUANTITIES
IMPROVEMENTS OF SECTION Nr.
EXPO 2020 ROADS NETWORK GENERAL ITEMS 1
d
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
Ref.

PART 1 - GENERAL ITEMS (Cont'd...)

Method Related Charges (Cont'd...)


(inserted by the Tenderer)

A Plant A34*

Establishment (Fixed) sum

Maintenance (Time Related) sum

Removal (Fixed) sum

Note:
The Tenderer shall specify "Fixed" or
"Time Related" next to the item description
of each Method Related Charge, inserted
by him.

Carried to Part Summary Dhs.

BILL PART
PROJECT:R1048/1 BILL OF QUANTITIES
IMPROVEMENTS OF SECTION Nr.
EXPO 2020 ROADS NETWORK GENERAL ITEMS 1
d
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
Ref.

PART1 - GENERAL ITEMS (Cont'd...)

Method Related Charges (Cont'd...)


(inserted by the Tenderer)

A Temporary Works A35*

Establishment (Fixed) sum

Maintenance (Time Related) sum

Removal (Fixed) sum


Note:
The Tenderer shall specify "Fixed" or
"Time Related" next to the item description
of each Method Related Charge, inserted
by him.

Carried to Part Summary Dhs.

BILL PART
PROJECT:R1048/1 BILL OF QUANTITIES
IMPROVEMENTS OF SECTION Nr.
EXPO 2020 ROADS NETWORK GENERAL ITEMS 1
d
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
Ref.

PART 1 - GENERAL ITEMS (Cont'd...)

Method Related Charges (Cont'd...)


(inserted by the Tenderer)

A Temporary Works A36*

Establishment (Fixed) sum

Maintenance (Time Related) sum

Removal (Fixed) sum


Note:
The Tenderer shall specify "Fixed" or
"Time Related" next to the item description
of each Method Related Charge, inserted
by him.

Carried to Part Summary Dhs.

BILL PART
PROJECT:R1048/1 BILL OF QUANTITIES
IMPROVEMENTS OF SECTION Nr.
EXPO 2020 ROADS NETWORK GENERAL ITEMS 1
d
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
Ref.

PART 1 - GENERAL ITEMS (Cont'd...)

Method Related Charges (Cont'd...)


(inserted by the Tenderer)

A Management,Supervision & Labour A370

Establishment (Fixed) sum

Maintenance (Time Related) sum

Removal (Fixed) sum


Note:
The Tenderer shall specify "Fixed" or
"Time Related" next to the item description
of each Method Related Charge, inserted
by him.

Carried to Part Summary Dhs.

BILL PART
PROJECT:R1048/1 BILL OF QUANTITIES
IMPROVEMENTS OF SECTION Nr.
EXPO 2020 ROADS NETWORK GENERAL ITEMS 1
d
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
Ref.

PART 1 - GENERAL ITEMS (Cont'd...)

A Compliance with the Conditions of Contract and


Specification (the Tender shall Separately list and
price below any other clause considered to have a
monetary value) A990 sum
Carried to Part Summary Dhs.

BILL PART
PROJECT:R1048/1 BILL OF QUANTITIES
IMPROVEMENTS OF SECTION Nr.
EXPO 2020 ROADS NETWORK GENERAL ITEMS 1
d
ITEM ITEM DESCRIPTION

PART 1 - GENERAL ITEMS (Cont'd...)

PART SUMMARY

Page d/1/1

Page d/1/2

Page d/1/3

Page d/1/4

Page d/1/5

Page d/1/6

Page d/1/7
Page d/1/8

Page d/1/9

Page d/1/10

Page d/1/11

Page d/1/12

Page d/1/13

Page d/1/14

Page d/1/15

Total for Part 1 - General Items Dhs.


Carried to Grand Summary
PAGE Nr.

d/1/1

AMOUNT
UAE. Dhs.

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
0.00

0.00

NTT-04
PAGE Nr.

d/1/2

AMOUNT
U.A.E. Dhs.

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
0.00

0.00

0.00

PAGE Nr.

d/1/3

AMOUNT
U.A.E. Dhs.

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
0.00

0.00

0.00

0.00

0.00

PAGE Nr.

d/1/4

AMOUNT
U.A.E. Dhs.

0.00

0.00

0.00

0.00

0.00

0.00

0.00
0.00

0.00

0.00

0.00

0.00

PAGE Nr.

d/1/5

AMOUNT
U.A.E. Dhs.

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
0.00

0.00

0.00

0.00

0.00

NTT-06
PAGE Nr.

d/1/6

AMOUNT
U.A.E. Dhs.
0.00

PAGE Nr.

d/1/7

AMOUNT
U.A.E. Dhs.

0.00

0.00

0.00
0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

NTT-06
PAGE Nr.

d/1/8

AMOUNT
U.A.E. Dhs.

0.00
0.00

0.00

0.00

0.00

0.00

0.00

NTT-06
PAGE Nr.

d/1/9

AMOUNT
U.A.E. Dhs.
0.00

0.00

0.00

0.00

PAGE Nr.

d/1/10

AMOUNT
U.A.E. Dhs.
0.00

0.00

0.00

0.00

PAGE Nr.
d/1/11

AMOUNT
U.A.E. Dhs.

0.00

0.00

0.00
0.00

PAGE Nr.

d/1/12

AMOUNT
U.A.E. Dhs.

0.00

0.00

0.00
0.00

PAGE Nr.

d/1/13

AMOUNT
U.A.E. Dhs.

0.00

0.00

0.00
0.00

PAGE Nr.

d/1/14

AMOUNT
U.A.E. Dhs.

0.00

0.00

0.00
0.00

PAGE Nr.

d/1/15

AMOUNT
U.A.E. Dhs.

0.00
0.00

PAGE Nr.

d/1/16

AMOUNT
U.A.E. Dhs.

0.00

0.00

0.00

0.00

0.00

0.00

0.00
0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF GROUND INVESTIGATION SECTION Nr. d/2/71
EXPO 2020 ROADS NETWORK d 2

ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE


REF.

PART 2 - GROUND INVESTIGATION

Trial pits and trenches to ascertain/ verify/


locate existing services : maximum length 3m,
excavation by hand

Number in material other than rock

A Depth not exceeding 1.0m B111.1 nr 50


0
B Max. depth 1-2m B112.1 nr 35
0
C Max. depth 2-3 m B113.1 nr 30
0
D Max. depth 3-5 m B114.1 nr 20
0
0 Depth in meter
0
E Depth in material other than rock B130.1 m 310
0
F Depth supported B150.1 m 190
0
G Depth backfilled with excavated material for
reinstatement B160.1 m 310
0
0
0 Trial trenches to ascertain/ verify/ locate
existing services : maximum length 3-6m,
excavation by hand

0
0 Number in material other than rock
0
H Depth not exceeding 1.0m B111.2 nr 30
0
J Max. depth 1-2m B112.2 nr 20
0
K Max. depth 2-3 m B113.2 nr 20
0
L Max. depth 3-5 m B114.2 nr 20
0
0 Depth in meter
0
M Depth in material other than rock B130.2 m 230
0
N Depth supported B150.2 m 160
0
P Depth backfilled with excavated material for
reinstatement B160.2 m 230
0
0
BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF GROUND INVESTIGATION SECTION Nr. d/2/72
EXPO 2020 ROADS NETWORK d 2

ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE


REF.

PART 2 - GROUND INVESTIGATION

0
0
0
0
0

To Part Summary Dhs.

0
0 Trial pits and trenches to ascertain/ verify/
locate existing services : maximum length 6-
12m, excavation by hand

0
0 Number in material other than rock

A Depth not exceeding 1.0m B111.1 nr 15


0
B Max. depth 1-2m B112.1 nr 15
0
C Max. depth 2-3 m B113.1 nr 15
0
D Max. depth 3-5 m B114.1 nr 15
0
0 Depth in meter
0
E Depth in material other than rock B130.1 m 165
0
F Depth supported B150.1 m 120
0
G Depth backfilled with excavated material for
reinstatement B160.1 m 165
0
0
0 Trial pits and trenches to ascertain/ verify/
locate existing services : maximum length 12-
18m, excavation by hand

0
0 Number in material other than rock
0
H Depth not exceeding 1.0m B111.2 nr 20
0
J Max. depth 1-2m B112.2 nr 20
0
K Max. depth 2-3 m B113.2 nr 15
0
L Max. depth 3-5 m B114.2 nr 15
0
0 Depth in meter
BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF GROUND INVESTIGATION SECTION Nr. d/2/73
EXPO 2020 ROADS NETWORK d 2

ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE


REF.

PART 2 - GROUND INVESTIGATION

0
M Depth in material other than rock B130.2 m 180
0
N Depth supported B150.2 m 120
0
P Depth backfilled with excavated material for
reinstatement B160.2 m 180
0
0
0
0
0
0
0

To Part Summary Dhs.

0
0 Trial pits and trenches to ascertain/ verify/
locate existing services : maximum length 18-
24m, excavation by hand

0
Number in material other than rock

A Depth not exceeding 1.0m B111.1 nr 15


0
B Max. depth 1-2m B112.1 nr 15
0
C Max. depth 2-3 m B113.1 nr 15
0
D Max. depth 3-5 m B114.1 nr 15
0
0 Depth in meter
0
E Depth in material other than rock B130.1 m 165
0
F Depth supported B150.1 m 120
0
G Depth backfilled with excavated material for
reinstatement B160.1 m 165
0
0
0 Trial trenches to ascertain/ verify/ locate
existing services : maximum length 24-30m,
excavation by hand

0
0 Number in material other than rock
BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF GROUND INVESTIGATION SECTION Nr. d/2/74
EXPO 2020 ROADS NETWORK d 2

ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE


REF.

PART 2 - GROUND INVESTIGATION

0
H Depth not exceeding 1.0m B111.2 nr 20
0
J Max. depth 1-2m B112.2 nr 20
0
K Max. depth 2-3 m B113.2 nr 15
0
L Max. depth 3-5 m B114.2 nr 15
0
0 Depth in meter
0
M Depth in material other than rock B130.2 m 180
0
N Depth supported B150.2 m 120
0
P Depth backfilled with excavated material for
reinstatement B160.2 m 180
0
0
0
0
0
0

To Part Summary Dhs.

0
0 Trial pits and trenches to ascertain/ verify/
locate existing services : maximum length 30-
36m, excavation by hand

0 Number in material other than rock


0
A Depth not exceeding 1.0m B111 nr 10
0
B Max. depth 1-2m B112 nr 15
0
C Max. depth 2-3 m B113 nr 10
0
D Max. depth 3-5 m B114 nr 15
0
0 Depth in meter
0
E Depth in material other than rock B130 m 145
0
F Depth supported B150 m 105
0
G Depth backfilled with excavated material for
reinstatement B160 m 145
BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF GROUND INVESTIGATION SECTION Nr. d/2/75
EXPO 2020 ROADS NETWORK d 2

ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE


REF.

PART 2 - GROUND INVESTIGATION

0
0
0
0
0
0
0
0
0

0
0
0
0

To Part Summary Dhs.

0
0 Rotary drilled boreholes

0
0 Nominal diameter at base 150mm
0
A Number of boreholes; sub-surface site
investigation for overhead road sign structures
and bridge foundations B310 nr 10
0
B Depth without core recovery in holes of maximum
depth not exceeding 5m B331 m 10
0
BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF GROUND INVESTIGATION SECTION Nr. d/2/76
EXPO 2020 ROADS NETWORK d 2

ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE


REF.

PART 2 - GROUND INVESTIGATION

C Depth with core recovery in holes of maximum


depth 5 - 10m B342 m 20
0
D Depth with core recovery in holes of maximum
depth 10 - 20m B343 m 40
0
E Depth with core recovery in holes of maximum
depth 20 - 30m B344 m 60
0
F Depth with core recovery in holes of maximum
depth 30 - 35m B345 m 70

G Depth backfill with excavated material B360 m 200

0 Samples

H Disturbed sample of soft material from the


surface; minimum 40kg B412 nr 10

0 Site Tests and Observations

J Site test for Ground Water Level; as directed by


the Engineer B512 nr 10
0
K Standard penetration for rotary drilled boreholes B513 nr 80
0
L California bearing ratio B523 nr 30
0
0 Laboratory Tests
0
M Moisture content B711 nr 30
0
N Particle size analysis by sieve B714 nr 30
0
P Unconfined compressive strength of core sample
1-2m height B771 nr 30
0
0
0
0
0
0

To Part Summary Dhs.

PART SUMMARY
BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF GROUND INVESTIGATION SECTION Nr. d/2/77
EXPO 2020 ROADS NETWORK d 2

ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE


REF.

PART 2 - GROUND INVESTIGATION

Page d/2/1

Page d/2/2

Page d/2/3

Page d/2/4

Page d/2/5
BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF GROUND INVESTIGATION SECTION Nr. d/2/78
EXPO 2020 ROADS NETWORK d 2

ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE


REF.

PART 2 - GROUND INVESTIGATION

Total for PART 2 - GROUND INVESTIGATION


Carried to Grand Summary Dhs.
PAGE Nr.

d/2/79

AMOUNT
UAE. Dhs.

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
PAGE Nr.

d/2/80

AMOUNT
UAE. Dhs.

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
PAGE Nr.

d/2/81

AMOUNT
UAE. Dhs.

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
PAGE Nr.

d/2/82

AMOUNT
UAE. Dhs.

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
PAGE Nr.

d/2/83

AMOUNT
UAE. Dhs.

0.00

0.00

0.00
PAGE Nr.

d/2/84

AMOUNT
UAE. Dhs.

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
PAGE Nr.

d/2/85

AMOUNT
UAE. Dhs.

0.00

0.00

0.00

0.00

0.00
PAGE Nr.

d/2/86

AMOUNT
UAE. Dhs.

0.00
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF DEMOLITION AND SECTION Nr. d/3/87
EXPO 2020 ROADS NETWORK SITE CLEARANCE d 3
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.

Part 3 - Demolition and Site Clearance


0
0 General clearance
0
A General clearance as specification clause 2/4. D100 ha 68
0
0 Removal of Existing palm trees and deliver to
DM designated location area for planting
Including trimming,watering prior to root ball
preparation, excavation to make root ball,
shifting to the new location, disposal of
excavated materials and making good of the
area.

0
B Girth 0.5-2.0m D210.1 nr 20
0
C Girth exceeding 2.0m D220.1 nr 20
0
0 Removal of Existing trees and deliver to DM
designated location area for planting Including
trimming,watering prior to root ball
preparation, excavation to make root ball,
shifting to the new location, disposal of
excavated materials and making good of the
area.

0
D Girth 0.5-2.0m D210.2 nr 2
0
E Girth exceeding 2.0m D220.2 nr 2
0
0 Removal of trees and disposal to tip.

F Girth 0.5-2.0m D210.3 nr 10


0
G Girth exceeding 2.0m D220.3 nr 10
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF DEMOLITION AND SECTION Nr. d/3/88
EXPO 2020 ROADS NETWORK SITE CLEARANCE d 3
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.

Part 3 - Demolition and Site Clearance


0
0
0
0
0
0

To Part Summary Dhs.

0 Demolition
0
0 Break out and remove existing kerbs including
concrete base, backing and haul to approved
dump site

0
A Existing upstand kerbs D900.1 m 4,300
0
B Existing drop kerbs D900.2 m 940
0
C Existing heel kerbs D900.3 m 800
0
D Existing flush kerbs D900.4 m 100
0
0 Break out and remove existing interlock tile
paving including under layers and haul to
approved dump site

0
E 60 mm thick interlock tiles D900.5 m2 1,200
0
F 80 mm thick interlock tiles D900.6 m2 500
0
0 Break out and carefully remove existing
interlock tile paving including under layers,
tiles palette and deliver to RTA stores, sand
bed and sub base cart to tip

G 60 mm thick interlock tiles D900.7 m2 1,200


0
H 80 mm thick interlock tiles D900.8 m2 500
0
0 Break out and carefully remove existing
interlock tile paving including under layers,
tiles palette and set aside for re use, sand bed
and sub base cart to tip

J 60 mm thick interlock tiles D900.9 m2 1,000


0
K 80 mm thick interlock tiles D900.10 m2 500
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF DEMOLITION AND SECTION Nr. d/3/89
EXPO 2020 ROADS NETWORK SITE CLEARANCE d 3
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.

Part 3 - Demolition and Site Clearance


0
0
L Breakout and remove existing crash barrier
(approximately 20-30m total length) at existing
overhead sign gantry and cart to approved tip. D900.11 nr 1
0
0
0
0
0
0
0
0
0
0
0

To Part Summary Dhs.

0 Demolition (Cont'd….)

0 Carefully dismantle and remove existing guide


sign structures and sign panels including
removal of foundation, cart to tip to the
approved dump site and backfill of voids

0
0 Store at site for future re-use
0
A Post Mounted Type D900.1 nr 1
0
B Cantilever Type D900.2 nr 1
0
C Gantry Type D900.3 nr 1
0
0
0 Clean and deliver to RTA stores.
0
D Post Mounted Type D900.4 nr 1
0
E Cantilever Type D900.5 nr 1
0
F Gantry Type D900.6 nr 1
0
0
0
0
0
0
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF DEMOLITION AND SECTION Nr. d/3/90
EXPO 2020 ROADS NETWORK SITE CLEARANCE d 3
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.

Part 3 - Demolition and Site Clearance


0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

To Part Summary Dhs.

0 Demolition (Cont'd….)
0
0 Removal of Existing Concrete Barrier
0
0 Break out and remove existing concrete
barrier of any specified type, including
concrete foundation, cart to tip to approved
dump site as directed by the Engineer.

0
A Single face concrete barrier D900.1 m 100
0
B Double face concrete barrier D900.2 m 100
0
0 Carefully and remove existing precast
concrete barrier of any specified type, set
aside in Contractor's store for reuse, including
foundation haul to approved dump site as
directed by the Engineer.

0
C Single face concrete barrier D900.3 m 100
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF DEMOLITION AND SECTION Nr. d/3/91
EXPO 2020 ROADS NETWORK SITE CLEARANCE d 3
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.

Part 3 - Demolition and Site Clearance


0
0
D Double face concrete barrier D900.4 m 100
0
0 Carefully remove existing metal beam guard
rail including posts, plates etc. and set aside
in Contractor's store for reuse, including
removal of foundation and cart to tip to
approved dump site and backfill of voids.

0
E Single face metal beam guard rail D900.5 m 1,000
0
F Double face metal beam guard rail D900.6 m 1,000
0
0 Carefully remove existing metal beam guard
rail, including posts, plates etc. and deliver to
RTA stores, including removal of foundation
and cart to tip to approved dump site and
backfill of voids.

0
G Single face metal beam guard rail D900.7 m 2,000
0
H Double face metal beam guard rail D900.8 m 8,100
0
0
0
0
0
0
0
0
0

To Part Summary Dhs.

0 Demolition (Cont'd….)
0
0 Carefully remove existing non illuminated
warning and regulatory signs, including posts

0
A Store at site for future re-use D900.1 nr 1
0
B Clean and deliver to RTA stores D900.2 nr 15
0
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF DEMOLITION AND SECTION Nr. d/3/92
EXPO 2020 ROADS NETWORK SITE CLEARANCE d 3
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.

Part 3 - Demolition and Site Clearance


0
0 Carefully remove existing street name signs
including posts.

0
C Store at site for future re-use D900.3 nr 1
0
D Clean and deliver to RTA stores D900.4 nr 12
0
E Carefully remove existing GR-FET type and
deliver to RTA Stores. D900.5 nr 2
0
0 Carefully remove existing Advertisment Board
including posts.

0
F Store at site for future re-use D900.6 m 400
0
G Clean and deliver to Owner stores D900.7 m 400
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

To Part Summary Dhs.

0 Demolition (Cont'd….)
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF DEMOLITION AND SECTION Nr. d/3/93
EXPO 2020 ROADS NETWORK SITE CLEARANCE d 3
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.

Part 3 - Demolition and Site Clearance


0
0
0 Carefully remove existing fence and post,
gates and set aside in Contractor's store for
reuse, including removal of foundation and
cart to tip to the approved dump site and
backfill of voids.

0
A Existing chainlink fence D900.1 m 2,000
0
B Existing right of way fence D900.2 m 3,000
0
C Existing DUSUP fence D900.3 m 250
0
D Existing fence gate - single leaf D900.4 nr 1
0
E Existing fence gate - double leaf D900.5 nr 1
0
0 Carefully remove existing fence and post,
deliver to RTA stores including removal of
foundation and cart to tip to the approved
dump site and backfill of voids.

0
F Existing chainlink fence D900.6 m 2,000
0
G Existing right of way fence D900.7 m 2,000
0
H Existing DUSUP fence D900.8 m 250
0
J Existing fence gate - single leaf D900.9 nr 3
0
K Existing fence gate - double leaf D900.10 nr 3
0
0 Breakout and remove existing fence and post,
including concrete foundation, cart to tip to
approved dump site as directed by the
Engineer.

0
L Existing chainlink fence D900.11 m 2,000
0
M Existing right of way fence D900.12 m 2,000
0
N Existing DUSUP fence D900.13 m 250
0
P Existing fence gate - single leaf D900.14 nr 3
0
Q Existing fence gate - double leaf D900.15 nr 3
0
0 Removal of existing survey monuments
0
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF DEMOLITION AND SECTION Nr. d/3/94
EXPO 2020 ROADS NETWORK SITE CLEARANCE d 3
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.

Part 3 - Demolition and Site Clearance


0
R Carefully remove existing survey monuments by
chiselling around, and handover to RTA Survey
Section, including carting debris to tip and
necessary reinstatement D900.16 nr 20
0

To Part Summary Dhs.

0 Demolition (Cont'd….)
0
0 Removal of existing grass
0
A Removal of existing grass and disposal to tip D900.1 m² 500
0
B Carefully remove existing grass and hand over to
DM Horticulture Dept. D900.2 m² 500
0
0
0 Removal of existing flag post
0
C Carefully remove existing flag post and hand over
to client/owner D900.3 nr 2
0
0
0 Removal of existing stone pitching
0
D Break out and remove existing stone pitching
including concrete bedding, sub base etc and cart
to approved tip D900.4 m² 200
0
0
0 Removal of existing foundations
0
0 Break out and remove existing concrete
beams, slabs, foundations or other isolated
volumes including all related earthworks.

0
E Volume not exceeding 50m³ D521 nr 1
0
F Volume 50 - 100m³ D522 nr 1
0
G Volume 100 - 250m³ D523 nr 1
0
H Volume 250 - 500m³ D524 nr 1
0
J Volume 500 - 1000m³ D525 nr 1
0
K Volume 1000 - 2500m³ D526 nr 1
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF DEMOLITION AND SECTION Nr. d/3/95
EXPO 2020 ROADS NETWORK SITE CLEARANCE d 3
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.

Part 3 - Demolition and Site Clearance


0
0
L Volume 2500 - 5000m³ D527 nr 1
0
M Volume 5000 - 8000 m³ D528 nr 1
50
0
0
0
0
0
0
0
0
0

To Part Summary Dhs.

REV-02
0 Demolition (Cont'd….)
0
0
0 Relocation of Automatic Irrigation system
0
A Relocation of Irrigation system for 7 Nrs trees
including loop of dripper line for trees, control
cables, uPVC lateral pipes, etc. D900.1 Sum
0
0 Speed Radar Cameras
0
B Demolition of Foundation of Speed Radar
Cameras including all civil works; coordination
with authorities.etc D900.2 nr 2
0
0 Cameras
0
C Demolition of Foundation of security Cameras
including all civil works; coordination with
authorities.etc D900.3 nr 5
0
0 Electrical Control Cabinets
0
D Careful removal of electrical cabinets including all
civil works; coordination with authorities.etc D900.4 nr 16
0
0 Brickwall
0
E Demolition of existing Brickwall D900.5 m 35
0
0
0 Removal of existing fence
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF DEMOLITION AND SECTION Nr. d/3/96
EXPO 2020 ROADS NETWORK SITE CLEARANCE d 3
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.

Part 3 - Demolition and Site Clearance


0
0
F Carefully remove existing pedestrian fence and
post, set aside in contractors store for reuse. D900.6 m 100
0
G Carefully remove existing pedestrian fence
including posts and deliver to RTA Stores. D900.7 m 100
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

To Part Summary Dhs.

0 Demolition (Cont'd….)
0
0 TRAFFIC SIGNAL SYSTEM REMOVAL
0
0 Carefully remove existing signal posts,
fittings, precast/reinforsed conc. foundations,
dismantle completely and set aside in
Contractor's store for later deliver to RTA
stores, including disposal of precast
foundations to approved tip, cable
disconnections and backfilling

0
A Cantilever Signal post with arms of length 3-6m.
X900.1 nr 4
0
B Cantilever Signal post with arms of length 6-9m.
X900.2 nr 4
0
C Cantilever Signal post with arms of length 12m
and 9m. X900.3 nr 1
0
D Post mounted 1 nrs Pedestrian signal only. X900.4 nr 20
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF DEMOLITION AND SECTION Nr. d/3/97
EXPO 2020 ROADS NETWORK SITE CLEARANCE d 3
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.

Part 3 - Demolition and Site Clearance


0
0
E Post mounted 2 nrs Pedestrian signal only. X900.5 nr 10
0
0 Carefully remove existing Loop detectors,
fittings and store in Contractor's stores for
later deliver to RTA stores or dispose to tip as
required , including to approved tip, cable
disconnections and backfilling

0
F Traffic Signal Never Fail Loop Detector.
X900.6 m 100
0
0 Carefully remove existing UPS and Change
Over Switch, fittings, precast foundations,
dismantle completely and set aside in
Contractor's enclosed store for reuse/return,

0
G Uninterrupted Power Supply (UPS). X900.7 nr 1
0
0 Carefully remove existing Traffic controllers
and fittings, dismantle completely and set
aside in Contractor's store for later deliver to
RTA stores, including disposal of precast
foundations to approved tip, cable
disconnections and backfilling

0
H Traffic Signal Controller. X900.8 nr 2
0
0
0
0

To Part Summary Dhs.

0
0 Demolition (Cont'd….)
0
0 Carefully remove existing cover and frame and
deliver to RTA stores including excavation,
breakout chambers, backfilling and remove to
tip and reinstatement of existing surfaces

0
A Traffic Signal manholes. X900.1 nr 16
0
B Traffic Signal bypass chambers. X900.2 nr 20
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF DEMOLITION AND SECTION Nr. d/3/98
EXPO 2020 ROADS NETWORK SITE CLEARANCE d 3
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.

Part 3 - Demolition and Site Clearance


0
0
0
0 Remove existing ducts and fittings, dismantle
completely cart to tip to approved dump site
as directed by the Engineer.

0
C 1-Way 100 mm Duct. X900.3 m 200
0
D 2-Way 100 mm Duct. X900.4 m 100
0
E 3-Way 100 mm Duct. X900.5 m 100
0
F 4-Way 100 mm Duct. X900.6 m 100
0
G 5-Way 100 mm Duct. X900.7 m 100
0
H 6-Way 100 mm Duct. X900.8 m 100
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0

To Part Summary Dhs.

PART SUMMARY
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF DEMOLITION AND SECTION Nr. d/3/99
EXPO 2020 ROADS NETWORK SITE CLEARANCE d 3
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.

Part 3 - Demolition and Site Clearance


0

Page d/3/1

Page d/3/2

Page d/3/3

Page d/3/4

Page d/3/5

Page d/3/6

Page d/3/7

Page d/3/8

Page d/3/9

Page d/3/10
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF DEMOLITION AND SECTION Nr. d/3/100
EXPO 2020 ROADS NETWORK SITE CLEARANCE d 3
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.

Part 3 - Demolition and Site Clearance


0

Total for Part 3 - Demolition and Site Clearance


Carried to Grand Summary Dhs.
PAGE Nr.

d/3/101

AMOUNT
UAE. Dhs.

0.00

0.00

0.00

0.00

0.00

0.00

0.00
PAGE Nr.

d/3/102

AMOUNT
UAE. Dhs.

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
PAGE Nr.

d/3/103

AMOUNT
UAE. Dhs.

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
PAGE Nr.

d/3/104

AMOUNT
UAE. Dhs.

0.00

0.00

0.00

0.00
PAGE Nr.

d/3/105

AMOUNT
UAE. Dhs.

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
PAGE Nr.

d/3/106

AMOUNT
UAE. Dhs.

0.00

0.00

0.00

0.00

0.00

0.00
PAGE Nr.

d/3/107

AMOUNT
UAE. Dhs.

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
PAGE Nr.

d/3/108

AMOUNT
UAE. Dhs.

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
PAGE Nr.

d/3/109

AMOUNT
UAE. Dhs.

0.00

0.00

0.00

NTT-05

0.00

0.00

0.00

0.00

0.00
PAGE Nr.

d/3/110

AMOUNT
UAE. Dhs.

0.00

0.00

0.00

0.00

0.00

0.00

0.00
PAGE Nr.

d/3/111

AMOUNT
UAE. Dhs.

0.00

0.00

0.00

0.00

0.00

0.00

0.00
PAGE Nr.

d/3/112

AMOUNT
UAE. Dhs.

0.00

0.00

0.00

0.00

0.00

0.00

0.00
PAGE Nr.

d/3/113

AMOUNT
UAE. Dhs.

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
PAGE Nr.

d/3/114

AMOUNT
UAE. Dhs.

0.00
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF EARTHWORKS SECTION Nr. d/4/115
EXPO 2020 ROADS NETWORK d 4
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.

Part 4 - Earthworks
0
0 Excavation

0
A Excavation for cuttings; material other than top
5 soil, rock or artificial hard material E22* m³ 123,560
0
B Excavation for cuttings rock E23* m3 500
0
C Excavation for cutting; artificial hard material;
existing road pavement; max. depth not
exceeding 0.25m comprising of AC wearing
course and/or AC base course E241 m3 20,119
0
D Excavation for cutting; artificial hard material;
existing road pavement; depth 0.25-0.5m
comprising of wet-mix macadam and/or granular
subbase E242.1 m3 10,200
0
E Excavation for cutting; artificial hard material;
existing road pavement; depth 0.25-0.5m
comprising of wet-mix macadam and/or granular
subbase and stockpile at approved location at site
for future reuse.
E242.2 m3 10,200
0
F Excavation of reinforced concrete foundation;
depth 1 -2m E454 m3 100
0
G Excavation of reinforced concrete foundation;
depth 2 -5m E455 m3 100
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF EARTHWORKS SECTION Nr. d/4/116
EXPO 2020 ROADS NETWORK d 4
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.

Part 4 - Earthworks
0
0
0
0
0
0
0

To Part Summary Dhs.

REV-01
0
0 Excavation ancillaries

0
A Trimming of excavated surfaces not to receive
permanent works; material other than topsoil rock
or artificial hard material E512 m2 424,354
0
B Preparation of excavated surfaces to receive
permanent works; material other than topsoil, rock
or artificial hard material E522 m2 395,700
0
C Preparation of excavated surfaces to receive
permanent works ; rock E523 m2 500
0
D Disposal of surplus excavated material; material
6 other than top soil, rock or artificial
hard material E532.1 m3 52,127
0
E Disposal of surplus excavated material; material
5 other than top soil, rock or artificial hard material
within R1048 contracts 1 thru 5
boundary E532.2 m3 1,000
0
F Disposal of excavated material, rock to tip E533 m3 100
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF EARTHWORKS SECTION Nr. d/4/117
EXPO 2020 ROADS NETWORK d 4
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.

Part 4 - Earthworks
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

To Part Summary Dhs.

REV-02
0
0 Excavation ancillaries (Cont'd…)

0
A Disposal of excavated artificial hard material; AC
wearing course and/or base course E534.1 m3 20,119
0
B Disposal of excavated artificial hard material; wet-
mix macadam and/or granular subbase E534.2 m3 10,200
0
C Disposal of excavated concrete or reinforced
concrete E534.3 m3 200
0
D Double-handling of excavated material other than
E542 m3
top soil, rock or artificial hard material 500
0
E Double-handling of excavated artificial hard
material; wet-mix macadam and/or granular
subbase to be reused E544 m3 1,000
0
F Excavation of material below the final surface and
replacement with stabilizing crushed materials,
including disposal of excavated material to tip
(Replacement measured separately) E560 m3
100
0
0 Filling
0
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF EARTHWORKS SECTION Nr. d/4/118
EXPO 2020 ROADS NETWORK d 4
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.

Part 4 - Earthworks
0
G Filling to embankments, suitable excavated
6 material other than top soil or rock @ 250mm
each layer E624.1 m3 169,567
0
H Filling to embankments, suitable excavated road
foundation material E624.2 m3 10,200
0
J Filling to embankments; imported material other
5 than top soil or rock @ 250mm each
layer. E625.1 m3 139,450
0
K Filling to embankments; imported material (free
5 issued by RTA within R1048 project boundary)
other than top soil or rock @ 250mm each layer.
E625.2 m3 25,000
0
L Filling below subgrade with imported natural
material (Improved Subgrade, material other than
top soil or rock) in areas where CBR is less than
specified E625.3 m3 500
0
0
0
0
0
0
0
0

To Part Summary Dhs.

REV-02
0
0 Filling (Cont'd…)

0
A Filling general, rock boulders grading 150-300mm
end dumped and rolled until area stabilized as
2 Particular specification Section PS 2/21.6
E637 m³ 36,000
0
B Filling general, thickness 150mm, crushed
aggregate material, as Particular specification
Section PS 2/21.6 E649.1 m3 10,800
0
C Filling below final surface at subkha area with 10-
70 mm crushed stones, average depth up to
300mm all in accordance with the Drawings and
Specifications E649.2 m3 10,800
0
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF EARTHWORKS SECTION Nr. d/4/119
EXPO 2020 ROADS NETWORK d 4
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.

Part 4 - Earthworks
0
D Filling 50mm thick sand layer over geotextile E645 m2 72,000
0
06

0 Filling ancillaries
0
E Trimming of filled surfaces not to receive
permanent works. E712 m2 424,354
0
F Preparation of filled surfaces to receive
permanent work E722 m2 264,600
0
G Geotextile filter fabric membrane surround to rock
boulders and crushed stones at subkha area.
E730.1 m2 72,000
0
06
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

To Part Summary Dhs.

REV-02
0
0 Trans Plantation of Trees

0
A Re-planting of Existing trees as per DM
designated location area for planting including pit
preparation, excavation, disposal of excavated
materials, compost and sweet soil E860 nr 7
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF EARTHWORKS SECTION Nr. d/4/120
EXPO 2020 ROADS NETWORK d 4
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.

Part 4 - Earthworks
0
0
B Tanker - Watering for trees for one month (30
days) X900.1 nr 7
0
C Extra and above item of re-planting of trees for
supply and installation of root barriers for trees re-
planted at the vicinity of Services Corridor
including hand excavation and disposal. X900.2 nr 10
0
0 Slope Protection
0
0 Slope protection including compacting the slope
surface, excavating and backfill for the foundation,
preparing the foundation, surnishing and applying
materials to protect slope,supply and laying
geotextile fabric and bedding materials, in
accordance with drawings and requirements of
specification.

0
D Stone Rip-rap;loose X900.3 m³ 50
0
E Stone Rip-rap;hand placed X900.4 m³ 50
0
F Stone Rip-rap;keyed X900.5 m³ 50
0
G Stone Rip-rap;grouted X900.6 m³ 50
0
06
0
0
0
0
0
H Coarse aggregate for surface covering including
preparing surface,shaping to finished grade X900.10 m³ 50
0
0
0
0
0
0

0
0
0
0
0
0

To Part Summary Dhs.


0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF EARTHWORKS SECTION Nr. d/4/121
EXPO 2020 ROADS NETWORK d 4
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.

Part 4 - Earthworks
0

REV-02
0
06 PIPE WORK - MANHOLES AND PIPE WORK
ANCILLARIES
0
0 Supply and lay uPVC slotted carrier Pipe and
fittings and connections, layed along with the
road complete as shown indrawings C1525 &
1531

A 250mm uPVC Slotted Pipe K529 m 13,000


0
0 PIPE WORK - FITTINGS AND VALVES
0
06 uPVC pipe fittings to BS 4660 & 5481
0
B 250mm dia, 45 degree bend. J412 nr 130
0
C Y Junction 250x250x250mm Dia J411.2 nr 130
0
0 Clean out Box
0
0 Clean out Box complete as detailed shown in
6 drawing No 2942 ; including frame and cover

0
D Clean out Box, Depth not exceeding 1.50m K231 nr 130
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF EARTHWORKS SECTION Nr. d/4/122
EXPO 2020 ROADS NETWORK d 4
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.

Part 4 - Earthworks
0
0
0
0
0
0
0
0
0

To Part Summary Dhs.

REV-01

PART SUMMARY

Page d/4/1

Page d/4/2

Page d/4/3

Page d/4/4

Page d/4/5

Page d/4/6
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF EARTHWORKS SECTION Nr. d/4/123
EXPO 2020 ROADS NETWORK d 4
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.

Part 4 - Earthworks
0

Total for Part 4 - Earthworks


Carried to Grand Summary Dhs.
PAGE Nr.

d/4/124

AMOUNT
UAE. Dhs.

0.00

0.00

0.00

0.00

0.00

0.00

0.00
PAGE Nr.

d/4/125

AMOUNT
UAE. Dhs.

0.00

NTT-05

0.00

0.00

0.00

0.00

0.00

0.00
PAGE Nr.

d/4/126

AMOUNT
UAE. Dhs.

0.00

NTT-06

0.00

0.00

0.00

0.00

0.00

0.00
PAGE Nr.

d/4/127

AMOUNT
UAE. Dhs.

0.00

0.00

0.00

0.00

0.00

0.00

NTT-06

0.00

0.00

0.00
PAGE Nr.

d/4/128

AMOUNT
UAE. Dhs.

0.00

0.00

0.00

0.00

0.00

NTT-06

0.00
PAGE Nr.

d/4/129

AMOUNT
UAE. Dhs.

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
PAGE Nr.

d/4/130

AMOUNT
UAE. Dhs.

NTT-06
PAGE Nr.

d/4/131

AMOUNT
UAE. Dhs.

0.00

NTT-06

0.00

0.00

0.00

0.00

0.00

0.00
PAGE Nr.

d/4/132

AMOUNT
UAE. Dhs.

0.00

NTT-06
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF STRUCTURAL METALWORK SECTION Nr. d/5/133
EXPO 2020 ROADS NETWORK d 5
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.

Part 5 - Structural Metalwork


0
0
0 Note : All New or Relocated Monotube Sign
Structures Type C & Type G or Ground
Mounted posts shall be provided with a Bar
Code with similar confriguration of the
existing Bar Code used by the Traffic
Department. The cost of the Bar Code shall be
included in the respective structures or posts.

0 Monotube Sign Structures

0 Hot rolled structural steelwork, all in


accordance with Specifications and Drawings
including necessary protective coating to Sign
Structures ref. Chapter 5 - Dubai Traffic
Control Devices Manual

0
0 Steelwork supporting monotube structure
complete as detailed in Dubai Traffic Control
Devices Manual including all supports,
bracings, catwalk assembly and anchoring
system to concrete foundations

0
0 Overhead Gantries and Cantilevers on ground
(foundation measured separately)

0
A Type C I M900.1 nr 1
0
B Type C II M900.2 nr 3
0
C Type C III M900.3 nr 1
0
D Type C IV M900.4 nr 10
0
E Type C V M900.5 nr 1
0
F Type G I M900.6 nr 4
0
G Type G II M900.7 nr 4
0
H Type G III M900.8 nr 8
0
J Type G IV M900.9 nr 1
0
K Type G V M900.10 nr 1
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF STRUCTURAL METALWORK SECTION Nr. d/5/134
EXPO 2020 ROADS NETWORK d 5
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.

Part 5 - Structural Metalwork


0
0
L Type G VI M900.11 nr 1
0
M Type G VII M900.12 nr 1
0
0

To Part Summary Dhs.

0
0 Monotube Sign Structures (Cont'd...)

A Extra over for fixing Type C Gantry over Bridge


structure including required anchors, fixing
arrangements etc. Complete (Structure measured
separately)
X900.1 nr 1
0
B Extra over for fixing Type G Gantry over Bridge
structure including required anchors, fixing
arrangements etc. Complete (Structure measured
separately)
X900.2 nr 1
0
0 Take from RTA's store, Monotube Sign
Structures, modify the structure and Bar Code
to suit the requirements of the sign facia at the
new location, etc. complete

0
0 Cantilever structures (Foundation measured
separately)

0
C Type C I M900.1 nr 1
0
D Type C II M900.2 nr 1
0
E Type C III M900.3 nr 1
0
F Type C IV M900.4 nr 1
0
G Type C V M900.5 nr 1
0
0 Overhead Gantries (Foundation measured
separately)

0
H Type G I M900.6 nr 1
0
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF STRUCTURAL METALWORK SECTION Nr. d/5/135
EXPO 2020 ROADS NETWORK d 5
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.

Part 5 - Structural Metalwork


0
J Type G II M900.7 nr 1
0
K Type G III M900.8 nr 1
0
L Type G IV M900.9 nr 1
0
M Type G V M900.10 nr 1
0
N Type G VI M900.11 nr 1
0
P Type G VII M900.12 nr 1
0
0
0
0
0

To Part Summary Dhs.

0
0 Monotube Sign Structures (Cont'd...)

0 Take from Contractor's store set aside


Monotube Sign Structures, modify the
structure and Bar Code, so as to suit the
requirements of the sign facia at the new
location, etc. complete

0 Cantilever structures (Foundation measured


separately)

A Type C I M900.1 nr 1
0
B Type C II M900.2 nr 1
0
C Type C III M900.3 nr 1
0
D Type C IV M900.4 nr 1
0
E Type C V M900.5 nr 1
0
0
0 Overhead Gantries (Foundation measured
separately)

0
F Type G I M900.6 nr 1
0
G Type G II M900.7 nr 1
0
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF STRUCTURAL METALWORK SECTION Nr. d/5/136
EXPO 2020 ROADS NETWORK d 5
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.

Part 5 - Structural Metalwork


0
H Type G III M900.8 nr 1
0
J Type G IV M900.9 nr 1
0
K Type G V M900.10 nr 1
0
L Type G VI M900.11 nr 1
0
M Type G VII M900.12 nr 1
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

To Part Summary Dhs.

0
0 Ground Mounted Sign Structures

0 Rectangular posts for ground mounted signs


complete as detailed in Dubai Traffic Control
Devices Manual

0 On Ground

A Type P I M900.1 nr 2
0
B Type P II M900.2 nr 2
0
C Type P III M900.3 nr 2
0
D Type P IV M900.4 nr 2
0
E Type P V M900.5 nr 2
0
F Type P VI M900.6 nr 1
0
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF STRUCTURAL METALWORK SECTION Nr. d/5/137
EXPO 2020 ROADS NETWORK d 5
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.

Part 5 - Structural Metalwork


0
G Type P VII M900.7 nr 1
0
H Extra over for fixing Type P sign structure over
Bridge structure/Bridge Ramp including fixing
arrangements etc. Complete (Structure measured
separately)
X900 nr 1
0
0 Take from RTA stores, Rectangular posts for
ground mounted signs and install at new
location, etc. complete as detailed in Dubai
Traffic Control Devices Manual (foundation
measured seperately)

0
J Type P I M900.8 nr 1
0
K Type P II M900.9 nr 1
0
L Type P III M900.10 nr 1
0
M Type P IV M900.11 nr 1
0
N Type P V M900.12 nr 1
0
P Type P VI M900.13 nr 1
0
Q Type P VII M900.14 nr 1
0
0
0
0
0

To Part Summary Dhs.

0
0 Take from Contractor's stores set aside,
Rectangular posts for ground mounted signs
and install at new location, etc. complete as
detailed in Dubai Traffic Control Devices
Manual (foundation measured seperately)

A Type P I M900.1 nr 1
0
B Type P II M900.2 nr 1
0
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF STRUCTURAL METALWORK SECTION Nr. d/5/138
EXPO 2020 ROADS NETWORK d 5
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.

Part 5 - Structural Metalwork


0
C Type P III M900.3 nr 1
0
D Type P IV M900.4 nr 1
0
E Type P V M900.5 nr 1
0
F Type P VI M900.6 nr 1
0
G Type P VII M900.7 nr 1
0
0 IN SITU CONCRETE
0
0 CIDH Foundations as shown in Dubai Traffic
Control Devices Manual including all
excavation, supply and fix concrete formwork
reinforcement, bolt assembly etc.

H 500mm diameter 900mm long F684.1 nr 2


0
J 500mm diameter 1300mm long F684.2 nr 2
0
K 600mm diameter 1500mm long F685.1 nr 2
0
L 600mm diameter 2000mm long F685.2 nr 2
0
M 750mm diameter 2300mm long F685.3 nr 2
0
N 900 mm diameter 2800 mm long F685.4 nr 1
0
P 900 mm diameter 3400 mm long F685.5 nr 3
0
0
0
0
0
0
0
0
0
0
0
0
0

To Part Summary Dhs.

0
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF STRUCTURAL METALWORK SECTION Nr. d/5/139
EXPO 2020 ROADS NETWORK d 5
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.

Part 5 - Structural Metalwork


0
0 PILING ANCILLARIES

0 Piling for Gantry and cantilever structure


foundations commencing surface level to be
agreed with the Engineer on site for each
location

0 Bored cast in place concrete grade 40/20


ordinary Portland cement

0 Diameter 1100mm

A Number of piles. P191.1 nr 16


0
B Concrete length. P192.1 m 80
0
C Depth bored maximum depth 9.5m. P193.1 m 88
0
0 Diameter 1300mm

D Number of piles. P191.2 nr 25


0
E Concrete length. P192.2 m 163
0
F Depth bored maximum depth 9.5m. P193.2 m 176
0
0 Diameter 1400mm

G Number of piles. P191.3 nr 13


0
H Concrete length. P192.3 m 103
0
J Depth bored maximum depth 9.5m. P193.3 m 110
0
0 Diameter 1500mm

K Number of piles. P171 nr 2


0
L Concrete length. P172 m 16
0
M Depth bored maximum depth 9.5m. P173 m 17
0
0
0
0
0
0
0
0
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF STRUCTURAL METALWORK SECTION Nr. d/5/140
EXPO 2020 ROADS NETWORK d 5
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.

Part 5 - Structural Metalwork


0
0
0
0
0

To Part Summary Dhs.

0
0 PILING ANCILLARIES (Cont'd...)

0 Cast in place concrete piles

A Cutting off surplus length; 1100mm diameter. Q179.1 m 8


0
B Cutting off surplus length; 1300mm diameter. Q179.2 m 13
0
C Cutting off surplus length; 1400mm diameter. Q179.3 m 7
0
D Cutting off surplus length; 1500mm diameter. Q177 m 2
0
E Preparing heads 1100mm diameter. Q189.1 nr 16
0
F Preparing heads 1300mm diameter. Q189.2 nr 25
0
G Preparing heads 1400mm diameter. Q189.3 nr 13
0
H Preparing heads 1500mm diameter. Q187 nr 2
0
0 Reinforcement

0 Deformed high yield steel bars to BS 4449

J Straight bars, nominal size not exceeding 25mm


diameter. Q211 t 6
0
K Straight bars, nominal size exceeding 25mm
diameter. Q212 t 30
0
0 Mild steel bars to BS 4449

L Helical bars not exceeding 14 mm diameter. Q213 t 18


0
0 Pile tests

M Non-destructive test by ultrasonic method; pile dia


1100mm Q840.1 nr 2
0
N Non-destructive test by ultrasonic method; pile dia
1300mm Q840.2 nr 16
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF STRUCTURAL METALWORK SECTION Nr. d/5/141
EXPO 2020 ROADS NETWORK d 5
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.

Part 5 - Structural Metalwork


0
0
P Non-destructive test by ultrasonic method; pile dia
1400mm Q840.3 nr 25
0
Q Non-destructive test by ultrasonic method; pile dia
1500mm Q840.4 nr 13
0

0
0
0

To Part Summary Dhs.

PART SUMMARY

Page d/5/1

Page d/5/2

Page d/5/3

Page d/5/4

Page d/5/5

Page d/5/6

Page d/5/7
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF STRUCTURAL METALWORK SECTION Nr. d/5/142
EXPO 2020 ROADS NETWORK d 5
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.

Part 5 - Structural Metalwork


0

Total for Part 5 - Structural Metalwork


Carried to Grand Summary Dhs.
PAGE Nr.

d/5/143

AMOUNT
UAE. Dhs.

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
PAGE Nr.

d/5/144

AMOUNT
UAE. Dhs.

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
PAGE Nr.

d/5/145

AMOUNT
UAE. Dhs.

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
PAGE Nr.

d/5/146

AMOUNT
UAE. Dhs.

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
PAGE Nr.

d/5/147

AMOUNT
UAE. Dhs.

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
PAGE Nr.

d/5/148

AMOUNT
UAE. Dhs.

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
PAGE Nr.

d/5/149

AMOUNT
UAE. Dhs.

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
PAGE Nr.

d/5/150

AMOUNT
UAE. Dhs.

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
PAGE Nr.

d/5/151

AMOUNT
UAE. Dhs.

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
PAGE Nr.

d/5/152

AMOUNT
UAE. Dhs.

0.00
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF 3 ROADS AND PAVINGS SECTION Nr. d/6/153
EXPO 2020 ROADS NETWORK d 6
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.

Part 6 - Roads and Pavings


0
0
0 Provision of concrete
0
A Concrete class 30/20 Ordinary Portland Cement F172 m3 100
0
0 Placing of concrete
0
B Insitu mass concrete between single face
concrete barriers shielding bridge pier / light pole /
sign post. F680 m3 100
0
0 Sub-bases, flexible road bases and surfacing

C 150mm cement stabilized granular subbase


compacted to 95% MDD as capping layer to
verges and side slopes R194 m2 217,880
0
D Aggregate subbase; 30% CBR; depth 150mm R195.1 m2 75,300
0
E Aggregate subbase; 30% CBR; depth 200mm R195.2 m2 32,100
0
F Aggregate subbase; 30% CBR; depth 220mm R195.3 m2 2,500
0
G Aggregate subbase; 30% CBR; depth 250mm R197.1 m2 13,100
0
H Aggregate subbase; 30% CBR; depth 270mm R197.2 m2 32,800
0
J Aggregate subbase; 30% CBR; depth 300mm R198.1 m2 414,500
0
K Wet mix macadam road base; depth 200mm,
CBR > 80% R196.1 m2 70,200
0
L Wet mix macadam road base; depth 220mm,
CBR > 80% R196.2 m2 1,000
0
M Wet mix macadam road base; depth 260mm,
CBR > 80% R196.3 m2 215,400
0
0
N Wet mix macadam road base; depth 300mm,
CBR > 80% R197 m2 177,800
0
P Wet mix macadam road base; depth 380mm,
CBR > 80% R198 m2 81,600
0
0
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF 3 ROADS AND PAVINGS SECTION Nr. d/6/154
EXPO 2020 ROADS NETWORK d 6
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.

Part 6 - Roads and Pavings


0

0
0

To Part Summary Dhs.

REV-02
0
0 Sub-bases, flexible road bases and surfacing
(Cont'd…)

0
A Bituminous Asphaltic concrete wearing course
depth 50mm R322.1 m2 525,300
0
B Bituminous Asphaltic concrete wearing course
depth 60mm R322.2 m2 2,000
0
C Bituminous Asphaltic concrete base course depth
60mm R322.3 m2 2,000
0
D Bituminous Asphaltic concrete base course depth
65mm R323.1 m2 2,000
0
E Bituminous Asphaltic concrete base course depth
70mm R323.2 m2 37,900
0
F Bituminous Asphaltic concrete base course depth
80mm R323.3 m2 177,200
0
G Bituminous Asphaltic concrete base course depth
90mm R323.4 m2 33,700
0
H Bituminous Asphaltic concrete base course depth
100mm R323.5 m2 104,300
0
J Bituminous Asphaltic concrete base course depth
120mm R323.5 m2 2,500
0
K Bituminous Asphaltic concrete base course depth
130mm R324.1 m2 2,500
0
L Bituminous Asphaltic concrete base course depth
140mm R324.2 m2 111,300
0
M 50mm bituminous Asphaltic concrete wearing
course overlay of existing pavement R322 m2 20,000
0
N Prime Coat - MC 70 R359.1 m2 544,800
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF 3 ROADS AND PAVINGS SECTION Nr. d/6/155
EXPO 2020 ROADS NETWORK d 6
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.

Part 6 - Roads and Pavings


0
0
P Tack Coat - SS-1h R359.2 m2 464,200
0
0
0
0
0
0
0
0
0
0
0
0

To Part Summary Dhs.

REV-02
0
0 Sub-bases, flexible road bases and surfacing
(Cont'd…)

0
A Preparation of existing pavement to receive
50mm overlay including removal of existing
pavement marking, lightly milling the existing
surface to roughen complete R390.1 m2 20,000
0
B Fill in 40-50mm gap between existing road and
new kerb with concrete and AC wearing course
including saw cutting, tack coat etc complete. R390.2 m 1,000
0
C Cold planning (milling) and remove existing road
surfaces up to 50mm depth; milled material to be
removed to dump site R390.3 m2 20,000
0
0
0 Adjustment for 0.1% binder content
0
D For item A page d/6/2 R390.4 m2
0
E For item B page d/6/2 R390.5 m2
0
F For item C page d/6/2 R390.6 m2
0
G For item D page d/6/2 R390.7 m2
0
H For item E page d/6/2 R390.8 m2
0
J For item F page d/6/2 R390.9 m2
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF 3 ROADS AND PAVINGS SECTION Nr. d/6/156
EXPO 2020 ROADS NETWORK d 6
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.

Part 6 - Roads and Pavings


0
0
K For item G page d/6/2 R390.10 m2
0
L For item H page d/6/2 R390.11 m2
0
M For item J page d/6/2 R390.12 m2
0
N For item K page d/6/2 R390.13 m2
0
P For item L page d/6/2 R390.14 m2
0
Q For item M page d/6/2 R390.15 m2
0
0
0
0
0
0
0
0
0
0
0

To Part Summary Dhs.

REV-01
0
0
0 Kerb, channels , edgings; footway and paved
areas; straight or curved complete including
earthworks, concrete bed and backing,
backfilling and transitions.

0
A Precast concrete upstand kerb 150 x 305mm R711.1 m 1,000
0
B Precast concrete heel kerb 75 x 150mm R711.2 m 500
0
C Precast concrete Flush kerb;225 x 150mm R711.3 m 500
0
D Precast concrete Drop kerb;305 x 150mm R711.4 m 500
0
0 Light duty pavement
0
E Aggregate subbase; 30% CBR; depth 150mm. R195.1 m2 4,500
0
F Aggregate road base; depth 150mm. R195.2 m2 2,250
0
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF 3 ROADS AND PAVINGS SECTION Nr. d/6/157
EXPO 2020 ROADS NETWORK d 6
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.

Part 6 - Roads and Pavings


0
G Aggregate road base; depth 200mm. R195.3 m2 2,250
0
H Precast concrete block paving tiles; thickness
60mm on and including 50mm thick sand bed. R750.1 m2 2,500
0
J Relay previously set aside precast concrete block
paving tiles; thickness 60mm on and including
50mm thick sand bed. R790.1 m2 1,000
0
K Precast concrete block paving tiles; thickness
80mm on and including 50mm thick sand bed. R750.2 m2 500
0
L Relay previously set aside precast concrete block
paving tiles; thickness 80mm on and including
50mm thick sand bed. R790.2 m2 500
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

To Part Summary Dhs.

REV-01
0
0 Ancillaries - Traffic signs

0 Non-illuminated

0
0 Warning and regulatory signs including posts
6 embedded in ground/pavement with selected
fill surround

0 Circular Sign Panels

A Diameter = 0.60m R811.1 nr 3


0
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF 3 ROADS AND PAVINGS SECTION Nr. d/6/158
EXPO 2020 ROADS NETWORK d 6
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.

Part 6 - Roads and Pavings


0
B Diameter = 0.75m R811.2 nr 24
0
C Diameter = 0.90m R811.3 nr 16
0
C Diameter = 1.20m R811.4 nr 15
0
D Diameter = 1.20m (on bridge) R811.4 nr 1
0
E Diameter = 1.50m R811.5 nr 4
0
0 Triangular Sign Panels

F Height = 0.60m R811.6 nr 5


0
F Height = 0.75m R811.7 nr 3
0
G Height = 0.75m (on bridge) R811.7 nr 1
0
H Height = 0.90m R811.8 nr 2
0
J Height = 1.20m R811.9 nr 15
0
K Height = 1.50m R811.10 nr 2
0
0 Octagonal Sign Panels

L Height = 0.60m R811.11 nr 5


0
M Height = 0.75m R811.12 nr 5
0
N Height = 0.90m R811.13 nr 5
0
P Height = 1.20m R811.14 nr 5
0
0
0
0
0
0
0
0
0

To Part Summary Dhs.

REV-02
0
0 Ancillaries - Traffic signs (Cont'd….)
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF 3 ROADS AND PAVINGS SECTION Nr. d/6/159
EXPO 2020 ROADS NETWORK d 6
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.

Part 6 - Roads and Pavings


0
0 Non-illuminated Traffic Signs

0 Warning and regulatory signs on shared


6 posts including mounting, clips, and bolt
assembly etc complete. (pole measured
elsewhere).

0 Circular Sign Panels (on shared pole)

A Diameter = 0.60m R811.1 nr 1


0
B Diameter = 0.75m R811.2 nr 1
0
C Diameter = 0.90m R811.3 nr 8
0
D Diameter = 1.20m R811.4 nr 4
0
E Diameter = 1.50m R811.5 nr 4
0
0 Triangular Sign Panels (on shared pole)

F Height = 0.60m R811.6 nr 2


0
G Height = 0.75m R811.7 nr 1
0
H Height = 0.90m R811.8 nr 3
0
J Height = 1.20m R811.9 nr 1
0
K Height = 1.50m R811.10 nr 1
0
0 Octagonal Sign Panels (on shared pole)

L Height = 0.60m R811.11 nr 1


0
M Height = 0.75m R811.12 nr 1
0
N Height = 0.90m R811.13 nr 1
0
P Height = 1.20m R811.14 nr 1
0
0 Rectangular Sign Panels (on shared pole)

Q Panel Size up to 0.5m2 R811.1 nr 1


0
R Panel Size 0.5m2 to 1.0m2 R811.2 nr 2
0
S Panel Size 1.0m2 to 1.5m2 R811.3 nr 24
0
T Panel Size 1.5m2 to 2.0m2 R811.4 nr 5
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF 3 ROADS AND PAVINGS SECTION Nr. d/6/160
EXPO 2020 ROADS NETWORK d 6
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.

Part 6 - Roads and Pavings


0
0
0

To Part Summary Dhs.

REV-02
0
0 Ancillaries - Traffic signs (Cont'd….)

0 Non-illuminated Traffic Signs

0 Warning and regulatory signs including posts


6 embedded in ground/pavement with selected
fill surround

0 Rectangular Sign Panels


A Panel Size up to 0.5m2 R811.1 nr 36
0
B Panel Size up to 0.5 m² (on bridges) R811.2 nr 71
0
C Panel Size up to 0.5 m² (Solar-LED signs on
bridges/ramps) R811.2 nr 20
0
D Panel Size 0.5m2 to 1.0m2 R811.3 nr 10
0
E Panel Size 1.0m2 to 1.5m2 R811.4 nr 13
0
F Panel Size 1.5m2 to 2.0m2 R811.5 nr 13
0
G Panel Size 1.5m2 to 2.0m² (on bridges) R811.6 nr 1
0
H Panel Size 2.0m2 to 2.5m2 R811.7 nr 4
0
J Panel Size 2.5m2 to 3.0m2 R811.8 nr 1
0
K Panel Size 3.0m2 to 3.5m2 R811.9 nr 2
0
L Panel Size 3.5m2 to 4.0m2 R811.10 nr 1
0
M Panel Size 4.0m2 to 4.5m2 R811.11 nr 17
0
N Panel Size 4.5m2 to 5.0m2 R811.12 nr 1
0
P Panel Size 5.0m2 to 5.5m2 R811.13 nr 2
0
Q Panel Size 5.5m2 to 6.0m2 R811.14 nr 1
0
R Panel Size 6.0m2 to 6.5m2 R811.15 nr 1
0
S Panel Size 6.5m2 to 7.0m2 R811.16 nr 1
0
T Re-erect previously set aside warning and
regulatory signs including posts. R811.17 nr 5
0
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF 3 ROADS AND PAVINGS SECTION Nr. d/6/161
EXPO 2020 ROADS NETWORK d 6
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.

Part 6 - Roads and Pavings


0
06 Guide signs

U Ground mounted sign panels on P type supports.


(Supports measured seperately) R819.16 m2 44
0
V Supply and install guide sign panels on "C" Type
sign structure (Structure measured separately).
R819.17 m2 512
0
W Supply and install guide sign panels on "G type
sign structure (Structure measured separately). R819.18 m2 1,896
0

To Part Summary Dhs.

REV-02
0
0 Ancillaries - Traffic signs (Cont'd….)

0 Guide signs

A Take from Contractor's store previously set aside


guide sign panels and install on 'P' type sign
structures (without sign panel modification).
R819.1 nr 1
0
B Take from Contractor's store previously set aside
guide sign panels and install on 'C' type sign
structures (without sign panel modification).
R819.2 nr 1
0
C Take from Contractor's store previously set aside
guide sign panels and install on 'G' type sign
structures (without sign panel modification).
R819.3 nr 1
0
0 Ancillaries - Surface markings

0 In accordance with Dubai Traffic Control


Devices Manual

0 Thermoplastic letters and shapes marking


(White/Yellow)

D Pavement arrow; type 614 R823.1 nr 350


0
E Pavement arrow; type 615 or 616 R823.2 nr 10
0
F Pavement arrow; type 617 or 618 R823.3 nr 10
0
G Pavement arrow; type 619 R823.4 nr 10
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF 3 ROADS AND PAVINGS SECTION Nr. d/6/162
EXPO 2020 ROADS NETWORK d 6
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.

Part 6 - Roads and Pavings


0
0
H Pavement arrow; type 656 R823.5 nr 10
0
J Pavement arrow; type U turn R823.6 nr 10
0
K White chevron and hatching marking. R829.1 m2 16,205
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

To Part Summary Dhs.

REV-01
0
0 Ancillaries - Surface markings (Cont'd…)

0 In accordance with Dubai Traffic Control


Devices Manual (Cont'd…)
0
0 Thermoplastic continuous pavement marking
(White/Yellow)

A 100mm wide. R824.1 m 200


0
B 150mm wide. R824.2 m 200
0
C 200mm wide. R824.3 m 1,373
0
D 300 mm wide. R824.4 m 356
0
E 600mm wide x 5mm thick rumble strips R824.5 m 500
0
0 Thermoplastic intermittent pavement marking
(White/Yellow)

F 100mm wide. R825.1 m 200


0
G 150mm wide. R825.2 m 172,000
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF 3 ROADS AND PAVINGS SECTION Nr. d/6/163
EXPO 2020 ROADS NETWORK d 6
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.

Part 6 - Roads and Pavings


0
0
H 200mm wide. R825.3 m 37,300
0
J 300 mm wide. R825.4 m 200
0
0 Removal of Surface Marking

K Remove existing surface marking by approved


mechanical method as directed by the Engineer.
R829.1 m2 1,000
0
0 Painting

L Chlorinated rubber based quick drying paint


(black and white) applied in two coats to exposed
faces of precast concrete upstand kerbs (marking
type 691).
R829.2 m2 5,000
0
0
0
0
0
0
0
0
0
0
0
0
0

To Part Summary Dhs.

REV-01
0
0 MISCELLANEOUS WORK

0 Fences

A Galvanized mild steel guard rail, single face (GR-


SF); 3200mm spacing between posts including
accessories complete. X171.1 m 50,700
0
B Galvanized mild steel guard rail, double face;
3200mm spacing between posts including
accessories complete. (Provisional) X171.2 m 3,000
0
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF 3 ROADS AND PAVINGS SECTION Nr. d/6/164
EXPO 2020 ROADS NETWORK d 6
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.

Part 6 - Roads and Pavings


0
C Take from Contractor's store and re-install
Galvanized mild steel guard rail, single face (GR-
SF); 3200mm spacing between posts including
accessories complete.
X171.3 m 1,000
0
D Take from Contractor's store and re-install
Galvanized mild steel guard rail, double face;
3200mm spacing between posts including
accessories complete. X171.4 m 1,000
0
E Galvanized mild steel single face flared end
terminal (GR-FET); 16m long complete. X179.1 nr 20
0
F Galvanized mild steel single face fixed object
attachment (GR-FOA); 13.55m long complete. X179.2 nr 40
0
G Cast-in-place single face concrete barrier (CB-SE)
6 complete. (length measured at center). X199.1 m 450
0
H Cast-in-place single face concrete barrier (CB-SF)
6 complete. X199.2 m 4,120
0
J Cast-in-place double face concrete barrier -
650mm (CB-DF) complete. X199.2 m 750
0
K Cast-in-place double face concrete barrier -
6 1100mm (CB-DF) complete. X199.3 m 750
0
L Cast in place concrete barrier flared end terminal
(CB-FET1) complete. X199.4 nr 15
0
M Cast in place concrete barrier flared end terminal
(CB-FET2) complete. X199.5 nr 20
0
N Cast in place concrete barrier flared end terminal
(CB-FET3) complete. X199.6 nr 20
0
P Lockable bollards X199.7 nr 20
0
Q Reinstall set aside Advertisement board in new
location as directed by the Engineer X199.8 m 400
0

To Part Summary Dhs.

REV-02
0
0 MISCELLANEOUS WORK (Cont'd….)
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF 3 ROADS AND PAVINGS SECTION Nr. d/6/165
EXPO 2020 ROADS NETWORK d 6
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.

Part 6 - Roads and Pavings


0
0 Fences (Cont'd….)

A Supply and install chainlink fence in new location


including new foundation.
X199.1 m 100
0
B Take from Contractor's store and re-install
chainlink fence in new location including new
foundation
X199.2 m 3,000
0
C Supply and install fence for DUSUP Gas pipe line
in new location including new foundation. X199.3 m 500
0
D Take from Contractor's store and reinstall fence
for DUSUP Gas pipe line in new location including
new foundation.
X199.4 m 250
0
E Supply and install fence gate for DUSUP Gas
pipe line in new location. X199.5 nr 1
0
F Take from Contractor's store and reinstall fence
gate for DUSUP Gas pipe line in new location. X199.6 nr 1
0
G Supply and install ROW fence in new location
including new foundation.
X199.7 m 100
0
H Take from Contractor's store and reinstall ROW
fence including new foundation. X199.8 m 3,000
0
J Emergency median crossing barrier as detail in
drawing C-1504. X199.9 m 100
4
0
05 Rip Rap to side slopes
K Rip Rap laid on 150mm mortar bed overall
thickness 300 mm to embankment slopes.
X900.1 m2 31,640
0
L Unreinforced Cast Insitu concrete class C20/20
edging X900.2 m 10,547
0
05 Slope protection with cement slab including
required earthwork, in situ concrete, concrete
ancillaries, etc complete as shown in drawing
C-1530

M Slope protection beam X900.3 m 4,520


0
N Concrete Slope protection X900.4 m2 13,560
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF 3 ROADS AND PAVINGS SECTION Nr. d/6/166
EXPO 2020 ROADS NETWORK d 6
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.

Part 6 - Roads and Pavings


0
0
P Concrete Toe wall X900.5 m 4,520
0

To Part Summary Dhs.

REV-03
0
0 MISCELLANEOUS WORK (Cont'd….)

0 Fences (Cont'd….)

A Crash Cushion Attenuating Terminal (CCAT)


including guard rails, pipes, tube sleeves, plates,
wood posts, Channel struts, bolts, nuts, washers
etc, complete for speed 120 km/hr X199.1 nr 8
0
B Crash Cushion Attenuating Terminal (CCAT)
including guard rails, pipes, tube sleeves, plates,
wood posts, Channel struts, bolts, nuts, washers
etc, complete for speed 100 km/hr X199.2 nr 7
0
C Crash Cushion Attenuating Terminal (CCAT)
including guard rails, pipes, tube sleeves, plates,
wood posts, Channel struts, bolts, nuts, washers
etc, complete for speed 80 km/hr X199.3 nr 7
0
D Supply and install pedestrian fence including new
foundation. X199.4 m 2,700
0
E Supply and install pedestrian fence on concrete
barrier. X199.5 m 1,600
0
F Take from Contractor's stores and re install
pedestrian fence and post including foundation. D900 m 100
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF 3 ROADS AND PAVINGS SECTION Nr. d/6/167
EXPO 2020 ROADS NETWORK d 6
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.

Part 6 - Roads and Pavings


0
0
0
0
0
0
0
0
0
0
0
0
0

To Part Summary Dhs.

REV-01
0
0 MISCELLANEOUS WORK (Cont'd….)

0 Tying to existing pavement; including


breakout existing pavement, saw cutting,
vertical tack coat, milling (if required) and all
necessary preparations work

0
A New pavement with existing pavement (Jebel Ali
Lehbab Road) ; transverse joints X900.1 m 1,000
0
B New pavement with existing pavement (Jebel Ali
Lehbab Road); longitudinal joints X900.2 m 5,420
0
C New pavement with existing pavement (Sheikh
Mohamed Bin Zayed Road) ; transverse joints X900.3 m 1,000
0
D New pavement with existing pavement (Sheikh
Mohamed Bin Zayed Road); longitudinal joints X900.4 m 5,750
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF 3 ROADS AND PAVINGS SECTION Nr. d/6/168
EXPO 2020 ROADS NETWORK d 6
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.

Part 6 - Roads and Pavings


0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

To Part Summary Dhs.

REV-01

PART SUMMARY

Page d/6/1

Page d/6/2

Page d/6/3

Page d/6/4

Page d/6/5

Page d/6/6

Page d/6/7
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF 3 ROADS AND PAVINGS SECTION Nr. d/6/169
EXPO 2020 ROADS NETWORK d 6
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.

Part 6 - Roads and Pavings


0

Page d/6/8

Page d/6/9

Page d/6/10

Page d/6/11

Page d/6/12

Page d/6/13

Total for Part 6 - Roads and Pavings


Carried to Grand Summary Dhs.
PAGE Nr.

d/6/170

AMOUNT
UAE. Dhs.

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
PAGE Nr.

d/6/171

AMOUNT
UAE. Dhs.

0.00

NTT-06

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
PAGE Nr.

d/6/172

AMOUNT
UAE. Dhs.

0.00

0.00

NTT-06

0.00

0.00

0.00

Rate only

Rate only

Rate only

Rate only

Rate only

Rate only
PAGE Nr.

d/6/173

AMOUNT
UAE. Dhs.

Rate only

Rate only

Rate only

Rate only

Rate only

Rate only

0.00

NTT-03

0.00

0.00

0.00

0.00

0.00

0.00
PAGE Nr.

d/6/174

AMOUNT
UAE. Dhs.

0.00

0.00

0.00

0.00

0.00

0.00

NTT-03

0.00
PAGE Nr.

d/6/175

AMOUNT
UAE. Dhs.

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

NTT-06
PAGE Nr.

d/6/176

AMOUNT
UAE. Dhs.

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
PAGE Nr.

d/6/177

AMOUNT
UAE. Dhs.

0.00

NTT-06

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
PAGE Nr.

d/6/178

AMOUNT
UAE. Dhs.

0.00

0.00

0.00

0.00

NTT-06

0.00

0.00

0.00

0.00

0.00

0.00

0.00
PAGE Nr.

d/6/179

AMOUNT
UAE. Dhs.

0.00

0.00

0.00

0.00

NTT-03

0.00

0.00

0.00

0.00

0.00

0.00

0.00
PAGE Nr.

d/6/180

AMOUNT
UAE. Dhs.

0.00

0.00

0.00

0.00

0.00

NTT-03

0.00

0.00
PAGE Nr.

d/6/181

AMOUNT
UAE. Dhs.

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

NTT-06
PAGE Nr.

d/6/182

AMOUNT
UAE. Dhs.

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
PAGE Nr.

d/6/183

AMOUNT
UAE. Dhs.

0.00

0.00

NTT-05

0.00

0.00

0.00

0.00

0.00

0.00
PAGE Nr.

d/6/184

AMOUNT
UAE. Dhs.

0.00

NTT-03

0.00

0.00

0.00

0.00
PAGE Nr.

d/6/185

AMOUNT
UAE. Dhs.

0.00

NTT-03

0.00

0.00

0.00

0.00

0.00

0.00

0.00
PAGE Nr.

d/6/186

AMOUNT
UAE. Dhs.

0.00

0.00

0.00

0.00

0.00

0.00

0.00
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF WORKS FOR DEWA - SECTION Nr. d/9/187
EXPO 2020 ROADS NETWORK WATER DIVISION d 9
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.

Part 9 - Works for DEWA - Water Division


0
0 DIVERSION WORKS

0 REMOVAL OF EXISTING WATER PIPE

30 Remove existing pipes and fittings and


dispose to tip as required including
excavation, breaking out pipe protection,
backfilling and reinstatement of existing
surfaces

A 100mm dia AC pipe D900.1 m 15 0.00


0
B 300mm dia AC pipe D900.2 m 335 0.00
0
C 450mm dia AC pipe D900.3 m 1,230 0.00
0
D 550mm dia AC pipe D900.4 m 3,590 0.00
0
E 600mm dia AC pipe D900.5 m 720 0.00
0
F 1200mm dia AC pipe D900.6 m 8,450 0.00
0
30 Carefully remove existing valves / flow
meters / pressure gauges and deliver to
RTA/DEWA stores including excavation,
breakout valve chambers, backfilling, cart to
tip and reinstatement of existing surfaces

G 100mm dia gate valve. D900.7 nr 1 0.00


0
H 300mm dia gate valve. D900.8 nr 5 0.00
0
J 450mm dia gate valve. D900.9 nr 8 0.00
0
K 550mm dia gate valve. D900.10 nr 1 0.00
0
L 600mm dia gate valve. D900.11 nr 1 0.00
0
M 1200mm dia gate valve. D900.12 nr 4 0.00
0
N 300mm dia butterfly valve. D900.13 nr 3 0.00
0
P 450mm dia butterfly valve. D900.14 nr 1 0.00
0
Q 550mm dia butterfly valve. D900.15 nr 10 0.00
0
R 600mm dia butterfly valve. D900.16 nr 2 0.00
0
0
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF WORKS FOR DEWA - SECTION Nr. d/9/188
EXPO 2020 ROADS NETWORK WATER DIVISION d 9
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.

Part 9 - Works for DEWA - Water Division


0

0
0
0
0
0

To Part Summary Dhs.

REV-01
0
0 DIVERSION WORKS (Cont'd…)

0 REMOVAL OF EXISTING WATER PIPE


(cont'd…)

0 Carefully remove existing valves / flow


meters / pressure gauges and deliver to
RTA/DEWA stores including excavation,
breakout valve chambers, backfilling and
remove to tip and reinstatement of existing
surfaces (cont'd…)

A 1200mm dia butterfly valve. D900.1 nr 32 0.00


0
B Flow meter on 300 mm dia pipe. D900.2 nr 1 0.00
0
C Flow meter on 1200mm dia . D900.3 nr 2 0.00
0
D Single Air valve for 450mm dia main pipe. D900.4 nr 1 0.00
0
E Double Air valve for 600mm dia main pipe. D900.5 nr 1 0.00
0
F Double Air valve for 1200mm dia main pipe. D900.6 nr 6 0.00
0
G Non Return Valve 1200mm dia main pipe. D900.7 nr 1 0.00
0
H Wasout for 450mm dia main pipe. D900.8 nr 1 0.00
0
J Wasout for 600mm dia main pipe. D900.9 nr 1 0.00
0
K Wasout for 1200mm dia main pipe. D900.10 nr 1 0.00
0
0
0
0
0
0
0
0
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF WORKS FOR DEWA - SECTION Nr. d/9/189
EXPO 2020 ROADS NETWORK WATER DIVISION d 9
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.

Part 9 - Works for DEWA - Water Division


0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

To Part Summary Dhs.

0
0 DIVERSION WORKS (Cont'd….)

0 PRECAST CONCRETE

0 Precast reinforced concrete protection slabs


placed over existing pipe lines including
excavation, back filling and bitumen paint

A 1000 x 500 x 150mm thick H512.1 nr 50 0.00


0
B 1600 x 500 x 150mm thick H513 nr 50 0.00
0
C 2000 x 500 x 200mm thick H512.2 nr 50 0.00
0
D 2500 x 500 x 200mm thick H523 nr 450 0.00
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF WORKS FOR DEWA - SECTION Nr. d/9/190
EXPO 2020 ROADS NETWORK WATER DIVISION d 9
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.

Part 9 - Works for DEWA - Water Division


0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0

To Part Summary Dhs.

0
0 DIVERSION WORKS (Cont'd…)

0 PIPE WORK - PIPES

0 Supply, lay and joint GRE pipeline in trench


with couplings

0 Nominal Bore: not exceeding 200 mm

A 100mm dia pipe, depth not exceeding 1.5m. I912 m 10 0.00


0
B 100mm dia, depth 1.5 - 2.0m. I913 m 5 0.00
0
C 100mm dia, depth 2.0 - 2.5m. I914 m 5 0.00
0
0 Nominal Bore: 200-300 mm

D 300mm dia, depth not exceeding 1.5m. I922 m 80 0.00


0
E 300mm dia, depth 1.5m - 2.0m. I923 m 10 0.00
0
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF WORKS FOR DEWA - SECTION Nr. d/9/191
EXPO 2020 ROADS NETWORK WATER DIVISION d 9
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.

Part 9 - Works for DEWA - Water Division


0
F 300mm dia, depth 2.0 - 2.5m I924 m 10 0.00
0
0 Nominal Bore: 300-600 mm

G 450mm dia, depth 1.5m - 2m. I933.1 m 805 0.00


0
H 450mm dia, depth 2m - 2.5m. I934.1 m 305 0.00
0
J 450mm dia, depth 2.5m - 3.0m. I935.1 m 55 0.00
0
K 450mm dia, depth 3.0m - 3.5m. I936.1 m 50 0.00
0
L 600mm dia, depth 1.5m -2m. I933.2 m 2,648 0.00
0
M 600mm dia, depth 2m - 2.5m. I934.2 m 620 0.00
0
N 600mm dia, depth 2.5m - 3m. I935 m 195 0.00
0
P 600mm dia, depth 3m- 3.5m. I936 m 145 0.00
0
Q 600mm dia, depth 3.5m - 4.0m. I937 m 50 0.00
0
0
0
0
0
0
0
0
0
0
0
0

To Part Summary Dhs.

0
0 DIVERSION WORKS (Cont'd…)

0 PIPE WORK - PIPES (Cont'd…)

0 Supply, lay and joint GRE pipeline in trench


with couplings

0 Nominal Bore: 900-1200 mm

A 1200mm dia, depth 2m - 2.5m. I954 m 1,624 0.00


0
B 1200mm dia, depth 2.5m - 3m. I955 m 3,550 0.00
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF WORKS FOR DEWA - SECTION Nr. d/9/192
EXPO 2020 ROADS NETWORK WATER DIVISION d 9
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.

Part 9 - Works for DEWA - Water Division


0
0
C 1200mm dia, depth 3m - 3.5m. I956 m 1,475 0.00
0
D 1200mm dia, depth 3.5m - 4m. I957 m 520 0.00
0
E 1200mm dia, depth 4.m - 4.5m. I958.1 m 410 0.00
0
F 1200mm dia, depth 4.5.m - 5.0m. I958.2 m 45 0.00

G 1200mm dia, depth 5.0m - 5.5m. I958.3 m 35 0.00


0
0 Supply, lay and joint GRE pipeline not in
trench with couplings

H 450mm dia I931.1 m 340 0.00


0
J 600mm dia I931.2 m 108 0.00
0
K 1200mm dia I951 m 1,345 0.00
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

To Part Summary Dhs.

0
0 DIVERSION WORKS (Cont'd…)
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF WORKS FOR DEWA - SECTION Nr. d/9/193
EXPO 2020 ROADS NETWORK WATER DIVISION d 9
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.

Part 9 - Works for DEWA - Water Division


0
0 PIPE WORK - PIPES (Cont'd…)

0 Supply, lay and joint Fully Laminated GRE


pipe 10,000 Stiffness with couplings (concrete
surrround measured seperately)

0 Nominal Bore: not exceeding 200 mm

A 100mm dia pipe, depth not exceeding 1.5m. I912 m 5 0.00


0
B 100mm dia, depth 1.5 - 2.0m. I913 m 5 0.00
0
C 100mm dia, depth 2.0 - 2.5m. I914 m 5 0.00
0
0 Nominal Bore: 200-300 mm

D 300mm dia, depth not exceeding 1.5m. I922 m 25 0.00


0
E 300mm dia, depth 1.5m - 2.0m. I923 m 35 0.00
0
F 300mm dia, depth 2.0 - 2.5m I924 m 15 0.00
0
0 Nominal Bore: 300-600 mm

G 450mm dia, depth 1.5m - 2m. I933.1 m 210 0.00


0
H 450mm dia, depth 2m - 2.5m. I934.1 m 60 0.00
0
J 450mm dia, depth 2.5m - 3.0m. I935.1 m 35 0.00
0
K 450mm dia, depth 3.0m - 3.5m. I936.1 m 40 0.00
0
L 600mm dia, depth 1.5m -2m. I933.2 m 450 0.00
0
M 600mm dia, depth 2m - 2.5m. I934.2 m 100 0.00
0
N 600mm dia, depth 2.5m - 3m. I935 m 50 0.00
0
P 600mm dia, depth 3m- 3.5m. I936 m 60 0.00
0
Q 600mm dia, depth 3.5m - 4.0m. I937 m 25 0.00
0
0
0
0
0
0
0
0
0
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF WORKS FOR DEWA - SECTION Nr. d/9/194
EXPO 2020 ROADS NETWORK WATER DIVISION d 9
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.

Part 9 - Works for DEWA - Water Division


0
0
0

To Part Summary Dhs.

0
0 DIVERSION WORKS (Cont'd…)

0 PIPE WORK - PIPES (Cont'd…)

0
0 Supply, lay and joint Fully Laminated GRE
pipe 10,000 Stiffness with couplings (concrete
surrround measured seperately) (Cont'd…)

0 Nominal Bore: 900-1200 mm

A 1200mm dia, depth 2m - 2.5m. I954 m 225 0.00


0
B 1200mm dia, depth 2.5m - 3m. I955 m 450 0.00
0
C 1200mm dia, depth 3m - 3.5m. I956 m 120 0.00
0
D 1200mm dia, depth 3.5m - 4m. I957 m 110 0.00
0
E 1200mm dia, depth 4.m - 4.5m. I958.1 m 105 0.00
0
F 1200mm dia, depth 4.5.m - 5.0m. I958.2 m 90 0.00
0
G 1200mm dia, depth 5.0m - 5.5m. I958.3 m 40 0.00
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF WORKS FOR DEWA - SECTION Nr. d/9/195
EXPO 2020 ROADS NETWORK WATER DIVISION d 9
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.

Part 9 - Works for DEWA - Water Division


0
0
0
0
0
0
0
0
0
0
0
0

To Part Summary Dhs.

0
0 DIVERSION WORKS (Cont'd…)

0 PIPE WORK - FITTINGS AND VALVES

0 Supply, lay and joint GRE pipe fitting in trench


in accordance with specification.

0 Bends

A 300mm dia 11.25 degree bend J912.1 nr 1 0.00


0
B 300mm dia 22.5 degree bend J912.2 nr 1 0.00
0
C 300mm dia 45 degree bend J912.3 nr 1 0.00
0
D 300mm dia 90 degree bend J912.4 nr 1 0.00
0
E 450mm dia 11.25 degree bend J913.1 nr 1 0.00
0
F 450mm dia 22.5 degree bend J913.2 nr 1 0.00
0
G 450mm dia 45 degree bend J913.3 nr 5 0.00
0
H 450mm dia 90 degree bend J913.4 nr 1 0.00
0
J 600mm dia 11.25 degree bend J913.5 nr 3 0.00
0
K 600mm dia 22.5 degree bend J913.6 nr 1 0.00
0
L 600mm dia 45 degree bend J913.7 nr 9 0.00
0
M 600mm dia 90 degree bend J913.8 nr 1 0.00
0
N 1200mm dia 11.25 degree bend J915.1 nr 1 0.00
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF WORKS FOR DEWA - SECTION Nr. d/9/196
EXPO 2020 ROADS NETWORK WATER DIVISION d 9
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.

Part 9 - Works for DEWA - Water Division


0
0
P 1200mm dia 22.5 degree bend J915.2 nr 5 0.00
0
Q 1200mm dia 45 degree bend J915.3 nr 17 0.00
0
R 1200mm dia 90 degree bend J915.4 nr 1 0.00
0
0
0
0
0
0
0
0
0
0
0
0
0
0

To Part Summary Dhs.

0
0 DIVERSION WORKS (Cont'd…)

0 PIPE WORK - FITTINGS AND VALVES


(Cont'd…)

0
Supply, lay and joint GRE pipe fitting in trench
in accordance with specification. (Cont'd…)

0 Junctions and Branches

A 100 x 100 x 100 mm dia Tee J921 nr 1 0.00


0 J923.1 nr 1 0.00
B 300 x 300 x 300 mm dia Tee
0
C 450 x 450 x 450 mm dia Tee. J923.2 nr 2 0.00
0
D 600 x 450 x 450 mm dia Tee. J923.3 nr 1 0.00
0
E 600 x 600 x 100 mm dia Tee. J923.4 nr 1 0.00
0
F 600 x 600 x 600 mm dia Tee. J923.5 nr 3 0.00
0
G 1200 x 1200 x 600 mm dia Tee. J925.1 nr 1 0.00
0
H 1200 x 1200 x 1200 mm dia Tee. J925.2 nr 22 0.00
0
J 1200 x 1200 x 450 mm dia Tee. J925.3 nr 10 0.00
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF WORKS FOR DEWA - SECTION Nr. d/9/197
EXPO 2020 ROADS NETWORK WATER DIVISION d 9
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.

Part 9 - Works for DEWA - Water Division


0
0
K 1200 x 1200 x 600 mm dia Tee. J925.4 nr 1 0.00
0
L 1200 x 1200 x 300 mm dia Tee. J925.5 nr 1 0.00
0
0 End Caps

M 225mm dia J992.1 nr 1 0.00


0
N 300mm dia J992.2 nr 3 0.00
0
P 450mm dia J993.1 nr 3 0.00
0
Q 600mm dia J993.2 nr 1 0.00
0
R 1200mm dia J995 nr 10 0.00
0
30 Tappers/ Reducers

S 300 x 100mm dia J931 nr 1 0.00


0
T 450 x 300mm dia J932.1 nr 1 0.00
0
U 600 x 450 mm dia J933.1 nr 1 0.00
0
V 1200 x 600mm dia J933.2 nr 2 0.00
0
0

To Part Summary Dhs.

REV-01
0
0 DIVERSION WORKS (Cont'd…)

0 PIPE WORK - FITTINGS AND VALVES

30 Supply and install valves including extension


spindles and accessories

0 Gate Valve

A 100mm dia. J811 nr 1 0.00


0
B 300mm dia. J812 nr 5 0.00
0
C 450mm dia. J813.1 nr 6 0.00
0
D 600mm dia. J813.2 nr 1 0.00
0
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF WORKS FOR DEWA - SECTION Nr. d/9/198
EXPO 2020 ROADS NETWORK WATER DIVISION d 9
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.

Part 9 - Works for DEWA - Water Division


0
E 1200mm dia. J815.1 nr 5 0.00
0
0 Butterfly Valve

F 80mm dia double flange valve with gear (for air


release). J841.1 nr 1 0.00
0
G 100mm dia. J841.2 nr 1 0.00
0
H 150mm dia double flange valve with gear (for air
release). J841.3 nr 13 0.00
0
J 200mm dia. (for washout) J841.4 nr 2 0.00
0
K 300mm dia. J842 nr 2 0.00
0
L 450mm dia. J843.1 nr 1 0.00
0
M 600mm dia. J843.2 nr 13 0.00
0
N 1200mm dia. J845 nr 37 0.00
0
0 Air Valve

P 80mm dia Single Air valve J862 nr 1 0.00


0
Q 150mm dia double Air valve J863.1 nr 13 0.00
0
0
0

0
0
0
0

To Part Summary Dhs.

REV-01
0
0 DIVERSION WORKS (Cont'd…)

0 PIPE WORK - FITTINGS AND VALVES


(Cont'd….)

0 Valves (Cont'd….)
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF WORKS FOR DEWA - SECTION Nr. d/9/199
EXPO 2020 ROADS NETWORK WATER DIVISION d 9
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.

Part 9 - Works for DEWA - Water Division


0
0 For Burried Valves 100mm ~ 300mm dia

0 Supply and install burried double spigot sluice


DI gate valve all in accordance with DEWA-
WD standard drawings, specifications and
DEWA-WD approval.

A 100mm dia. gate valve chamber; depth not


exceeding 1.5 m. J811 nr 1 0.00
0
B 300mm dia. gate valve chamber; depth not
exceeding 1.5 m. J812 nr 1 0.00
0
30 GRE pipe fittings including flexible joints

C 100mm dia straight special 600 mm long. J981 nr 2 0.00


0
D 300mm dia straight special 600 mm long. J982 nr 14 0.00
0
E 450mm dia straight special 900 mm long. J983.1 nr 14 0.00
0
F 600mm dia straight special 1200 mm long. J983.2 nr 30 0.00
0
G 1200mm dia straight special 1200 mm long. J985 nr 96 0.00
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

To Part Summary Dhs.


0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF WORKS FOR DEWA - SECTION Nr. d/9/200
EXPO 2020 ROADS NETWORK WATER DIVISION d 9
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.

Part 9 - Works for DEWA - Water Division


0
REV-01
0
0 DIVERSION WORKS (Cont'd….)

0 PIPE WORK - MANHOLES AND PIPE WORK


ANCILLARIES

0 Extend existing uPVC ducts in trenches


including supply, lay, excavation, backfilling,
compaction, special joints, connections,
1 testing and complete.; all in accordance to the
drawings and specifications.

A 150mm dia duct; depth not exceeding 1.5m K512 m 160 0.00
0
0
0 Valve chambers

0 Chambers complete, including pipe


pieces,valve wrappings, vertical pipe, water
tight sealing arrangement, surface box,
concrete slab, PCC work, structural back fill,
marker post, spindle support etc complete.

30 Gate Vavle Chamber

0
B 100mm dia. depth 1.5 -2.0m m. K232.1 nr 1 0.00
0
C 300mm dia. depth 1.5 -2.0m m. K232.2 nr 5 0.00
0
D 450mm dia. depth 1.5 -2.0m m. K232.3 nr 4 0.00
0
E 600mm dia. depth not exceeding 1.5 m. K231.1 nr 1 0.00
0
F 1200mm dia. depth 2.0m -2.5. K233.1 nr 2 0.00
0
G 1200mm dia. depth 2.5m -3.0. K234.1 nr 2 0.00
0
H 1200mm dia. depth 2.5m -3.0. (On existing pipe) K234.2 nr 1 0.00
0
0
0
0
0
0
0
0
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF WORKS FOR DEWA - SECTION Nr. d/9/201
EXPO 2020 ROADS NETWORK WATER DIVISION d 9
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.

Part 9 - Works for DEWA - Water Division


0
0
0
0
0
0
0

To Part Summary Dhs.

REV-01
0
0 DIVERSION WORKS (Cont'd….)

0 PIPE WORK - MANHOLES AND PIPE WORK


ANCILLARIES (Cont'd…)

0 Valve chambers (Cont'd…)

0 Chambers complete including ladders, built


in pipe pieces, ductile manhole covers and
water proofing works

30 Butterfly valve chamber

A 100mm dia. depth 1.5 -2.0m m. K232.1 nr 1 0.00


0
B 300mm dia. depth 1.5 -2.0m m. K232.2 nr 2 0.00
0
C 450 mm dia. depth 1.5 -2.0m m. K232.3 nr 1 0.00
0
D 600mm dia. depth 1.5 -2.0m m. K232.4 nr 2 0.00
0
E 600mm dia. depth 2.0m -2.5. K233.1 nr 2 0.00
0
F 600mm dia. depth 2.5m -3.0 K234 nr 4 0.00
0
G 600mm dia. depth 3.0m -3.5. K235 nr 2 0.00
0
H 600mm dia. depth 3.5m -4.0 K236 nr 1 0.00
0
J 600mm dia. depth 1.5 -2.0mm.
(On existing pipe ) K232.5 nr 1 0.00
0
K 600mm dia. depth 2.0m -2.5.
(On existing pipe ) K233.2 nr 1 0.00
0
L 1200mm dia. depth 2.0m -2.5. K233.3 nr 10 0.00
0
M 1200mm dia. depth 2.5m -3.0. K234.1 nr 25 0.00
0
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF WORKS FOR DEWA - SECTION Nr. d/9/202
EXPO 2020 ROADS NETWORK WATER DIVISION d 9
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.

Part 9 - Works for DEWA - Water Division


0
N 1200mm dia. depth 2.0m -2.5.
(On existing pipe) K233.4 nr 1 0.00
0
P 1200mm dia.depth 2.5m -3.0. ( On existing pipe) K234.2 nr 1 0.00
0
0
0
0
0
0
0
0
0
0
0

To Part Summary Dhs.

REV-01
0
0 PIPE WORK - MANHOLES AND PIPE WORK
ANCILLARIES (cont'd…)

0 Valve chambers (cont'd…)

0 Chambers complete as per Specifications


including ladders, built in pipe pieces, spindle
supports, ductile manhole covers and water
proofing works (cont'd…)

30 Air Valve Chamber

A 300mm dia. Single air valve chamber; depth


1.5 - 2.0 m. K232.1 nr 1 0.00
0
B 450mm dia. Double air valve chamber; depth 1.5
-2.0 m. K232.2 nr 1 0.00
0
C 600mm dia. Double air valve chamber; depth 2.0
- 2.5 m. K233.1 nr 1 0.00
0
D 1200mm dia. Double air valve chamber; depth
2.5 - 3.0 m. K234.1 nr 6 0.00
0
E 1200mm dia. Double air valve chamber; depth
3.0 - 3.5 m. K235 nr 4 0.00
0
F 1200mm dia. Double air valve chamber; depth
2.5 - 3.0 m. (on existing Pipe ) K234.2 nr 1 0.00
0
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF WORKS FOR DEWA - SECTION Nr. d/9/203
EXPO 2020 ROADS NETWORK WATER DIVISION d 9
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.

Part 9 - Works for DEWA - Water Division


0
0
0 Washout Chamber

G For 600mm dia. depth 2.0 - 2.5 m. K233.2 nr 1 0.00


0
H For 1200mm dia. depth 2.5 - 3.0 m. K234.2 nr 1 0.00
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

To Part Summary Dhs.

REV-01
0
0 PIPE WORK - MANHOLES AND PIPE WORK
ANCILLARIES (cont'd…)

0 Valve chambers (cont'd…)

0 Electromagnetic Flow Meter Chamber

30 Electromegnatic Flow Meter Chamber as


detailed on drawings; DI Fittings, Gate Valve,
Electromegnatic Flow meter charges Etc.
excavation, backfilling, insitu concrete,
supports, DEWA Standard access cover and
frame, metal work, water proof coating etc.
complete. including RTU linked with DEWA
SCADA control for metering purpose or solar
type if power is not available ( If required),
complete including cable, connection etc. as
per DEWA Standard Drawings, Specification
and Site requirements.
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF WORKS FOR DEWA - SECTION Nr. d/9/204
EXPO 2020 ROADS NETWORK WATER DIVISION d 9
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.

Part 9 - Works for DEWA - Water Division


0
0
A On 450mm diameter GRE line
Depth =1.5-2.0m K235 nr 1 282,495.00
RTU Panel nr 1 0.00
Fiber cable considered at 100mtr distance nr 1 0.00
Power, Signal cables, glanding, GRP enclosure nr 1 0.00
Power Supply for Flow Meters @ 150m from
nearest feeder pillar nr 1 0.00
On 450mm diameter GRE line Depth =1.5-2.0m nr 1 0.00
Battery back up unit nr 1 0.00
450 GRE Flange adaptor nr 1 0.00
450 Dismantling Joint nr 1 0.00
450 DI Flange adaptor nr 2 0.00
Short Piece with puddle flanged Pipe(450mm L)
with Flex.Joints (FJ/FJ) nr 2 0.00
Short Piece Pipe (450mm L) with PF (SO/SO) nr 4 0.00
450 coupling nr 4 0.00
10MM NEOPRENE MEMBRANS
2 LAYERS SLIP AND MASTIC SEALANT nr 4 0.00
Pressure Transmitter nr 1 0.00
Supports nr 1 0.00

B On 1200mm diameter GRE line


Depth =3.0-3.5m K235 nr 1 414,583.00
RTU Panel nr 1 0.00
Fiber cable considered at 100mtr distance nr 1 0.00
Power, Signal cables, glanding, GRP enclosure nr 1 0.00
Power Supply for Flow Meters @ 150m from
nearest feeder pillar nr 1 0.00
On 1200mm diameter GRE line Depth =1.5-2.0m
nr 1 0.00
Battery back up unit nr 1 0.00
1200 GRE Flange adaptor nr 1 0.00
1200 Dismantling Joint nr 1 0.00
1200 DI Flange adaptor nr 2 0.00
Short Piece with puddle flanged Pipe(1200mm L)
with Flex.Joints (FJ/FJ) nr 2 0.00
Short Piece Pipe (1200mm L) with PF (SO/SO) nr 4 0.00
1200 coupling nr 2 0.00
10MM NEOPRENE MEMBRANS
2 LAYERS SLIP AND MASTIC SEALANT nr 4 0.00
Pressure Transmitter nr 1 0.00
Supports nr 1 0.00

0
0 Reinstatement

D Breaking of existing pavement of main roads and


reinstate including saw cutting; pipe bore 150-
600mm K732.1 m 100 0.00
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF WORKS FOR DEWA - SECTION Nr. d/9/205
EXPO 2020 ROADS NETWORK WATER DIVISION d 9
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.

Part 9 - Works for DEWA - Water Division


0
0
E Breaking of existing pavement of service roads
and reinstate including saw cutting; pipe bore
150-600mm K732.2 m 100 0.00
0
F
Breaking of existing pavement of main roads and
reinstate including saw cutting; pipe bore 1200mm
K733.1 m 100 0.00
0
G Breaking of existing pavement of service roads
and reinstate including saw cutting; pipe bore
1200mm K733.2 m 100 0.00
0
0
0
0
0
0
0

To Part Summary Dhs.

REV-01
0
0 PIPE WORK MANHOLES AND PIPE WORK
ANCILLARIES (Cont'd…)

0 Connections to existing pipe

A Connect new 225 mm dia GRE pipe line to


existing 225 mm dia. AC pipe line (not in same
direction) including necessary fittings, additional
excavation and backfilling etc. K862.1 nr 4 0.00
0
B Connect new 300 mm dia GRE pipe line to
existing 300 mm dia. AC pipe line (not in same
direction) including necessary fittings, additional
excavation and backfilling etc. K862.2 nr 1 0.00
0
C Connect new 300 mm dia GRE pipe line to
existing 300 mm dia. AC pipe line (in same
direction) including necessary fittings, additional
excavation and backfilling etc. K862.3 nr 4 0.00
0
D Connect new 450 mm dia GRE pipe line to
existing 450 mm dia. AC pipe line (not in same
direction) including necessary fittings, additional
excavation and backfilling etc. K863.1 nr 4 0.00
0
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF WORKS FOR DEWA - SECTION Nr. d/9/206
EXPO 2020 ROADS NETWORK WATER DIVISION d 9
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.

Part 9 - Works for DEWA - Water Division


0
E Connect new 450 mm dia GRE pipe line to
existing 450 mm dia. AC pipe line (in same
direction) including necessary fittings, additional
excavation and backfilling etc. K863.2 nr 1 0.00
0
F Connect new 600 mm dia GRE pipe line to
existing 600 mm dia. AC pipe line (not in same
direction) including necessary fittings, additional
excavation and backfilling etc. K863.3 nr 8 0.00
0
G Connect new 1200 mm dia GRE pipe line to
existing 1200 mm dia. AC pipe line (not in same
direction) including necessary fittings, additional
excavation and backfilling etc. K865.1 nr 13 0.00
0
H Connect new 1200 mm dia GRE pipe line to
existing 1200 mm dia. AC pipe line (in same
direction) including necessary fittings, additional
excavation and backfilling etc. K865.2 nr 93 0.00
0
0
0
0
0
0
0
0
0
0

To Part Summary Dhs.

0
0 PIPE WORK - SUPPORTS AND PROTECTION,
ANCILLARIES TO LAYING AND EXCAVATION.

0 Non disruptive special pipe laying using micro


tunnelling methods for installing pipes. (The rate
shall include for all service diversions,
reinstatements, sleeve pipes/ caisson pipes,
concrete encasement, surplus material removals,
grouting etc. complete)

A For 450mm dia pipe L293 m 290 0.00


0
B For 600mm dia pipe L294 m 60 0.00
0
C For 1200mm dia pipe L295 m 860 0.00
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF WORKS FOR DEWA - SECTION Nr. d/9/207
EXPO 2020 ROADS NETWORK WATER DIVISION d 9
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.

Part 9 - Works for DEWA - Water Division


0
0
0 Access and reciving Pits for NDM

D Access Pit L900.1 nr 10 0.00


0
E Receiving Pit L900.2 nr 10 0.00
0
0 Pipe Crossings

F
Steel sleeve for 450mm dia. GRE pipe, including
excavation, spacers, brackets, grouting, protective
coating, backfilling etc complete as per drawings.
L900.3 m 50 0.00
0
G
Steel sleeve for 600mm dia. GRE pipe, including
excavation, spacers, brackets, grouting, protective
coating, backfilling etc complete as per drawings.
L900.4 m 48 0.00
0
H
Steel sleeve for 1200mm dia. GRE pipe, including
excavation, spacers, brackets, grouting, protective
coating, backfilling etc complete as per drawings.
L900.5 m 485 0.00
0
0
0
0
0
0
0
0
0
0
0
0
0
0

To Part Summary Dhs.

0
0 DIVERSION WORKS (Cont'd….)

0 PIPE WORK - SUPPORTS AND PROTECTION,


ANCILLARIES TO LAYING AND EXCAVATION
(Cont'd…)

0 Bed & Surround including Warning Tape


0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF WORKS FOR DEWA - SECTION Nr. d/9/208
EXPO 2020 ROADS NETWORK WATER DIVISION d 9
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.

Part 9 - Works for DEWA - Water Division


0
A Imported sand bed to 100mm dia pipe. L311 m 10 0.00
0
B Imported sand bed to 300mm dia pipe. L312 m 25 0.00

C Imported sand bed to 450mm dia pipe. L313 m 855 0.00


0
D Selected excavated material bed to 100mm dia
3 pipe. L321 m 10 0.00
0
E Selected excavated material bed to 300mm dia
pipe. L322 m 75 0.00
0
F Selected excavated material bed to 450mm dia
GRE pipe L333.1 m 360 0.00
0
G Imported granular material bed and surround to
600mm dia GRE pipe L333.2 m 3,658 0.00
0
H Imported granular material bed and surround to
1200mm dia GRE pipe L335 m 7,659 0.00
0
0
30 Concrete bed and surround to pipes, including
formwork, polythene sheet and bituminous
paint

J Reinforced concrete class 40/20 bed and


surround to 100mm dia GRE pipe. L541 m 15 0.00
0
K Reinforced concrete class 40/20 bed and
surround to 300mm dia GRE pipe. L542 m 75 0.00
0
L Reinforced concrete class 40/20 bed and
surround to 450mm dia GRE pipe. L543.1 m 345 0.00
0
M Reinforced concrete class 40/20 bed and
surround to 600mm dia GRE pipe. L543.2 m 685 0.00
0
N Reinforced concrete class 40/20 bed and
surround to 1200mm dia GRE pipe. L545 m 1,140 0.00
0
0
0
0
0
0

To Part Summary Dhs.

REV-01
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF WORKS FOR DEWA - SECTION Nr. d/9/209
EXPO 2020 ROADS NETWORK WATER DIVISION d 9
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.

Part 9 - Works for DEWA - Water Division


0
0
0 DIVERSION WORKS (Cont'd….)

0 PIPE WORK - SUPPORTS AND PROTECTION,


ANCILLARIES TO LAYING AND EXCAVATION
(Cont'd…)

0 Concrete thrust blocks

A Volume not exceeding 0.1m3 Concrete 30/20 L719 nr 3 0.00


0
B Volume 0.1 - 0.2m3 Concrete 30/20 L729 nr 2 0.00
0
C Volume 0.2 - 0.5m3 Concrete 30/20 L739 nr 8 0.00
0
D Volume 0.5 - 1.0m3 Concrete 30/20 L749 nr 9 0.00
0
E Volume 1.0 - 2.0m3 Concrete 30/20 L759 nr 18 0.00
0
F Volume 2.0 - 4.0m3 Concrete 30/20 L769 nr 6 0.00
0
G Volume 4.0 - 6.0m3 Concrete 30/20 L779 nr 2 0.00
0
H Volume 6-8m3 Concrete 30/20 L789.1 nr 6 0.00
0
J Volume 10-12m3 Concrete 30/20 L789.2 nr 51 0.00
0
K Volume 12-14m3 Concrete 30/20 L789.3 nr 1 0.00
0
L Volume 14-16m3 Concrete 30/20 L789.4 nr 1 0.00
0
M Volume 16-20m3 Concrete 30/20 L789.5 nr 10 0.00
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF WORKS FOR DEWA - SECTION Nr. d/9/210
EXPO 2020 ROADS NETWORK WATER DIVISION d 9
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.

Part 9 - Works for DEWA - Water Division


0
0
0
0
0
0

To Part Summary Dhs.

0
0 DIVERSION WORKS (Cont'd….)

0 PIPE WORK - SUPPORTS AND PROTECTION,


ANCILLARIES TO LAYING AND EXCAVATION
(Cont'd…)

0 Geotextile Filter Fabric membrane as per


Specifications to granular bed and surround
(granular bed and surround measured
separately)

3 L900.1 m 1,215 0.00


A 450mm dia. GRE pipe.
0
B 600mm dia. GRE pipe. L900.2 m 3,658 0.00
0
C 1200mm dia. GRE pipe. L900.3 m 7,659 0.00
0
0 DEWA-WD SCADA SYSTEM

D DEWA-WD SCADA System including diversion of


cables through ducts, steel sleeves, relocation of
service and pulling pits, relocation of pressure
transmitters and type B instrument, connection
with existing cables etc complete as shown in
drawings U-2700 thru U-2713 and inline with
DEWA- Water utility layout drawings U-2200 thru
U-2213.

X900 Sum 1 462,614.00


SCADA system 1 1 0.00
0
0
0
0
0
0
0
0
0
0
0
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF WORKS FOR DEWA - SECTION Nr. d/9/211
EXPO 2020 ROADS NETWORK WATER DIVISION d 9
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.

Part 9 - Works for DEWA - Water Division


0
0
0
0
0
0
0
0
0
0
0
0
0
0

To Part Summary Dhs.

REV-01

PART SUMMARY

Page d/9/1

Page d/9/2

Page d/9/3

Page d/9/4

Page d/9/5

Page d/9/6

Page d/9/7

Page d/9/8

Page d/9/9

Page d/9/10
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF WORKS FOR DEWA - SECTION Nr. d/9/212
EXPO 2020 ROADS NETWORK WATER DIVISION d 9
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.

Part 9 - Works for DEWA - Water Division


0
Page d/9/11

Page d/9/12

Page d/9/13

Page d/9/14

Page d/9/15

Page d/9/16

Page d/9/17

Page d/9/18

To Part Summary Dhs.

PART SUMMARY

Page d/9/19

Page d/9/20

Page d/9/21
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF WORKS FOR DEWA - SECTION Nr. d/9/213
EXPO 2020 ROADS NETWORK WATER DIVISION d 9
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.

Part 9 - Works for DEWA - Water Division


0

Total for Part 9 - Works for DEWA - Water Division


Carried to Grand Summary Dhs.
PAGE Nr.

d/9/214

AMOUNT
UAE. Dhs.

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
PAGE Nr.

d/9/215

AMOUNT
UAE. Dhs.

0.00

NTT-03

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
PAGE Nr.

d/9/216

AMOUNT
UAE. Dhs.

0.00

0.00

0.00

0.00

0.00
PAGE Nr.

d/9/217

AMOUNT
UAE. Dhs.

0.00

0.00

0.00

0.00

0.00

0.00
PAGE Nr.

d/9/218

AMOUNT
UAE. Dhs.

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
PAGE Nr.

d/9/219

AMOUNT
UAE. Dhs.

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
PAGE Nr.

d/9/220

AMOUNT
UAE. Dhs.

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
PAGE Nr.

d/9/221

AMOUNT
UAE. Dhs.

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
PAGE Nr.

d/9/222

AMOUNT
UAE. Dhs.

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
PAGE Nr.

d/9/223

AMOUNT
UAE. Dhs.

0.00

0.00

0.00

0.00

0.00
0.00
0.00
0.00
0.00

0.00

0.00

0.00

0.00
PAGE Nr.

d/9/224

AMOUNT
UAE. Dhs.

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

NTT-03

0.00

0.00

0.00

0.00
PAGE Nr.

d/9/225

AMOUNT
UAE. Dhs.

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

NTT-03
PAGE Nr.

d/9/226

AMOUNT
UAE. Dhs.

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
PAGE Nr.

d/9/227

AMOUNT
UAE. Dhs.

NTT-03

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
PAGE Nr.

d/9/228

AMOUNT
UAE. Dhs.

0.00

NTT-03

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
PAGE Nr.

d/9/229

AMOUNT
UAE. Dhs.

0.00

0.00

0.00

NTT-03

0.00

0.00

0.00

0.00

0.00

0.00
PAGE Nr.

d/9/230

AMOUNT
UAE. Dhs.

0.00

0.00

0.00

NTT-03
PAGE Nr.

d/9/231

AMOUNT
UAE. Dhs.

282,495.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

414,583.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
PAGE Nr.

d/9/232

AMOUNT
UAE. Dhs.

0.00

0.00

0.00

697,078.00

NTT-03

0.00

0.00

0.00

0.00
PAGE Nr.

d/9/233

AMOUNT
UAE. Dhs.

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
PAGE Nr.

d/9/234

AMOUNT
UAE. Dhs.

0.00

0.00

0.00

0.00

0.00

0.00
PAGE Nr.

d/9/235

AMOUNT
UAE. Dhs.

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

NTT-03
PAGE Nr.

d/9/236

AMOUNT
UAE. Dhs.

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
PAGE Nr.

d/9/237

AMOUNT
UAE. Dhs.

0.00

0.00

0.00

0.00

462,614.00
0.00
PAGE Nr.

d/9/238

AMOUNT
UAE. Dhs.

462,614.00

NTT-03

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
PAGE Nr.

d/9/239

AMOUNT
UAE. Dhs.

0.00

0.00

0.00

0.00

697,078.00

0.00

0.00

0.00

697,078.00

0.00

462,614.00

697,078.00
PAGE Nr.

d/9/240

AMOUNT
UAE. Dhs.

1,159,692.00
BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF WORKS FOR ETISALAT SECTION Nr. d/11/241
EXPO 2020 ROADS NETWORK d 11

ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE


REF.

PART 11 - WORKS FOR ETISALAT

0
0 Notes:
0
0 ETISALAT will provide all cable ducts, end
caps, draw ropes, spacers and furniture for
manholes and joint boxes. The Tenderer shall
include in his rates for collection and storage
of these materials from Etisalat stores in
Dubai

0 Contractor is reminded to exercise extreme


caution when working near Fiber Optic and
Coaxial Cable routes

0 DIVERSION WORKS

0 DEMOLITION

0 Removal of existing ducts

A Excavate and remove 1-4 way D54 ducts and


surrounds and cart to tip including backfilling of
voids and reinstate. D690.1 m 3,720
0
B Excavate and remove 4-6 way D54 ducts and
surrounds and cart to tip including backfilling of
voids and reinstate. D690.2 m 720
0
C Excavate and remove 6-9 way D54 ducts and
surrounds and cart to tip including backfilling of
voids and reinstate. D690.3 m 2,170
0
D Excavate and remove 9-12 way D54 ducts and
surrounds and cart to tip including backfilling of
voids and reinstate. D690.4 m 35
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF WORKS FOR ETISALAT SECTION Nr. d/11/242
EXPO 2020 ROADS NETWORK d 11

ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE


REF.

PART 11 - WORKS FOR ETISALAT

0
0
0
0
0
0
0

To Part Summary Dhs.

0 REV-01
0
0 DIVERSION WORKS (Cont'd…)

0 PIPE WORK MANHOLES AND PIPE WORK


ANCILLARIES

0 Reinforced concrete manholes complete,


including fixing of Manhole fixtures, all in
accordance with drawings, specifications and
requirements

A Type MR 2B. K133.1 nr 1


0
B Type MR 4. K133.2 nr 1
0
C Type MRT-8B. K133.3 nr 1
0
D Type MRT-7. K133.4 nr 1
0
E Type MR 2B on existing duct. K133.5 nr 1
0
F Type MR 4 on existing duct. K133.6 nr 1
0
G Type MRT-8B on existing duct. K133.7 nr 1
0
H Type MRT-7 on existing duct. K133.8 nr 1
0
0 Other chambers

0 Reinforced concrete joint boxes complete in


accordance with drawings, specifications and
requirements

J Type JRC 04. K231.1 nr 1


0
K Type JRC 12. K231.2 nr 1
0
L Type JRC 14. K231.3 nr 20
0
BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF WORKS FOR ETISALAT SECTION Nr. d/11/243
EXPO 2020 ROADS NETWORK d 11

ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE


REF.

PART 11 - WORKS FOR ETISALAT

0
M Type JRC 04 on existing duct. K231.4 nr 1
0
N Type JRC 12 on existing duct. K231.5 nr 1
0
P Type JRC 14 on existing duct. K231.6 nr 1
0

0
0
0
0
0

To Part Summary Dhs.

0 REV-01
0
0 DIVERSION WORKS (Cont'd…)

0 Ducts

0 Collect, lay & joint uPVC Cable Ducts (D54)


90mm dia. in trench including backfilling,
endcap and all related work complete.

A 2-way, depth not exceeding 1.5m. K522 m 50


0
B 4-way, depth not exceeding 1.5m. K542.1 m 1,950
0
C 4-way, depth 1.5m - 2.0m. K543.1 m 725
0
D 4-way, depth 2.0m - 2.5m. K544.1 m 790
0
E 6-way, depth not exceeding 1.5m. K542.2 m 350
0
F 6-way, depth 1.5m - 2.0m. K543.2 m 125
0
G 6-way, depth 2.0m - 2.5m. K544.2 m 95
0
H 9-way, depth not exceeding 1.5m. K542.3 m 1,565
0
J 9-way, depth 1.5m - 2.0m. K543.3 m 850
0
K 9-way, depth 2.0m - 2.5m. K544.3 m 340
0
BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF WORKS FOR ETISALAT SECTION Nr. d/11/244
EXPO 2020 ROADS NETWORK d 11

ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE


REF.

PART 11 - WORKS FOR ETISALAT

0
L 12-way, depth not exceeding 1.5m. K542.4 m 325
0
M 12-way, depth 1.5m - 2.0m. K543.4 m 155
0
N 12-way, depth 2.0m - 2.5m. K544.4 m 85
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

To Part Summary Dhs.

REV-01
0
0 DIVERSION WORKS (Cont'd…)

0 PIPE WORK MANHOLES AND PIPE WORK


ANCILLARIES (Cont'd…)

0 Ducts (Cont'd…)

0 Extension of Existing Ducts


0
0 Extend existing uPVC ducts including collect,
lay & joint with existing ducts in trench
beneath carriageways, provide end caps, duct
markers, draw ropes and warning tapes etc.

A 2-way, depth not exceeding 1.5m. K522 m 20


0
B 4-way, depth not exceeding 1.5m. K542.1 m 275
BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF WORKS FOR ETISALAT SECTION Nr. d/11/245
EXPO 2020 ROADS NETWORK d 11

ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE


REF.

PART 11 - WORKS FOR ETISALAT

0
0
C 4-way, depth 1.5m - 2.0m. K543.1 m 140
0
D 4-way, depth 2.0m - 2.5m. K544.1 m 85
0
E 6-way, depth not exceeding 1.5m. K542.2 m 65
0
F 6-way, depth 1.5m - 2.0m. K543.2 m 10
0
G 6-way, depth 2.0m - 2.5m. K544.2 m 20
0
H 9-way, depth not exceeding 1.5m. K542.3 m 51
0
J 9-way, depth 1.5m - 2.0m. K543.3 m 32
0
K 9-way, depth 2.0m - 2.5m. K544.3 m 16
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

To Part Summary Dhs.

REV-01
0
0 DIVERSION WORKS (Cont'd…)

0 PIPE WORK MANHOLES AND PIPE WORK


ANCILLARIES (Cont'd…)

0 Ducts (Cont'd…)
BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF WORKS FOR ETISALAT SECTION Nr. d/11/246
EXPO 2020 ROADS NETWORK d 11

ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE


REF.

PART 11 - WORKS FOR ETISALAT

0
0 Extend existing uPVC ducts including collect,
lay & joint with existing ducts in trench
beneath carriageways, provide end caps, duct
markers, draw ropes and warning tapes etc.
(Cont'd…)

A 12-way, depth not exceeding 1.5m. K542 m 175


0
B 12-way, depth 1.5m - 2.0m. K543 m 25
0
C 12-way, depth 2.0m - 2.5m. K544 m 10
0
0 Supply Lay & Joint HDPE Cable Ducts (D54)
90mm dia thru HDPE pipe NOT in trench
including end caps, draw ropes, duct markers
and all related work complete

D 2-way HDPE Cable ducts through NDRC. K521 m 10


0
E 4-way HDPE Cable ducts through NDRC. K541.1 m 15
0
F 6-way HDPE Cable ducts through NDRC. K541.2 m 20
0
G 9-way HDPE Cable ducts through NDRC. K541.3 m 20
0
H 12-way HDPE Cable ducts through NDRC. K541.4 m 160
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

To Part Summary Dhs.


BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF WORKS FOR ETISALAT SECTION Nr. d/11/247
EXPO 2020 ROADS NETWORK d 11

ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE


REF.

PART 11 - WORKS FOR ETISALAT

REV-01
0
0 DIVERSION WORKS (Cont'd…)

0 PIPE WORK MANHOLES AND PIPE WORK


ANCILLARIES (Cont'd…)

0 Connections to Manholes / Ducts

A Connect new 2-way D54 duct to existing ducts,


including additional fittings, additional excavation
and backfill etc. K861.1 nr 1
0
B Connect new 4-way D54 duct to existing ducts,
including additional fittings, additional excavation
and backfill etc. K861.2 nr 2
0
C Connect new 6-way D54 duct to existing ducts,
including additional fittings, additional excavation
and backfill etc. K861.3 nr 1
0
D Connect new 9-way D54 duct to existing ducts,
including additional fittings, additional excavation
and backfill etc. K861.4 nr 3
0
E Connect new 12-way D54 duct to existing ducts,
including additional fittings, additional excavation
and backfill etc. K861.5 nr 1
0
F Connect new 2-way duct to existing Manhole
including breaking, additional fittings, additional
excavation and backfill etc. K851.1 nr 1
0
G Connect new 4-way duct to existing Manhole
including breaking, additional fittings, additional
excavation and backfill etc. K851.2 nr 1
0
H Connect new 6-way duct to existing Manhole
including breaking, additional fittings, additional
excavation and backfill etc. K851.3 nr 1
0
0
0
0
0
0
0
0
BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF WORKS FOR ETISALAT SECTION Nr. d/11/248
EXPO 2020 ROADS NETWORK d 11

ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE


REF.

PART 11 - WORKS FOR ETISALAT

0
0
0
0
0
0
0
0
0

To Part Summary Dhs.

0 REV-01
0
0 DIVERSION WORKS (Cont'd…)

0 PIPE WORK MANHOLES AND PIPE WORK


ANCILLARIES (Cont'd…)

0 Connections to Manholes / Ducts (Cont'd…)

A Connect existing 9-way duct to proposed JRC 14


manhole including breaking into manhole,
additional fittings, additional excavation and
backfill etc. K851.1 nr 7
0
B Connect existing 12-way duct to proposed JRC 14
manhole including breaking into manhole,
additional fittings, additional excavation and
backfill etc. K851.2 nr 1
0
0
0 PIPE WORK - SUPPORTS AND PROTECTION,
ANCILLARIES TO LAYING AND EXCAVATION

0 Non disruptive special pipe laying using


Directional drilling method for installing ducts
(The rate shall include for all service
diversions, reinstatements, etc) complete in all
respect as per dwg

0
C For 2-way L291.1 m 10
0
D For 4-way L291.2 m 15
0
E For 6-way L291.3 m 20
0
F For 9-way L291.4 m 20
BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF WORKS FOR ETISALAT SECTION Nr. d/11/249
EXPO 2020 ROADS NETWORK d 11

ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE


REF.

PART 11 - WORKS FOR ETISALAT

0
0
G For 12-way L291.5 m 160
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

To Part Summary Dhs.

REV-01
0
0 DIVERSION WORKS (Cont'd..)

0 PIPE WORK - SUPPORTS AND PROTECTION,


ANCILLARIES TO LAYING AND EXCAVATION

0 Beds & Surrounds including warning tape

0 Imported sand bed & surround

0 For 90 mm dia duct

A 2-way duct. L511.1 m 25


0
B 4-way duct. L511.2 m 1,470
0
C 6-way duct. L511.3 m 260
0
D 9-way duct. L511.4 m 1,155
0
E 12-way duct. L511.5 m 260
0
0 Selected excavated material bed & surround

0 For 90 mm dia duct


BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF WORKS FOR ETISALAT SECTION Nr. d/11/250
EXPO 2020 ROADS NETWORK d 11

ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE


REF.

PART 11 - WORKS FOR ETISALAT

0
F 2-way duct. L521.1 m 35
0
G 4-way duct. L521.1 m 2,125
0
H 6-way duct. L521.3 m 335
0
J 9-way duct. L521.4 m 1,409
0
K 12-way duct. L521.5 m 435
0
0 Mass concrete class 30/20 surround to 90mm
dia duct including formwork, polythene sheet
and bituminous paint

L For 2-way duct. L541.1 m 10


0
M For 4-way duct. L541.2 m 370
0
N For 6-way duct. L541.3 m 70
0
P For 9-way duct. L541.4 m 290
0
Q For 12-way duct. L541.5 m 80
0
0
0
0

To Part Summary Dhs.

0 REV-01
0
0 DIVERSION WORKS (Cont'd..)

0 Mass concrete class 30/20 surround to


existing duct in trench including formwork,
polythene sheet and bituminous paint

A For 2-way duct. L541.1 m 10


0
B For 4-way duct. L541.2 m 400
0
C For 6-way duct. L541.3 m 22
0
D For 9-way duct. L541.4 m 750
0
E For 12-way duct. L541.5 m 260
0
BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF WORKS FOR ETISALAT SECTION Nr. d/11/251
EXPO 2020 ROADS NETWORK d 11

ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE


REF.

PART 11 - WORKS FOR ETISALAT

0
0 ANCILLARY WORKS

0 Demolish existing manholes and chambers


and cart to approved tip including backfilling
of voids.

F Type JRC 12. D520.1 nr 1


0
G Type JRC 14. D520.2 nr 13
0
H MRT 2B. D520.3 nr 1
0
J MRT 8B. D520.4 nr 1
0
K Type MRT-7 D520.5 nr 1
0
L MR 4. D520.6 nr 1
0
M MR 2B. D520.7 nr 1
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

To Part Summary Dhs.

0 REV-01
0
0 DIVERSION WORKS (Cont'd..)

0 MISCELLANEOUS WORKS

A Adjust cover levels of existing manholes to suit


proposed levels, maximum level adjustment up to
0.25m X900.1 nr 1
BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF WORKS FOR ETISALAT SECTION Nr. d/11/252
EXPO 2020 ROADS NETWORK d 11

ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE


REF.

PART 11 - WORKS FOR ETISALAT

0
0
B Adjust cover levels of existing manholes to suit
proposed levels, maximum level adjustment up to
0.5m X900.2 nr 1
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

To Part Summary Dhs.


BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF WORKS FOR ETISALAT SECTION Nr. d/11/253
EXPO 2020 ROADS NETWORK d 11

ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE


REF.

PART 11 - WORKS FOR ETISALAT

REV-01

PART SUMMARY

Page d/11/1

Page d/11/2

Page d/11/3

Page d/11/4

Page d/11/5

Page d/11/6

Page d/11/7

Page d/11/8

Page d/11/9

Page d/11/10
BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF WORKS FOR ETISALAT SECTION Nr. d/11/254
EXPO 2020 ROADS NETWORK d 11

ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE


REF.

PART 11 - WORKS FOR ETISALAT

Total for PART 11 - WORKS FOR ETISALAT


Carried to Grand Summary Dhs.

REV-01
PAGE Nr.

4 d/11/255

AMOUNT
UAE. Dhs.

0.00

0.00

0.00

0.00
PAGE Nr.

4 d/11/256

AMOUNT
UAE. Dhs.

0.00

NTT-04

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
PAGE Nr.

4 d/11/257

AMOUNT
UAE. Dhs.

0.00

0.00

0.00

0.00

NTT-04

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
PAGE Nr.

4 d/11/258

AMOUNT
UAE. Dhs.

0.00

0.00

0.00

0.00

NTT-04

0.00

0.00
PAGE Nr.

4 d/11/259

AMOUNT
UAE. Dhs.

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

NTT-04
PAGE Nr.

4 d/11/260

AMOUNT
UAE. Dhs.

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
PAGE Nr.

4 d/11/261

AMOUNT
UAE. Dhs.

NTT-04

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
PAGE Nr.

4 d/11/262

AMOUNT
UAE. Dhs.

0.00

NTT-04

0.00

0.00

0.00

0.00

0.00

0.00
PAGE Nr.

4 d/11/263

AMOUNT
UAE. Dhs.

0.00

0.00

NTT-04

0.00

0.00

0.00

0.00

0.00
PAGE Nr.

4 d/11/264

AMOUNT
UAE. Dhs.

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

NTT-04

0.00

0.00

0.00

0.00

0.00
PAGE Nr.

4 d/11/265

AMOUNT
UAE. Dhs.

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

NTT-04

0.00
PAGE Nr.

4 d/11/266

AMOUNT
UAE. Dhs.

0.00

0.00
PAGE Nr.

4 d/11/267

AMOUNT
UAE. Dhs.

NTT-04

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
PAGE Nr.

4 d/11/268

AMOUNT
UAE. Dhs.

0.00

NTT-04
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF DUBAI MUNICIPALITY - SECTION Nr. d/12/269
EXPO 2020 ROADS NETWORK IRRIGATION WORKS d 12
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.

Part 12 - Works for DM - Irrigation Section


0
0 PART 12 - WORKS FOR DM - IRRIGATION
WORKS

0 DIVERSION WORKS

0 REMOVAL OF EXISTING IRRIGATION PIPE,


VALVES AND CHAMBERS

0 Remove existing pipe /duct, fittings and store


temporarily in contractor's stores and later
deliver to RTA stores or dispose to tip as
required including excavation, break out pipe
protection and thrust blocks, backfilling and
remove to tip and reinstatement of existing
surfaces

A 200mm dia. AC pipe. D900.1 m 10


0
B 500mm dia. AC pipe. D900.2 m 10
0 0
C 800mm dia. AC pipe. D900.3 m 795
0
D 1800mm dia. AC pipe. D900.4 m 20
0
E 1way 300mm dia AC duct D900.5 m 350
0
F 1way 500mm dia AC duct D900.6 m 40
0
G 2 way 150 mm dia AC duct D900.7 m 350
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF DUBAI MUNICIPALITY - SECTION Nr. d/12/270
EXPO 2020 ROADS NETWORK IRRIGATION WORKS d 12
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.

Part 12 - Works for DM - Irrigation Section


0
0
0
0
0
0

To Part Summary Dhs.

0
0 DIVERSION WORKS (Cont'd…)

0 REMOVAL OF EXISTING IRRIGATION PIPE,


VALVES AND CHAMBERS (Cont'd…)

0 Carefully remove existing valve assemblies


and set aside in Contractor's store for re use
including excavation, breakout valve
chambers, remove to tip and backfilling

A Washout Valve on 800mm dia AC pipe line. D900.1 nr 1


0
B Air valve on 800mm dia AC pipe line. D900.2 nr 2
0
C Gate valve on 200mm dia AC pipe line(FC
Chamber). D900.3 nr 1
0
D Gate valve on 500mm dia AC pipe line(FC
Chamber). D900.4 nr 1
0
E Gate valve on 800mm dia AC pipe line(FC
Chamber). D900.5 nr 1
0
F Inlet valve on 1800mm dia AC pipe line. D900.6 nr 1
0
0 PRECAST CONCRETE
0
0 Precast reinforced concrete protection slabs
placed over existing pipe lines including
excavation, backfilling and bitumen paint etc.
complete

0
G 1600 x 500 x 150mm thick. H512.1 nr 50
0
H 1600 x 500 x 200mm thick. H512.2 nr 2,750
0
J 1800 x 500 x 200mm thick. H512.3 nr 25
0
K 3600 x 1000 x 250mm thick. H525 nr 20
0
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF DUBAI MUNICIPALITY - SECTION Nr. d/12/271
EXPO 2020 ROADS NETWORK IRRIGATION WORKS d 12
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.

Part 12 - Works for DM - Irrigation Section


0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

To Part Summary Dhs.

0
0 DIVERSION WORKS (Cont'd….)

0 PIPE WORK MANHOLES AND PIPE WORK


ANCILLARIES

0 Supply and lay GRP pressure pipes in trench


with couplings as specified

A 200mm dia. depth; not exceeding 1.5m I612 m 10


0
B 200mm dia. depth; 1.5 - 2.0m. I613 m 5
0
C 500mm dia. depth; 1.5 - 2.0m. I633.1 m 10
0
D 500mm dia. depth; 2.0 - 2.5m. I634 m 15
0
E 800mm dia. depth; 1.5 - 2.0m. I643 m 30
0
F 800mm dia. depth; 2.0 - 2.5m. I644 m 255
0
G 800mm dia. depth; 2.5 - 3.0m. I645 m 120
0
H 800mm dia. depth; 3.0 - 3.5m. I646 m 95
0
J 800mm dia. depth; 3.5.0 - 4.0m. I647 m 50
0
K 800mm dia. depth; 4.0 - 4.5m. I648 m 25
0
L 1800mm dia. depth; 3.0 - 3.5m. I676 m 10
0
M 1800mm dia. depth; 3.5.0 - 4.0m. I677 m 5
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF DUBAI MUNICIPALITY - SECTION Nr. d/12/272
EXPO 2020 ROADS NETWORK IRRIGATION WORKS d 12
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.

Part 12 - Works for DM - Irrigation Section


0
0
N 1800mm dia. depth; 4.0 - 4.5m. I678 m 5
0
0
0 Supply and lay GRP pressure pipes not in
trench with couplings as specified

P 800mm dia. I641 m 50


0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

To Part Summary Dhs.

0
0 DIVERSION WORKS (Cont'd….)

0 PIPE WORK - FITTINGS AND VALVES

0 Supply, lay and joint GRP pipe fitting in trench


in accordance with specification clause PS
6/62

0 Bends
0
A 200mm dia 11.25 degree bend J512.1 nr 1
0
B 200mm dia 22.25 degree bend J512.2 nr 1
0
C 200mm dia 45 degree bend J512.3 nr 1
0
D 200mm dia 90 degree J512.4 nr 1
0
E 500mm dia 11.25 degree J513.1 nr 1
0
F 500mm dia 22.25 degree J513.2 nr 1
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF DUBAI MUNICIPALITY - SECTION Nr. d/12/273
EXPO 2020 ROADS NETWORK IRRIGATION WORKS d 12
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.

Part 12 - Works for DM - Irrigation Section


0
0
G 500mm dia 45 degree J513.3 nr 1
0
H 500mm dia 90 degree J513.4 nr 1
0
J 800mm dia 11.25 degree J514.1 nr 1
0
K 800mm dia 22.25 degree J514.2 nr 1
0
L 800mm dia 45 degree J514.3 nr 1
0
M 800mm dia 90 degree J514.4 nr 1
0
N 1800mm dia 11.25 degree J517.1 nrr 1
0
P 1800mm dia 22.25 degree J517.2 nr 1
0
Q 1800mm dia 45 degree J517.3 nr 1
0
R 1800mm dia 90 degree J517.4 nr 1
0
0
0
0
0
0
0
0
0
0
0
0
0
0

To Part Summary Dhs.

0
PIPE WORK - FITTINGS AND VALVES
(Cont'd…)
0
0 Supply, lay and joint GRP pipe fitting in trench
in accordance with specification clause PS
6/62

Junctions & Branches


0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF DUBAI MUNICIPALITY - SECTION Nr. d/12/274
EXPO 2020 ROADS NETWORK IRRIGATION WORKS d 12
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.

Part 12 - Works for DM - Irrigation Section


0
A 800 x 800 x 200 mm dia Tee. J524.1 nr 1
0
B 800 x 800 x 500 mm dia Tee. J524.2 nr 1
0
C 800 x 800 x 800 mm dia Tee. J524.3 nr 2
0
D 1800 x 1800 x 1800 mm dia Tee. J527 nr 1
0
Endcaps

E 200mmdia endcap J591 nr 1


0
F 500mmdia endcap J594.1 nr 2
0
G 800mmdia endcap J594.2 nr 4
0
H 1800mmdia endcap J597 nr 1
0
0 Take from Contractor's store and reinstall
0
J Gate valve assembly for 200 mm dia pipe line
(FC Chamber). J811 nr 1
0
K Gate valve assembly for 500 mm dia pipe line
(FC Chamber). J813 nr 1
0
L Gate valve assembly for 800 mm dia pipe line
(FC Chamber). J814.1 nr 1
0
M Washout valves assembly for 800 mm dia pipe
line. J814.2 nr 1
0
N Air valve assembly for 800 mm dia pipe line. J864 nr 2
0
P Inlet valve assembly for 1800 mm dia pipe line .
J897 nr 1
0
0

0
0

To Part Summary Dhs.

0
0
0
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF DUBAI MUNICIPALITY - SECTION Nr. d/12/275
EXPO 2020 ROADS NETWORK IRRIGATION WORKS d 12
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.

Part 12 - Works for DM - Irrigation Section


0
0 PIPE WORK MANHOLES AND PIPE WORK
ANCILLARIES

0
Chambers complete including supply of all
ladders, pipe work, pipe pieces, stub pipe,
pipe fittings, ductile manhole covers, extra
joints, extra excavation, extra backfilling, extra
reinforcement, protective coating and lining
metal work

0
0 Valve chambers
0
A Gate valve chamber (FC Connection) on 200mm
dia GRP pipe line; depth 1.5 -2.0 m. K232.1 nr 1
0
B Gate valve chamber (FC Connection) on 500mm
dia GRP pipe line; depth 1.5 -2.0 m. K232.2 nr 1
0
C Gate valve chamber (FC Connection) on 500mm
dia GRP pipe line; depth 2.0 -2.5 m. K233.1 nr 1
0
D Washout valve chamber on 800mm dia GRP pipe
line; depth 2.50 -3.0 m. K234.1 nr 1
0
E Air release valve chamber on 800mm dia GRP
pipe line; depth 2.00 -2.5 m. (on existing pipe) K233.2 nr 1
0
F Air release valve chamber on 800mm dia GRP
pipe line; depth 2.50 -3.0 m. K234.2 nr 1
0
G Inlet valve chamber on 1800mm dia GRP pipe
line; depth 3.0 -3.5 m. (on existing pipe) K235 nr 1
0
H Inlet valve chamber on 1800mm dia GRP pipe
line; depth 3.5 -4.0 m. (on existing pipe) K236 nr 1
0
0
0
0
0
0
0
0
0
0

0
0
0
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF DUBAI MUNICIPALITY - SECTION Nr. d/12/276
EXPO 2020 ROADS NETWORK IRRIGATION WORKS d 12
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.

Part 12 - Works for DM - Irrigation Section


0
0
0

To Part Summary Dhs.

0
0
0
0 PIPE WORK - MANHOLES AND PIPE WORK
ANCILLARIES (Cont'd....)

0 Ducts
0
0 Supply and lay in trench uPVC ducts including
end caps, draw ropes and duct markers

A 1-way, 300mm dia Depth not exceeding 1.5m. K512.1 m 1,145


0
B 1-way, 300mm dia Depth not exceeding 1.5m. K512.2 m 15
0
C 2-way, 150mm dia Depth not exceeding 1.5m. K522.1 m 1,145
0
0 Extend existing ducts, including connection to
existing duct, end caps, draw ropes and duct
markers

D 1-way 300mm dia uPVC duct (along existing


300mm AC); depth not exceeding 1.5m. K512.3 m 85
0
E 1-way 300mm dia uPVC duct (along existing
300mm uPVC); depth not exceeding 1.5m. K512.4 m 85
0
F 1-way 500mm dia GRP duct (along existing
500mm AC); depth not exceeding 1.5-2.0m. K513.1 m 10
0
G 1-way 500mm dia GRP duct (along existing
500mm GRP); depth not exceeding 1.5-2.0m. K513.2 m 40
0
H 2-way 150mm dia uPVC duct (along existing
150mm uPVC); depth not exceeding 1.5m. K522.2 m 85
0
J 2-way 150mm dia uPVC duct (along existing
150mm AC); depth not exceeding 1.5m. K522.3 m 85
0
0
0
0
0
0
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF DUBAI MUNICIPALITY - SECTION Nr. d/12/277
EXPO 2020 ROADS NETWORK IRRIGATION WORKS d 12
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.

Part 12 - Works for DM - Irrigation Section


0
0
0
0
0
0
0
0
0
0
0
0

To Part Summary Dhs.

0
0
0
0 PIPE WORK - MANHOLES AND PIPE WORK
ANCILLARIES (Cont'd....)

0 Connection to pipes
0
0 Connections to existing pipe including
excavation, necessary fittings, couplers, short
pipes, thrust blocks, shutdown, water losses,
dewatering, backfilling, etc complete

A Connect new 800 mm dia GRP pipe line to


existing 800 mm dia. AC pipe line not in same
direction including necessary fittings. K864.1 nr 1
0
B Connect new 800 mm dia GRP pipe line to
existing 800 mm dia. AC pipe line in same
direction including necessary fittings. K864.2 nr 6
0
C Connect new 1800 mm dia GRP pipe line to
existing 1800 mm dia. AC pipe line not in same
direction including necessary fittings. K867.1 nr 2
0
D Connect new 1800 mm dia GRP pipe line to
existing 1800 mm dia. AC pipe line in same
direction including necessary fittings. K867.2 nr 2
0
0
PIPE WORK - SUPPORTS AND PROTECTION,
ANCILLARIES TO LAYING AND EXCAVATION.
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF DUBAI MUNICIPALITY - SECTION Nr. d/12/278
EXPO 2020 ROADS NETWORK IRRIGATION WORKS d 12
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.

Part 12 - Works for DM - Irrigation Section


0
0 Non disruptive special pipe laying using micro
tunnelling methods for installing pipes. (The
rate shall include for all service diversions,
reinstatements, sleeve pipes/ caisson pipes,
concrete encasement, surplus material
removals, grouting etc. complete)

0
E For 800mm dia pipe L294 m 50
0
0 Access and reciving Pits for NDM
0
F Access Pit L900.1 nr 1
0
G Receiving Pit L900.2 nr 1
0
0

0
0
0
0
0
0

To Part Summary Dhs.

0
0
0
0 PIPE WORK - SUPPORTS AND PROTECTION
ANCILLARIES TO LAYING AND EXCAVATION
(Cont'd…)

0 Beds and surrounds including warning tape as


applicable

A Imported granular material bed and surround to


200mm dia GRP pipe. L532 m 10
0
B Imported sand bed and surround to 1 way 300mm
dia duct. L512 m 660
0
C Imported granular bed and surround to 1 way
500mm dia duct. L533.1 m 35
0
D Imported granular material bed and surround to
500mm dia GRP pipe. L533.2 m 10
0
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF DUBAI MUNICIPALITY - SECTION Nr. d/12/279
EXPO 2020 ROADS NETWORK IRRIGATION WORKS d 12
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.

Part 12 - Works for DM - Irrigation Section


0
E Imported granular material bed and surround to
800mm dia GRP pipe. L534 m 565
0
F Imported granular material bed and surround to
1800mm dia GRP pipe. L537 m 10
0
G Imported sand bed and surround to 2 way 150mm
dia duct. L511 m 620
0
H Selected excavated material bed and surround to
1 way 300mm dia duct. L522 m 665
0
J Selected excavated material bed and surround to
1 way 500mm dia duct. L523 m 40
0
K Selected excavated material bed and surround to
2 way 150mm dia duct. L521 m 665
0
0 Geotextile Filter Fabric membrane as per
Specifications

L For 200mm dia. pipe. L900.1 m 10


0
M For 500mm dia. pipe. L900.2 m 10
0
N For 800mm dia. pipe. L900.3 m 575
0
P For 1800mm dia. pipe. L900.4 m 20
0
0
0
0
0
0

To Part Summary Dhs.

0 PIPE WORK - SUPPORTS AND PROTECTION


ANCILLARIES TO LAYING AND EXCAVATION
(Cont'd…)

0 Concrete Thrust Blocks as Detailed Drawings

A Volume not exceeding 0.1m3 Concrete 30/20 L719 nr 1


0
B Volume 0.1 - 0.2m3 Concrete 30/20 L729 nr 3
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF DUBAI MUNICIPALITY - SECTION Nr. d/12/280
EXPO 2020 ROADS NETWORK IRRIGATION WORKS d 12
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.

Part 12 - Works for DM - Irrigation Section


0
0
C Volume 0.2 - 0.5m3 Concrete 30/20 L739 nr 1
0
D Volume 0.5 - 1.0m3 Concrete 30/20 L749 nr 2
0
E Volume 1.0 - 2.0m3 Concrete 30/20 L759 nr 2
0
F Volume 2.0 - 4.0m3 Concrete 30/20 L769 nr 3
0
G Volume 4.0 - 6.0m3 Concrete 30/20 L779 nr 1
0
H Volume 6-8m3 Concrete 30/20 L789.1 nr 3
0
J Volume 10-12m3 Concrete 30/20 L789.2 nr 2
0
K Volume 12-14m3 Concrete 30/20 L789.3 nr 1
0
L Volume 14-16m3 Concrete 30/20 L789.4 nr 1
0
M Volume 16-20m3 Concrete 30/20 L789.5 nr 1
0
N Volume 20-25m3 Concrete 30/20 L789.6 nr 1
0
P Volume 25-30m3 Concrete 30/20 L789.7 nr 5
0
Q Volume 30-35m3 Concrete 30/20 L789.8 nr 1
0
R Volume 35-40m3 Concrete 30/20 L789.9 nr 1
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

To Part Summary Dhs.

PART SUMMARY
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF DUBAI MUNICIPALITY - SECTION Nr. d/12/281
EXPO 2020 ROADS NETWORK IRRIGATION WORKS d 12
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.

Part 12 - Works for DM - Irrigation Section


0

Page d/12/1

Page d/12/2

Page d/12/3

Page d/12/4

Page d/12/5

Page d/12/6

Page d/12/7

Page d/12/8

Page d/12/9

Page d/12/10
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF DUBAI MUNICIPALITY - SECTION Nr. d/12/282
EXPO 2020 ROADS NETWORK IRRIGATION WORKS d 12
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.

Part 12 - Works for DM - Irrigation Section


0

Total for Part 12 - Works for DM - Irrigation Section


Carried to Grand Summary Dhs.
PAGE Nr.

d/12/283

AMOUNT
UAE. Dhs.

0.00

0.00

0.00

0.00

0.00

0.00

0.00
PAGE Nr.

d/12/284

AMOUNT
UAE. Dhs.

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
PAGE Nr.

d/12/285

AMOUNT
UAE. Dhs.

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
PAGE Nr.

d/12/286

AMOUNT
UAE. Dhs.

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
PAGE Nr.

d/12/287

AMOUNT
UAE. Dhs.

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
PAGE Nr.

d/12/288

AMOUNT
UAE. Dhs.

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
PAGE Nr.

d/12/289

AMOUNT
UAE. Dhs.

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
PAGE Nr.

d/12/290

AMOUNT
UAE. Dhs.

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
PAGE Nr.

d/12/291

AMOUNT
UAE. Dhs.

0.00

0.00

0.00

0.00

0.00
PAGE Nr.

d/12/292

AMOUNT
UAE. Dhs.

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
PAGE Nr.

d/12/293

AMOUNT
UAE. Dhs.

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
PAGE Nr.

d/12/294

AMOUNT
UAE. Dhs.

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
PAGE Nr.

d/12/295

AMOUNT
UAE. Dhs.

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
PAGE Nr.

d/12/296

AMOUNT
UAE. Dhs.

0.00
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF DUBAI MUNICIPALITY - SECTION Nr. d/13/297
EXPO 2020 ROADS NETWORK DRAINAGE WORKS d 13
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.

Part 13 - Dubai Municipality - Drainage Works

0
0
0 DEMOLITION
0
0 Carefully excavate, expose and remove
existing drainage pipe lines and cart to
approved tip including fittings, surrounds,
backfilling of voids etc.

0
A 160mm dia. uPVC gully pipe. D610.1 m 135
0
B 200mm dia. uPVC pipe. D610.2 m 250
0
C 200mm dia. Slotted uPVC pipe. D610.3 m 360
0
D 250mm dia. uPVC pipe. D610.4 m 85
0
E 315mm dia. uPVC pipe. D610.5 m 252
0
F 400mm dia. uPVC pipe. D610.6 m 235
0
0
0
0 PRECAST CONCRETE
0
0 Precast reinforced concrete protection slabs
placed over existing pipe lines as detailed on
Dwg. U2.1.9 including excavation, backfilling,
bitumen paint and 50mm polystyrene board

0
G 1200 x 500 x 150mm thick. H511.1 nr 40
0
H 1600 x 500 x 150mm thick. H511.2 nr 75
0
J 2500 x 500 x 150mm thick. H521 nr 30
0
0
0
0
0
0
0
0

0
0
0
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF DUBAI MUNICIPALITY - SECTION Nr. d/13/298
EXPO 2020 ROADS NETWORK DRAINAGE WORKS d 13
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.

Part 13 - Dubai Municipality - Drainage Works

0
0
0
0
0
0
0

To Part Summary Dhs.

0
0 PIPE WORK - PIPES
0
0 Supply and lay uPVC pipes to BS 4660 & 5481
storm water drain laid and jointed in trenches
including excavation, backfilling, etc.

0 160mm dia uPVC gully pipe


0
A Depth not exceeding 1.5m I512.1 m 4,850
0
B Depth 1.5 - 2.0m. I513.1 m 900
0
C Depth 2.0 - 2.5m. I514.1 m 750
0
0 200mm dia uPVC gully pipe
0
D Depth not exceeding 1.5m I512.2 m 175
0
E Depth 1.5 - 2.0m. I513.2 m 75
0
F Depth 2.0 - 2.5m. I514.2 m 75
0
0
60 250mm dia uPVC
0
G Depth 2.5 - 3.0m. I525 m 144
0
H Depth 3.0 - 3.5m. I526 m 251
0
J Depth 3.5 - 4.0m. I527 m 40
0
K Depth 4.0 - 4.5m. I528 m 221
0
0
0
6 315mm dia uPVC
0
L Depth 2.5 - 3.0m. I525 m 400
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF DUBAI MUNICIPALITY - SECTION Nr. d/13/299
EXPO 2020 ROADS NETWORK DRAINAGE WORKS d 13
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.

Part 13 - Dubai Municipality - Drainage Works

0
0
M Depth 3.0 - 3.5m. I526 m 150
0
N Depth 3.5 - 4.0m. I527 m 37
0
P Depth 4.0 - 4.5m. I528 m 50
0
0

0
0
0
0

To Part Summary Dhs.

REV-02
0
0 PIPE WORK - PIPES (Cont'd…)
0
0 Supply, lay and joint pipeline Not in trench
through microtunnelled sleeve including
special joints and connections, testing and
complete as specified. (micro tunnelling
measured separately)

A 200mm dia. uPVC pipe I511 m 125


0
B 250mm dia. uPVC pipe I521 m 25
0
0
0 Supply, lay and joint GRP pipline in trenches
including excavation, backfilling, special joints
6
and connections, detectable waring tape, etc.
complete as specified.

0 Nominal bore 300 - 600 mm


0
C 400mm dia depth 1.5-2.0m. I633.1 m 20
0
D 400mm dia depth 2.0-2.5m. I634 m 800
0
E 400mm dia depth 2.5-3.0m. I635.1 m 400
0
F 400mm dia depth 3.0-3.5 m. I636.1 m 100
0
G 400mm dia depth 3.5-4.0 m. I637.1 m 50
0
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF DUBAI MUNICIPALITY - SECTION Nr. d/13/300
EXPO 2020 ROADS NETWORK DRAINAGE WORKS d 13
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.

Part 13 - Dubai Municipality - Drainage Works

0
H 400mm dia depth 4.0-4.5 m. I638.1 m 50
0
J 400mm dia depth 4.0-4.5 m. I638.2 m 50
0
K 400mm dia depth 5.0-5.5 m. I638.3 m 100
0
L 400mm dia depth 5.5-6.0 m. I638.4 m 100
0
M 400mm dia depth 6.0-6.5 m. I638.5 m 100
0
N 500mm dia depth 1.5-2.0m. I633.2 m 75
0
P 500mm dia depth 2.0-2.5m. I634 m 400
0
Q 500mm dia depth 2.5-3.0m. I635.2 m 1,037
0
R 500mm dia depth 3.0-3.5 m. I636.2 m 533
0
S 500mm dia depth 3.5-4.0 m. I637.2 m 420
0
T 500mm dia depth 4.0-4.5 m. I638.2 m 251
0
U 500mm dia depth 4.5-5.0 m. I638.3 m 300
0

To Part Summary Dhs.

REV-02
0
0 PIPE WORK - PIPES (Cont'd…)
0
0 Supply, lay and joint GRP pipline in trenches
including excavation, backfilling, special joints
6 and connections, detectable waring tape, etc.
complete as specified. (Cont'd…)

0 Nominal bore 300 - 600 mm (Cont'd…)


0
A 600mm dia depth 1.5-2.0m. I633 m 10
0
B 600mm dia depth 2.0-2.5m. I634 m 10
0
C 600mm dia depth 2.0-3.0m. I635 m 40
0
D 600mm dia depth 3.0-3.5 m. I636 m 226
0
E 600mm dia depth 3.5-4.0 m. I637 m 100
0
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF DUBAI MUNICIPALITY - SECTION Nr. d/13/301
EXPO 2020 ROADS NETWORK DRAINAGE WORKS d 13
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.

Part 13 - Dubai Municipality - Drainage Works

0
F 600mm dia depth 4.0-4.5 m. I638.1 m 154
0
G 600mm dia depth 4.5-5.0 m. I638.2 m 479
0
H 600mm dia depth 5.0-5.5 m. I638.3 m 100
0
J 600mm dia depth 5.5-6.0 m. I638.4 m 95
0
K 600mm dia depth 6.0-6.5 m. I638.5 m 25
0
0 Nominal bore 600 - 900 mm
0
L 800mm dia depth 2.0-2.5m. I644.2 m 10
0
M 800mm dia depth 3.5-4.0m. I647 m 10
0
N 800mm dia depth 4.0-4.5m. I637 m 105
0
P 800mm dia depth 6.5-7.0m. I648 m 72
0
Q 800mm dia depth 7.0-7.5m. I648.6 m 15
0
0
0
0
0
0
0
0
0
0

0
0

To Part Summary Dhs.

REV-02
0
0 PIPE WORK - PIPES (Cont'd…)
0
0 Supply, lay and joint GRP pipline in trenches
including excavation, backfilling, special joints
6
and connections, detectable waring tape, etc.
complete as specified. (Cont'd…)

0 Nominal bore 900 - 1200 mm


0
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF DUBAI MUNICIPALITY - SECTION Nr. d/13/302
EXPO 2020 ROADS NETWORK DRAINAGE WORKS d 13
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.

Part 13 - Dubai Municipality - Drainage Works

0
A 1000mm dia depth 3.5-4.0m. I657 m 10
0
B 1000mm dia depth 5.5-6.0m. I658.1 m 40
0
C 1000mm dia depth 6.0-6.5m. I658.2 m 100
0
D 1000mm dia depth 6.5-7.0m. I658.3 m 150
0
E 1000mm dia depth 7.0-7.5m. I658.4 m 428
0
F 1000mm dia depth 7.5-8.0m. I658.5 m 170
0
G 1000mm dia depth 8.5-9.0m. I658.6 m 30
0
H 1200mm dia depth 6.0-6.5m. I658.7 m 12
0
J 1200mm dia depth 6.5-7.0m. I658.8 m 16
0
K 1200mm dia depth 7.5-8.0m. I658.10 m 30
0
L 1200mm dia depth 8.0-8.5m. I658.11 m 60
0
M 1200mm dia depth 8.5-9.0m. I658.12 m 270
0
N 1200mm dia depth 9.0-9.5m. I658.13 m 100
0
P 1200mm dia depth 9.5-10.0m. I658.14 m 70
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

To Part Summary Dhs.

REV-02
0
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF DUBAI MUNICIPALITY - SECTION Nr. d/13/303
EXPO 2020 ROADS NETWORK DRAINAGE WORKS d 13
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.

Part 13 - Dubai Municipality - Drainage Works

0
0 PIPE WORK - PIPES (Cont'd…)
0
0
0
0
0 Supply, lay and joint GRP pipline not in
trenches including excavation, backfilling,
special joints and connections, detectable
waring tape, etc. complete as specified.

A For 200mm dia pipe I611 m 50


0
B For 250mm dia pipe I621 m 90
0
C For 315mm dia pipe I631 m 90
0
D For 800mm dia pipe I641 m 115
0
E For 1000mm dia pipe I651 m 190
0
F For 1200mm dia pipe I651 m 75
4
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF DUBAI MUNICIPALITY - SECTION Nr. d/13/304
EXPO 2020 ROADS NETWORK DRAINAGE WORKS d 13
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.

Part 13 - Dubai Municipality - Drainage Works

0
0
0
0
0
0

To Part Summary Dhs.

REV-01
0
04 PIPE WORK - PIPES (Cont'd…)
0
0 Slotted drain with gravel trench as shown on
Volume 2, Part IV Appendix 4 detail nr 402
including excavation, uPVC slotted pipe and
fittings, natural gravel bed and surround,
natural gravel fill, sand back fill, geotextile
membrane and romoval surplus excavated
material

0 250mm dia uPVC (Slotted drain)

A Depth not exceeding 1.5m I522 m 100


0
B Depth 1.5 - 2.0m. I523 m 395
0
C Depth 2.0 - 2.5m. I524 m 121
0
315mm dia uPVC (Slotted drain)

D Depth not exceeding 1.5m I532 m 50


0
E Depth 1.5 - 2.0m. I533 m 75
0
F Depth 2.0 - 2.5m. I534 m 275
6
0
0 Land drain with gravel trench as shown on
Volume 2, Part IV Appendix 4 detail nr 403
including excavation, uPVC pipe and fittings,
natural gravel bed and surround, natural
gravel fill, sand back fill, geotextile membrane
and romoval surplus excavated material

G 200mm dia; depth not exceeding 1.5m. K499.1 m 7,040


0
H 200mm dia; depth 1.5 - 2.0m. K499.2 m 3,017
0
0
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF DUBAI MUNICIPALITY - SECTION Nr. d/13/305
EXPO 2020 ROADS NETWORK DRAINAGE WORKS d 13
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.

Part 13 - Dubai Municipality - Drainage Works

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

To Part Summary Dhs.

REV-02
0
0 PIPE WORK - FITTINGS AND VALVES
0
0 uPVC pipe fittings to BS 4660 & 5481
0
A 160 mm dia 15 degree bend. J411.1 nr 10
0
B 160 mm dia 30 degree bend. J411.2 nr 15
0
C 160 mm dia 45 degree bend. J411.3 nr 9
0
D 160 mm dia 60 degree bend. J411.4 nr 8
0
E 160 mm dia 90 degree bend. J411.5 nr 7
0
F 200 mm dia 30 degree bend. J411.6 nr 8
0
G 200 mm dia 45 degree bend. J411.7 nr 6
0
H 200 mm dia 60 degree bend. J411.8 nr 8
0
J 200 mm dia 90 degree bend. J411.9 nr 7
0
K 160 x 200 x 200mm junction. J421 nr 15
0
L 250 x 250 x 160mm junction. J422.1 nr 14
0
M 250 x 250 x 200mm junction. J422.2 nr 8
0
N 160 x 200 reducer. J431 nr 6
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF DUBAI MUNICIPALITY - SECTION Nr. d/13/306
EXPO 2020 ROADS NETWORK DRAINAGE WORKS d 13
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.

Part 13 - Dubai Municipality - Drainage Works

0
0
P 250 mm dia end cap. J492.1 nr 1
0
0
0
0 Pipe stubs for future connection including end
cap, additional excavation, backfill, bedding
4
etc complete

Q 250 mm dia, uPVC stub pipe. J492.2 nr 1


0
R 315 mm dia, uPVC stub pipe. J493.1 nr 1
0
S 400 mm dia, uPVC stub pipe. J493.2 nr 2
0
0
0
0
0
0
0
0
0
0
0

To Part Summary Dhs.

REV-01
0
0 PIPE WORK - FITTINGS AND VALVES
(Cont'd…)

0
4 0 Straight Specials Pipes
0
A uPVC Pipe Fittings Straight Specials as Rocker
Pipes-200 mm dia 600 long J481 nr 20
0
B uPVC Pipe Fittings Straight Specials as Rocker
Pipes-250 mm dia 600 long J482 nr 48
0
C uPVC Pipe Fittings Straight Specials as Rocker
Pipes-315 mm dia 600 long J483.1 nr 8
0
D GRP Pipe Fittings Straight Specials as Rocker
Pipes-400 mm dia 1000 long J483.2 nr 2
0
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF DUBAI MUNICIPALITY - SECTION Nr. d/13/307
EXPO 2020 ROADS NETWORK DRAINAGE WORKS d 13
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.

Part 13 - Dubai Municipality - Drainage Works

0
E GRP Pipe Fittings Straight Specials as Rocker
Pipes-500 mm dia 1000 long J483.3 nr 4
0
F GRP Pipe Fittings Straight Specials as Rocker
Pipes-600 mm dia 1000 long J483.4 nr 8
0
G GRP Pipe Fittings Straight Specials as Rocker
Pipes-800 mm dia 1000 long J484.2 nr 6
0
H GRP Pipe Fittings Straight Specials as Rocker
Pipes-1000 mm dia 1000 long J485 nr 2
0
0
J GRP Pipe Fittings Straight Specials as Rocker
Pipes-1200 mm dia 1000 long J484.1 nr 26
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

To Part Summary Dhs.

REV-01
0
0 PIPE WORK - MANHOLES AND PIPE WORK
4
ANCILLARIES

0 Manholes
0
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF DUBAI MUNICIPALITY - SECTION Nr. d/13/308
EXPO 2020 ROADS NETWORK DRAINAGE WORKS d 13
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.

Part 13 - Dubai Municipality - Drainage Works

0
0 Manhole complete as detailed in Volume 2 Part
IV Appendix 4; including frame and cover

06 Type G
0
A Depth not exceeding 1.5m. K131.1 nr 1
0
B Depth 1.5 - 2.0m. K132.1 nr 1

C Depth 2.0 - 2.5m. K133.1 nr 2

D Depth 2.5 - 3.0m. K134.1 nr 1

6
0 Type H
0
E Depth not exceeding 1.5m. K131.2 nr 1
0
F Depth 1.5 - 2.0m. K132.2 nr 1
0
G Depth 2.0 - 2.5m. K133.2 nr 16
0
H Depth 2.5 - 3.0m. K134.2 nr 18
0
J Depth 3.0 - 3.5m. K135 nr 13
0
K Depth 3.5 - 4.0m. K136.1 nr 2
0
L Depth 4.0 - 4.5m. K137.1 nr 1
0
6
0 Type I
0
M Depth 3.5 - 4.0m. K136.2 nr 8
0
N Depth 4.0 - 4.5m. K137.2 nr 10
0
P Depth 4.5 - 5.0m. K137.3 nr 6
0
Q Depth 5.0 - 5.5m. K137.4 nr 1
0
0

0
0
0
0
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF DUBAI MUNICIPALITY - SECTION Nr. d/13/309
EXPO 2020 ROADS NETWORK DRAINAGE WORKS d 13
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.

Part 13 - Dubai Municipality - Drainage Works

To Part Summary Dhs.

REV-03
0
04 PIPE WORK - MANHOLES AND PIPE WORK
ANCILLARIES (Cont'd…)

0
0 Manhole complete as detailed in Volume 2 Part
IV Appendix 4; including frame and cover
(Cont'd…)

05 Type I (Cont'd...)
0
0
A Depth 5.5 - 6.0m. K137.1 nr 1
0
B Depth 6.0 - 6.5m. K137.2 nr 1
0
0 Type J
0
5
C Depth 3.5 - 4.0m. K136 nr 1
6
0
D Depth 4.5 - 5.0m. K137.3 nr 1
0
E Depth 5.5 - 6.0m. K137.4 nr 1
0
F Depth 6.0 - 6.5m. K137.5 nr 1
0
G Depth 6.5 - 7.0m. K137.6 nr 1
0
H Depth 7.0 - 7.5m. K137.7 nr 1
0
J Depth 7.5 - 8.0m. K137.8 nr 1
0
0
6 Type K
0
0
K Depth 5.5 - 6.0m. K137.9 nr 1
0
L Depth 6.0 - 6.5m. K137.10 nr 2
0
M Depth 6.5 - 7.0m. K137.11 nr 3
0
N Depth 7.0 - 7.5m. K137.12 nr 3
0
P Depth 7.5 - 8.0m. K137.13 nr 3
0
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF DUBAI MUNICIPALITY - SECTION Nr. d/13/310
EXPO 2020 ROADS NETWORK DRAINAGE WORKS d 13
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.

Part 13 - Dubai Municipality - Drainage Works

0
Q Depth 8.0 - 8.5m. K137.14 nr 1
0
R Depth 8.5 - 9.0m. K137.15 nr 1
0
0
0
0
0
0
0

To Part Summary Dhs.

REV-03
0
0 PIPE WORK - MANHOLES AND PIPE WORK
4 ANCILLARIES (Cont'd…)

0
0 Manhole complete as detailed in Volume 2 Part
IV Appendix 4; including frame and cover
(Cont'd…)

6
0 Type L
0
A Depth 6.0 - 6.5m. K137.7 nr 1
0
B Depth 6.5 - 7.0m. K137.8 nr 2
0
C Depth 7.0 - 7.5m. K137.9 nr 1
0
D Depth 7.5 - 8.0m. K137.10 nr 1
0
E Depth 8.0 - 8.5m. K137.11 nr 1
0
F Depth 8.5 - 9.0m. K137.11 nr 4
0
G Depth 9.5 - 10.0m. K137.11 nr 1
0
0
0
0
0
0
0
0
0
0
0
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF DUBAI MUNICIPALITY - SECTION Nr. d/13/311
EXPO 2020 ROADS NETWORK DRAINAGE WORKS d 13
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.

Part 13 - Dubai Municipality - Drainage Works

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

To Part Summary Dhs.

REV-02
0
0 PIPE WORK - MANHOLES AND PIPE WORK
ANCILLARIES (Cont'd…)

0
0 Other stated chambers
0
A Insitu concrete Gully Chamber with grates
complete as detailed on drawings and as per
specification ; maximum depth not exceeding
2.0m. K232 nr 34
0
B Insitu concrete Gully Chamber with grates
complete as detailed on drawings and as per
specification ; depth 2.0 - 2.5m. K233 nr 16
0
0
06 Gullies
0
C Side entry gully complete as per DM standard
detail no. 604 , including removable basket,
concrete surround, gully frame and cover,
excavation, backfilling, compaction and removal
of surplus material to tip.
K370.1 nr 105
0
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF DUBAI MUNICIPALITY - SECTION Nr. d/13/312
EXPO 2020 ROADS NETWORK DRAINAGE WORKS d 13
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.

Part 13 - Dubai Municipality - Drainage Works

0
D Side entry gully complete as per DM standard
detail no. 605, including removable basket,
concrete surround, gully frame and cover,
excavation, backfilling, compaction and removal
of surplus material to tip.
K370.2 nr 55
0
E Top entry gully complete as per DM standards
including removable basket, concrete surround,
gully frame and cover, excavation, backfilling,
compaction and removal of surplus material to tip.
K370.3 nr 165
0
F Reinstall set aside gully in new location including
connection to gulley pipes, excavation, backfilling,
compaction and removal of surplus material to tip.
K370.4 nr 5
0
G Special detail (Bridge deck-Scupper drain) gully
including removable basket, gully frame, cover,
4 150mm dia uPVC pipe, fittings, etc complete as
shown in drawing U-2935. K370.5 nr 6
0
0
0
0
0
0
0
0
0

To Part Summary Dhs.

REV-03
0
0 PIPE WORK - MANHOLES AND PIPE WORK
ANCILLARIES (Cont'd…)

0
04 Drain Chute
0
0 Drain Chute complete including earthwork,
concrete, concrete ancillaries, stone pitching
and subgrade as detailed in drawing U-2931.

A Drain Chute for elevation not exceeding 3m K490.1 nr 2


0
B Drain Chute for elevation 3.0 - 5.0 m K490.2 nr 2
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF DUBAI MUNICIPALITY - SECTION Nr. d/13/313
EXPO 2020 ROADS NETWORK DRAINAGE WORKS d 13
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.

Part 13 - Dubai Municipality - Drainage Works

0
0
C Drain Chute for elevation 5.0 - 7.0 m K490.3 nr 4
0
0 Reinstatement
0
D Breaking of existing pavement of main roads and
reinstate including saw cutting; pipe bore not
exceeding 300mm. K731.1 m 50
0
E Breaking of existing pavement of service roads
and reinstate including saw cutting; pipe bore not
exceeding 300mm. K731.2 m 50
0
F Breaking of existing pavement of main roads and
reinstate including saw cutting; pipe bore 300-
900mm. K732.1 m 25
0
G Breaking of existing pavement of service roads
and reinstate including saw cutting; pipe bore
300-900mm. K732.2 m 25
0
H Breaking of existing pavement of main roads and
reinstate including saw cutting; pipe bore 900-
1800mm. K733.1 m 25
0
J Breaking of existing pavement of service roads
and reinstate including saw cutting; pipe bore
900-1800mm. K733.2 m 25
0
0
0
0
0
0
0
0
0
0
0
0

To Part Summary Dhs.

REV-01
0
0 PIPE WORK - MANHOLES AND PIPE WORK
ANCILLARIES (Cont'd…)

0 Connection to Existing Pipe / Manholes


0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF DUBAI MUNICIPALITY - SECTION Nr. d/13/314
EXPO 2020 ROADS NETWORK DRAINAGE WORKS d 13
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.

Part 13 - Dubai Municipality - Drainage Works

0
0
0 Connection to existing pipes / manholes
including excavation, necessary fittings,
couplers, short pipes, over pumping,
diversion, dewatering, backfilling, etc
complete

A Connect new 160/200 mm dia uPVC gully pipe to


existing manhole including re-benching, additional
fittings, excavation, backfill etc. K851 nr 2
0
B Connect new 160/200 mm dia uPVC gully pipe to
existing 250mm dia UPVC drainage pipe including
additional fittings, excavation, backfill etc.
K861 nr 7
0
C Connect new 1000 mm dia uPVC pipe to existing
manhole including re-benching, additional fittings,
excavation, backfill etc. K855 nr 2
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF DUBAI MUNICIPALITY - SECTION Nr. d/13/315
EXPO 2020 ROADS NETWORK DRAINAGE WORKS d 13
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.

Part 13 - Dubai Municipality - Drainage Works

0
0

To Part Summary Dhs.

REV-01
0
0 PIPE WORK - SUPPORTS AND PROTECTION,
6 ANCILLARIES TO LAYING AND EXCAVATION

0
0 Beds and Surrounds
0
0 Imported granular material bed and surround

0
A For 160mm dia uPVC gully pipe L531.1 m 6,110
0
B For 200mm dia uPVC gully pipe L531.2 m 306
0
C For 250mm dia uPVC L532.1 m 617
0
D For 315mm dia L533.2 m 599
0
E For 400mm dia L533.2 m 1,664
0
F For 500mm dia L533.3 m 2,835
0
G For 600mm dia L533.4 m 1,165
0
H For 800mm dia L534.3 m 199
0
J For 1000mm dia L535.1 m 872
0
K For 1200mm dia L535.3 m 525
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF DUBAI MUNICIPALITY - SECTION Nr. d/13/316
EXPO 2020 ROADS NETWORK DRAINAGE WORKS d 13
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.

Part 13 - Dubai Municipality - Drainage Works

0
0
0
0
0
0
0
0
0
0
0
0

To Part Summary Dhs.

REV-02
0
0 PIPE WORK - SUPPORTS AND PROTECTION,
ANCILLARIES TO LAYING AND EXCAVATION
6
(Cont'd…)

0
0 Mass Concrete surround class 25/20 including
polythene sheet, bitumen paint and detectable
warning tape as applicable

0
0 Mass concrete class 25/20 surround
0
A For 160mm dia uPVC gully pipe L541.1 m 390
0
B For 200mm dia uPVC gully pipe L541.2 m 20
0
C For 250mm dia uPVC L542.1 m 39
0
D For 315mm dia uPVC L543.1 m 38
0
0
0
0 Reinforced concrete class 40/20 surround
0
E For 400mm dia L543.2 m 106
0
F For 500mm dia L543.3 m 181
0
G For 600mm dia L543.4 m 74
0
H For 800mm dia L544.2 m 13
0
J For 1000mm dia L545.1 m 56
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF DUBAI MUNICIPALITY - SECTION Nr. d/13/317
EXPO 2020 ROADS NETWORK DRAINAGE WORKS d 13
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.

Part 13 - Dubai Municipality - Drainage Works

0
0
K For 1200mm dia L545.3 m 33
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

To Part Summary Dhs.

REV-02
0
0 PIPE WORK - SUPPORTS AND PROTECTION,
6 ANCILLARIES TO LAYING AND EXCAVATION
(Cont'd…)

0
0 Geotextile Filter Fabric Membrane as per
Specifications to granular bed and surround
(granular bed and surround measured
separately)

0
A For 160mm dia uPVC gully pipe L900.1 m 6,500
0
B For 200mm dia uPVC gully pipe L900.2 m 325
0
C For 250mm dia uPVC L900.3 m 656
0
D For 315mm dia uPVC L900.4 m 637
0
E For 400mm dia L900.5 m 1,770
0
F For 500mm dia L900.6 m 3,016
0
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF DUBAI MUNICIPALITY - SECTION Nr. d/13/318
EXPO 2020 ROADS NETWORK DRAINAGE WORKS d 13
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.

Part 13 - Dubai Municipality - Drainage Works

0
G For 600mm dia L900.7 m 1,279
0
H For 800mm dia L900.8 m 212
0
J For 1000mm dia L900.10 m 928
0
K For 1200mm dia L900.12 m 558
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

To Part Summary Dhs.

REV-02
0
0 PIPE WORK - SUPPORTS AND PROTECTION,
ANCILLARIES TO LAYING AND EXCAVATION
(Cont'd…)

0
0
PIPE WORK - SUPPORTS AND PROTECTION,
ANCILLARIES TO LAYING AND EXCAVATION.
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF DUBAI MUNICIPALITY - SECTION Nr. d/13/319
EXPO 2020 ROADS NETWORK DRAINAGE WORKS d 13
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.

Part 13 - Dubai Municipality - Drainage Works

0
0 Non disruptive special pipe laying using micro
tunnelling methods for installing pipes. (The
rate shall include for all service diversions,
reinstatements, sleeve pipes/ caisson pipes,
concrete encasement, surplus material
removals, grouting etc. complete)

0
A For 200mm dia pipe L291 m 50
0
B For 250mm dia pipe L292 m 90
0
C For 315mm dia pipe L293 m 90
0
D For 800mm dia pipe L294 m 115
0
E For 1000mm dia pipe L295 m 190
0
F For 1200mm dia pipe L296 m 75
4
0
0 Access and reciving Pits for NDM
0
G Access Pit L900.1 nr 8
0
H Receiving Pit L900.2 nr 8
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0

To Part Summary Dhs.


0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF DUBAI MUNICIPALITY - SECTION Nr. d/13/320
EXPO 2020 ROADS NETWORK DRAINAGE WORKS d 13
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.

Part 13 - Dubai Municipality - Drainage Works

0
REV-02
0
0 MISCELLANEOUS WORKS
0
A Adjust cover levels of existing gullies to suit
proposed levels, maximum level adjustment upto
0.25m. X900.1 nr 2
0
B Adjust cover levels of existing gullies to suit
proposed levels, level adjustment 0.25 - 0.5m. X900.2 nr 2
0
C Adjust cover levels of existing drainage manholes
to suit proposed levels, level adjustment upto
0.25m. X900.4 nr 2
0
D Adjust cover levels of existing drainage manholes
to suit proposed levels, level adjustment 0.25 -
0.5m. X900.5 nr 2
0
E Adjust cover levels of existing drainage manholes
to suit proposed levels, level adjustment 0.5 -
0.75m. X900.6 nr 2
0
0
05
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF DUBAI MUNICIPALITY - SECTION Nr. d/13/321
EXPO 2020 ROADS NETWORK DRAINAGE WORKS d 13
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.

Part 13 - Dubai Municipality - Drainage Works

0
0

0
0
0
0
0

To Part Summary Dhs.

REV-02
0
0 Works on existing manholes
0
A Demolish existing drainage chambers and cart to
tip including backfilling and reinstatement. Y790.1 nr 1
0
B Demolish existing drainage manholes and cart to
tip including backfilling and reinstatement. Y790.2 nr 2
0
C Demolish and dispose existing gullies including
reinstatement, hand over cover and frame to the
client store etc complete as instructed by the
Engineer. Y790.3 nr 3
0
0
0
0 Works on existing utility culvert
0
0 Allow for extending existing utility culvert
including demolition of existing wingwall and
construction of new wingwall to suit the
proposed grading.

0
D for 600Ø SWD pipe X900.1 m 45
0
E for 1000Ø SWD pipe X900.2 m 180
0
F for 1500Ø SWD pipe X900.3 m 25
0
0
60 Ditches and Swales
0 Note: Disposal of excess excavated material shall
be measured under Bill 4 - Earthworks
0
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF DUBAI MUNICIPALITY - SECTION Nr. d/13/322
EXPO 2020 ROADS NETWORK DRAINAGE WORKS d 13
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.

Part 13 - Dubai Municipality - Drainage Works

0
G Excavation for Ditches and Swales including
earthwork ancillaries etc. complete to the
dimensions and details on drawings U-2937, U-
2938 & U-2939. E299 m³ 101,634
0
H Filling to Ditches & Swales with suitable
excavated material, incluidng filling ancillaries etc.
complete to the dimensions and details on
drawings. E624 m3 2,500
0
J Cement Stabilized sand on cross slopes as
detailed on drawings R194 m2 88,601
0
0
0
0
0
0
0
0

To Part Summary Dhs.

REV-02

PART SUMMARY

Page d/13/1

Page d/13/2

Page d/13/3

Page d/13/4

Page d/13/5

Page d/13/6

Page d/13/7

Page d/13/8
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF DUBAI MUNICIPALITY - SECTION Nr. d/13/323
EXPO 2020 ROADS NETWORK DRAINAGE WORKS d 13
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.

Part 13 - Dubai Municipality - Drainage Works

Page d/13/9

Page d/13/10

Page d/13/11

Page d/13/12

Page d/13/13

Page d/13/14

Page d/13/15

Page d/13/16

Page d/13/17

To Part Summary Dhs.

PART SUMMARY (Cont'd…)


Page d/13/18

Page d/13/19

Page d/13/20

Page d/13/21

Page d/13/22
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF DUBAI MUNICIPALITY - SECTION Nr. d/13/324
EXPO 2020 ROADS NETWORK DRAINAGE WORKS d 13
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.

Part 13 - Dubai Municipality - Drainage Works

Total for Part 13 - Dubai Municipality - Drainage Works


Carried to Grand Summary Dhs.
PAGE Nr.

d/13/325

AMOUNT
UAE. Dhs.

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
PAGE Nr.

d/13/326

AMOUNT
UAE. Dhs.

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
PAGE Nr.

d/13/327

AMOUNT
UAE. Dhs.

0.00

0.00

0.00

0.00

NTT-06

0.00

0.00

0.00

0.00

0.00

0.00

0.00
PAGE Nr.

d/13/328

AMOUNT
UAE. Dhs.

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

NTT-06

0.00

0.00

0.00

0.00

0.00
PAGE Nr.

d/13/329

AMOUNT
UAE. Dhs.

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

NTT-06
PAGE Nr.

d/13/330

AMOUNT
UAE. Dhs.

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

NTT-06
PAGE Nr.

d/13/331

AMOUNT
UAE. Dhs.

0.00

0.00

0.00

0.00

0.00

0.00
PAGE Nr.

d/13/332

AMOUNT
UAE. Dhs.

0.00

NTT-04

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
PAGE Nr.

d/13/333

AMOUNT
UAE. Dhs.

0.00

NTT-06

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
PAGE Nr.

d/13/334

AMOUNT
UAE. Dhs.

0.00

0.00

0.00

0.00

0.00

NTT-04

0.00

0.00

0.00

0.00
PAGE Nr.

d/13/335

AMOUNT
UAE. Dhs.

0.00

0.00

0.00

0.00

0.00

0.00

NTT-04
PAGE Nr.

d/13/336

AMOUNT
UAE. Dhs.

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
PAGE Nr.

d/13/337

AMOUNT
UAE. Dhs.

0.00

NTT-06

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
PAGE Nr.

d/13/338

AMOUNT
UAE. Dhs.

0.00

0.00

0.00

NTT-06

0.00

0.00

0.00

0.00

0.00

0.00

0.00
PAGE Nr.

d/13/339

AMOUNT
UAE. Dhs.

0.00

NTT-06

0.00

0.00

0.00
PAGE Nr.

d/13/340

AMOUNT
UAE. Dhs.

0.00

0.00

0.00

0.00

0.00

NTT-06

0.00

0.00
PAGE Nr.

d/13/341

AMOUNT
UAE. Dhs.

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

NTT-04
PAGE Nr.

d/13/342

AMOUNT
UAE. Dhs.

0.00

0.00

0.00
PAGE Nr.

d/13/343

AMOUNT
UAE. Dhs.

0.00

NTT-04

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
PAGE Nr.

d/13/344

AMOUNT
UAE. Dhs.

0.00

NTT-06

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
PAGE Nr.

d/13/345

AMOUNT
UAE. Dhs.

0.00

0.00

NTT-06

0.00

0.00

0.00

0.00

0.00

0.00
PAGE Nr.

d/13/346

AMOUNT
UAE. Dhs.

0.00

0.00

0.00

0.00

0.00

NTT-06
PAGE Nr.

d/13/347

AMOUNT
UAE. Dhs.

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
PAGE Nr.

d/13/348

AMOUNT
UAE. Dhs.

NTT-04

0.00

0.00

0.00

0.00

0.00
PAGE Nr.

d/13/349

AMOUNT
UAE. Dhs.

0.00

NTT-05

0.00

0.00

0.00

0.00

0.00

0.00
PAGE Nr.

d/13/350

AMOUNT
UAE. Dhs.

0.00

0.00

0.00

0.00

NTT-06

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
PAGE Nr.

d/13/351

AMOUNT
UAE. Dhs.

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

NTT-04

0.00

0.00

0.00

0.00

0.00
PAGE Nr.

d/13/352

AMOUNT
UAE. Dhs.

0.00

NTT-04
BILL OF QUANTITIES BILL PART
PROJECT:R1048
IMPROVEMENTS OF WORKS FOR DM - SECTION Nr. d/14/353
EXPO 2020 ROADS NETWORK SEWERAGE SECTION d 14

ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE


REF.

0
0
0
0
0
0

NOT USE
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
BILL OF QUANTITIES BILL PART
PROJECT:R1048
IMPROVEMENTS OF WORKS FOR DM - SECTION Nr. d/14/354
EXPO 2020 ROADS NETWORK SEWERAGE SECTION d 14

ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE


REF.

0
0
0
0
0
0
0

Dhs.
PAGE Nr.

d/14/355

AMOUNT
UAE. Dhs.

NOT USED
PAGE Nr.

d/14/356

AMOUNT
UAE. Dhs.

0.00
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF RTA - SPARE DUCTS SECTION Nr. d/16/357
EXPO 2020 ROADS NETWORK d 16
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.

Part 16 - RTA - Spare Ducts


0
0 PIPE WORK - MANHOLES AND PIPE WORK
ANCILLARIES

0
0 Ducts
0
0 Supply and install uPVC ducts to BS 3506
class C, 200mm dia. Laid and jointed in
trenches beneath carriage way including end
caps, draw ropes and duct markers for using
as spare ducts.

0
A 2-way, 200mm dia, depth not exceeding 1.5m. K522.1 m 1,090
0
0 Reinstatement
0
B Breaking of existing cross road pavement
including saw cutting and reinstatement for laying
2 to 4 way ducts. K731 m 100
0
0 Extend existing uPVC Spare Ducts 200mm dia,
in trench including, end caps, draw ropes and
duct markers

0
C 2-way, 200mm dia, depth not exceeding 1.5m. K522.2 m 210
5
0
0
0 PIPE WORK - SUPPORTS AND PROTECTION
ANCILLARIES TO LAYING AND EXCAVATION

0
0 Bed & surrounds including warning tape as
applicable

D Imported sand surround to 2-way 200mm dia


uPVC duct. L511 m 155
0
E Selected excavated material surround to 2-way
5 200mm dia uPVC duct. L521 m 1,025
0
0 Mass concrete class 30/20 surround to ducts
including formwork, polythene sheet and
bituminous paint

0
F Mass concrete surround to 200mm dia 2 way
duct. L541 m 120
0
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF RTA - SPARE DUCTS SECTION Nr. d/16/358
EXPO 2020 ROADS NETWORK d 16
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.

Part 16 - RTA - Spare Ducts


0

0
0
0

To Part Summary Dhs.

0 REV-01
0
MISCELLANEOUS WORKS
0
0
0 ABANDONMENT
0
0 Existing spare ducts to abandoned as per
standards including grouting etc. complete.
200 mm dia Upvc pipe line

0
A 1-way, 200mm dia, depth not exceeding 1.5m. X900.1 m 10
0
B 2-way, 200mm dia, depth not exceeding 1.5m. X900.2 m 295
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF RTA - SPARE DUCTS SECTION Nr. d/16/359
EXPO 2020 ROADS NETWORK d 16
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.

Part 16 - RTA - Spare Ducts


0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

To Part Summary Dhs.

PART SUMMARY

Page d/16/1

Page d/16/2
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF RTA - SPARE DUCTS SECTION Nr. d/16/360
EXPO 2020 ROADS NETWORK d 16
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.

Part 16 - RTA - Spare Ducts


0

Total for Part 16 - RTA - Spare Ducts


Carried to Grand Summary Dhs.
PAGE Nr.

d/16/361

AMOUNT
UAE. Dhs.

0.00

0.00

0.00

0.00

0.00

0.00
PAGE Nr.

d/16/362

AMOUNT
UAE. Dhs.

0.00

NTT-05

0.00

0.00
PAGE Nr.

d/16/363

AMOUNT
UAE. Dhs.

0.00

0.00

0.00
PAGE Nr.

d/16/364

AMOUNT
UAE. Dhs.

0.00
BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF EITC-DU / ITS SECTION Nr. d/17/365
EXPO 2020 ROADS NETWORK TELECOMMIUNICATION d 17
WORKS
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.
0
0 Part 17 - EITC - DU/ITS Utility Works
0
0 REMOVAL OF EXISTING DU/ITS DUCTS
0
0 Carefully remove existing pipe /duct, fittings
and store temporarily in contractor's stores
and later deliver to RTA stores or dispose to
tip as required including excavation, break out
pipe protection and thrust blocks, backfilling
and remove to tip and reinstatement of
existing surfaces

A 2-way Ducts. D900.1 m 15


0
B 4-way Ducts. D900.2 m 250
0
C 6-way Ducts. D900.3 m 5,884
5
0
D 9-way Ducts. D900.4 m 25
0
E 12-way Ducts. D900.5 m 10
0
0
0
0 Work on existing Manholes / Chambers
0
0 Demolish existing manholes and chambers
and cart to approved tip including backfilling
of voids and reinstatement of existing
surfaces

0
F DU/ITS-Manhole D900.6 nr 1
0
G DU/ITS-Chamber D900.7 nr 15
0
0 Carefully remove existing RVD, fittings,
precast foundations, dismantle completely
and set a side in Contractor's store or hand
over to RTA stores as instructed by the
Engineer including disposal of precast
foundations to approved tip, cable
disconnections and backfilling of voids

0
H Existing RVD D900.8 nr 1
0
0
0
0
0
0
0
BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF EITC-DU / ITS SECTION Nr. d/17/366
EXPO 2020 ROADS NETWORK TELECOMMIUNICATION d 17
WORKS
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.
0
0 Part 17 - EITC - DU/ITS Utility Works
0
0
0
0
0
0
0
0
0 To Part Summary Dhs.
0
0 REV-01
0
0 DIVERSION WORKS (Cont'd....)
0
0 PIPE WORK - MANHOLES AND PIPE WORK
ANCILLARIES

0 Ducts
0
0 Supply, Lay & Joint uPVC Cable Ducts 100mm
dia. in trench

A 2-way DU/ITS duct, depth not exceeding 1.5m. K522 m 1,205


0
B 2-way DU/ITS duct, depth 1.5-2.0m. K523 m 180
0
C 4-way DU/ITS duct, depth not exceeding 1.5m. K542.1 m 450
0
D 4-way DU/ITS duct, depth 1.5-2.0m. K543.1 m 85
0
E 4-way DU/ITS duct, depth 2.0-2.5m. K544.1 m 45
0
5
F 6-way DU/ITS duct, depth not exceeding 1.5m. K542.2 m 4,630
0
G 6-way DU/ITS duct, depth 1.5-2.0m. K543.2 m 885
0
H 6-way DU/ITS duct, depth 2.0-2.5m. K544.2 m 590
0
J 9-way DU/ITS duct, depth not exceeding 1.5m. K542.3 m 30
0
K 9-way DU/ITS duct, depth 1.5-2.0m. K543.3 m 25
0
L 9-way DU/ITS duct, depth 2.0-2.5m. K544.3 m 15
0
M
12-way DU/ITS duct, depth not exceeding 1.5m. K542.4 m 15
0
N 12-way DU/ITS duct, depth 1.5-2.0m. K543.4 m 10
0
P 12-way DU/ITS duct, depth 2.0-2.5m. K544.4 m 5
0
BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF EITC-DU / ITS SECTION Nr. d/17/367
EXPO 2020 ROADS NETWORK TELECOMMIUNICATION d 17
WORKS
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.
0
0 Part 17 - EITC - DU/ITS Utility Works
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0 To Part Summary Dhs.
0
0 REV-01
0
0 DIVERSION WORKS (Cont'd....)
0
0 PIPE WORK - MANHOLES AND PIPE WORK
ANCILLARIES (Cont'd....)

0
0 Ducts (Cont'd....)
0
0 Supply, Lay & Joint uPVC Cable Ducts 100mm
dia. in trench

0
A 6-way + 2-way, DU/ITS duct, depth not exceeding
1.5m. K542.1 m 80
0
B 6-way + 2-way,DU/ITS duct, depth 1.5-2.0m. K543.1 m 15
0
C 6-way + 2-way, DU/ITS duct, depth 2.0-2.5m. K544.1 m 15
0
D 6-way + 4-Way DU/ITS duct, depth not exceeding
1.5m. K542.2 m 25
0
E 6-way + 4-Way DU/ITS duct, depth 1.5-2.0m. K543.2 m 20
0
F 6-way ITS + 4 Way Du duct, depth 2.0-2.5m. K544.2 m 15
0
0 Extension of Existing Ducts
0
BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF EITC-DU / ITS SECTION Nr. d/17/368
EXPO 2020 ROADS NETWORK TELECOMMIUNICATION d 17
WORKS
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.
0
0 Part 17 - EITC - DU/ITS Utility Works
0
0 Extend existing uPVC ducts including supply,
lay & joint with existing ducts in trench
beneath carriageways, provide end caps, duct
markers, draw ropes and warning tapes etc.

0
0
G 2-way DU/ITS duct, depth not exceeding 1.5m. K522.1 m 20
0
H 2-way DU/ITS duct, depth 1.5-2.0m. K523.1 m 15
0
J 4-way DU/ITS duct, depth not exceeding 1.5m. K542.3 m 25
0
K 4-way DU/ITS duct, depth 1.5-2.0m. K543.3 m 10
0
L 4-way duct, depth 2.0-2.5m. K544.3 m 5
0
0
0
0

0
0
0
0
0
0
0
0 To Part Summary Dhs.
0
0
0
0 DIVERSION WORKS (Cont'd....)
0
0 PIPE WORK - MANHOLES AND PIPE WORK
ANCILLARIES (Cont'd....)

0 Ducts (Cont'd....)
0
0 Extension of Existing Ducts
0
0 Extend existing 100mm uPVC ducts including
supply, lay & joint with existing ducts in trench
beneath carriageways, provide end caps, duct
markers, draw ropes and warning tapes etc.

0
A 6-way DU/ITS duct, depth not exceeding 1.5m. K542.1 m 20
0
BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF EITC-DU / ITS SECTION Nr. d/17/369
EXPO 2020 ROADS NETWORK TELECOMMIUNICATION d 17
WORKS
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.
0
0 Part 17 - EITC - DU/ITS Utility Works
0
B 6-way DU/ITS duct, depth 1.5-2.0m. K543.1 m 10
0
C 6-way DU/ITS duct, depth 2.0-2.5m. K544.1 m 5
0
D 9-way DU/ITS duct, depth not exceeding 1.5m. K542.2 m 15
0
E 9-way DU/ITS duct, depth 1.5-2.0m. K543.2 m 10
0
F 9-way DU/ITS duct, depth 2.0-2.5m. K544.2 m 5
0
G
12-way DU/ITS duct, depth not exceeding 1.5m. K542.3 m 10
0
H 12-way DU/ITS duct, depth 1.5-2.0m. K543.3 m 10
0
J 12-way DU/ITS duct, depth 2.0-2.5m. K544.3 m 5
0
K 6-way + 2-way, DU/ITS duct, depth not exceeding
1.5m. K542.3 m 80
0
L 6-way + 2-way,DU/ITS duct, depth 1.5-2.0m. K543.3 m 15
0
M 6-way + 2-way, DU/ITS duct, depth 2.0-2.5m. K544.3 m 10
0
N 6-way + 4-Way DU/ITS duct, depth not exceeding
1.5m. K542.4 m 25
0
P 6-way + 4-Way DU/ITS duct, depth 1.5-2.0m. K543.4 m 15
0
Q 6-way ITS + 4 Way Du duct, depth 2.0-2.5m. K544.4 m 10
0

0
0
0
0
0
0 To Part Summary Dhs.
0
0
0 DIVERSION WORKS (Cont'd....)
0
0 PIPE WORK - MANHOLES AND PIPE WORK
ANCILLARIES (Cont'd....)

0 Ducts
0
BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF EITC-DU / ITS SECTION Nr. d/17/370
EXPO 2020 ROADS NETWORK TELECOMMIUNICATION d 17
WORKS
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.
0
0 Part 17 - EITC - DU/ITS Utility Works
0
0 Supply, Lay & Joint uPVC Cable Ducts 150mm
dia. in trench

A 2-way cable duct, depth not exceeding 1.5m. K522 m 150


0
B 2-way cable duct, depth 1.5-2.0m. K523 m 40
0
C 4-way cable duct, depth not exceeding 1.5m. K542 m 50
0
D 4-way cable duct, depth 1.5-2.0m. K543 m 15
0
E 4-way cable duct, depth 2.0-2.5m. K544 m 10
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF EITC-DU / ITS SECTION Nr. d/17/371
EXPO 2020 ROADS NETWORK TELECOMMIUNICATION d 17
WORKS
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.
0
0 Part 17 - EITC - DU/ITS Utility Works
0
0 To Part Summary Dhs.
0
0
0
0 DIVERSION WORKS (Cont'd....)
0
0 PIPE WORK - MANHOLES AND PIPE WORK
ANCILLARIES (Cont'd....)

0
0 Ducts (Cont'd....)
0
0 Supply Lay & Joint HDPE Cable Ducts 100mm
dia thru HDPE pipe NOT in trench including
end caps, draw ropes, duct markers and all
related work complete

A 2-way HDPE Cable ducts through NDRC. K521.1 m 370


0
B 4-way HDPE Cable ducts through NDRC. K541.1 m 100
0
C 6-way HDPE Cable ducts through NDRC. K541.2 m 80
0
D 9-way HDPE Cable ducts through NDRC. K541.3 m 20
0
E 12-way HDPE Cable ducts through NDRC. K541.4 m 15
0
0
0 Supply Lay & Joint HDPE Cable Ducts 150mm
dia thru HDPE pipe NOT in trench including
end caps, draw ropes, duct markers and all
related work complete

F 2-way HDPE Cable ducts through NDRC. K521.2 m 50


0
G 4-way HDPE Cable ducts through NDRC. K541.5 m 25
0
0
0
0
0
0
0
0
0
0
0
0
0
0
BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF EITC-DU / ITS SECTION Nr. d/17/372
EXPO 2020 ROADS NETWORK TELECOMMIUNICATION d 17
WORKS
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.
0
0 Part 17 - EITC - DU/ITS Utility Works
0
0
0
0
0
0
0
0
0
0
0
0 To Part Summary Dhs.
0
0 REV-01
0
0 DIVERSION WORKS (Cont'd....)
0
0 PIPE WORK - MANHOLES AND PIPE WORK
ANCILLARIES (Cont'd....)

0
0 Manholes
0
0 Reinforced concrete manholes complete in
accordance with drawings, specifications and
requirements

0
A DU MH; Ref. JRC -14. K134.1 nr 15
0
B DU MH; Ref. JRC -14 on existing duct K134.2 nr 1
0
C ITS-MH K134.3 nr 6
0
D ITS-Pull box K134.4 nr 12
0
0
0
0
0
0
0 Reinstatement
0
E Breaking of existing pavement of main roads and
reinstate including saw cutting; pipe bore 4-way
100mm. K731.1 m 20
0
F Breaking of existing pavement of cross roads and
reinstate including saw cutting; pipe bore 6-way
100mm. K731.2 m 30
0
0 Connection to Manholes / Ducts
BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF EITC-DU / ITS SECTION Nr. d/17/373
EXPO 2020 ROADS NETWORK TELECOMMIUNICATION d 17
WORKS
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.
0
0 Part 17 - EITC - DU/ITS Utility Works
0
0
0 DU/ITS Network
0
G Connect existing 2 way 100mm duct to new
manhole, Including additional fittings, additional
excavation and backfill etc. K859.1 nr 1
0
H Connect existing 4 way 100mm duct to new
manhole, Including additional fittings, additional
excavation and backfill etc. K859.2 nr 1
0

0
0
0
0
0
0
0
0
0 To Part Summary Dhs.
0
0
0
0 DIVERSION WORKS (Cont'd....)
0
0 PIPE WORK - MANHOLES AND PIPE WORK
ANCILLARIES (Cont'd....)

0
0 Connection to Manholes / Ducts (cont'd…)
0
0 DU/ITS Network
0
0
A Connect existing 6 way 100mm duct to new
manhole, Including additional fittings, additional
excavation and backfill etc. K859.1 nr 3
0
B Connect existing 9 way 100mm duct to new
manhole, Including additional fittings, additional
excavation and backfill etc. K859.2 nr 1
0
C Connect existing 12 way 100mm duct to new
manhole, Including additional fittings, additional
excavation and backfill etc. K859.3 nr 1
0
D Connect new 2 way 100mm duct to existing
Ducts, Including additional fittings, additional
excavation and backfill etc. D861.1 nr 1
BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF EITC-DU / ITS SECTION Nr. d/17/374
EXPO 2020 ROADS NETWORK TELECOMMIUNICATION d 17
WORKS
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.
0
0 Part 17 - EITC - DU/ITS Utility Works
0
0
E Connect new 4 way 100mm duct to existing
Ducts, Including additional fittings, additional
excavation and backfill etc. D861.2 nr 1
0
F Connect new 6 way 100mm duct to existing
Ducts, Including additional fittings, additional
excavation and backfill etc. D861.3 nr 3
0
G Connect new 9 way 100mm duct to existing
Ducts, Including additional fittings, additional
excavation and backfill etc. D861.4 nr 1
0
H Connect new 12 way 100mm duct to existing
Ducts, Including additional fittings, additional
excavation and backfill etc. D861.5 nr 1
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0 To Part Summary Dhs.
0
0
0
0 DIVERSION WORKS (Cont'd...)
0
0 PIPE WORK - SUPPORTS AND PROTECTION,
ANCILLARIES TO LAYING AND EXCAVATION

0
0 Non disruptive special pipe laying using
Directional drilling method for installing ducts
(The rate shall include for all service
diversions, reinstatements, etc) complete in all
respect as per dwg

0 For 100mm dia Ducts


0
A 2-way, through directional drilled HDPE pipe L291.1 m 370
0
BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF EITC-DU / ITS SECTION Nr. d/17/375
EXPO 2020 ROADS NETWORK TELECOMMIUNICATION d 17
WORKS
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.
0
0 Part 17 - EITC - DU/ITS Utility Works
0
B 4-way, through directional drilled HDPE pipe L291.2 m 100
0
C 6-way, through directional drilled HDPE pipe L291.3 m 80
0
D 9-way, through directional drilled HDPE pipe L291.4 m 20
0
E 12-way, through directional drilled HDPE pipe L291.5 m 15
0
0 For 150mm dia Ducts
0
F 2-way, through directional drilled HDPE pipe L291.6 m 50
0
G 4-way, through directional drilled HDPE pipe L291.7 m 25
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0 To Part Summary Dhs.
0
0
0
0 DIVERSION WORKS (Cont'd....)
0
0 PIPE WORK - SUPPORTS AND PROTECTION,
ANCILLARIES TO LAYING AND EXCAVATION
(Cont'd..)
BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF EITC-DU / ITS SECTION Nr. d/17/376
EXPO 2020 ROADS NETWORK TELECOMMIUNICATION d 17
WORKS
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.
0
0 Part 17 - EITC - DU/ITS Utility Works
0
0 Beds & Surrounds including warning tape

0
0 Imported sand bed & surround
0
A 100mm dia 2-way uPVC duct. L511.1 m 640
0
B 100mm dia 4-way uPVC duct. L511.2 m 280
0
C 100mm dia 6-way uPVC duct. L511.3 m 2,500
0
D 100mm dia 9-way uPVC duct. L511.4 m 10
0
E 100mm dia 12-way uPVC duct. L511.5 m 5
0
F 100mm dia 6 + 2-way uPVC duct. L511.6 m 20
0
G 100mm dia 6 + 2-way uPVC duct. L511.7 m 10
0
H 150mm dia 2-way uPVC duct. L511.8 m 20
0
J 150mm dia 4-way uPVC duct. L511.9 m 10
0
0 Selected excavated material bed & surround

0
K 100mm dia 2-way uPVC duct. L521.1 m 527
0 0
L 100mm dia 4-way uPVC duct. L521.2 m 140
0 0
M 100mm dia 6-way uPVC duct. L521.3 m 3,030
0 0
N 100mm dia 9-way uPVC duct. L521.4 m 80
0 0
P 100mm dia 12-way uPVC duct. L521.5 m 45
0 0
Q 100mm dia 2 + 6-way uPVC duct. L521.6 m 175
0 0
R 100mm dia 4 + 6-way uPVC duct. L521.7 m 90
0
S 150mm dia 2-way uPVC duct. L521.8 m 175
0
T 150mm dia 4-way uPVC duct. L521.9 m 40
0
0
0
0
0
0
BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF EITC-DU / ITS SECTION Nr. d/17/377
EXPO 2020 ROADS NETWORK TELECOMMIUNICATION d 17
WORKS
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.
0
0 Part 17 - EITC - DU/ITS Utility Works
0
0 To Part Summary Dhs.
0
0
0
0 DIVERSION WORKS (Cont'd....)
0
0 PIPE WORK - SUPPORTS AND PROTECTION,
ANCILLARIES TO LAYING AND EXCAVATION
(Cont'd....)

0 Beds & Surrounds including warning tape


(Cont'd....)

0 Mass concrete class 30/20 surround to 100mm


dia duct including formwork, polythene sheet
and bituminous paint

A 100mm dia 2-way uPVC duct. L541.1 m 253


0 0
B 100mm dia 4-way uPVC duct. L541.2 m 200
0 0
C 100mm dia 6-way uPVC duct. L541.3 m 610
0 0
D 100mm dia 9-way uPVC duct. L541.4 m 10
0 0
E 100mm dia 12-way uPVC duct. L541.5 m 5
0 0
F 100mm dia 2 + 6-way uPVC duct. L541.6 m 20
0 0
G 100mm dia 4 + 6-way uPVC duct. L541.7 m 10
0
H 150mm dia 2-way uPVC duct. L541.8 m 25
0
J 150mm dia 4-way uPVC duct. L541.9 m 25
0
0 Mass concrete class 30/20 surround to
existing 100mm dia duct including formwork,
polythene sheet and bituminous paint

0
K 100mm dia 2-way uPVC duct. L541.10 m 35
0
L 100mm dia 4-way uPVC duct. L541.11 m 40
0
M 100mm dia 6-way uPVC duct. L541.12 m 35
0
N 100mm dia 9-way uPVC duct. L541.13 m 30
0
P 100mm dia 12-way uPVC duct. L541.14 m 25
0
BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF EITC-DU / ITS SECTION Nr. d/17/378
EXPO 2020 ROADS NETWORK TELECOMMIUNICATION d 17
WORKS
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.
0
0 Part 17 - EITC - DU/ITS Utility Works
0
Q 100mm dia 6 + 2-way uPVC duct. L541.15 m 105
0
R 100mm dia 6 + 4-way uPVC duct. L541.16 m 50
0

0
0
0
0
0
0 To Part Summary Dhs.
0
0
0
0 DIVERSION WORKS (Cont'd....)
0
0 MISCELLANEOUS WORKS
0
0 Foundations
0
0 Mass concrete foundation as per drawings
and Spacifications; including excavation,
backfilling, concrete, formwork; holding down
chemical anchor bolts, stainless steel cover
plate, protection of holding down bolts, nuts
and washers with denso tape, bitumen paint
etc.

0
A For CCTV Camera pole X900.1 nr 3
0
B For RVD pole X900.2 nr 1
0
C For Outstation Cabinet X900.3 nr 3
0
5
0
0
D For Bluetooth assembly pole X900.5 nr 1
0
E For RVD and Bluetooth assembly pole X900.6 nr 1
0
F For MDB X900.7 nr 2
0
05
0
G For feeder pillar X900.9 nr 2
0
H For Speed Radar X900.10 nr 3
0
5
0
0
BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF EITC-DU / ITS SECTION Nr. d/17/379
EXPO 2020 ROADS NETWORK TELECOMMIUNICATION d 17
WORKS
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.
0
0 Part 17 - EITC - DU/ITS Utility Works
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

To Part Summary Dhs.

REV-01

PART SUMMARY

Page d/17/1

Page d/17/2

Page d/17/3

Page d/17/4

Page d/17/5

Page d/17/6

Page d/17/7

Page d/17/8
BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF EITC-DU / ITS SECTION Nr. d/17/380
EXPO 2020 ROADS NETWORK TELECOMMIUNICATION d 17
WORKS
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.
0
0 Part 17 - EITC - DU/ITS Utility Works
0
Page d/17/9

Page d/17/10

Page d/17/11

Page d/17/12

Total for Part 17 - EITC - DU/ITS Utility Works


Carried to Grand Summary Dhs.
PAGE Nr.

d/17/381

AMOUNT
UAE. Dhs.

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
PAGE Nr.

d/17/382

AMOUNT
UAE. Dhs.

0.00

NTT-05

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
PAGE Nr.

d/17/383

AMOUNT
UAE. Dhs.

0.00

NTT-05

0.00

0.00

0.00

0.00

0.00

0.00
PAGE Nr.

d/17/384

AMOUNT
UAE. Dhs.

0.00

0.00

0.00

0.00

0.00

0.00

0.00
PAGE Nr.

d/17/385

AMOUNT
UAE. Dhs.

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
PAGE Nr.

d/17/386

AMOUNT
UAE. Dhs.

0.00

0.00

0.00

0.00

0.00
PAGE Nr.

d/17/387

AMOUNT
UAE. Dhs.

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
PAGE Nr.

d/17/388

AMOUNT
UAE. Dhs.

0.00

NTT-06

0.00

0.00

0.00

0.00

0.00

0.00
PAGE Nr.

d/17/389

AMOUNT
UAE. Dhs.

0.00

0.00

0.00

0.00

0.00

0.00

0.00
PAGE Nr.

d/17/390

AMOUNT
UAE. Dhs.

0.00

0.00

0.00

0.00

0.00

0.00
PAGE Nr.

d/17/391

AMOUNT
UAE. Dhs.

0.00

0.00

0.00

0.00

0.00

0.00

0.00
PAGE Nr.

d/17/392

AMOUNT
UAE. Dhs.

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
PAGE Nr.

d/17/393

AMOUNT
UAE. Dhs.

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
PAGE Nr.

d/17/394

AMOUNT
UAE. Dhs.

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
PAGE Nr.

d/17/395

AMOUNT
UAE. Dhs.

0.00

NTT-05

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
PAGE Nr.

d/17/396

AMOUNT
UAE. Dhs.

0.00

0.00

0.00

0.00

0.00
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF DUSUP GAS PIPELINE SECTION Nr. d/18/397
EXPO 2020 ROADS NETWORK d 18
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.

Part 18 - DUSUP Gas Pipeline


0
0
0 PIPE WORK - SUPPORTS AND PROTECTION
ANCILLARIES TO LAYING AND EXCAVATION

0
0 Precast Pedestal and Precast Slab protection
System to the Gas pipelines complete
including excavation, backfilling etc as per
Dwg. 900-08-003-001-RD (DUSUP)

0
A 2000x1000x250 mm thick precast Slab H522 m 6,015
0
0
0 PRECAST CONCRETE
0
B Protection to existing fuel pipeline including
precast slab 4500x1000x350, pedestals,
additional excavation, bedding layer and backfill
etc. complete as detailed in drawings H500.1 m 500
0
C Protection to existing fuel pipeline including
precast slab 6000x2000x450, pedestals,
additional excavation, bedding layer and backfill
etc. complete as detailed in drawings H500.2 m 500
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF DUSUP GAS PIPELINE SECTION Nr. d/18/398
EXPO 2020 ROADS NETWORK d 18
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.

Part 18 - DUSUP Gas Pipeline


0
0
0
0
0
0
0
0
0 To Part Summary Dhs.
0
0
0
0 DIVERSION WORKS
0
0 REMOVAL OF EXISTING DUSUP LINE
0
0 Carefully remove existing Gas pipes and
fittings and store temporary in contractor's
stores and later deliver to DUSUP stores or
dispose to tip as required including
excavation, breaking out pipe protection,
cleaning, backfilling and remove to tip and
reinstatement of existing surfaces

0
A 16" dia DUSUP pipe D930 m 725
0
0
0
0
0 PIPE WORK - PIPES
0
0 Supply, lay and joint internally and externally
DUSUP pipeline in trench ; complete as
specified and directed by the Engineer

B 16" dia. depth 1.5 - 2.0m I933 m 350


0
C 16" dia. depth 2.0 - 2.5m I934 m 1,125
0
D 16" dia. depth 2.5 - 3.0m I935 m 250
0
0 PIPE WORK - FITTINGS AND VALVES
0
0 Supply, lay and joint pipe fitting for DUSUP
pipes in trench in accordance with
specification clause

E 45 degree bend for 16" dia. Pipe J913 nr 6


0
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF DUSUP GAS PIPELINE SECTION Nr. d/18/399
EXPO 2020 ROADS NETWORK d 18
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.

Part 18 - DUSUP Gas Pipeline


0
F End Cap 16"dia J993 nr 2
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0 To Part Summary Dhs.
0
0
0
0 DIVERSION WORKS (Cont'd…)
0
0 Connections to existing pipe
0
0 Make Connections to Existing Pipes including
all necessary shut down, thrust blocks,
additional excavation, backfill etc. complete

0
A Connect new 16" mm dia DUSUP pipeline to
existing 16"dia. DUSUP pipeline (not in the same
direction) including necessary fittings. K861.1 nr 2
0
B Connect new 16" DUSUP pipeline to existing 16"
dia. DUSUP pipeline (in the same direction)
including necessary fittings. K861.2 nr 1
0
0
0 Sleeves
0
0 Protection by Spilt Steel sleeves X 46 class B
type in trench including bed&Surround,
backfilling, endcap, warning tape and all
related work complete

0
C Split Steel Sleeve X 46 class B type for 16"
DUSUP pipe L900 m 75
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF DUSUP GAS PIPELINE SECTION Nr. d/18/400
EXPO 2020 ROADS NETWORK d 18
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.

Part 18 - DUSUP Gas Pipeline


0
0
0
0 Connections to existing pipe
0
0 Make Connections to Existing Pipes including
all necessary shut down, thrust blocks,
additional excavation, backfill etc. complete

0
D Connect new 16" mm dia DUSUP pipeline to
existing 16"dia. DUSUP pipeline (not in the same
direction) including necessary fittings. K861.3 nr 2
0
E Connect new 16" DUSUP pipeline to existing 16"
dia. DUSUP pipeline (in the same direction)
including necessary fittings. K861.4 nr 1
0
0
0
0

0
0
0
0
0
0 To Part Summary Dhs.
0
0
0
0 DIVERSION WORKS (Cont'd…)
0
0
PIPE WORK - SUPPORTS AND PROTECTION,
ANCILLARIES TO LAYING AND EXCAVATION

0
0 Beds & Surrounds including warning tape
0
A Imported sand bed & surround to 16"dia. pipe L511 m 1,466
0
B Selected excavated material bed & surround to
16" dia. pipe L521 m 259
0
0
0
0 Support to existing DUSUP pipes for utility
crossings

C for 200Ø drainage pipe crossing X900.1 m 20


0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF DUSUP GAS PIPELINE SECTION Nr. d/18/401
EXPO 2020 ROADS NETWORK d 18
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.

Part 18 - DUSUP Gas Pipeline


0
0
D for 250Ø drainage pipe crossing X900.2 m 120
0
E for 315Ø drainage pipe crossing X900.3 m 40
0
F for 450Ø portable water pipe crossing X900.4 m 50
0
G for 600Ø portable water pipe crossing X900.5 m 40
0
H for 800Ø portable irrigation pipe crossing X900.6 m 20
0
J for 800Ø drainage pipe crossing X900.7 m 50
0
K for 1000Ø drainage pipe crossing X900.8 m 80
0
L for 1200Ø portable water pipe crossing X900.9 m 240
0
M for 1200Ø drainage pipe crossing X900.10 m 20
0
6 for Electrical cable crossings

N for Electrical cable trench; Width not exceeding


1.0m X900.11 m 30
0
P for Electrical cable trench; Width 1.0-2.0m X900.12 m 50
0
Q for Electrical cable trench; Width 2.0-3.0m X900.13 m 120
0
0
0
0
0
0
0
0
0

To Part Summary Dhs.

REV-01

PART SUMMARY

Page d/18/1

Page d/18/2

Page d/18/3
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF DUSUP GAS PIPELINE SECTION Nr. d/18/402
EXPO 2020 ROADS NETWORK d 18
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.

Part 18 - DUSUP Gas Pipeline


0

Page d/18/4

Total for Part 18 - DUSUP Gas Pipeline


Carried to Grand Summary Dhs.
PAGE Nr.

d/18/403

AMOUNT
UAE. Dhs.

0.00

0.00

0.00
PAGE Nr.

d/18/404

AMOUNT
UAE. Dhs.

0.00

0.00

0.00

0.00

0.00

0.00
PAGE Nr.

d/18/405

AMOUNT
UAE. Dhs.

0.00

0.00

0.00

0.00

0.00
PAGE Nr.

d/18/406

AMOUNT
UAE. Dhs.

0.00

0.00

0.00

0.00

0.00

0.00
PAGE Nr.

d/18/407

AMOUNT
UAE. Dhs.

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

NTT-06

0.00

0.00

0.00
PAGE Nr.

d/18/408

AMOUNT
UAE. Dhs.

0.00

0.00
0

d/15/409

ITEM ITEM DESCRIPTION UNIT QUANTITY RATE

BILL NO. 9 STREET LIGHTING WORKS


0
0 PIPE WORK: MANHOLES AND PIPE WORKS
0 ANCILLARIES

Ducts

uPVC cable ducts to BS 3536 class C laid and


jointed in trench beneath carriage ways
0
inckuding end caps, 8mm dua cords, studs and
concrete ducts markers as specified

A 2 Way; 100mm dia depth not exceeding 1.5m nr 525 0.00

B 4 Way; 100mm dia depth not exceeding 1.5m nr 506 0.00


0
PIPE WORK: SUPPORTS AND PROTECTION
0
ANCILLARIES TO LAYING AND EXCAVATON
Beds and Surround including warning tape

Imported sand bed and surround to 2 way duct


G nr 315 0.00
100mm dia

Imported sand bed and surround to 4 way duct


H nr 304 0.00
100mm dia

Mass concrete bed and surround to 2 way duct


0 nr 210 0.00
100mm dia

Mass concrete bed and surround to 4 way duct


0 nr 202 0.00
100mm dia

0
0

To Part Summary Dhs.

BILL NO. 9 STREET LIGHTING WORKS


0
(Cont'd…)

0
0 MISCELLANEOUS WORKS
0
0

d/15/410

ITEM ITEM DESCRIPTION UNIT QUANTITY RATE

BILL NO. 9 STREET LIGHTING WORKS


0
Carefuly remove and set aside the existing
lighting pole: including excavation of foundation,
disposal backfilling and compacting with
0 selected excavated material and making good
the surface, reusable materials to be retained by
contractor for possible reuse on project or
returned to appropriate authority
0
Existing 10m to 14m high lighting pole with
A nr 25 563.00
luminaires
0
Remove of Existing cable
0
Carefully remove existig cables including
disconnections, excavation backfilling of voids,
complete as per local authority (FEWA)
requirements ans dilever to FEWA -ED
0
1 way 6.6/11 KV cable m 50 8.00
5 Size not indicated, considered 3C 300
2 way 6.6/11 KV cable m 75 17.00
Size not indicated, considered 3C 300
Lowering of existing cable

Carefully remove existing cables including


desconnection, excavation, backfilling of voids
0 m 80 10.00
complete as per local authority / FEWA requirements
and lowering

0 Size not indicated, considered 4C 35 and 1 C 25

Carefully remove and diversion of existing cables


including excavation laying protection, cleaning
A backfilling and disposal excavated material to m 70 10.00
approved tip, bed and surround and all related works
complete as per local authority / FEWA standard

Size not indicated, considered 4C 35 and 1 C 25


0

d/15/411

ITEM ITEM DESCRIPTION UNIT QUANTITY RATE

BILL NO. 9 STREET LIGHTING WORKS


0

To Part Summary Dhs.

BILL NO. 9 STREET LIGHTING WORKS


0
(Cont'd…)

0 MISCELLANEOUS WORKS
0
Mass concrete high lighting column bases
complete as detailed on drawing including
excavation backfilling, compaction formwork,
0 concete, holding down with 12mm rebar link
protection of holdng down bolts nuts and washer
with densotape (before casting and after
erection) bitumen paint etc.

A Foundation for 10m lighting column nr 355 0.00


0
B Foundation for 14m lighting column nr 321 0.00
0
0 Foundation for existing 10m Height lighting column nr 6
0
Mass concrete foundation for feeder pillar as
detailed on dwg, including excavation backfillinh
concrete, formwork, holding down chemical anchor
C nr 20 0.00
bolts, stainledd steel cover plate, protection of
holding down bolts nuts and washers awith
densotape, bitumen paint etc
0

0
0

d/15/412

ITEM ITEM DESCRIPTION UNIT QUANTITY RATE

BILL NO. 9 STREET LIGHTING WORKS


0

To Part Summary Dhs.

0
BILL NO. 9 STREET LIGHTING WORKS
(Cont'd…)
0
0 MISCELLANEOUS WORKS (Cont'd)
0

Supply and Install LED Luminaires and


accessories complete with brackets, lamps and
0
cutouts termination cables, commission and
handling as shown on dwg and specification

0
A Existing Lighting pole retained with 1 new Luminary nr 88 63.00
0
B Existing Lighting pole retained with 1 new Luminary nr 44 63.00
0
C Existing Lighting pole retained with 2 new Luminary nr 177 125.00
0
D Existing Lighting pole replacing with 1 new Luminary nr 6 63.00
0

Supply and Install lighting column and


accessories complete with brackets, LED
E Luminaries lamps and cutouts termination
cables, commision and grouting of base plate
and andling as shown on dwg and specification

0
0
G 10m high lighting column with 1 luminary nr 306 563.00
0
H 10m high lighting column with 2 luminary nr 42 625.00
0
J 14m high lighting column with 1 luminary nr 43 563.00
0
K 14m high lighting column with 2 luminary nr 270 625.00
0
L 14m high lighting column with 3 luminary nr 8 688.00
0
Relocation of existing set aside lighting pole as
M nr 6 563.00
detailed on drawing and specification
0
0
0

d/15/413

ITEM ITEM DESCRIPTION UNIT QUANTITY RATE

BILL NO. 9 STREET LIGHTING WORKS


0
0
0
0
0
0
0

0
0
0
0
0
0
0
0

To Part Summary Dhs.

0
BILL NO. 9 STREET LIGHTING WORKS
(Cont'd…)
0
0 MISCELLANEOUS WORKS (Cont'd)
0
0 Feeder Pillar

Supply and Install of feeder pillar including with


accessories including termination of cables and
0 commisioning and all related works complete as
directed by the engineer and as per the
SEWA/FEWA standard specification

A 2 way Feeder Pillar nr 10 500.00


0
B 4 way Feeder Pillar nr 5 1,000.00
0
C 6 way Feeder Pillar nr 4 1,000.00
0
D 8 way Feeder Pillar nr 1 1,000.00
0
E Lighting Panel
0
Supply and Install of Underbridge lighting panel
including with accessoried including termination of
F cables and commissioning and all related works
complete as directed by the engineer and as per the
SEWA/FEWA standard specification
0

d/15/414

ITEM ITEM DESCRIPTION UNIT QUANTITY RATE

BILL NO. 9 STREET LIGHTING WORKS


0
0
Underbridge Lighting Panel nr 5 500.00

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0

To Part Summary Dhs.

0
0
BILL NO. 9 STREET LIGHTING WORKS
0
(Cont'd…)

0 MISCELLANEOUS WORKS (Cont'd)


0
Excavate for cable trenches
0
Trench not exceeding 1.5m deep width varying
B m 20,111
between 0.4-0.8 for varying number of cables
0
Supply and Intall the following power supply cabling
C in trench including warning tape etc, as shown on
the drawings and specification
0
0

d/15/415

ITEM ITEM DESCRIPTION UNIT QUANTITY RATE

BILL NO. 9 STREET LIGHTING WORKS


0
4C 16mm2 Cu/XLPE/SWA/PVC + 1C 16mm2
D m 15,111 38.00
Cu/PVC 1way
0
4C 25mm2 Cu/XLPE/SWA/PVC + 1C 25mm2
E m 10,439 57.00
Cu/PVC 1way
0
4C 50mm2 Cu/XLPE/SWA/PVC + 1C 25mm2
F m 5,000 174.00
Cu/PVC 2way
0
Warning Tape 250mm wide with English and Arabic
G m 20,111 0.00
written as approved by Road Lighting Department

Termination Item 1 58,476.00

To Part Summary Dhs.

0
BILL NO. 9 STREET LIGHTING WORKS
0
(Cont'd…)
0
0 MISCELLANEOUS WORKS (Cont'd)
0
Supply and Install the following power supply cabling
not in trech as shown on the drawings and
specification
0
A 4C 50mm2 cable + 1C 25mm2 earth cable 1 way m 50 79.00
0
B 4C 75mm2 cable + 1C 50mm2 earth cable 1 way m 50 113.00
0
0
0 Earthing System

Supply and Install complete earthing system


0 including excavation backfilling, compaction and nr 128
handling as shown in dwg and specification
0
0

d/15/416

ITEM ITEM DESCRIPTION UNIT QUANTITY RATE

BILL NO. 9 STREET LIGHTING WORKS


0

0
0
0

To Part Summary Dhs.

0
BILL NO. 9 STREET LIGHTING WORKS
0
(Cont'd…)
0
0 MISCELLANEOUS WORKS (Cont'd)

WIRELESS CENTRALISED STREET LIGHTING


CONTROL SYSTEMS (CMS)

Supply and Installation, testing and


commissioning of street lighting management
system (CMS) including node controllers, base
staton , servers, software and internet interface
and interface with MOID central system and all
other necessary accessories as per MOID
requirement.
0
A Control node per each pole as specified nr 622

GSM dual sim WAN/LAN, WIFI interface Base


B nr 2
station, location to be proposed by supplier
0
GSM Base station post complete with pole
foundation, ducting, ducts crossing and all
C accessories for power supply. Base station shall be nr 2
powered for nearest feeder pillar (Power cable
measured elsewhere).

D High grade industrial inter based servers as nr 2


0
Life time licensed, upgrade supported software,
license shall be in accordance with total numbers of
nodes specified or as per client requirement. Hosting
E of server at local service provider data center and sum 1
clouding of the software costs to be included
0

d/15/417

ITEM ITEM DESCRIPTION UNIT QUANTITY RATE

BILL NO. 9 STREET LIGHTING WORKS


0
Traffic Detection sencor (Traffic volume
measurement) completeincluding posts, foundation,
F cabling, testing and commissioning (Traffic volume nr 3
measurement).
0
2 Years technical support for all the CMS
G components including control nodes base station sum 1
software update.. Etc

H Training of client engineers as specified. nr 1


0

0
0

To Part Summary Dhs.

0
BILL NO. 9 STREET LIGHTING WORKS
0
(Cont'd…)
0

d/15/418

ITEM ITEM DESCRIPTION UNIT QUANTITY RATE

BILL NO. 9 STREET LIGHTING WORKS


0
0
0 MISCELLANEOUS WORKS (Cont'd)

WIRELESS CENTRALISED STREET LIGHTING


CONTROL SYSTEMS (CMS) (Cont'd)

0
Drawings, O&M Manuals (Hard & Soft copies in PDF
Format, approvals and nstruction books for central
A lighting amanagement system supplied as specified sum 1
and as per client's / Engineers Approval.

Spare Parts for 2 Years trouble free operaion as per


manufacturer recommendation & supplier records of
B system components failure in precious installation / sum 1
Project
0
Integration of CMS with central lighting management
C system. Location & Interface requirement to be sum 1
coordinated with MOID

System Testing validation and output report


D sum 1
Evaluation as specified
0
Other accessories, provisions etc to make the
E system effeciently operation as per employer's & sum 1
Engineers Instruction
0

d/15/419

ITEM ITEM DESCRIPTION UNIT QUANTITY RATE

BILL NO. 9 STREET LIGHTING WORKS


0

0
0

To Part Summary Dhs.

0
BILL NO. 9 STREET LIGHTING WORKS
0
(Cont'd…)
0
0 Additional Items

The tendered is to identify here below any other


items which he may consider applicable yet not
given in the BOQ, quantifued and priced to
ensure the sufficiency and completenss of the
lump sum price includes all items whether
shown on the drawings or implied by
interpretation, or described in the specifications
or deemed necessary by the tenderer based on
their field inspection or to cover any other
obligation / risk allocated to the contractor. the
lumpsum price shall represent the entire value of
the works and no subsequent clain for any
additional items wil be entertained.

0
0

d/15/420

ITEM ITEM DESCRIPTION UNIT QUANTITY RATE

BILL NO. 9 STREET LIGHTING WORKS


0

0
0

To Part Summary Dhs.

PART SUMMARY

Page
0

d/15/421

ITEM ITEM DESCRIPTION UNIT QUANTITY RATE

BILL NO. 9 STREET LIGHTING WORKS


0
Page

Page

Page

Page

Page

Page

Page

Page

Page

Page

Page

Page

Page

Page

Page

Page

Total for Part 15 - RTA - Road Lighting Works


0

d/15/422

ITEM ITEM DESCRIPTION UNIT QUANTITY RATE

BILL NO. 9 STREET LIGHTING WORKS


0
Carried to Grand Summary Dhs.
d/15/423

AMOUNT
UAE. Dhs.

0.00

0.00

0.00

0.00

0.00

0.00

0.00
d/15/424

AMOUNT
UAE. Dhs.

14,075.00

400.00

1,275.00

800.00

700.00
d/15/425

AMOUNT
UAE. Dhs.

17,250.00

0.00

0.00

0.00

0.00
d/15/426

AMOUNT
UAE. Dhs.

0.00

5,544.00

2,772.00

22,125.00

378.00

172,278.00

26,250.00

24,209.00

168,750.00

5,504.00

3,378.00
d/15/427

AMOUNT
UAE. Dhs.

431,188.00

5,000.00

5,000.00

4,000.00

1,000.00
d/15/428

AMOUNT
UAE. Dhs.

2,500.00

17,500.00

0.00
d/15/429

AMOUNT
UAE. Dhs.

574,218.00

595,023.00

870,000.00

58,476.00

2,097,717.00

3,950.00

5,650.00

0.00
d/15/430

AMOUNT
UAE. Dhs.

9,600.00

0.00

0.00

0.00

0.00

0.00
d/15/431

AMOUNT
UAE. Dhs.

0.00

0.00

0.00

0.00
d/15/432

AMOUNT
UAE. Dhs.

0.00

0.00

0.00

0.00

0.00
d/15/433

AMOUNT
UAE. Dhs.

0.00
d/15/434

AMOUNT
UAE. Dhs.

0.00

0.00
d/15/435

AMOUNT
UAE. Dhs.

17,250.00

0.00

431,188.00

17,500.00

2,097,717.00

9,600.00
d/15/436

AMOUNT
UAE. Dhs.

2,573,255.00
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 437
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/1/1-A

d/1/1-B

d/1/1-C

d/1/1-D
d/1/1-E
d/1/1-F
d/1/1-G
d/1/1-H
d/1/1-J
d/1/1-K
d/1/1-L
d/1/1-M
d/1/1-N
d/1/1-P
d/1/1-Q
d/1/1-R

d/1/2-A
d/1/2-B
d/1/2-C
d/1/2-D
d/1/2-E
d/1/2-F
d/1/2-G
d/1/2-H
d/1/2-J
d/1/2-K
d/1/2-L
d/1/2-M
d/1/2-N
d/1/2-P
d/1/2-Q

d/1/3-A

Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 438
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/1/3-B
d/1/3-C
d/1/3-D
d/1/3-E
d/1/3-F
d/1/3-G
d/1/3-H
d/1/3-J
d/1/3-K
d/1/3-L
d/1/3-M

d/1/4-A
d/1/4-B
d/1/4-C
d/1/4-D
d/1/4-E
d/1/4-F
d/1/4-G
d/1/4-H
d/1/4-J
d/1/4-K
d/1/4-L

d/1/5-A
d/1/5-B
d/1/5-C
d/1/5-D
d/1/5-E
d/1/5-F
d/1/5-G
d/1/5-H
d/1/5-J
d/1/5-K

Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 439
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/1/5-L
d/1/5-M

d/1/6-A
d/1/6-B

d/1/7-A
d/1/7-B
d/1/7-C
d/1/7-D
d/1/7-E
d/1/7-F
d/1/7-G
d/1/7-H
d/1/7-J
d/1/7-K

d/1/8-A
d/1/8-B
d/1/8-C
d/1/8-D
d/1/8-E
d/1/8-F

d/1/9-A
d/1/9-B
d/1/9-C

d/1/10-A

d/1/11-A

d/1/12-A

Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 440
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/1/13-A

d/1/14-A

d/1/15-A

d/2/1-A

d/2/1-B
d/2/1-C

d/2/1-D
d/2/1-E
d/2/1-F
d/2/1-G
d/2/1-H
d/2/1-J
d/2/1-K
d/2/1-L
d/2/1-M
d/2/1-N
d/2/1-P

d/2/2-A
d/2/2-B
d/2/2-C
d/2/2-D
d/2/2-E
d/2/2-F
d/2/2-G
d/2/2-H
d/2/2-J
d/2/2-K
d/2/2-L
d/2/2-M

Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 441
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/2/2-N
d/2/2-P

d/2/3-A
d/2/3-B
d/2/3-C
d/2/3-D
d/2/3-E
d/2/3-F
d/2/3-G
d/2/3-H
d/2/3-J
d/2/3-K
d/2/3-L
d/2/3-M
d/2/3-N
d/2/3-P

d/2/4-A
d/2/4-B
d/2/4-C
d/2/4-D
d/2/4-E
d/2/4-F
d/2/4-G

d/2/5-A
d/2/5-B
d/2/5-C
d/2/5-D
d/2/5-E
d/2/5-F
d/2/5-G
d/2/5-H

Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 442
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/2/5-J
d/2/5-K
d/2/5-L
d/2/5-M
d/2/5-N
d/2/5-P

d/3/1-A
d/3/1-B
d/3/1-C
d/3/1-D
d/3/1-E
d/3/1-F
d/3/1-G

d/3/2-A
d/3/2-B
d/3/2-C
d/3/2-D
d/3/2-E
d/3/2-F
d/3/2-G
d/3/2-H
d/3/2-J
d/3/2-K
d/3/2-L

d/3/3-A
d/3/3-B
d/3/3-C
d/3/3-D
d/3/3-E
d/3/3-F

Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 443
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %

d/3/4-A
d/3/4-B
d/3/4-C
d/3/4-D
d/3/4-E
d/3/4-F
d/3/4-G
d/3/4-H

d/3/5-A
d/3/5-B
d/3/5-C
d/3/5-D
d/3/5-E
d/3/5-F
d/3/5-G

d/3/6-A
d/3/6-B
d/3/6-C
d/3/6-D
d/3/6-E
d/3/6-F
d/3/6-G
d/3/6-H
d/3/6-J
d/3/6-K
d/3/6-L
d/3/6-M
d/3/6-N
d/3/6-P
d/3/6-Q
d/3/6-R

Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 444
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %

d/3/7-A
d/3/7-B
d/3/7-C
d/3/7-D
d/3/7-E
d/3/7-F
d/3/7-G
d/3/7-H
d/3/7-J
d/3/7-K
d/3/7-L
d/3/7-M

d/3/8-A
d/3/8-B
d/3/8-C
d/3/8-D
d/3/8-E
d/3/8-F
d/3/8-G

d/3/9-A
d/3/9-B
d/3/9-C
d/3/9-D
d/3/9-E
d/3/9-F
d/3/9-G
d/3/9-H

d/3/10-A
d/3/10-B
d/3/10-C

Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 445
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/3/10-D
d/3/10-E
d/3/10-F
d/3/10-G
d/3/10-H

d/4/1-A
d/4/1-B
d/4/1-C
d/4/1-D
d/4/1-E
d/4/1-F
d/4/1-G

d/4/2-A
d/4/2-B
d/4/2-C
d/4/2-D
d/4/2-E
d/4/2-F

d/4/3-A
d/4/3-B
d/4/3-C
d/4/3-D
d/4/3-E
d/4/3-F
d/4/3-G
d/4/3-H
d/4/3-J
d/4/3-K
d/4/3-L

Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 446
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/4/4-A
d/4/4-B
d/4/4-C
d/4/4-D
d/4/4-E
d/4/4-F
d/4/4-G

d/4/5-A
d/4/5-B
d/4/5-C
d/4/5-D
d/4/5-E
d/4/5-F
d/4/5-G
d/4/5-H

d/4/6-A
d/4/6-B
d/4/6-C
d/4/6-D

d/5/1-A
d/5/1-B
d/5/1-C
d/5/1-D
d/5/1-E
d/5/1-F
d/5/1-G
d/5/1-H
d/5/1-J
d/5/1-K
d/5/1-L

Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 447
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/5/1-M

d/5/2-A
d/5/2-B
d/5/2-C
d/5/2-D
d/5/2-E
d/5/2-F
d/5/2-G
d/5/2-H
d/5/2-J
d/5/2-K
d/5/2-L
d/5/2-M
d/5/2-N
d/5/2-P

d/5/3-A
d/5/3-B
d/5/3-C
d/5/3-D
d/5/3-E
d/5/3-F
d/5/3-G
d/5/3-H
d/5/3-J
d/5/3-K
d/5/3-L
d/5/3-M

d/5/4-A
d/5/4-B
d/5/4-C
d/5/4-D

Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 448
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/5/4-E
d/5/4-F
d/5/4-G
d/5/4-H
d/5/4-J
d/5/4-K
d/5/4-L
d/5/4-M
d/5/4-N
d/5/4-P
d/5/4-Q

d/5/5-A
d/5/5-B
d/5/5-C
d/5/5-D
d/5/5-E
d/5/5-F
d/5/5-G
d/5/5-H
d/5/5-J
d/5/5-K
d/5/5-L
d/5/5-M
d/5/5-N
d/5/5-P

d/5/6-A
d/5/6-B
d/5/6-C
d/5/6-D
d/5/6-E
d/5/6-F
d/5/6-G

Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 449
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/5/6-H
d/5/6-J
d/5/6-K
d/5/6-L
d/5/6-M

d/5/7-A
d/5/7-B
d/5/7-C
d/5/7-D
d/5/7-E
d/5/7-F
d/5/7-G
d/5/7-H
d/5/7-J
d/5/7-K
d/5/7-L
d/5/7-M
d/5/7-N
d/5/7-P
d/5/7-Q

d/6/1-A
d/6/1-B
d/6/1-C
d/6/1-D
d/6/1-E
d/6/1-F
d/6/1-G
d/6/1-H
d/6/1-J
d/6/1-K
d/6/1-L

Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 450
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/6/1-M
d/6/1-N
d/6/1-P

d/6/2-A
d/6/2-B
d/6/2-C
d/6/2-D
d/6/2-E
d/6/2-F
d/6/2-G
d/6/2-H
d/6/2-J
d/6/2-K
d/6/2-L
d/6/2-M
d/6/2-N
d/6/2-P

d/6/3-A
d/6/3-B
d/6/3-C
d/6/3-D
d/6/3-E
d/6/3-F
d/6/3-G
d/6/3-H
d/6/3-J
d/6/3-K
d/6/3-L
d/6/3-M
d/6/3-N
d/6/3-P
d/6/3-Q

Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 451
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %

d/6/4-A
d/6/4-B
d/6/4-C
d/6/4-D
d/6/4-E
d/6/4-F
d/6/4-G
d/6/4-H
d/6/4-J
d/6/4-K
d/6/4-L

d/6/5-A
d/6/5-B
d/6/5-C
d/6/5-D
d/6/5-E
d/6/5-F
d/6/5-G
d/6/5-H
d/6/5-J
d/6/5-K
d/6/5-L
d/6/5-M
d/6/5-N
d/6/5-P

d/6/6-A
d/6/6-B
d/6/6-C
d/6/6-D
d/6/6-E
d/6/6-F

Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 452
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/6/6-G
d/6/6-H
d/6/6-J
d/6/6-K
d/6/6-L
d/6/6-M
d/6/6-N
d/6/6-P
d/6/6-Q
d/6/6-R
d/6/6-S
d/6/6-T

d/6/7-A
d/6/7-B
d/6/7-C
d/6/7-D
d/6/7-E
d/6/7-F
d/6/7-G
d/6/7-H
d/6/7-J
d/6/7-K
d/6/7-L
d/6/7-M
d/6/7-N
d/6/7-P
d/6/7-Q
d/6/7-R
d/6/7-S
d/6/7-T
d/6/7-U
d/6/7-V
d/6/7-W

Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 453
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %

d/6/8-A
d/6/8-B
d/6/8-C
d/6/8-D
d/6/8-E
d/6/8-F
d/6/8-G
d/6/8-H
d/6/8-J
d/6/8-K

d/6/9-A
d/6/9-B
d/6/9-C
d/6/9-D
d/6/9-E
d/6/9-F
d/6/9-G
d/6/9-H
d/6/9-J
d/6/9-K
d/6/9-L

d/6/10-A
d/6/10-B
d/6/10-C
d/6/10-D
d/6/10-E
d/6/10-F
d/6/10-G
d/6/10-H
d/6/10-J
d/6/10-K

Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 454
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/6/10-L
d/6/10-M
d/6/10-N
d/6/10-P
d/6/10-Q

d/6/11-A
d/6/11-B
d/6/11-C
d/6/11-D
d/6/11-E
d/6/11-F
d/6/11-G
d/6/11-H
d/6/11-J
d/6/11-K
d/6/11-L
d/6/11-M
d/6/11-N
d/6/11-P

d/6/12-A
d/6/12-B
d/6/12-C
d/6/12-D
d/6/12-E
d/6/12-F

d/6/13-A
d/6/13-B
d/6/13-C
d/6/13-D

Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 455
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/7a/1-A
d/7a/1-B
d/7a/1-C
d/7a/1-D
d/7a/1-E
d/7a/1-F
d/7a/1-G
d/7a/1-H
d/7a/1-J
d/7a/1-K

d/7a/2-A
d/7a/2-B
d/7a/2-C
d/7a/2-D

d/7a/3-A
d/7a/3-B
d/7a/3-C
d/7a/3-D
d/7a/3-E
d/7a/3-F
d/7a/3-G
d/7a/3-H
d/7a/3-J
d/7a/3-K
d/7a/3-L

d/7a/4-A
d/7a/4-B
d/7a/4-C
d/7a/4-D
d/7a/4-E
d/7a/4-F

Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 456
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/7a/4-G
d/7a/4-H
d/7a/4-J

d/7a/5-A
d/7a/5-B
d/7a/5-C
d/7a/5-D
d/7a/5-E
d/7a/5-F
d/7a/5-G
d/7a/5-H
d/7a/5-J
d/7a/5-K
d/7a/5-L
d/7a/5-M
d/7a/5-N
d/7a/5-P

d/7a/6-A
d/7a/6-B
d/7a/6-C
d/7a/6-D
d/7a/6-E
d/7a/6-F
d/7a/6-G
d/7a/6-H
d/7a/6-J
d/7a/6-K
d/7a/6-L

d/7a/7-A
d/7a/7-B
d/7a/7-C

Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 457
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/7a/7-D
d/7a/7-E
d/7a/7-F
d/7a/7-G
d/7a/7-H

d/7a/8-A
d/7a/8-B
d/7a/8-C
d/7a/8-D
d/7a/8-E
d/7a/8-F
d/7a/8-G
d/7a/8-H

d/7a/9-A
d/7a/9-B
d/7a/9-C
d/7a/9-D
d/7a/9-E
d/7a/9-F

d/7a/10-A
d/7a/10-B
d/7a/10-C
d/7a/10-D
d/7a/10-E
d/7a/10-F
d/7a/10-G
d/7a/10-H
d/7a/10-J
d/7a/10-K
d/7a/10-L
d/7a/10-M

Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 458
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/7a/10-N

d/7a/11-A
d/7a/11-B
d/7a/11-C
d/7a/11-D
d/7a/11-E
d/7a/11-F
d/7a/11-G
d/7a/11-H
d/7a/11-J
d/7a/11-K
d/7a/11-L
d/7a/11-M

d/7a/12-A
d/7a/12-B
d/7a/12-C
d/7a/12-D
d/7a/12-E
d/7a/12-F
d/7a/12-G
d/7a/12-H
d/7a/12-J
d/7a/12-K
d/7a/12-L
d/7a/12-M
d/7a/12-N
d/7a/12-P
d/7a/12-Q
d/7a/12-R

d/7a/13-A

Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 459
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/7a/14-A
d/7a/14-B
d/7a/14-C
d/7a/14-D
d/7a/14-E
d/7a/14-F

d/7a/15-A
d/7a/15-B
d/7a/15-C
d/7a/15-D
d/7a/15-E
d/7a/15-F
d/7a/15-G

d/7a/16-A
d/7a/16-B
d/7a/16-C
d/7a/16-D
d/7a/16-E

d/7a/17-A
d/7a/17-B
d/7a/17-C
d/7a/17-D
d/7a/17-E
d/7a/17-F
d/7a/17-G
d/7a/17-H
d/7a/17-J
d/7a/17-K
d/7a/17-L

d/7a/18-A

Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 460
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/7a/18-B
d/7a/18-C

d/7b/1-A
d/7b/1-B
d/7b/1-C
d/7b/1-D
d/7b/1-E
d/7b/1-F
d/7b/1-G
d/7b/1-H
d/7b/1-J
d/7b/1-K

d/7b/2-A
d/7b/2-B
d/7b/2-C
d/7b/2-D

d/7b/3-A
d/7b/3-B
d/7b/3-C
d/7b/3-D
d/7b/3-E
d/7b/3-F
d/7b/3-G
d/7b/3-H

d/7b/4-A
d/7b/4-B
d/7b/4-C
d/7b/4-D

Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 461
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/7b/5-A
d/7b/5-B
d/7b/5-C
d/7b/5-D
d/7b/5-E
d/7b/5-F
d/7b/5-G
d/7b/5-H
d/7b/5-J
d/7b/5-K

d/7b/6-A
d/7b/6-B
d/7b/6-C
d/7b/6-D
d/7b/6-E
d/7b/6-F
d/7b/6-G

d/7b/7-A
d/7b/7-B
d/7b/7-C
d/7b/7-D
d/7b/7-E
d/7b/7-F
d/7b/7-G
d/7b/7-H

d/7b/8-A
d/7b/8-B
d/7b/8-C
d/7b/8-D
d/7b/8-E
d/7b/8-F

Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 462
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/7b/8-G
d/7b/8-H

d/7b/9-A
d/7b/9-B
d/7b/9-C
d/7b/9-D
d/7b/9-E
d/7b/9-F
d/7b/9-G

d/7b/10-A
d/7b/10-B
d/7b/10-C
d/7b/10-D
d/7b/10-E

d/7b/11-A
d/7b/11-B
d/7b/11-C
d/7b/11-D
d/7b/11-E
d/7b/11-F

d/7b/12-A
d/7b/12-B
d/7b/12-C
d/7b/12-D
d/7b/12-E
d/7b/12-F
d/7b/12-G
d/7b/12-H
d/7b/12-J
d/7b/12-K

Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 463
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/7b/12-L
d/7b/12-M
d/7b/12-N

d/7b/13-A
d/7b/13-B
d/7b/13-C
d/7b/13-D
d/7b/13-E
d/7b/13-F
d/7b/13-G
d/7b/13-H
d/7b/13-J

d/7b/14-

d/7b/15-A

d/7b/16-A
d/7b/16-B
d/7b/16-C
d/7b/16-D
d/7b/16-E
d/7b/16-F
d/7b/16-G

d/7b/17-A
d/7b/17-B
d/7b/17-C
d/7b/17-D
d/7b/17-E
d/7b/17-F
d/7b/17-G

Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 464
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/7b/18-A
d/7b/18-B
d/7b/18-C
d/7b/18-D
d/7b/18-E

d/7b/19-A
d/7b/19-B
d/7b/19-C
d/7b/19-D
d/7b/19-E
d/7b/19-F
d/7b/19-G
d/7b/19-H
d/7b/19-J
d/7b/19-K
d/7b/19-L

d/7b/20-A
d/7b/20-B
d/7b/20-C

d/7c/1-A
d/7c/1-B
d/7c/1-C
d/7c/1-D
d/7c/1-E
d/7c/1-F
d/7c/1-G
d/7c/1-H
d/7c/1-J
d/7c/1-K

Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 465
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/7c/2-A
d/7c/2-B
d/7c/2-C
d/7c/2-D

d/7c/3-A
d/7c/3-B
d/7c/3-C
d/7c/3-D
d/7c/3-E
d/7c/3-F
d/7c/3-G
d/7c/3-H
d/7c/3-J

d/7c/4-A
d/7c/4-B
d/7c/4-C
d/7c/4-D

d/7c/5-A
d/7c/5-B
d/7c/5-C
d/7c/5-D
d/7c/5-E
d/7c/5-F
d/7c/5-G
d/7c/5-H
d/7c/5-J
d/7c/5-K

d/7c/6-A
d/7c/6-B
d/7c/6-C

Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 466
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/7c/6-D
d/7c/6-E
d/7c/6-F
d/7c/6-G

d/7c/7-A
d/7c/7-B
d/7c/7-C
d/7c/7-D
d/7c/7-E
d/7c/7-F
d/7c/7-G
d/7c/7-H

d/7c/8-A
d/7c/8-B
d/7c/8-C
d/7c/8-D
d/7c/8-E
d/7c/8-F
d/7c/8-G
d/7c/8-H
d/7c/8-J

d/7c/9-A
d/7c/9-B
d/7c/9-C
d/7c/9-D
d/7c/9-E
d/7c/9-F
d/7c/9-G
d/7c/9-H
d/7c/9-J
d/7c/9-K

Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 467
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/7c/9-L

d/7c/10-A
d/7c/10-B
d/7c/10-C
d/7c/10-D
d/7c/10-E
d/7c/10-F
d/7c/10-G
d/7c/10-H
d/7c/10-J
d/7c/10-K
d/7c/10-L
d/7c/10-M
d/7c/10-N

d/7c/11-A
d/7c/11-B
d/7c/11-C
d/7c/11-D
d/7c/11-E
d/7c/11-F
d/7c/11-G
d/7c/11-H
d/7c/11-J
d/7c/11-K
d/7c/11-L
d/7c/11-M

d/7c/12-A

d/7c/13-A

d/7c/14-A

Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 468
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/7c/14-B
d/7c/14-C
d/7c/14-D
d/7c/14-E
d/7c/14-F
d/7c/14-G
d/7c/14-H
d/7c/14-J
d/7c/14-K

d/7c/15-A
d/7c/15-B
d/7c/15-C
d/7c/15-D
d/7c/15-E
d/7c/15-F
d/7c/15-G
d/7c/15-H
d/7c/15-J
d/7c/15-K

d/7c/16-A
d/7c/16-B
d/7c/16-C
d/7c/16-D
d/7c/16-E
d/7c/16-F
d/7c/16-G
d/7c/16-H
d/7c/16-J
d/7c/16-K

d/7c/17-A
d/7c/17-B

Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 469
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/7c/17-C
d/7c/17-D
d/7c/17-E
d/7c/17-F
d/7c/17-G
d/7c/17-H
d/7c/17-J
d/7c/17-K
d/7c/17-L

d/7c/18-A
d/7c/18-B
d/7c/18-C

d/7d/1-A
d/7d/1-B
d/7d/1-C
d/7d/1-D
d/7d/1-E
d/7d/1-F
d/7d/1-G
d/7d/1-H
d/7d/1-J
d/7d/1-K

d/7d/2-A
d/7d/2-B
d/7d/2-C
d/7d/2-D

d/7d/3-A
d/7d/3-B
d/7d/3-C

Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 470
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/7d/3-D
d/7d/3-E
d/7d/3-F
d/7d/3-G
d/7d/3-H

d/7d/4-A
d/7d/4-B
d/7d/4-C
d/7d/4-D

d/7d/5-A
d/7d/5-B
d/7d/5-C
d/7d/5-D
d/7d/5-E
d/7d/5-F
d/7d/5-G
d/7d/5-H
d/7d/5-J
d/7d/5-K

d/7d/6-A
d/7d/6-B
d/7d/6-C
d/7d/6-D
d/7d/6-E
d/7d/6-F

d/7d/7-A
d/7d/7-B
d/7d/7-C
d/7d/7-D
d/7d/7-E

Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 471
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/7d/7-F
d/7d/7-G
d/7d/7-H

d/7d/8-A
d/7d/8-B
d/7d/8-C
d/7d/8-D
d/7d/8-E
d/7d/8-F
d/7d/8-G
d/7d/8-H

d/7d/9-A
d/7d/9-B
d/7d/9-C
d/7d/9-D
d/7d/9-E
d/7d/9-F
d/7d/9-G
d/7d/9-H

d/7d/10-A
d/7d/10-B
d/7d/10-C
d/7d/10-D
d/7d/10-E
d/7d/10-F
d/7d/10-G
d/7d/10-H
d/7d/10-J
d/7d/10-K
d/7d/10-L
d/7d/10-M

Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 472
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/7d/10-N

d/7d/11-A
d/7d/11-B
d/7d/11-C
d/7d/11-D
d/7d/11-E
d/7d/11-F

d/7d/12-A

d/7d/13-A

d/7d/14-A
d/7d/14-B
d/7d/14-C
d/7d/14-D
d/7d/14-E
d/7d/14-F
d/7d/14-G

d/7d/15-A
d/7d/15-B
d/7d/15-C
d/7d/15-D
d/7d/15-E
d/7d/15-F
d/7d/15-G

d/7d/16-A
d/7d/16-B
d/7d/16-C
d/7d/16-D
d/7d/16-E

Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 473
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %

d/7d/17-A
d/7d/17-B
d/7d/17-C
d/7d/17-D
d/7d/17-E
d/7d/17-F
d/7d/17-G
d/7d/17-H
d/7d/17-J
d/7d/17-K
d/7d/17-L

d/7d/18-A
d/7d/18-B
d/7d/18-C

d/7e/1-A
d/7e/1-B
d/7e/1-C
d/7e/1-D
d/7e/1-E
d/7e/1-F
d/7e/1-G
d/7e/1-H
d/7e/1-J
d/7e/1-K

d/7e/2-A
d/7e/2-B
d/7e/2-C
d/7e/2-D

Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 474
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/7e/3-A
d/7e/3-B
d/7e/3-C
d/7e/3-D
d/7e/3-E
d/7e/3-F
d/7e/3-G
d/7e/3-H

d/7e/4-A
d/7e/4-B
d/7e/4-C
d/7e/4-D
d/7e/4-E

d/7e/5-A
d/7e/5-B
d/7e/5-C
d/7e/5-D
d/7e/5-E
d/7e/5-F
d/7e/5-G
d/7e/5-H
d/7e/5-J
d/7e/5-K
d/7e/5-L
d/7e/5-M

d/7e/6-A
d/7e/6-B
d/7e/6-C
d/7e/6-D
d/7e/6-E
d/7e/6-F

Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 475
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %

d/7e/7-A
d/7e/7-B
d/7e/7-C
d/7e/7-D
d/7e/7-E
d/7e/7-F
d/7e/7-G
d/7e/7-H

d/7e/8-A
d/7e/8-B
d/7e/8-C
d/7e/8-D
d/7e/8-E
d/7e/8-F
d/7e/8-G

d/7e/9-A
d/7e/9-B
d/7e/9-C
d/7e/9-D

d/7e/10-A
d/7e/10-B
d/7e/10-C
d/7e/10-D
d/7e/10-E
d/7e/10-F
d/7e/10-G
d/7e/10-H
d/7e/10-J
d/7e/10-K
d/7e/10-L

Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 476
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/7e/10-M
d/7e/10-N

d/7e/11-A
d/7e/11-B
d/7e/11-C
d/7e/11-D
d/7e/11-E
d/7e/11-F
d/7e/11-G
d/7e/11-H

d/7e/12-A

d/7e/13-A

d/7e/14-A
d/7e/14-B
d/7e/14-C
d/7e/14-D
d/7e/14-E
d/7e/14-F
d/7e/14-G
d/7e/14-H
d/7e/14-J

d/7e/15-A
d/7e/15-B
d/7e/15-C
d/7e/15-D
d/7e/15-E
d/7e/15-F
d/7e/15-G
d/7e/15-H

Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 477
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/7e/15-J
d/7e/15-K

d/7e/16-A
d/7e/16-B
d/7e/16-C
d/7e/16-D
d/7e/16-E
d/7e/16-F
d/7e/16-G
d/7e/16-H
d/7e/16-J
d/7e/16-K

d/7e/17-A
d/7e/17-B
d/7e/17-C
d/7e/17-D
d/7e/17-E
d/7e/17-F
d/7e/17-G
d/7e/17-H
d/7e/17-J
d/7e/17-K
d/7e/17-L

d/7e/18-A
d/7e/18-B
d/7e/18-C

d/7f/1-A
d/7f/1-B
d/7f/1-C

Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 478
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/7f/1-D
d/7f/1-E
d/7f/1-F
d/7f/1-G
d/7f/1-H
d/7f/1-J
d/7f/1-K

d/7f/2-A
d/7f/2-B
d/7f/2-C
d/7f/2-D

d/7f/3-A
d/7f/3-B
d/7f/3-C
d/7f/3-D
d/7f/3-E
d/7f/3-F
d/7f/3-G
d/7f/3-H
d/7f/3-J

d/7f/4-A
d/7f/4-B
d/7f/4-C
d/7f/4-D
d/7f/4-E

d/7f/5-A
d/7f/5-B
d/7f/5-C
d/7f/5-D
d/7f/5-E

Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 479
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/7f/5-F
d/7f/5-G
d/7f/5-H
d/7f/5-J
d/7f/5-K
d/7f/5-L

d/7f/6-A
d/7f/6-B
d/7f/6-C
d/7f/6-D
d/7f/6-E
d/7f/6-F

d/7f/7-A
d/7f/7-B
d/7f/7-C
d/7f/7-D
d/7f/7-E
d/7f/7-F
d/7f/7-G
d/7f/7-H

d/7f/8-A
d/7f/8-B
d/7f/8-C
d/7f/8-D
d/7f/8-E
d/7f/8-F
d/7f/8-G

d/7f/9-A
d/7f/9-B
d/7f/9-C

Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 480
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/7f/9-D

d/7f/10-A
d/7f/10-B
d/7f/10-C
d/7f/10-D
d/7f/10-E
d/7f/10-F
d/7f/10-G
d/7f/10-H
d/7f/10-J
d/7f/10-K
d/7f/10-L
d/7f/10-M
d/7f/10-N

d/7f/11-A
d/7f/11-B
d/7f/11-C
d/7f/11-D
d/7f/11-E
d/7f/11-F

d/7f/12-A

d/7f/13-A

d/7f/14-A
d/7f/14-B
d/7f/14-C
d/7f/14-D
d/7f/14-E
d/7f/14-F
d/7f/14-G

Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 481
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/7f/14-H
d/7f/14-J

d/7f/15-A
d/7f/15-B
d/7f/15-C
d/7f/15-D
d/7f/15-E
d/7f/15-F
d/7f/15-G
d/7f/15-H
d/7f/15-J
d/7f/15-K

d/7f/16-A
d/7f/16-B
d/7f/16-C
d/7f/16-D
d/7f/16-E
d/7f/16-F
d/7f/16-G
d/7f/16-H
d/7f/16-J
d/7f/16-K

d/7f/17-A
d/7f/17-B
d/7f/17-C
d/7f/17-D
d/7f/17-E
d/7f/17-F
d/7f/17-G
d/7f/17-H
d/7f/17-J

Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 482
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/7f/17-K
d/7f/17-L

d/7f/18-A
d/7f/18-B
d/7f/18-C

d/7g/1-A
d/7g/1-B
d/7g/1-C
d/7g/1-D
d/7g/1-E
d/7g/1-F
d/7g/1-G
d/7g/1-H
d/7g/1-J
d/7g/1-K

d/7g/2-A
d/7g/2-B
d/7g/2-C
d/7g/2-D

d/7g/3-A
d/7g/3-B
d/7g/3-C
d/7g/3-D
d/7g/3-E
d/7g/3-F
d/7g/3-G
d/7g/3-H
d/7g/3-J

Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 483
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/7g/4-A
d/7g/4-B
d/7g/4-C
d/7g/4-D
d/7g/4-E

d/7g/5-A
d/7g/5-B
d/7g/5-C
d/7g/5-D
d/7g/5-E
d/7g/5-F
d/7g/5-G
d/7g/5-H
d/7g/5-J
d/7g/5-K
d/7g/5-L
d/7g/5-M

d/7g/6-A
d/7g/6-B
d/7g/6-C
d/7g/6-D
d/7g/6-E
d/7g/6-F

d/7g/7-A
d/7g/7-B
d/7g/7-C
d/7g/7-D
d/7g/7-E
d/7g/7-F
d/7g/7-G
d/7g/7-H

Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 484
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %

d/7g/8-A
d/7g/8-B
d/7g/8-C
d/7g/8-D
d/7g/8-E
d/7g/8-F
d/7g/8-G

d/7g/9-A
d/7g/9-B
d/7g/9-C
d/7g/9-D

d/7g/10-A
d/7g/10-B
d/7g/10-C
d/7g/10-D
d/7g/10-E
d/7g/10-F
d/7g/10-G
d/7g/10-H
d/7g/10-J
d/7g/10-K
d/7g/10-L
d/7g/10-M
d/7g/10-N

d/7g/11-A
d/7g/11-B
d/7g/11-C
d/7g/11-D
d/7g/11-E
d/7g/11-F

Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 485
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/7g/11-G
d/7g/11-H

d/7g/12-A

d/7g/13-A

d/7g/14-A
d/7g/14-B
d/7g/14-C
d/7g/14-D
d/7g/14-E
d/7g/14-F
d/7g/14-G
d/7g/14-H
d/7g/14-J

d/7g/15-A
d/7g/15-B
d/7g/15-C
d/7g/15-D
d/7g/15-E
d/7g/15-F
d/7g/15-G
d/7g/15-H
d/7g/15-J
d/7g/15-K

d/7g/16-A
d/7g/16-B
d/7g/16-C
d/7g/16-D
d/7g/16-E
d/7g/16-F

Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 486
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/7g/16-G
d/7g/16-H
d/7g/16-J
d/7g/16-K

d/7g/17-A
d/7g/17-B
d/7g/17-C
d/7g/17-D
d/7g/17-E
d/7g/17-F
d/7g/17-G
d/7g/17-H
d/7g/17-J
d/7g/17-K
d/7g/17-L

d/7g/18-A
d/7g/18-B
d/7g/18-C

d/7h/1-A
d/7h/1-B
d/7h/1-C
d/7h/1-D
d/7h/1-E
d/7h/1-F
d/7h/1-G
d/7h/1-H
d/7h/1-J
d/7h/1-K

d/7h/2-A

Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 487
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/7h/2-B
d/7h/2-C
d/7h/2-D

d/7h/3-A
d/7h/3-B
d/7h/3-C
d/7h/3-D
d/7h/3-E
d/7h/3-F
d/7h/3-G
d/7h/3-H
d/7h/3-J
d/7h/3-K

d/7h/4-A
d/7h/4-B
d/7h/4-C
d/7h/4-D
d/7h/4-E

d/7h/5-A
d/7h/5-B
d/7h/5-C
d/7h/5-D
d/7h/5-E
d/7h/5-F
d/7h/5-G
d/7h/5-H
d/7h/5-J
d/7h/5-K
d/7h/5-L
d/7h/5-M

Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 488
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/7h/6-A
d/7h/6-B
d/7h/6-C
d/7h/6-D
d/7h/6-E
d/7h/6-F

d/7h/7-A
d/7h/7-B
d/7h/7-C
d/7h/7-D
d/7h/7-E
d/7h/7-F
d/7h/7-G
d/7h/7-H

d/7h/8-A
d/7h/8-B
d/7h/8-C
d/7h/8-D
d/7h/8-E
d/7h/8-F
d/7h/8-G

d/7h/9-A
d/7h/9-B
d/7h/9-C
d/7h/9-D

d/7h/10-A
d/7h/10-B
d/7h/10-C
d/7h/10-D
d/7h/10-E

Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 489
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/7h/10-F
d/7h/10-G
d/7h/10-H
d/7h/10-J
d/7h/10-K
d/7h/10-L
d/7h/10-M
d/7h/10-N

d/7h/11-A
d/7h/11-B
d/7h/11-C
d/7h/11-D
d/7h/11-E
d/7h/11-F

d/7h/12-A

d/7h/13-A

d/7h/14-A
d/7h/14-B
d/7h/14-C
d/7h/14-D
d/7h/14-E
d/7h/14-F
d/7h/14-G
d/7h/14-H
d/7h/14-J

d/7h/15-A
d/7h/15-B
d/7h/15-C
d/7h/15-D

Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 490
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/7h/15-E
d/7h/15-F
d/7h/15-G
d/7h/15-H
d/7h/15-J
d/7h/15-K

d/7h/16-A
d/7h/16-B
d/7h/16-C
d/7h/16-D
d/7h/16-E
d/7h/16-F
d/7h/16-G
d/7h/16-H
d/7h/16-J
d/7h/16-K

d/7h/17-A
d/7h/17-B
d/7h/17-C
d/7h/17-D
d/7h/17-E
d/7h/17-F
d/7h/17-G
d/7h/17-H
d/7h/17-J
d/7h/17-K
d/7h/17-L

d/7h/18-A
d/7h/18-B
d/7h/18-C

Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 491
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %

d/7i/1-A
d/7i/1-B
d/7i/1-C
d/7i/1-D
d/7i/1-E
d/7i/1-F

d/7i/2-A
d/7i/2-B
d/7i/2-C
d/7i/2-D
d/7i/2-E
d/7i/2-F
d/7i/2-G

d/7i/3-A
d/7i/3-B
d/7i/3-C
d/7i/3-D
d/7i/3-E
d/7i/3-F

d/7i/4-A
d/7i/4-B
d/7i/4-C
d/7i/4-D
d/7i/4-E
d/7i/4-F
d/7i/4-G
d/7i/4-H
d/7i/4-J
d/7i/4-K
d/7i/4-L

Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 492
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %

d/7i/5-A
d/7i/5-B
d/7i/5-C
d/7i/5-D
d/7i/5-E

d/7i/6-A
d/7i/6-B
d/7i/6-C
d/7i/6-D
d/7i/6-E
d/7i/6-F

d/7i/7-A
d/7i/7-B
d/7i/7-C
d/7i/7-D
d/7i/7-E
d/7i/7-F
d/7i/7-G
d/7i/7-H

d/8/1-A
d/8/1-B
d/8/1-C
d/8/1-D
d/8/1-E
d/8/1-F
d/8/1-G
d/8/1-H
d/8/1-J
d/8/1-K

Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 493
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/8/1-L
d/8/1-M
d/8/1-N

d/8/2-A
d/8/2-B
d/8/2-C
d/8/2-D
d/8/2-E
d/8/2-F
d/8/2-G
d/8/2-H
d/8/2-J
d/8/2-K
d/8/2-L
d/8/2-M
d/8/2-N
d/8/2-P

d/8/3-A
d/8/3-B
d/8/3-C
d/8/3-D
d/8/3-E
d/8/3-F
d/8/3-G
d/8/3-H
d/8/3-J
d/8/3-K
d/8/3-L
d/8/3-M
d/8/3-N

d/8/4-A

Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 494
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/8/4-B
d/8/4-C
d/8/4-D
d/8/4-E
d/8/4-F
d/8/4-G
d/8/4-H
d/8/4-J
d/8/4-K
d/8/4-L
d/8/4-M
d/8/4-N
d/8/4-P

d/8/5-A
d/8/5-B
d/8/5-C
d/8/5-D
d/8/5-E
d/8/5-F
d/8/5-G
d/8/5-H
d/8/5-J
d/8/5-K

d/8/6-A
d/8/6-B
d/8/6-C
d/8/6-D
d/8/6-E

d/8/7-A
d/8/7-B
d/8/7-C

Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 495
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/8/7-D
d/8/7-E

d/8/8-A

d/9/1-A
d/9/1-B
d/9/1-C
d/9/1-D
d/9/1-E
d/9/1-F
d/9/1-G
d/9/1-H
d/9/1-J
d/9/1-K
d/9/1-L
d/9/1-M
d/9/1-N
d/9/1-P
d/9/1-Q
d/9/1-R

d/9/2-A
d/9/2-B
d/9/2-C
d/9/2-D
d/9/2-E
d/9/2-F
d/9/2-G
d/9/2-H
d/9/2-J
d/9/2-K

Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 496
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/9/3-A
d/9/3-B
d/9/3-C
d/9/3-D

d/9/4-A
d/9/4-B
d/9/4-C
d/9/4-D
d/9/4-E
d/9/4-F
d/9/4-G
d/9/4-H
d/9/4-J
d/9/4-K
d/9/4-L
d/9/4-M
d/9/4-N
d/9/4-P
d/9/4-Q

d/9/5-A
d/9/5-B
d/9/5-C
d/9/5-D
d/9/5-E
d/9/5-F
d/9/5-G
d/9/5-H
d/9/5-J
d/9/5-K

d/9/6-A
d/9/6-B

Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 497
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/9/6-C
d/9/6-D
d/9/6-E
d/9/6-F
d/9/6-G
d/9/6-H
d/9/6-J
d/9/6-K
d/9/6-L
d/9/6-M
d/9/6-N
d/9/6-P
d/9/6-Q

d/9/7-A
d/9/7-B
d/9/7-C
d/9/7-D
d/9/7-E
d/9/7-F
d/9/7-G

d/9/8-A
d/9/8-B
d/9/8-C
d/9/8-D
d/9/8-E
d/9/8-F
d/9/8-G
d/9/8-H
d/9/8-J
d/9/8-K
d/9/8-L
d/9/8-M

Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 498
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/9/8-N
d/9/8-P
d/9/8-Q
d/9/8-R

d/9/9-A
d/9/9-B
d/9/9-C
d/9/9-D
d/9/9-E
d/9/9-F
d/9/9-G
d/9/9-H
d/9/9-J
d/9/9-K
d/9/9-L
d/9/9-M
d/9/9-N
d/9/9-P
d/9/9-Q
d/9/9-R
d/9/9-S
d/9/9-T
d/9/9-U
d/9/9-V

d/9/10-A
d/9/10-B
d/9/10-C
d/9/10-D
d/9/10-E
d/9/10-F
d/9/10-G
d/9/10-H

Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 499
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/9/10-J
d/9/10-K
d/9/10-L
d/9/10-M
d/9/10-N
d/9/10-P
d/9/10-Q

d/9/11-A
d/9/11-B
d/9/11-C
d/9/11-D
d/9/11-E
d/9/11-F
d/9/11-G

d/9/12-A
d/9/12-B
d/9/12-C
d/9/12-D
d/9/12-E
d/9/12-F
d/9/12-G
d/9/12-H

d/9/13-A
d/9/13-B
d/9/13-C
d/9/13-D
d/9/13-E
d/9/13-F
d/9/13-G
d/9/13-H
d/9/13-J
d/9/13-K

Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 500
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/9/13-L
d/9/13-M
d/9/13-N
d/9/13-P

d/9/14-A
d/9/14-B
d/9/14-C
d/9/14-D
d/9/14-E
d/9/14-F
d/9/14-G
d/9/14-H

d/9/15-A
d/9/15-B
d/9/15-C
d/9/15-D
d/9/15-E
d/9/15-F
d/9/15-G

d/9/16-A
d/9/16-B
d/9/16-C
d/9/16-D
d/9/16-E
d/9/16-F
d/9/16-G
d/9/16-H

d/9/17-A
d/9/17-B
d/9/17-C

Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 501
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/9/17-D
d/9/17-E
d/9/17-F
d/9/17-G
d/9/17-H

d/9/18-A
d/9/18-B
d/9/18-C
d/9/18-D
d/9/18-E
d/9/18-F
d/9/18-G
d/9/18-H
d/9/18-J
d/9/18-K
d/9/18-L
d/9/18-M
d/9/18-N

d/9/19-A
d/9/19-B
d/9/19-C
d/9/19-D
d/9/19-E
d/9/19-F
d/9/19-G
d/9/19-H
d/9/19-J
d/9/19-K
d/9/19-L
d/9/19-M

d/9/20-A

Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 502
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/9/20-B
d/9/20-C
d/9/20-D

d/10/1-A
d/10/1-B
d/10/1-C
d/10/1-D
d/10/1-E
d/10/1-F
d/10/1-G
d/10/1-H
d/10/1-J
d/10/1-K
d/10/1-L
d/10/1-M
d/10/1-N
d/10/1-P
d/10/1-Q
d/10/1-R
d/10/1-S

d/10/2-A
d/10/2-B
d/10/2-C
d/10/2-D
d/10/2-E
d/10/2-F
d/10/2-G
d/10/2-H
d/10/2-J
d/10/2-K
d/10/2-L

Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 503
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/10/2-M
d/10/2-N
d/10/2-P
d/10/2-Q
d/10/2-R
d/10/2-S

d/10/3-A
d/10/3-B
d/10/3-C
d/10/3-D
d/10/3-E
d/10/3-F
d/10/3-G
d/10/3-H
d/10/3-J
d/10/3-K
d/10/3-L
d/10/3-M
d/10/3-N

d/10/4-A
d/10/4-B
d/10/4-C
d/10/4-D
d/10/4-E
d/10/4-F
d/10/4-G
d/10/4-H
d/10/4-J
d/10/4-K
d/10/4-L
d/10/4-M
d/10/4-N

Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 504
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/10/4-P
d/10/4-Q
d/10/4-R

d/10/5-A
d/10/5-B
d/10/5-C
d/10/5-D
d/10/5-E
d/10/5-F
d/10/5-G

d/10/6-A
d/10/6-B
d/10/6-C
d/10/6-D
d/10/6-E
d/10/6-F
d/10/6-G
d/10/6-H
d/10/6-J
d/10/6-K
d/10/6-L
d/10/6-M
d/10/6-N
d/10/6-P
d/10/6-Q
d/10/6-R

d/10/7-A
d/10/7-B
d/10/7-C
d/10/7-D
d/10/7-E

Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 505
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/10/7-F
d/10/7-G
d/10/7-H
d/10/7-J
d/10/7-K
d/10/7-L
d/10/7-M
d/10/7-N
d/10/7-P
d/10/7-Q
d/10/7-R

d/10/8-A
d/10/8-B
d/10/8-C
d/10/8-D
d/10/8-E
d/10/8-F
d/10/8-G
d/10/8-H
d/10/8-J
d/10/8-K
d/10/8-L
d/10/8-M
d/10/8-N

d/10/9-A
d/10/9-B
d/10/9-C
d/10/9-D
d/10/9-E
d/10/9-F
d/10/9-G
d/10/9-H

Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 506
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/10/9-J
d/10/9-K
d/10/9-L
d/10/9-M
d/10/9-N

d/10/10-A
d/10/10-B
d/10/10-C
d/10/10-D
d/10/10-E
d/10/10-F
d/10/10-G
d/10/10-H
d/10/10-J
d/10/10-K
d/10/10-L
d/10/10-M
d/10/10-N

d/10/11-A
d/10/11-B
d/10/11-C
d/10/11-D
d/10/11-E
d/10/11-F

d/10/12-A
d/10/12-B
d/10/12-C
d/10/12-D
d/10/12-E
d/10/12-F
d/10/12-G

Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 507
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/10/12-H
d/10/12-J
d/10/12-K
d/10/12-L
d/10/12-M
d/10/12-N
d/10/12-P
d/10/12-Q
d/10/12-R
d/10/12-S
d/10/12-T
d/10/12-U

d/10/13-A
d/10/13-B
d/10/13-C
d/10/13-D
d/10/13-E
d/10/13-F
d/10/13-G
d/10/13-H
d/10/13-J
d/10/13-K
d/10/13-L
d/10/13-M
d/10/13-N
d/10/13-P
d/10/13-Q
d/10/13-R
d/10/13-S
d/10/13-T
d/10/13-U
d/10/13-V
d/10/13-W

Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 508
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/10/13-X

d/10/14-A
d/10/14-B
d/10/14-C
d/10/14-D
d/10/14-E
d/10/14-F
d/10/14-G
d/10/14-H
d/10/14-J
d/10/14-K
d/10/14-L
d/10/14-M
d/10/14-N
d/10/14-P
d/10/14-Q
d/10/14-R
d/10/14-S
d/10/14-T
d/10/14-U
d/10/14-V
d/10/14-W
d/10/14-X

d/10/15-A
d/10/15-B
d/10/15-C
d/10/15-D
d/10/15-E
d/10/15-F
d/10/15-G
d/10/15-H
d/10/15-J

Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 509
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/10/15-K
d/10/15-L
d/10/15-M
d/10/15-N
d/10/15-P
d/10/15-Q
d/10/15-R
d/10/15-S
d/10/15-T
d/10/15-U
d/10/15-V
d/10/15-W

d/10/16-A
d/10/16-B
d/10/16-C
d/10/16-D
d/10/16-E
d/10/16-F
d/10/16-G
d/10/16-H
d/10/16-J
d/10/16-K
d/10/16-L
d/10/16-M
d/10/16-N
d/10/16-P
d/10/16-Q
d/10/16-R
d/10/16-S

d/10/17-A
d/10/17-B
d/10/17-C

Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 510
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/10/17-D
d/10/17-E
d/10/17-F
d/10/17-G
d/10/17-H
d/10/17-J
d/10/17-K
d/10/17-L
d/10/17-M
d/10/17-N
d/10/17-P

d/10/18-A
d/10/18-B
d/10/18-C
d/10/18-D
d/10/18-E
d/10/18-F
d/10/18-G
d/10/18-H
d/10/18-J
d/10/18-K
d/10/18-L
d/10/18-M
d/10/18-N
d/10/18-P

d/10/19-A
d/10/19-B

d/10/20-A
d/10/20-B
d/10/20-C
d/10/20-D

Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 511
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/10/20-E
d/10/20-F

d/10/21-A
d/10/21-B
d/10/21-C
d/10/21-D
d/10/21-E

d/10/22-A
d/10/22-B
d/10/22-C

d/11/1-A
d/11/1-B
d/11/1-C
d/11/1-D

d/11/2-A
d/11/2-B
d/11/2-C
d/11/2-D
d/11/2-E
d/11/2-F
d/11/2-G
d/11/2-H
d/11/2-J
d/11/2-K
d/11/2-L
d/11/2-M
d/11/2-N
d/11/2-P

Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 512
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/11/3-A
d/11/3-B
d/11/3-C
d/11/3-D
d/11/3-E
d/11/3-F
d/11/3-G
d/11/3-H
d/11/3-J
d/11/3-K
d/11/3-L
d/11/3-M
d/11/3-N

d/11/4-A
d/11/4-B
d/11/4-C
d/11/4-D
d/11/4-E
d/11/4-F
d/11/4-G
d/11/4-H
d/11/4-J
d/11/4-K

d/11/5-A
d/11/5-B
d/11/5-C
d/11/5-D
d/11/5-E
d/11/5-F
d/11/5-G
d/11/5-H

Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 513
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/11/6-A
d/11/6-B
d/11/6-C
d/11/6-D
d/11/6-E
d/11/6-F
d/11/6-G
d/11/6-H

d/11/7-A
d/11/7-B
d/11/7-C
d/11/7-D
d/11/7-E
d/11/7-F
d/11/7-G

d/11/8-A
d/11/8-B
d/11/8-C
d/11/8-D
d/11/8-E
d/11/8-F
d/11/8-G
d/11/8-H
d/11/8-J
d/11/8-K
d/11/8-L
d/11/8-M
d/11/8-N
d/11/8-P
d/11/8-Q

d/11/9-A

Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 514
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/11/9-B
d/11/9-C
d/11/9-D
d/11/9-E
d/11/9-F
d/11/9-G
d/11/9-H
d/11/9-J
d/11/9-K
d/11/9-L
d/11/9-M

d/11/10-A
d/11/10-B

d/12/1-A
d/12/1-B
d/12/1-C
d/12/1-D
d/12/1-E
d/12/1-F
d/12/1-G

d/12/2-A
d/12/2-B
d/12/2-C
d/12/2-D
d/12/2-E
d/12/2-F
d/12/2-G
d/12/2-H
d/12/2-J
d/12/2-K

Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 515
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %

d/12/3-A
d/12/3-B
d/12/3-C
d/12/3-D
d/12/3-E
d/12/3-F
d/12/3-G
d/12/3-H
d/12/3-J
d/12/3-K
d/12/3-L
d/12/3-M
d/12/3-N
d/12/3-P

d/12/4-A
d/12/4-B
d/12/4-C
d/12/4-D
d/12/4-E
d/12/4-F
d/12/4-G
d/12/4-H
d/12/4-J
d/12/4-K
d/12/4-L
d/12/4-M
d/12/4-N
d/12/4-P
d/12/4-Q
d/12/4-R

d/12/5-A

Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 516
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/12/5-B
d/12/5-C
d/12/5-D
d/12/5-E
d/12/5-F
d/12/5-G
d/12/5-H
d/12/5-J
d/12/5-K
d/12/5-L
d/12/5-M
d/12/5-N
d/12/5-P

d/12/6-A
d/12/6-B
d/12/6-C
d/12/6-D
d/12/6-E
d/12/6-F
d/12/6-G
d/12/6-H

d/12/7-A
d/12/7-B
d/12/7-C
d/12/7-D
d/12/7-E
d/12/7-F
d/12/7-G
d/12/7-H
d/12/7-J

d/12/8-A

Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 517
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/12/8-B
d/12/8-C
d/12/8-D
d/12/8-E
d/12/8-F
d/12/8-G

d/12/9-A
d/12/9-B
d/12/9-C
d/12/9-D
d/12/9-E
d/12/9-F
d/12/9-G
d/12/9-H
d/12/9-J
d/12/9-K
d/12/9-L
d/12/9-M
d/12/9-N
d/12/9-P

d/12/10-A
d/12/10-B
d/12/10-C
d/12/10-D
d/12/10-E
d/12/10-F
d/12/10-G
d/12/10-H
d/12/10-J
d/12/10-K
d/12/10-L
d/12/10-M

Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 518
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/12/10-N
d/12/10-P
d/12/10-Q
d/12/10-R

d/13/1-A
d/13/1-B
d/13/1-C
d/13/1-D
d/13/1-E
d/13/1-F
d/13/1-G
d/13/1-H
d/13/1-J

d/13/2-A
d/13/2-B
d/13/2-C
d/13/2-D
d/13/2-E
d/13/2-F
d/13/2-G
d/13/2-H
d/13/2-J
d/13/2-K
d/13/2-L
d/13/2-M
d/13/2-N
d/13/2-P

d/13/3-A
d/13/3-B
d/13/3-C

Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 519
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/13/3-D
d/13/3-E
d/13/3-F
d/13/3-G
d/13/3-H
d/13/3-J
d/13/3-K
d/13/3-L
d/13/3-M
d/13/3-N
d/13/3-P
d/13/3-Q
d/13/3-R
d/13/3-S
d/13/3-T
d/13/3-U

d/13/4-A
d/13/4-B
d/13/4-C
d/13/4-D
d/13/4-E
d/13/4-F
d/13/4-G
d/13/4-H
d/13/4-J
d/13/4-K
d/13/4-L
d/13/4-M
d/13/4-N
d/13/4-P
d/13/4-Q

d/13/5-A

Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 520
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/13/5-B
d/13/5-C
d/13/5-D
d/13/5-E
d/13/5-F
d/13/5-G
d/13/5-H
d/13/5-J
d/13/5-K
d/13/5-L
d/13/5-M
d/13/5-N
d/13/5-P

d/13/6-A
d/13/6-B
d/13/6-C
d/13/6-D
d/13/6-E
d/13/6-F

d/13/7-A
d/13/7-B
d/13/7-C
d/13/7-D
d/13/7-E
d/13/7-F
d/13/7-G
d/13/7-H

d/13/8-A
d/13/8-B
d/13/8-C
d/13/8-D

Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 521
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/13/8-E
d/13/8-F
d/13/8-G
d/13/8-H
d/13/8-J
d/13/8-K
d/13/8-L
d/13/8-M
d/13/8-N
d/13/8-P
d/13/8-Q
d/13/8-R
d/13/8-S

d/13/9-A
d/13/9-B
d/13/9-C
d/13/9-D
d/13/9-E
d/13/9-F
d/13/9-G
d/13/9-H
d/13/9-J

d/13/10-A
d/13/10-B
d/13/10-C
d/13/10-D
d/13/10-E
d/13/10-F
d/13/10-G
d/13/10-H
d/13/10-J
d/13/10-K

Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 522
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/13/10-L
d/13/10-M
d/13/10-N
d/13/10-P
d/13/10-Q

d/13/11-A
d/13/11-B
d/13/11-C
d/13/11-D
d/13/11-E
d/13/11-F
d/13/11-G
d/13/11-H
d/13/11-J
d/13/11-K
d/13/11-L
d/13/11-M
d/13/11-N
d/13/11-P
d/13/11-Q
d/13/11-R

d/13/12-A
d/13/12-B
d/13/12-C
d/13/12-D
d/13/12-E
d/13/12-F
d/13/12-G

d/13/13-A
d/13/13-B
d/13/13-C

Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 523
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/13/13-D
d/13/13-E
d/13/13-F
d/13/13-G

d/13/14-A
d/13/14-B
d/13/14-C
d/13/14-D
d/13/14-E
d/13/14-F
d/13/14-G
d/13/14-H
d/13/14-J

d/13/15-A
d/13/15-B
d/13/15-C

d/13/16-A
d/13/16-B
d/13/16-C
d/13/16-D
d/13/16-E
d/13/16-F
d/13/16-G
d/13/16-H
d/13/16-J
d/13/16-K

d/13/17-A
d/13/17-B
d/13/17-C
d/13/17-D

Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 524
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/13/17-E
d/13/17-F
d/13/17-G
d/13/17-H
d/13/17-J
d/13/17-K

d/13/18-A
d/13/18-B
d/13/18-C
d/13/18-D
d/13/18-E
d/13/18-F
d/13/18-G
d/13/18-H
d/13/18-J
d/13/18-K

d/13/19-A
d/13/19-B
d/13/19-C
d/13/19-D
d/13/19-E
d/13/19-F
d/13/19-G
d/13/19-H

d/13/20-A
d/13/20-B
d/13/20-C
d/13/20-D
d/13/20-E

d/13/21-A

Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 525
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/13/21-B
d/13/21-C
d/13/21-D
d/13/21-E
d/13/21-F
d/13/21-G
d/13/21-H
d/13/21-J

d/15/1-A
d/15/1-B
d/15/1-C
d/15/1-D
d/15/1-E
d/15/1-F
d/15/1-G
d/15/1-H
d/15/1-J

d/15/2-A
d/15/2-B
d/15/2-C
d/15/2-D
d/15/2-E
d/15/2-F
d/15/2-G
d/15/2-H
d/15/2-J
d/15/2-K
d/15/2-L
d/15/2-M

d/15/3-A

Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 526
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/15/3-B
d/15/3-C
d/15/3-D
d/15/3-E
d/15/3-F
d/15/3-G
d/15/3-H
d/15/3-J
d/15/3-K

d/15/4-A
d/15/4-B
d/15/4-C
d/15/4-D
d/15/4-E
d/15/4-F
d/15/4-G
d/15/4-H
d/15/4-J
d/15/4-K
d/15/4-L
d/15/4-M

d/15/5-A
d/15/5-B
d/15/5-C
d/15/5-D
d/15/5-E
d/15/5-F

d/15/6-A
d/15/6-B
d/15/6-C
d/15/6-D

Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 527
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/15/6-E
d/15/6-F
d/15/6-G
d/15/6-H

d/15/7-A
d/15/7-B
d/15/7-C

d/15/8-A
d/15/8-B
d/15/8-C
d/15/8-D
d/15/8-E
d/15/8-F
d/15/8-G
d/15/8-H
d/15/8-J
d/15/8-K
d/15/8-L
d/15/8-M
d/15/8-N
d/15/8-P

d/15/9-A
d/15/9-B
d/15/9-C
d/15/9-D
d/15/9-E
d/15/9-F
d/15/9-G

d/15/10-A
d/15/10-B

Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 528
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/15/10-C
d/15/10-D
d/15/10-E
d/15/10-F
d/15/10-G
d/15/10-H
d/15/10-J
d/15/10-K

d/15/11-A
d/15/11-B
d/15/11-C
d/15/11-D
d/15/11-E
d/15/11-F
d/15/11-G

d/15/12-A
d/15/12-B
d/15/12-C
d/15/12-D
d/15/12-E
d/15/12-F
d/15/12-G
d/15/12-H
d/15/12-J
d/15/12-K
d/15/12-L
d/15/12-M
d/15/12-N

d/15/13-A
d/15/13-B
d/15/13-C

Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 529
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/15/13-D
d/15/13-E
d/15/13-F
d/15/13-G
d/15/13-H
d/15/13-J
d/15/13-K
d/15/13-L

d/15/14-A
d/15/14-B
d/15/14-C
d/15/14-D
d/15/14-E
d/15/14-F

d/15/15-A
d/15/15-B

d/15/16-A
d/15/16-B
d/15/16-C
d/15/16-D

d/15/17-A
d/15/17-B
d/15/17-C
d/15/17-D
d/15/17-E
d/15/17-F
d/15/17-G
d/15/17-H
d/15/17-J
d/15/17-K

Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 530
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/15/17-L
d/15/17-M
d/15/17-N
d/15/17-P
d/15/17-Q

d/16/1-A
d/16/1-B
d/16/1-C
d/16/1-D
d/16/1-E
d/16/1-F

d/16/2-A
d/16/2-B

d/17/1-A
d/17/1-B
d/17/1-C
d/17/1-D
d/17/1-E
d/17/1-F
d/17/1-G
d/17/1-H

d/17/2-A
d/17/2-B
d/17/2-C
d/17/2-D
d/17/2-E
d/17/2-F
d/17/2-G

Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 531
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/17/2-H
d/17/2-J
d/17/2-K
d/17/2-L
d/17/2-M
d/17/2-N
d/17/2-P

d/17/3-A
d/17/3-B
d/17/3-C
d/17/3-D
d/17/3-E
d/17/3-F
d/17/3-G
d/17/3-H
d/17/3-J
d/17/3-K
d/17/3-L

d/17/4-A
d/17/4-B
d/17/4-C
d/17/4-D
d/17/4-E
d/17/4-F
d/17/4-G
d/17/4-H
d/17/4-J
d/17/4-K
d/17/4-L
d/17/4-M
d/17/4-N
d/17/4-P

Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 532
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/17/4-Q

d/17/5-A
d/17/5-B
d/17/5-C
d/17/5-D
d/17/5-E

d/17/6-A
d/17/6-B
d/17/6-C
d/17/6-D
d/17/6-E
d/17/6-F
d/17/6-G

d/17/7-A
d/17/7-B
d/17/7-C
d/17/7-D
d/17/7-E
d/17/7-F
d/17/7-G
d/17/7-H

d/17/8-A
d/17/8-B
d/17/8-C
d/17/8-D
d/17/8-E
d/17/8-F
d/17/8-G
d/17/8-H

Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 533
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/17/9-A
d/17/9-B
d/17/9-C
d/17/9-D
d/17/9-E
d/17/9-F
d/17/9-G

d/17/10-A
d/17/10-B
d/17/10-C
d/17/10-D
d/17/10-E
d/17/10-F
d/17/10-G
d/17/10-H
d/17/10-J
d/17/10-K
d/17/10-L
d/17/10-M
d/17/10-N
d/17/10-P
d/17/10-Q
d/17/10-R
d/17/10-S
d/17/10-T

d/17/11-A
d/17/11-B
d/17/11-C
d/17/11-D
d/17/11-E
d/17/11-F
d/17/11-G

Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 534
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/17/11-H
d/17/11-J
d/17/11-K
d/17/11-L
d/17/11-M
d/17/11-N
d/17/11-P
d/17/11-Q
d/17/11-R

d/17/12-A
d/17/12-B
d/17/12-C
d/17/12-D
d/17/12-E
d/17/12-F
d/17/12-G
d/17/12-H

d/18/1-A
d/18/1-B
d/18/1-C

d/18/2-A
d/18/2-B
d/18/2-C
d/18/2-D
d/18/2-E
d/18/2-F

d/18/3-A
d/18/3-B
d/18/3-C

Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 535
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/18/3-D
d/18/3-E

d/18/4-A
d/18/4-B
d/18/4-C
d/18/4-D
d/18/4-E
d/18/4-F
d/18/4-G
d/18/4-H
d/18/4-J
d/18/4-K
d/18/4-L
d/18/4-M
d/18/4-N
d/18/4-P
d/18/4-Q

d/19/1-A
d/19/1-B
d/19/1-C
d/19/1-D
d/19/1-E
d/19/1-F
d/19/1-G

d/19/2-A
d/19/2-B
d/19/2-C
d/19/2-D
d/19/2-E
d/19/2-F

Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 536
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/19/2-G

Rev - 02 NTT - 06
PAGE Nr.

f 537

Total
%

Rev - 02 NTT - 06
PAGE Nr.

f 538

Total
%

Rev - 02 NTT - 06
PAGE Nr.

f 539

Total
%

Rev - 02 NTT - 06
PAGE Nr.

f 540

Total
%

Rev - 02 NTT - 06
PAGE Nr.

f 541

Total
%

Rev - 02 NTT - 06
PAGE Nr.

f 542

Total
%

Rev - 02 NTT - 06
PAGE Nr.

f 543

Total
%

Rev - 02 NTT - 06
PAGE Nr.

f 544

Total
%

Rev - 02 NTT - 06
PAGE Nr.

f 545

Total
%

Rev - 02 NTT - 06
PAGE Nr.

f 546

Total
%

Rev - 02 NTT - 06
PAGE Nr.

f 547

Total
%

Rev - 02 NTT - 06
PAGE Nr.

f 548

Total
%

Rev - 02 NTT - 06
PAGE Nr.

f 549

Total
%

Rev - 02 NTT - 06
PAGE Nr.

f 550

Total
%

Rev - 02 NTT - 06
PAGE Nr.

f 551

Total
%

Rev - 02 NTT - 06
PAGE Nr.

f 552

Total
%

Rev - 02 NTT - 06
PAGE Nr.

f 553

Total
%

Rev - 02 NTT - 06
PAGE Nr.

f 554

Total
%

Rev - 02 NTT - 06
PAGE Nr.

f 555

Total
%

Rev - 02 NTT - 06
PAGE Nr.

f 556

Total
%

Rev - 02 NTT - 06
PAGE Nr.

f 557

Total
%

Rev - 02 NTT - 06
PAGE Nr.

f 558

Total
%

Rev - 02 NTT - 06
PAGE Nr.

f 559

Total
%

Rev - 02 NTT - 06
PAGE Nr.

f 560

Total
%

Rev - 02 NTT - 06
PAGE Nr.

f 561

Total
%

Rev - 02 NTT - 06
PAGE Nr.

f 562

Total
%

Rev - 02 NTT - 06
PAGE Nr.

f 563

Total
%

Not Used

Rev - 02 NTT - 06
PAGE Nr.

f 564

Total
%

Rev - 02 NTT - 06
PAGE Nr.

f 565

Total
%

Rev - 02 NTT - 06
PAGE Nr.

f 566

Total
%

Rev - 02 NTT - 06
PAGE Nr.

f 567

Total
%

Rev - 02 NTT - 06
PAGE Nr.

f 568

Total
%

Not used

Rev - 02 NTT - 06
PAGE Nr.

f 569

Total
%

Rev - 02 NTT - 06
PAGE Nr.

f 570

Total
%

Rev - 02 NTT - 06
PAGE Nr.

f 571

Total
%

Rev - 02 NTT - 06
PAGE Nr.

f 572

Total
%

Not Used

Rev - 02 NTT - 06
PAGE Nr.

f 573

Total
%

Rev - 02 NTT - 06
PAGE Nr.

f 574

Total
%

Rev - 02 NTT - 06
PAGE Nr.

f 575

Total
%

Rev - 02 NTT - 06
PAGE Nr.

f 576

Total
%

Not Used

Rev - 02 NTT - 06
PAGE Nr.

f 577

Total
%

Rev - 02 NTT - 06
PAGE Nr.

f 578

Total
%

Rev - 02 NTT - 06
PAGE Nr.

f 579

Total
%

Rev - 02 NTT - 06
PAGE Nr.

f 580

Total
%

Not Used

Rev - 02 NTT - 06
PAGE Nr.

f 581

Total
%

Rev - 02 NTT - 06
PAGE Nr.

f 582

Total
%

Rev - 02 NTT - 06
PAGE Nr.

f 583

Total
%

Rev - 02 NTT - 06
PAGE Nr.

f 584

Total
%

Not Used

Rev - 02 NTT - 06
PAGE Nr.

f 585

Total
%

Rev - 02 NTT - 06
PAGE Nr.

f 586

Total
%

Rev - 02 NTT - 06
PAGE Nr.

f 587

Total
%

Rev - 02 NTT - 06
PAGE Nr.

f 588

Total
%

Not Used

Rev - 02 NTT - 06
PAGE Nr.

f 589

Total
%

Rev - 02 NTT - 06
PAGE Nr.

f 590

Total
%

Rev - 02 NTT - 06
PAGE Nr.

f 591

Total
%

Rev - 02 NTT - 06
PAGE Nr.

f 592

Total
%

Rev - 02 NTT - 06
PAGE Nr.

f 593

Total
%

Rev - 02 NTT - 06
PAGE Nr.

f 594

Total
%

Rev - 02 NTT - 06
PAGE Nr.

f 595

Total
%

Rev - 02 NTT - 06
PAGE Nr.

f 596

Total
%

Rev - 02 NTT - 06
PAGE Nr.

f 597

Total
%

Rev - 02 NTT - 06
PAGE Nr.

f 598

Total
%

Rev - 02 NTT - 06
PAGE Nr.

f 599

Total
%

Rev - 02 NTT - 06
PAGE Nr.

f 600

Total
%

Rev - 02 NTT - 06
PAGE Nr.

f 601

Total
%

Rev - 02 NTT - 06
PAGE Nr.

f 602

Total
%

Rev - 02 NTT - 06
PAGE Nr.

f 603

Total
%

Rev - 02 NTT - 06
PAGE Nr.

f 604

Total
%

Rev - 02 NTT - 06
PAGE Nr.

f 605

Total
%

Rev - 02 NTT - 06
PAGE Nr.

f 606

Total
%

Rev - 02 NTT - 06
PAGE Nr.

f 607

Total
%

Rev - 02 NTT - 06
PAGE Nr.

f 608

Total
%

Rev - 02 NTT - 06
PAGE Nr.

f 609

Total
%

Rev - 02 NTT - 06
PAGE Nr.

f 610

Total
%

Rev - 02 NTT - 06
PAGE Nr.

f 611

Total
%

Rev - 02 NTT - 06
PAGE Nr.

f 612

Total
%

Rev - 02 NTT - 06
PAGE Nr.

f 613

Total
%

Rev - 02 NTT - 06
PAGE Nr.

f 614

Total
%

Rev - 02 NTT - 06
PAGE Nr.

f 615

Total
%

Rev - 02 NTT - 06
PAGE Nr.

f 616

Total
%

Rev - 02 NTT - 06
PAGE Nr.

f 617

Total
%

Rev - 02 NTT - 06
PAGE Nr.

f 618

Total
%

Rev - 02 NTT - 06
PAGE Nr.

f 619

Total
%

Rev - 02 NTT - 06
PAGE Nr.

f 620

Total
%

Rev - 02 NTT - 06
PAGE Nr.

f 621

Total
%

Rev - 02 NTT - 06
PAGE Nr.

f 622

Total
%

Rev - 02 NTT - 06
PAGE Nr.

f 623

Total
%

Rev - 02 NTT - 06
PAGE Nr.

f 624

Total
%

Rev - 02 NTT - 06
PAGE Nr.

f 625

Total
%

Rev - 02 NTT - 06
PAGE Nr.

f 626

Total
%

Rev - 02 NTT - 06
PAGE Nr.

f 627

Total
%

Rev - 02 NTT - 06
PAGE Nr.

f 628

Total
%

Rev - 02 NTT - 06
PAGE Nr.

f 629

Total
%

Rev - 02 NTT - 06
PAGE Nr.

f 630

Total
%

Rev - 02 NTT - 06
PAGE Nr.

f 631

Total
%

Rev - 02 NTT - 06
PAGE Nr.

f 632

Total
%

Rev - 02 NTT - 06
PAGE Nr.

f 633

Total
%

Rev - 02 NTT - 06
PAGE Nr.

f 634

Total
%

Rev - 02 NTT - 06
PAGE Nr.

f 635

Total
%

Rev - 02 NTT - 06
PAGE Nr.

f 636

Total
%

Rev - 02 NTT - 06