LTSA 77 77 0 330 315 15
Contractor
Sub-
FSS Contractor 20 20 0 297 266 31
Sub-
MASAFI 57 57 0 322 321 1
Contractor
Sub-
JOUD Contractor 0 0 0 129 120 9
Sub-
SQCO Contractor 86 86 0 429 427 2
Sub-
Asloobs Contractor 0 0 0 393 381 12
Sub-
MCCL 92 92 0 368 367 1
Contractor
LTHSC 302 11
FSS 20 20
MASAFI 57 57
SAQC0 86 86 429
MCCL 92 92
27. Civil Testing Results
Descriptio This Month Cumulative
Sr. No. Remark
n Tested Passed Failed Tested Passed Failed
Concrete
Sampling
and
1 48 48 0 300 300 0 -
Testing (14
MPA) – 28
Days
Concrete
Sampling
and
2 0 0 0 44 44 0 -
Testing (30
MPA) – 28
Days
Concrete
Sampling
and
3 0 0 0 0 0 0 -
Testing (32
MPA) – 28
Days
Concrete
Sampling
and
4 220 220 0 922 922 0 -
Testing (35
MPA) – 28
Days
Concrete
Sampling
and
5 0 0 0 0 0 0 -
Testing
(2000 PSI)
– 28 Days
28. Non-Shrink Grout And Compressive Strength Testing
This Month Cumulative
Sr. No. Description Remark
Tested Passed Failed Tested Passed Failed
Mixing, Placement,
Sampling, Testing,
6 Inspection of Cement 15 15 0 33 33 0 -
Based Non-Shrink
Grout – 7 Days