OVERVIEW OF IDAP Muhammad Shoaib

OPERATIONS 2019-EMBA-004

1
CONTENTS

1
• Company’s Brief Introduction
2
• Phases and Disciplines of Project
3
• Engineering Discipline
4
• Geotechnical Engineering
5
• Post COVID-19 Operations
2
COMPANY’S BRIEF
INTRODUCTION
1. Full Name: Infrastructure Development Authority of Punjab (IDAP)
2. Nature of Business: Design and Construction (Complete Solution)
3. Conception Year: April 2016
4. Till Date Completed Major Projects: more than 20
5. Major Completed Projects: PKLI-Lahore, PAFDA-Lahore, PFSA-Lahore,
RTEH-Muzaffargarh, Upgradation of 40 DHQs/THQs in Punjab, ITU-Lahore
6. Major Projects in Hand: SFMKBIC DG Khan, MCCH Murree, Nishter-II
Multan, DHQ Mianwali, DHQ Chakwal

3
PHASES AND DISCIPLINES OF
PROJECT

Third Planning
Initiatio Planning Party & Closure
n & Design Validations Execution

• Project • Detailed • Design • Planning • Handing


Charter Engineering Vetting & Over
& Executio Formalities
Architectural n of
Design Projects
4
PHASES AND DISCIPLINES OF
PROJECT (CNTD..)

CEO

CFO CLO COO CIA

GM(E&P GM(P& GM(P&C GM(Tech


GM(PM) GM(BM)
) D) ) .)

5
ENGINEERING DISCIPLINES

GM(E&P)

SM Manager Manager
Manager Manager
(Infrastructure (Geotechnical (Public
(Structures) (QA/QC)
) ) Health)
Assistan
t
Manager
Assistan
t Supporting
Enginee Staff
r
6
GEOTECHNICAL
ENGINEERING
Drilling Rig Drilling Rig Drilling Rig

Test Pits

Boreholes

Groundwater Table
Super
Structure Silty Clay

Silty Sand

Foundations
Silt/Sandy Silt

Silty Sand
7
GEOTECHNICAL OPERATIONS
IN IDAP
Inputs:
1. Master Plan 2. Topographic Survey 3. Building Details
Processes:
Planning Hiring Drilling Laboratory Geotechnical Geotechnical
Field Operations
Contractor Operations Interpretation Construction
Outputs:
1. Foundation Analysis & Design
2. Roads & Pavement Design Parameter
3. Ground Water Details
4. Other Construction Considerations
8
POST COVID-19 OPERATIONS
1. Work from Home
2. Marginal Field/Laboratory Operations
3. Suppressed Teamwork
4. Slow Construction Progress
5. Withdrawal/Alteration in Project Policies

9
THANKS!!