This document provides a breakdown of excavation and earth works for a construction project including quantities, rates, and amounts for: clearing the site, bulk excavation to adjust the site contour to design levels, pit excavation for footings and foundations, trench excavation, fill, and disposal of surplus excavated material. It estimates the total cost for excavation and earth works to be approximately $6,883,181.65.
This document provides a breakdown of excavation and earth works for a construction project including quantities, rates, and amounts for: clearing the site, bulk excavation to adjust the site contour to design levels, pit excavation for footings and foundations, trench excavation, fill, and disposal of surplus excavated material. It estimates the total cost for excavation and earth works to be approximately $6,883,181.65.
This document provides a breakdown of excavation and earth works for a construction project including quantities, rates, and amounts for: clearing the site, bulk excavation to adjust the site contour to design levels, pit excavation for footings and foundations, trench excavation, fill, and disposal of surplus excavated material. It estimates the total cost for excavation and earth works to be approximately $6,883,181.65.
QTY Rate Amount Clear of site to remove top soil to an 1.1 average depth of 20 cm. M2 3,240.00 20 64,800.00 - Bulk excavation to adjust the site contour to the design FFL level but not exceeding 1.2 1.5 m from the lowest ground level of the site . - a) in ordinary soil M3 4,860.00 100 486,000.00 b)in soft rock M3 486.00 150 72,900.00 c)in boulder rock M3 86.00 170 14,620.00 d)in Hard rock M3 86.00 200 17,200.00 Ditto above but over 1.5 m but not 1.3 exceeding 3.0 m from reduced level - a) in ordinary soil M3 4,860.00 100 486,000.00 b)in soft rock M3 972.00 300 291,600.00 c)in boulder rock M3 74.80 500 37,400.00 d)in Hard rock M3 20.60 500 10,300.00 Ditto above but over 3m but not exceeding 1.4 4.5m from reduced level - a) in ordinary soil M3 4,860.00 60 291,600.00 b)in soft rock M3 486.00 536 260,496.00 c)in boulder rock M3 83.20 616 51,251.20 d)in hard rock M3 37.40 648 24,235.20 Ditto above but over 4.5m but not 1.5 exceeding 6m from reduced level - a) in ordinary soil M3 4,860.00 60 291,600.00 b)in soft rock M3 534.60 540 288,684.00 c)in boulder rock M3 83.20 620 51,584.00 d)in hard rock M3 31.80 650 20,670.00 Ditto above but over 6m but not exceeding 1.6 7.5m from reduced level - a) in ordinary soil M3 972.00 60 58,320.00 b)in soft rock M3 1,798.20 200 359,640.00 c)in boulder rock M3 46.80 620 29,016.00 d)in hard rock M3 95.40 650 62,010.00 Ditto above but over 7.5 m from reduced 1.7 level - a) in ordinary soil M3 2,916.00 60 174,960.00 b)in soft rock M3 2,916.00 120 349,920.00 c)in boulder rock M3 16.00 620 9,920.00 d)in hard rock M3 16.00 650 10,400.00 1.8 PIT EXCAVATION - Excavate isolated footing from reduced leveled up to 1.5m below reduced bulk level. - a) in ordinary soil M3 159.26 60 9,555.69 b)in soft rock M3 318.52 400 127,409.25 c)in boulder rock M3 27.41 500 13,704.63 d)in Hard rock M3 59.26 500 29,630.78 Excavate isolated footing 1.5 m but not 1.9 exceeding 3.0 m to below reduced bulk level. - b)in soft rock M3 318.52 540 172,002.49 c)in boulder rock M3 27.41 540 14,801.00 d)in Hard rock M3 59.26 620 36,742.17 Excavation for retaining wall Foundation 1.10 - a) in ordinary soil M3 383.06 500 191,531.25 b)in soft rock M3 766.13 540 413,707.50 c)in boulder rock M3 12.90 620 7,998.00 d)in Hard rock M3 16.45 650 10,692.50 Trench excavation in ordinary soil from 1.11 reduced level to a depth of not exceeding 1500cm . - a) in ordinary soil M3 75.00 350 26,250.00 b)in soft rock M3 37.50 460 17,250.00 1.12 FILL -
Backfill around footings ,Foundation
masonry wall , retaining wall and foundation column to maintain the desired level with selected borrowed non expansive material from Quarry and M3 1,004.19 compact in layers not exceeding 200mmthick by sprinkling water to insure 95% modified AASHTO maximum dry density. - Ditto item 1.11 but non-expansive selected 1.13 material from site M3 1,083.35 -
Backfill under hard core to maintain the
desired level with selected borrowed non expansive material from Quarry and 1.14 compact in layers not exceeding M3 4,180.00 200mmthick by sprinkling water to insure 95% modified AASHTO dry maximum density. - Ditto item 1.13 but non-expansive selected 1.15 M3 1,854.00 material from site - 1.16 DISPOSAL - Cart away surplus excavated material to permissible municipal location to a distance not exceeding 5km from site. M3 27,474.34 Finding suitable location for Cart away is the responsibility of the contactor. 40 1,098,973.70 5,985,375.35 897,806.30 6,883,181.65