You are on page 1of 3

or ium

udit
ringA
nginee
E
m ical
Che

Grey

The small area on the entrance gate near chemical Change in the design is done to increase the movement ease within the site as well as to create a
engineering auditorium was left un watched so can be fountain which creates a sitting place. Fountain creates a cooling environment to create a pleasent sitting
Metallurgy Engineerin
g used and was the great opportunity. space.

Trees

g
Chemical Engineerin

Car Parking

garden

garden

back entry

Contour

This approach is used to increase the movement within the site as well as provide a pleasent
Previous Plan experience of the people/students having a pleasent walk within the site.

There were 2 gardens that were symentrically placed as courtyard for the building were the place of
opportunity as there we can provide water feature and sitting spce for the students who are waiting for their The certain portion in the begning of the site is left un used so to make a better use of it and make
lectures. certain intresting sitting space as it is nesar bicycle parking and also can be used by students who
came early for a lecture and in the evening can be used by the public for a nice sitting space.

N
Akshit Gupta & Raghav Mittal ARN-212
CONCEPT DEVELOPMENT
20110004 & 20110025 Landscape Assignment
N

Akshit Gupta & Raghav Mittal ARN-212

CONCEPT SHEET
20110004 & 20110025 Landscape Assignment
BUILDING

PEDESTRAIN WALK

INTERNAL ROAD

CONTOUR

GRASS

PARKING
N

Akshit Gupta & Raghav Mittal ARN-212

LANDSCAPE DESIGN
20110004 & 20110025 Landscape Assignment

You might also like