Professional Documents
Culture Documents
Trajectory Design
Nguyễn Ngọc Thanh Phương – Application Engineer
13 November 2018 2
3 AWO
Tuesday, June 22, 2004
Confidential. Not to be copied, distributed, or reproduced without prior approval.
Exploration and Production Process
13 November 2018 4
data management
Obtain well
requirements Data transfer procedure Drilling Drillstring
Input & validate T&D, Casing Wear and system and BHA
Hydraulic study OK? design
No
13 November 2018 6
13 November 2018 7
Trajectory Design
Surface collision avoidance
Dogleg limitations
Formation responses
Reservoir orientation and placement
Availability of tools to deliver profile ???
Trajectory Planning Design - All wells classified as either “single” or “nearby wells”
After global scan of definitive database if no other well within 12,000 meters + MD of
subject well of its surface location - Treat as a single well
All other wells classified as nearby wells
13 November 2018 8
Very useful
13 November 2018 9
Very useful
13 November 2018 10
13 November 2018 11
13 November 2018 12
Curve-Curve (2D)
13 November 2018 13
13 November 2018 14
Limited use
13 November 2018 15
13 November 2018 16
A simplification of the reservoir target that can be used for geometric well-planning
• Layer / Lithology
• Location
• Layer / Lithology & Location
13 November 2018 17
Sources
Gy
ro
16” MWD
12 ¼” MWD
8 ½” MWD
13 November 2018 18
Sources
• Wellhead position measurement
• Wellbore position
• Geologic target position uncertainty
13 November 2018 19
13 November 2018 20
Survey Program
Instrument from to
I1 GMS / GWD Surface I1
MWD Curve I2
I2 GMS Curve I2
MWD Tangent I3
GMS Tangent I3
Curve MWD I3 TD
I3
13 November 2018 21
Identify process to
monitor
No No
Reports
Is allowable
Can plan be
deviation Yes Modify and inform
modified within Yes
from plan ALL parties
limits?
quantified?
No
Non-Conformance
Report issued
Halt operations No
13 November 2018 22
13 November 2018 23
13 November 2018 24
Wellpath Profiles
• – Several options
• Build & Hold
• S-turn
• Pseudo Catenery
• Horizontal
• Double build
• 3-Dimensional
• – Significant issues associated
with each.
13 November 2018 25
13 November 2018 26
13 November 2018 27
Double Build
• Build to intermediate angle (say 50°), hold, then build again to final angle (say 80°)
• Used to get surface casing below a critical formation without excessive MD
• Reduced angle and MD compared to Catenery profile
13 November 2018 28
S-turn
• Drop angle at depth ….
• To reduce effect of vertical geological &
survey uncertainty
• To reduce risk in pay-zone or deeper
formations
• To enable reduced mud weight in
payzone
• To reduce interval of slowest drilling
• To reduce total MD (if TD based on
vertical depth)
• Increases intermediate angle
• Maybe to the point of being negative
weight
13 November 2018 29
13 November 2018 30
31 AWO
Tuesday, June 22, 2004
Confidential. Not to be copied, distributed, or reproduced without prior approval.
Thank you !
13 November 2018 39
13 November 2018 40
13 November 2018 41