1 Forman
2 Loader oprator
3 Dump truck driver
4 Carpenter
5 Mason
6 Welder
7 Plasterer
8 Bar Bender
9 Painter, Decorator
10 Mixer operator
11 Vibrator operator
12 Sledge hammer man
13 Jack hammer operator
14 Gang Chief
15 Daily Labourer
16 Electrician
17 Plumber
18 Chiseler
19 Grinder
20 Tailer
21 Proofer
22 Helper
23 Glazer
24 Alumnium technician
9
10
80
የኮ.ኢን.አቅ.ግን.አስተዳደር ቡድን (ደሴ/Dessie) 3rd Qtr.CIVIL WORKS UNIT RATE WITH OUT VAT
A. SUBSTRUCTURE
1. EXCAVATION & EARTH WORK unit price
1.01 Site clearing and removing of the top 20 cm thick soil m2 37.81
1.02 Bulk excavation in ordinary soil to an average depth of 1500 mm from reduced level. m3 210.08
1.03 Ditto, but in soft rock m3 507.60
1.04 Ditto but in boulder rock m3 1,745.73
1.05 Ditto but in hardrock m3 3,438.20
1.06 Bulk Excavation In ordinary soil to a depth over 1500mm not exceeding 3000mm m3 210.08
1.07 Bulk Excavation in softrock to a depth over 1500mm not exceeding 3000mm m3 761.40
1.08 Bulk Excavation in boulder rock to a depth over 1500mm not exceeding 3000mm m3 1,012.16
1.09 Bulk Excavation in hard rock to a depth over 1500mm not exceeding 3000mm m3 1,927.93
1.10 Bulk Excavation In ordinary soil to a depth over 3000mm not exceeding 4500mm m3 378.14
1.11 Bulk Excavation in softrock to a depth over 3000mm not exceeding 4500mm m3 1,370.52
1.12 Bulk excavation in boulder rock to a depth over 3000mm not exceeding 4500mm m3 1,634.45
1.13 Bulk excavation in Harde rock to a depth over 3000mm not exceeding 4500mm m3 3,160.01
1.14 Pit excavation in ordinary soil to depth of 1500mm from reduced level m3 222.43
1.15 Ditto ,but in soft rock m3 595.88
1.16 Ditto , but in boulder rock m3 2,014.30
1.17 Ditto , but in hardrock m3 3,536.58
1.18 Pit excavation in ordinary soil over 1500mm but not exceeding 3000mm. m3 502.20
1.19 Ditto, but in soft rock. m3 806.19
1.20 Ditto , but in boulder rock . m3 2,618.60
1.21 Ditto ,but in hardrock . m3 4,041.80
1.22 Trench excavation for masonry foundation wall to an average depth of 1000mm from reduced level in ordinary soil m3 236.33
1.23 Ditto, but in soft rock . m3 685.26
1.24 Ditto, but in boulder rock . m 3
1,876.91
1.25 Ditto, but in hardrock . m3 4,041.80
1.26 50 cm thick well compacted bolder fill imported from outside( from quarry). m3 1,767.94
1.27 50 cm thick well compacted bolder fill from the site . m3 371.93
1.28 Fill around foundation from granular material imported from outside( from quarry) and
compact in layers not exceeding 20cm thick. m3 1,485.84
1.29 Ditto, but under hard core by sprinkling water insure 95% modified AASHTO dry density . m3 1,485.84
1.30 Ditto as item no 1.18 ,but with selected excavated material from site for around foundation . m3 304.59
1.31 Ditto as item No. 1.19, but under hard core . m3 304.59
1.32 Load and cart away excavated material as per engineers direction. m3 216.34
1.33 25cm thick basaltic or equivalent stone hardcore, well rolled, consolidated and blinded with crushed stone. m2 514.11
2. CONCRETE WORK
2.01 5cm lean concrete quality C-5 150kg of
cement/m3 : "type of cement to be PPC"under:
a) Footing m2 345.59
b) Grade Beams and ground floor slab m2 345.59
c)Stone Masonry m2 345.59
2.02 Ditto, but C-7 180 kg/m of cement under :
3
a) Footing m2 397.90
b) Grade Beams and ground floor slab m2 397.90
c) Stone Masonry m2 397.90
2.03 C-20 Concrete for lintel m3 11,852.55
2.04 C-20 Concrete for 10 cm thick slab m2 1,098.63
የ2015.3ኛ ሩብ አመት ወቅታዊ የግንባታ ነጠላ ዋጋ 2015 3rd QUARTER 2015 EDITION
የኮ.ኢን.አቅ.ግን.አስተዳደር ቡድን (ደሴ/Dessie) 3rd Qtr.CIVIL WORKS UNIT RATE WITH OUT VAT
2.05 C-25Cyclopean Concrete under footing "Type of cement to be PPC " m3 12,042.22
2.06 C-25Cyclopean Concrete under footing "Type of cement to be OPC " m3 12,394.35
2.07 Reinforced concrete quality C-25 , filled into form work and vibrated around rod
reinforcement/ form work and reinforcement measured separately/. "Type of cement to be PPC" .
a) In footings. m3 12,042.22
b) In foundation columns. m3 12,042.22
c) In grade beams. m3 12,042.22
d) In 10cm thick ground floor slab. m2 1,204.22
2.08 Reinforced concrete quality C-25 , filled into form work and vibrated around rod
reinforcement/ form work and reinforcement measured separately/. "Type of cement to be OPC" .
a) In footings. m3 12,528.22
b) In foundation columns. m3 12,528.22
c) In grade beams. m3 12,528.22
d) In 10cm thick ground floor slab. m2 1,252.82
2.07 Provide, cut and fix in position sawn wooden
or steel formwork which ever appropriate.
a) To footings,subgradebeam & mat foundation m2 701.38
b) To subgrade column,grade beam,concrete wall & liftshaft m2 744.59
የ2015.3ኛ ሩብ አመት ወቅታዊ የግንባታ ነጠላ ዋጋ 2015 3rd QUARTER 2015 EDITION
የኮ.ኢን.አቅ.ግን.አስተዳደር ቡድን (ደሴ/Dessie) 3rd Qtr.CIVIL WORKS UNIT RATE WITH OUT VAT
B. SUPER STRUCTURE
1. CONCRET WORK
1.01 Reinforced concrete quality C-25 , filled into form work and vibrated around rod
reinforcement/ form work and reinforcement measured separately/. "Type of cement to be PPC" .
g) In 280mm thick floor slab to be casted with concrete in place of slab block. m2 3,769.67
1.03 Reinforced concrete quality C-30 , filled into form work and vibrated around rod
reinforcement/ form work and reinforcement measured separately/. "Type of cement to be OPC" .
g) In 280mm thick floor slab to be casted with concrete in place of slab block. m2 3,874.02
1.04 Reinforced concrete quality C-30 , filled into form work and vibrated around rod
reinforcement/ form work and reinforcement measured separately/. "Type of cement to be PPC" .
የ2015.3ኛ ሩብ አመት ወቅታዊ የግንባታ ነጠላ ዋጋ 2015 3rd QUARTER 2015 EDITION
የኮ.ኢን.አቅ.ግን.አስተዳደር ቡድን (ደሴ/Dessie) 3rd Qtr.CIVIL WORKS UNIT RATE WITH OUT VAT
Reinforced concrete quality C-30 filled into form work and vibrated around rod m3
1.06 reinforcement/ form work and reinforcement measured separately/. "Type of cement to be OPC" . 13,835.78
Reinforced concrete quality C-30 filled into form work and vibrated around rod
1.07 reinforcement/ form work and reinforcement measured separately/. "Type of cement to be PPC" . m3 13,320.08
1.08 Mild steel reinforcement according to structural drawings Price includes cutting, bending, placing
in position and tying wires, chairs and spacers .
a) Dia 6mm plain bar . kg 268.59
b) Dia 8mm deformed bar . kg 215.25
c) Dia 10mm deformed bar . kg 210.15
d) Dia 12mm deformed bar. kg 210.15
e) Dia 14mm deformed bar. kg 210.15
f) Dia 16mm deformed bar . kg 210.15
g) Dia 20mm deormed bar . kg 210.15
h) Dia 24mm deformed bar . kg 210.15
2. BLOCK WORK
2.1 20 cm thick HCB wall class C m2 1,055.90
2.2 15 cm thick HCB wall class C m2 952.90
2.3 10 cm thick HCB wall class C m2 903.16
2.4 20 cm thick HCB wall class B m2 1,140.28
2.5 15 cm thick HCB wall class B m2 1,037.27
2.6 10 cm thick HCB wall class B m2 953.79
2.7 20 cm thick HCB wall class A m2 1,224.65
2.8 15 cm thick HCB wall class A m2 1,121.65
2.9 10 cm thick HCB wall class A m2 1,021.29
2.10 Agrostone wall 100mm thick m2 2,790.83
2.11 12cm thick Brick wall m2 3,547.06
2.12 25cm thick Brick wall m2 6,818.22
3. CARPENTARY AND JOINERY
3.1 5*7 Zigba purlin ml 299.31
3.2 Dia 10-12cm Eucaliptus truss upper & lower chord ml 418.38
3.3 Dia 8cm Eucaliptus truss Vertical & Diagonal ml 415.68
3.4 8mm chip wood Ceiling soffit m2 2,088.585
3.5 PVC Ceiling m2 1,574.0
3.6 Plywooden Door m2 10,238.91
3.7 Wooden Window m2 7,545.66
3.8 Facia board 25cm width ml 689.24
4. STEEL STRUCTURE &METAL WORK
Fix steel roof truss made out of RHS and fixed in position as shown in detail ST-drawing.
Erection work includes anchorage platesto beam/column, welding and all associated works on.
Price includes cleaning , wire brushing and finally two coats of antirust paint .The Employer shall suply all material that
will incorporate into the work except anti -rust paint .
4.01 RHS Lattice purlin
a) 25 x 25 x 2.5mm RHS & Diameter 16mm Rein bar ml 383.55
b) 25 x 25 x 2.5mm lattice purlin kg 252.00
c)25x25x2.5mm Rafter with Price included metal plate kg 2,017.48
d) 30 x 30 x 2mm lattice purlin kg 331.74
e) All RHS >1.5mm thick kg 417.90
f)All RHS <1.5mm thick kg 319.54
4.02 Connection plate, price includes bolt & nut, welding to lattice purlin & two coats of antirust.
Size 75 x 50 x 3mm No 291.98
4.03 Angle iron anchored to concrete beam using 8mm diameter reinforcement bar and eventually
connected to lattice purlin by M10 bolt.Price includes two coats of anti -rust.
የ2015.3ኛ ሩብ አመት ወቅታዊ የግንባታ ነጠላ ዋጋ 2015 3rd QUARTER 2015 EDITION
የኮ.ኢን.አቅ.ግን.አስተዳደር ቡድን (ደሴ/Dessie) 3rd Qtr.CIVIL WORKS UNIT RATE WITH OUT VAT
6.09 Apply two coats of plaster cement mortar concrete Vertical sur.&soffit m2 510.33
6.10 Apply two coats of Compomortar Inter & Exte surface m2 316.17
6.11 Pointing to stone masonry wall in cement mortar (1:3) mix. m2 118.30
6.12 pointing to stone H.C.B wall in cement mortar (1:3) mix. m2 105.08
6.13 pointing to brick wall cement mortar (1:3) mix. m2 182.12
7. FINISHING WORK
7.01 5cm thick Cement screed 1:3 m2 674.22
7.02 3cm thick Cement screed 1:3 m2 439.59
7.03 Comon cement tile 20*20cm gray m2 1,177.67
7.04 Comon cement tile 20*20cm colrful m2 1,315.37
7.05 PVC tile: 20cmx20cm (Korea) m2 2,859.36
7.06 PVC tile: 20cmx20cm thick (Ethiopia) m2 793.86
7.07 PVC tile: 33cm x 33cm (Imported) m2 1,482.36
7.04 300*300mm PVC tile m2 2,859.36
7.05 Terrazo tile gray 20*20* 2cm thick m2 1,694.04
7.06 Terrazzo tile coulerfull m2 1,797.32
7.07 Marble floor tile m2 8,375.74
የ2015.3ኛ ሩብ አመት ወቅታዊ የግንባታ ነጠላ ዋጋ 2015 3rd QUARTER 2015 EDITION
የኮ.ኢን.አቅ.ግን.አስተዳደር ቡድን (ደሴ/Dessie) 3rd Qtr.CIVIL WORKS UNIT RATE WITH OUT VAT
የ2015.3ኛ ሩብ አመት ወቅታዊ የግንባታ ነጠላ ዋጋ 2015 3rd QUARTER 2015 EDITION
የኮ.ኢን.አቅ.ግን.አስተዳደር ቡድን (ደሴ/Dessie) 3rd Qtr.CIVIL WORKS UNIT RATE WITH OUT VAT
የ2015.3ኛ ሩብ አመት ወቅታዊ የግንባታ ነጠላ ዋጋ 2015 3rd QUARTER 2015 EDITION