4. WORK PLAN 4.1 Research Time Schedule plan Table4. 1: Time schedule plan for different activities of the study
Description of Activity Time duration
Tools development ( Observation guidelines and formats ) 3 weeks review of literature and references 4 weeks Recruitment and training of research assistants 2 weeks Data collection: survey 1 month Data collection Qualitative 1 month Data analysis quantitative data and qualitative data 2 moth Final write up of report and submission 2 months Total 6.2 months
1.2 Research Budget Breakdown
Table 4.2: The cost breakdown of the research study is summarized No Expense item 1 No or pieces Birr per No Total birr 1 EMA X,Y,Z Coordinate 6 250 1,500 2 Pilot study on field X,Y,Z Coordinate 60 50 3000 3 Data collector training Cost 1 250 250 Data collector on field X,Y,Z 715 50 35,750 4 Coordinate 5 Communication cost for researcher 3 100 300 6 Transport cost for the researcher 30 300 9000 Data encoding X,Y,Z Coordinate to ( 7 715 50 35,750 arc GIS, excel and AutoCAD) 8 Interview administration cost 15 250 3750 Subtotal cost (1) 89,300 Expense item Birr per No Total days Total cost day Digitizing satellite image and decoding 8 1 20 250 5000 in to geo database(GIS) Traffic police to control the traffic 10 1 20 250 5000 during Measurement time Subtotal Cost (2) 10,000 Research total Cost(1+2) 99, 300 Birr