Professional Documents
Culture Documents
in Project Design
Sondang Aryanto
Kepala Divisi Manajemen Proyek EPC & Jargas
PT. PGAS Solution Bandung, September 1st 2023
Outline
1. Speaker and company profile
2. Oil and gas business
3. How to design a project
4. Materials engineering aspects in
oil and gas project
Hello!
• Name : Sondang Aryanto
• Birth : …….
• Education : Teknik Material ITB 2002
• Position : Kepala Divisi Manajemen Proyek EPC & Jargas
PT. PGAS Solution
• Experience :
• Component Retailing;
• Warehouse Services;
SUPPLY
PROJEC
CHAIN
• Manufacture;
• Other Services (MTK,
HSSE, etc).
T
Operational Area
1. KANTOR PUSAT JAKARTA 6. AREA CILEGON 11. AREA KARAWANG 16. AREA SEMARANG
2. AREA MEDAN 7. AREA TANGERANG 12. AREA CIREBON 17. AREA DUMAI
3. AREA BATAM 8. AREA BOGOR 13. AREA PASURUAN 18. AREA TARAKAN
4. AREA PALEMBANG 9. AREA BEKASI 14. AREA SIDOARJO 19. AREA SORONG
5. AREA LAMPUNG 10. AREA JAKARTA 15. AREA SURABAYA
Our Works
OFFSHORE
Oil Rig TRANSPORT FURTHER PROCESSING
Engineering, Procurement, Operation &
and Construction Maintenance
I need a new 24 kilometers Don’t worry, we can design and I need to repair my existing We can service it and operate
pipeline system for my oil… construct it for you! gas production facility… your system
Project:
• Unique characteristics
EPC •
•
Defined start and end date
Measurable & quantifiable deliverables
• Constrained by budget and resource
How does a project start?
Step 2: Step 4:
Proposal
Submission & Contract Signing
Evaluation
Instrument
Piping Engineering Mechanical Engineeriing
Engineering
End
So, how do we design a project?
• Scope of Work
• Front End Engineering Design
(FEED)
• Other bidding document
Start
Instrument
Piping Engineering Mechanical Engineeriing
Engineering
Engineering disciplines
where materials engineering
plays a major role
Materials Engineering Aspects
in Oil and Gas Projects
Equipment
Material Selection Designing
Corrosion • Translate project needs • Mainly for pipe and
• Corrosion study into material specs mechanical equipment
• Corrosion inspection • Knowledge in material • Determine specs &
composition and standards design and calculate
• Develop material selection load for dimension
guideline • Review/develop
equipment datasheet
Higher Initial
Improper Cost
Catastrophic
Material Failure
Design, Shorter Lifetime
Testing, and
Inspection
Reduced Higher Maintenance
Reliability & Cost
Integrity
Several contributing factors
causing failure of the vessel:
Improper • Material variability
Material • Excessive hydrogen in the
Design, welding arc causing HIC
• Inadequate inspection of
Testing, and nozzle welds
Inspection • Hydrotest temperature below
transition temperature
• Overpressure during testing
Materials Design
Inspection
Inspection
Product
How can we prepare as engineering students?
ANY QUESTIONS?