On May 17, 2021 I travelled to Puerto to attend our monthly meeting. I reported the
site status and accomplishments we had. During the meeting I was informed that I
will supervise the relocation at Narra. On tuesday morning I travelled back to my
destination to prepare for the new task that was assigned to me. Tuesday afternoon
I went to Narra together with my team to do the relocation. The work lasted until
friday noon.
Prepared by:
June 14, 2021 Monday I travelled to Puerto Princesa City to attend our monthly
meeting. I reported the accomplishments done on your station. The next day I trav-
elled back to my station and monitored fabrication of pipe hanger and repair of leaks
and supervise the pipe laying the work lasted for the whole week.
Prepared by:
On July 12, 2021 I travelled to Puerto Princesa City to attend our monthly meeting. I
reported again our accomplishment on the site. After the meeting I travelled back to
my station I supervised the installation of ladders and valves, installation of primary
filters and dual media filters and fabrication of covers of valve and boxes and fabri-
cation of filters.
Prepared by:
I travelled to Puerto Princesa City on monday to attend our monthly meeting. I trav-
elled back to my station on Tuesday. I continued supervising the different repairs
and laying of pipes on the following days.
Prepared by:
I travelled to Puerto Princesa City early in the morning on Monday to attend our
monthly meeting. As soon as the meeting ended I travelled back to my station and
on Tuesday until Friday I supervised the repairs of the different pipelines. I also su-
pervised the WTP and the filter valve installation.