Water Supply Distribution Design of Terrace main ( Domestic Water )

C 120 Table no-3 sp-35 code page no 22


Dia of Equivalent
Demand Demand Demand Dia of pipe Total
S. Fixture pipe Distance length of Head loss Total head Cumm
Point to point load in load in load in Proposed length in Velocity Material Remarks
no units Required in 'm' fittings in in 'm' loss head loss
LPM LPS KLD in 'mm' 'm'
in 'mm' 'm'

WATER TANK -2

LINE - 1
1 32 to 34 8 16.99 0.28 24.465 28 80 18.79 4.70 23.49 0.0001 0.002 0.002 0.056 CPVC
2 34 to 35 16 56.63 0.94 81.550 49 80 7.89 1.97 9.86 0.001 0.008 0.010 0.188 CPVC
3 35 to A 32 78.72 1.31 113.355 57 80 13.89 3.47 17.36 0.002 0.027 0.0369 0.261 CPVC
4 A to 36 32 78.72 1.31 113.355 57 80 7.60 1.90 9.51 0.002 0.015 0.052 0.261 CPVC
5 36 to 37 56 116.10 1.93 167.178 68 80 7.72 1.93 9.65 0.003 0.030 0.082 0.385 CPVC
6 37 to 38 72 135.35 2.26 194.905 73 80 3.44 0.86 4.29 0.004 0.018 0.100 0.449 CPVC
7 38 to G 96 158.00 2.63 227.525 78 80 6.23 1.56 7.79 0.006 0.043 0.143 0.524 CPVC
8 31a to B 12 56.63 0.94 81.550 49 80 5.34 1.33 6.67 0.001 0.006 0.006 0.188 CPVC
9 31 to B 12 56.63 0.94 81.550 49 80 0.60 0.15 0.74 0.001 0.001 0.001 0.188 CPVC
10 B to 30 24 63.99 1.07 92.152 51 80 7.15 1.79 8.93 0.001 0.009 0.016 0.212 CPVC
11 30 to 29 28 71.36 1.19 102.753 54 80 2.89 0.72 3.62 0.001 0.005 0.020 0.237 CPVC
12 29 to C 44 99.11 1.65 142.713 63 80 4.89 1.22 6.11 0.002 0.014 0.034 0.329 CPVC
13 C to D 44 99.11 1.65 142.713 63 80 8.44 2.11 10.54 0.002 0.025 0.059 0.329 CPVC
14 28 to D 8 16.99 0.28 24.465 28 80 7.18 1.80 8.98 0.0001 0.001 0.001 0.056 CPVC
15 D to 39 52 110.43 1.84 159.023 66 80 13.91 3.48 17.39 0.0029 0.050 0.110 0.366 CPVC
16 39 to F 60 56.63 0.94 81.550 49 80 8.39 2.10 10.49 0.001 0.009 0.119 0.188 CPVC
17 40 to 41a 8 16.99 0.28 24.465 28 80 6.53 1.63 8.17 0.000 0.001 0.001 0.056 CPVC
18 41a to 41 20 56.63 0.94 81.550 49 80 4.65 1.16 5.82 0.001 0.005 0.006 0.188 CPVC
19 41 to E 22 60.31 1.01 86.851 50 80 3.73 0.93 4.67 0.001 0.004 0.010 0.200 CPVC
20 E to F 22 60.31 1.01 86.851 50 80 8.44 2.11 10.54 0.001 0.010 0.0198 0.200 CPVC
21 F to G 82 146.11 2.44 210.399 75 80 1.36 0.34 1.70 0.005 0.008 0.147 0.485 CPVC
22 G to H 178 230.49 3.84 331.909 93 80 7.19 1.80 8.99 0.011 0.101 0.390 0.765 CPVC
23 H to I 178 230.49 3.84 331.909 93 80 13.25 3.31 16.56 0.011 0.185 0.576 0.765 CPVC

Page 1 of 5
Dia of Equivalent
Demand Demand Demand Dia of pipe Total
S. Fixture pipe Distance length of Head loss Total head Cumm
Point to point load in load in load in Proposed length in Velocity Material Remarks
no units Required in 'm' fittings in in 'm' loss head loss
LPM LPS KLD in 'mm' 'm'
in 'mm' 'm'

24 I to J 178 230.49 3.84 331.909 93 80 17.99 4.50 22.49 0.011 0.252 0.827 0.765 CPVC
25 J to Tank 178 230.49 3.84 331.909 93 80 0.94 0.24 1.18 0.011 0.013 0.841 0.765 CPVC

LINE - 2
1 13 to 14 8 16.99 0.28 24.465 28 80 4.38 1.10 5.48 0.0001 0.0005 0.0005 0.056 CPVC
2 14 to 15 18 56.63 0.94 81.550 49 80 2.77 0.69 3.46 0.001 0.003 0.003 0.188 CPVC
3 15 to A 28 71.36 1.19 102.753 54 80 11.59 2.90 14.49 0.001 0.019 0.022 0.237 CPVC
4 16 to A 12 56.63 0.94 81.550 49 80 0.62 0.16 0.78 0.001 0.001 0.001 0.188 CPVC
5 A to B 40 93.44 1.56 134.558 61 80 27.21 6.80 34.02 0.002 0.072 0.095 0.310 CPVC
6 B to 20 40 93.44 1.56 134.558 61 80 1.26 0.32 1.58 0.002 0.003 0.098 0.310 CPVC
7 20 to 21 46 101.94 1.70 146.790 64 80 3.95 0.99 4.94 0.002 0.012 0.110 0.338 CPVC
8 21 to 22 54 113.26 1.89 163.100 67 80 2.08 0.52 2.60 0.003 0.008 0.118 0.376 CPVC
9 22 to C 78 142.15 2.37 204.691 74 80 1.14 0.28 1.42 0.005 0.007 0.125 0.472 CPVC
10 17 to 18 8 16.99 0.28 24.465 28 80 2.26 0.56 2.82 0.000 0.000 0.000 0.056 CPVC
11 18 to C 10 56.63 0.94 81.550 49 80 11.36 2.84 14.20 0.001 0.012 0.012 0.188 CPVC
12 C to 23 88 151.21 2.52 217.739 76 80 8.31 2.08 10.38 0.005 0.053 0.190 0.502 CPVC
13 23 to F 120 181.22 3.02 260.960 83 80 8.90 2.23 11.13 0.007 0.080 0.270 0.601 CPVC
14 12 to 11 8 16.99 0.28 24.465 28 80 4.21 1.05 5.26 0.000 0.000 0.0005 0.056 CPVC
15 11 to 10 30 75.04 1.25 108.054 55 80 14.15 3.54 17.69 0.001 0.025 0.025 0.249 CPVC
16 10 to D 38 89.76 1.50 129.257 60 80 7.63 1.91 9.54 0.002 0.019 0.044 0.298 CPVC
17 D to 24 38 89.76 1.50 129.257 60 80 7.73 1.93 9.66 0.002 0.019 0.063 0.298 CPVC
18 24 to 25 24 63.99 1.07 92.152 51 80 3.87 0.97 4.84 0.001 0.005 0.068 0.212 CPVC
19 19 to 25 2 3.40 0.06 4.893 13 80 9.90 2.48 12.38 0.000 0.000 0.0001 0.011 CPVC
20 25 to E 14 56.63 0.94 81.550 49 80 7.16 1.79 8.95 0.001 0.007 0.075 0.188 CPVC
21 26 to E 22 60.31 1.01 86.851 50 80 0.48 0.12 0.60 0.001 0.001 0.076 0.200 CPVC
22 E to 27 36 86.08 1.43 123.956 59 80 4.00 1.00 5.01 0.002 0.009 0.160 0.286 CPVC
23 27 to F 56 116.10 1.93 167.178 68 80 2.23 0.56 2.78 0.003 0.009 0.169 0.385 CPVC
24 F to G 176 228.79 3.81 329.462 93 80 5.23 1.31 6.54 0.011 0.072 0.511 0.759 CPVC
25 G to H 176 228.79 3.81 329.462 93 80 13.25 3.31 16.56 0.011 0.183 0.694 0.759 CPVC
26 H to I 176 228.79 3.81 329.462 93 80 13.25 3.31 16.56 0.011 0.183 0.877 0.759 CPVC

Page 2 of 5
Dia of Equivalent
Demand Demand Demand Dia of pipe Total
S. Fixture pipe Distance length of Head loss Total head Cumm
Point to point load in load in load in Proposed length in Velocity Material Remarks
no units Required in 'm' fittings in in 'm' loss head loss
LPM LPS KLD in 'mm' 'm'
in 'mm' 'm'

27 43c to 43d 2 3.40 0.06 4.893 13 80 5.40 1.35 6.75 0.000 0.000 0.0001 0.011 CPVC
28 43d to I 18 56.63 0.94 81.550 49 80 14.95 3.74 18.69 0.001 0.016 0.016 0.188 CPVC
29 I to M 194 240.12 4.00 345.772 95 80 4.70 1.17 5.87 0.012 0.071 0.963 0.797 CPVC
30 5 to 6 14 56.63 0.94 81.550 49 80 5.20 1.30 6.50 0.001 0.005 0.005 0.188 CPVC
31 6 to 7 24 63.99 1.07 92.152 51 80 2.40 0.60 3.00 0.001 0.003 0.009 0.212 CPVC
32 7 to 8 48 104.77 1.75 150.868 65 80 9.84 2.46 12.31 0.003 0.032 0.041 0.348 CPVC
33 8 to 9 70 133.09 2.22 191.643 72 80 4.68 1.17 5.85 0.004 0.024 0.064 0.441 CPVC
34 9 to J 94 156.30 2.61 225.078 78 80 6.90 1.72 8.62 0.005 0.047 0.111 0.519 CPVC
35 J to K 94 156.30 2.61 225.078 78 80 4.81 1.20 6.01 0.005 0.033 0.144 0.519 CPVC
36 K to L 94 156.30 2.61 225.078 78 80 2.58 0.64 3.22 0.005 0.018 0.162 0.519 CPVC
37 43b to 43a 30 75.04 1.25 108.054 55 80 0.26 0.07 0.33 0.001 0.000 0.000 0.249 CPVC
38 43a to 43 60 121.76 2.03 175.333 69 80 3.62 0.90 4.52 0.003 0.016 0.016 0.404 CPVC
39 43 to 42 64 126.29 2.10 181.857 70 80 4.00 1.00 5.00 0.004 0.018 0.034 0.419 CPVC
40 42 to L 88 151.21 2.52 217.739 76 80 7.25 1.81 9.06 0.005 0.046 0.081 0.502 CPVC
41 L to M 182 267.87 4.46 385.732 99 80 2.28 0.57 2.84 0.015 0.042 0.285 0.889 CPVC
42 M to Tank 376 378.75 6.31 545.407 117 80 1.44 0.36 1.80 0.028 0.051 1.298 1.256 CPVC

Page 3 of 5
PROPOSED SUPER SPECIALTY HOSPITAL BUILDING IN THE PREMISES OF RAJIV GANDHI INSTITUTE OF MEDICAL SCIENCES (RIMS)
AT PUTLAMPALLI (V), KADAPA(D), A.P.
Water Supply Distribution Design of Terrace main ( Domestic Water )

C 120 Table no-3 sp-35 code page no 22


Dia of Equivalent
Demand Demand Demand Dia of pipe Total
Fixture pipe Distance length of Head loss Total head Cumm
S.no Point to point load in load in load in Proposed length in Velocity Material Remarks
units Required in 'm' fittings in in 'm' loss head loss
LPM LPS KLD in 'mm' 'm'
in 'mm' 'm'

WATER TANK -1

1 54b to 54a 10 56.63 0.94 81.550 49 80 3.40 0.85 4.25 0.001 0.004 0.004 0.188 CPVC
2 54a to 54 20 56.63 0.94 81.550 49 80 3.33 0.83 4.17 0.001 0.003 0.007 0.188 CPVC
3 54 to 55 54 113.26 1.89 163.100 67 80 6.92 1.73 8.65 0.003 0.026 0.0330 0.376 CPVC
4 55 to 56 82 146.11 2.44 210.399 75 80 3.08 0.77 3.85 0.005 0.019 0.052 0.485 CPVC
5 56 to 57 92 154.61 2.58 222.632 77 80 4.92 1.23 6.16 0.005 0.033 0.084 0.513 CPVC
6 57 to D 122 183.20 3.05 263.815 84 80 9.96 2.49 12.45 0.007 0.091 0.176 0.608 CPVC
7 68 to 68a 40 93.44 1.56 134.558 61 80 4.66 1.16 5.82 0.002 0.012 0.012 0.310 CPVC
8 68a to 67 44 99.11 1.65 142.713 63 80 5.01 1.25 6.26 0.002 0.015 0.027 0.329 CPVC
9 67 to 66 80 144.41 2.41 207.953 75 80 2.96 0.74 3.69 0.005 0.017 0.044 0.479 CPVC
10 66 to 65 112 173.29 2.89 249.543 81 80 3.81 0.95 4.76 0.007 0.031 0.076 0.575 CPVC
11 65 to 61 136 197.08 3.28 283.794 86 80 22.07 5.52 27.59 0.008 0.231 0.307 0.654 CPVC
12 61 to 60 152 209.54 3.49 301.735 89 80 4.95 1.24 6.19 0.009 0.058 0.365 0.695 CPVC
13 60 to A 164 218.60 3.64 314.783 91 80 5.53 1.38 6.91 0.010 0.070 0.435 0.725 CPVC
14 A to 58 164 220.30 3.67 317.230 91 80 6.63 1.66 8.29 0.010 0.085 0.520 0.731 CPVC
15 58 to B 170 223.70 3.73 322.123 92 80 5.15 1.29 6.43 0.011 0.068 0.589 0.742 CPVC
16 71 to 71a 16 56.63 0.94 81.550 49 80 4.20 1.05 5.25 0.001 0.004 0.004 0.188 CPVC
17 71a to 70 26 67.68 1.13 97.452 53 80 4.46 1.12 5.58 0.001 0.006 0.011 0.225 CPVC
18 70 to 69 36 86.08 1.43 123.956 59 80 5.33 1.33 6.67 0.002 0.012 0.0229 0.286 CPVC
19 69 to 69a 46 101.94 1.70 146.790 64 80 4.37 1.09 5.47 0.002 0.014 0.036 0.338 CPVC
20 69a to 69b 66 128.55 2.14 185.119 71 80 4.96 1.24 6.20 0.004 0.024 0.060 0.426 CPVC
21 69b to B 70 133.09 2.22 191.643 72 80 5.70 1.43 7.13 0.004 0.029 0.089 0.441 CPVC
22 B to C 240 271.83 4.53 391.440 100 80 8.46 2.12 10.58 0.015 0.161 0.249 0.902 CPVC
23 72 to C 10 56.63 0.94 81.550 49 80 2.79 0.70 3.49 0.001 0.003 0.003 0.188 CPVC

Page 4 of 5
Dia of Equivalent
Demand Demand Demand Dia of pipe Total
Fixture pipe Distance length of Head loss Total head Cumm
S.no Point to point load in load in load in Proposed length in Velocity Material Remarks
units Required in 'm' fittings in in 'm' loss head loss
LPM LPS KLD in 'mm' 'm'
in 'mm' 'm'

24 C to D 250 280.33 4.67 403.673 102 80 5.02 1.25 6.27 0.016 0.101 0.353 0.930 CPVC
25 D to E 372 375.81 6.26 541.166 116 80 6.46 1.61 8.07 0.028 0.223 0.576 1.247 CPVC
26 E to F 372 375.81 6.26 541.166 116 80 6.74 1.69 8.43 0.028 0.233 0.809 1.247 CPVC
27 83 to 82 16 56.63 0.94 81.550 49 80 4.64 1.16 5.80 0.001 0.005 0.005 0.188 CPVC
28 82 to 81 36 86.08 1.43 123.956 59 80 6.13 1.53 7.67 0.002 0.014 0.019 0.286 CPVC
29 81 to 80 38 89.76 1.50 129.257 60 80 3.83 0.96 4.78 0.002 0.009 0.028 0.298 CPVC
30 80 to F 66 128.55 2.14 185.119 71 80 3.68 0.92 4.60 0.004 0.017 0.046 0.426 CPVC
31 F to G 438 425.48 7.09 612.686 123 80 10.02 2.50 12.52 0.035 0.436 0.481 1.411 CPVC
32 G to 84 438 425.48 7.09 612.686 123 80 12.74 3.18 15.92 0.035 0.554 1.035 1.411 CPVC
33 84 to I 454 437.71 7.30 630.301 125 100 14.26 3.57 17.83 0.012 0.221 1.256 0.929 CPVC
34 4 to 3 6 11.33 0.19 16.310 23 80 5.94 1.49 7.43 0.000 0.000 0.000 0.038 CPVC
35 3 to 2 30 75.04 1.25 108.054 55 80 11.36 2.84 14.20 0.001 0.020 0.020 0.249 CPVC
36 2 to 1 52 110.43 1.84 159.023 66 80 4.70 1.18 5.88 0.003 0.017 0.037 0.366 CPVC
37 1 to H 76 139.88 2.33 201.429 74 80 7.16 1.79 8.95 0.004 0.040 0.077 0.464 CPVC
38 H to I 76 139.88 2.33 201.429 74 80 6.12 1.53 7.65 0.004 0.034 0.111 0.464 CPVC
39 85a to 85b 30 75.04 1.25 108.054 55 80 0.26 0.07 0.33 0.001 0.000 0.000 0.249 CPVC
40 85b to 85c 60 121.76 2.03 175.333 69 80 3.62 0.91 4.53 0.003 0.016 0.016 0.404 CPVC
41 85c to 85 64 126.29 2.10 181.857 70 80 4.21 1.05 5.26 0.004 0.019 0.035 0.419 CPVC
42 85 to I 96 158.00 2.63 227.525 78 80 7.45 1.86 9.31 0.006 0.052 0.087 0.524 CPVC
43 I to J 626 758.87 12.65 1092.771 161 100 5.72 1.43 7.15 0.034 0.245 1.699 1.611 CPVC
44 J to Tank 626 758.87 12.65 1092.771 161 100 2.06 0.52 2.58 0.034 0.088 1.787 1.611 CPVC