S.No No Remarks
ofWork m m m cu.cm
Surveying ,
14m land
1 dagbelling, 1 5km 14 _ 5km
width
etc
Assume nearby
land is acquired
Land acquisition
3 1 _ _ _ _ and soil is taken
temporary
from there for
filling
Earthwork in 60,000cu.cm
4
Embankment 5000 6hectares (Bd+sd^2)xL
METALLING
Preparation of sole coat width
6 1 5000 4.8 _ 24,000 sq.m
Subgrade =4.8m
7 Soling Coat
i)Laterite stone
of 150mm
size& bindage Ht of stone
1 5000 4.8 0.15 3600
with 20mm =150mm
thick
murum
ii)Laying and
consolidation
of boulders Ht of stone
1 5000 4.8 0.15 3600
including =150mm
binding with
local sandy soil
8 Inter Coat
i)Stone ballast 12cm is the
1 5000 3.7 0.12 2220
40mm gauge loose thickness
ii)Laying and
consolidation
of boulders 12cm is the
1 5000 3.7 0.12 2220
including loose thickness
binding with
local sandy soil
9 Top Coat
i)Stone ballast
12cm is the
40mm 1 5000 3.7 0.12 2220
loose thickness
gauge
ii)Laying and
consolidation
of boulders 12cm is the
1 5000 3.7 0.12 2220
including loose thickness
binding with
local sandy soil
ii)Laying and
consolidation
of boulders 12cm is the
1 5000 3.7 0.12 2220
including loose thickness
binding with
local sandy soil
Painting or
Black Top Surfacing
ii)Bitumen
10,360kg
@56 kg 1 5000 3.7 0.56 56/100
103.6tonne
% sq.m
iii)Laying
12 Painting 2nd coat with
i)Stone chips
12mm gauge
1 5000 3.7 0.027 499.5 2.7/100
@ 2.7 cu.cm
%sq.m
ii)Bitumen @
100 kg 1 5000 3.7 1 18500 185tonne
% sq.m
iii)Laying
Brick Edging on
13 5km _ _ _ _ 5km
both sides